Pilot PPP projects in the infrastructure of Ukraine February 2017 Kyiv, Ukraine Investment opportunities MINISTRY OF INFRASTRUCTURE OF UKRAINE
Transcript
Page 1: Pilot PPP projects in the infrastructure of Ukraineimages.mofcom.gov.cn/ua/201704/20170406152310036.pdf · Pilot PPP projects in the infrastructure of Ukraine February 2017 Kyiv,

Pilot PPP projects in the

infrastructure of Ukraine

February 2017

Kyiv, Ukraine

Investment opportunities

MINISTRY OF INFRASTRUCTURE

OF UKRAINE

Page 2: Pilot PPP projects in the infrastructure of Ukraineimages.mofcom.gov.cn/ua/201704/20170406152310036.pdf · Pilot PPP projects in the infrastructure of Ukraine February 2017 Kyiv,

2

KEY DEVELOPMENTS IN PPP LEGISLATION

LEGISLATION

The Interagency Work Group on Concession Legislation Reforming with the participation of

representatives of the Ministry of Infrastructure approved the Concept for Concessions Legal

Framework

The Ministry of Economic Development and Trade with financial support from EBRD is drafting a

new law "On Concession"

The Ministry of Infrastructure is drafting an order of the Cabinet of Ministers of Ukraine regarding the

pilot concession projects in infrastructure

PPP Project Office is working on the methodical recommendations on the implementation of PPP

projects

The work on elaboration of a unified approach to the private sector participation in

modernization of infrastructure and the provision of public services on PPP basis is

underway:

Page 3: Pilot PPP projects in the infrastructure of Ukraineimages.mofcom.gov.cn/ua/201704/20170406152310036.pdf · Pilot PPP projects in the infrastructure of Ukraine February 2017 Kyiv,

3

RussiaEU

EURussia

Black Sea

STEVEDORING COMPANY “OLVIA”

Key factsTotal area of the seaport: 178.8 ha

Outdoor storage: 277 200 m²; indoor storage: 41 135 m²

Total berth length (7 berths): 1.53 km

Depth near berths: 9.75-11.5 m

Total processing capacity of the port is about 3 mln tones

Main cargos: construction materials, ferrous metals, grain

Train station capacity is 828 wagons / day

1

Revenue (2016)

$15.4 mln

EBITDA margin (2016)

47%

Cargo turnover (2016)

2.2 mln tones

Unique opportunity for the concession in Black Sea region

SC “Olvia”

Located on the west

bank of the Dnieper-Bug

estuary in a Southern

agricultural region of

Ukraine

2.21.8

2.4 2.52.2

2012 2013 2014 2015 2016

Cargo turnovermillion tones

CONCESSION

Page 4: Pilot PPP projects in the infrastructure of Ukraineimages.mofcom.gov.cn/ua/201704/20170406152310036.pdf · Pilot PPP projects in the infrastructure of Ukraine February 2017 Kyiv,

4

RussiaEU

EURussia

Black Sea

KHERSON SEA COMMERCIAL PORT

Key factsTotal area of the seaport: 47 ha

Outdoor storage: 38 560 m²; indoor storage: 12 328 m² including 3 silos of 608 m² and 12 000 tones capacity

Total berth length (4 berths): 600 m

Depth near berths: 6.9-8.2 m

Total processing capacity of the port is about 2.5 mln tones

Main cargos: grain, construction materials, food products, mineral fertilizers

The port has a sand pit with total reserves of 12 mln tones

2

Revenue (2016)

$7.9 mln

EBITDA margin (2016)

14%

Cargo turnover (2016)

1.2 mln tones

Future potential for development of multimodal cargo hub

Located on both

banks of the

Dnieper river (key

inland waterway in

Ukraine) 28 km

away from the

Dnieper-Bug

estuary and 90 km

from the Black Sea.

1.3 1.31.5

1.7

1.2

2012 2013 2014 2015 2016

Cargo turnovermillion tones

Kherson SCP

Kherson city

CONCESSION

Kyiv

Page 5: Pilot PPP projects in the infrastructure of Ukraineimages.mofcom.gov.cn/ua/201704/20170406152310036.pdf · Pilot PPP projects in the infrastructure of Ukraine February 2017 Kyiv,

5

RAILWAY FERRY COMPLEX OF THE SEA COMMERCIAL PORT

CHORNOMORSK

Key factsThe Railway Ferry Complex is a part of Sea Commercial Port “Chornomorsk”

The only facility in Ukraine, which handles rail and auto ferry lines, as well as “ro-ro” vessels

It has two berths (#26, 27) with total length of 210 m and one “ro-ro” berth with total length of 269 m (#28)

The depth of port berths is 9.7 m

Total handling capacity is 4.5 mln tones of cargoes in wagons, 150 000 trucks and 250 000 vehicles per year

The complex is a part of rail ferry lines functioning on the Black Sea and the “New Silk Road” trade corridor

3

Revenue (2016)

$3.7 mln

EBITDA margin (2016)

37%

Cargo turnover (2016)

1.8 mln tones

Niche and unique potential for development of Silk Road logistic

Cargo turnovermillion tones

1.4 1.6

2.2

1.41.8

2012 2013 2014 2015 2016

Ferry

complex

CONCESSION

Located on

the north-

western shore

of the Black

Sea in

Chornomorsk

sea port

Ukraine

Russia

Georgia

Turkey

Bulgaria

Romania

Page 6: Pilot PPP projects in the infrastructure of Ukraineimages.mofcom.gov.cn/ua/201704/20170406152310036.pdf · Pilot PPP projects in the infrastructure of Ukraine February 2017 Kyiv,

6

OUR KEY PARTNERS

PARTNERSHIP

MINISTRY OF INFRASTRUCTURE

OF UKRAINE

Ukrainian Institute for the Future

Page 7: Pilot PPP projects in the infrastructure of Ukraineimages.mofcom.gov.cn/ua/201704/20170406152310036.pdf · Pilot PPP projects in the infrastructure of Ukraine February 2017 Kyiv,

WWW.SPILNO.IN.UA

Contact details:Ministry of Infrastructure of Ukraine

“SP3ILNO” PPP Project Management Office

14 Peremohy avenue

01135, Kyiv, Ukraine

Artem Khoroshun

Project Manager

Mobile: +38 067 999 45 03

E-mail: [email protected]

Yuriy Husyev

Head of PPP PMO

Mobile: +38 067 440 88 99

E-mail: [email protected]

Taras Boichuk

Project Manager

Mobile: +380 63 585 13 85

E-mail: [email protected]