    PILOT PLANTSCALE- UP TECHNIQUE

    Dr. Basavaraj K. NanjwadeM. Pharm., Ph. D

    Associate Professor

    Department of Pharmaceutics

    KLE University, JN Medical College

    BELGAUM - 590010

  • 8/3/2019 Pilot Scale Up Technique

    2/33

    08 June 2009 SRTM University, Nanded 2

    Contents

    Definition

    Objectives

    Steps in scale-up General considerations

    GMP considerations

    Advantages and Disadvantages References

  • 8/3/2019 Pilot Scale Up Technique

    3/33

    08 June 2009 SRTM University, Nanded 3

    Plant:- It is a place were the 5 Ms likemoney, material, man, method andmachine are brought together for themanufacturing of the products.

    Pilot Plant:- It is the part of thepharmaceutical industry where a lab scaleformula is transformed into a viableproduct by development of liable and

    practical procedure of manufacture. Scale-up:- The art for designing ofprototype using the data obtained from thepilot plant model.

    Definitions

  • 8/3/2019 Pilot Scale Up Technique

    4/33

    08 June 2009 SRTM University, Nanded 4

    Objective

    To try the process on a model of proposedplant before committing large sum ofmoney on a production unit.

    Examination of the formula to determine itsability to withstand Batch-scale andprocess modification.

    Evaluation and Validation for process andequipments

    To identify the critical features of theprocess.

  • 8/3/2019 Pilot Scale Up Technique

    5/33

    08 June 2009 SRTM University, Nanded 5

    Guidelines for production and processcontrols.

    To provide master manufacturing formulawith instructions for manufacturing

    procedure.

    To avoid the scale-up problems.

  • 8/3/2019 Pilot Scale Up Technique

    6/33

    08 June 2009 SRTM University, Nanded 6

    STEPS IN SCALE UP

  • 8/3/2019 Pilot Scale Up Technique

    7/33

    08 June 2009 SRTM University, Nanded 7

    Define product economics based on projected market size andcompetitive selling and provide guidance for allowable manufacturing costs

    Conduct laboratory studies and scale-up planning at the same time

    Define key rate-controlling steps in the proposed process

    Conduct preliminary larger-than-laboratory studies with equipment

    to be used in rate-controlling step to aid in plant design

  • 8/3/2019 Pilot Scale Up Technique

    8/33

    08 June 2009 SRTM University, Nanded 8

    Design and construct a pilot plant including provisions for process and

    environmental controls, cleaning and sanitizing systems, packaging andwaste handling systems, and meeting regulatory agency requirements

    Evaluate pilot plant results (product and process) including process

    Economics to make any corrections and a decision on whether or not

    to proceed with a full scale plant development

  • 8/3/2019 Pilot Scale Up Technique

    9/33

    08 June 2009 SRTM University, Nanded 9

    Why conduct Pilot PlantStudies?

    A pilot plant allows investigation of a product andprocess on an intermediate scale before largeamounts of money are committed to full-scale

    production It is usually not possible to predict the effects of

    a many-fold increase in scale

    It is not possible to design a large scaleprocessing plant from laboratory data alone withany degree of success

  • 8/3/2019 Pilot Scale Up Technique

    10/33

    08 June 2009 SRTM University, Nanded 10

    A pilot plant can be used for

    Evaluating the results of laboratory studies andmaking product and process corrections andimprovements

    Producing small quantities of product for sensory,

    chemical, microbiological evaluations, limitedmarket testing or furnishing samples to potentialcustomers, shelf-life and storage stability studies

    Providing data that can be used in making adecision on whether or not to proceed to a full-scaleproduction process; and in the case of a positivedecision, designing and constructing a full-size

    plant or modifying an existing plant

  • 8/3/2019 Pilot Scale Up Technique

    11/33

    08 June 2009 SRTM University, Nanded 11

    General considerations

    1. Reporting Responsibility

    R & Dgroup withseparate

    staffing

    The formulator whodeveloped the product cantake into the production

    and can provide supporteven after transition intoproduction has been

    completed

  • 8/3/2019 Pilot Scale Up Technique

    12/33

    08 June 2009 SRTM University, Nanded 12

    Scientists with experience inpilot plant operations as well

    as in actual production areaare the most preferable

    As they have to understandthe intent of the formulatoras well as understand the

    perspective of theproduction personnel.The group should have some

    personnel with engineeringknowledge as well as scale

    up also involves engineeringprinciples

    2.Personnel Requirement:-

  • 8/3/2019 Pilot Scale Up Technique

    13/33

    08 June 2009 SRTM University, Nanded 13

    3. Space Requirements

    Administrationand informationprocessing

    Physicaltestingarea

    Standardequipmentfloor space

    Storagearea

  • 8/3/2019 Pilot Scale Up Technique

    14/33

    08 June 2009 SRTM University, Nanded 14

    Administration and information process:

    Adequate office and desk space should be

    providedfor both scientist and technicians.The space should be adjacent to the workingarea.

  • 8/3/2019 Pilot Scale Up Technique

    15/33

    08 June 2009 SRTM University, Nanded 15

    Physical testing area:-

    This area should provide permanentbench top space for routinely usedphysical- testing equipment.

  • 8/3/2019 Pilot Scale Up Technique

    16/33

    08 June 2009 SRTM University, Nanded 16

    Standard pilot-plant equipment floor space:-

    Discreet pilot plant space, where the equipment

    needed for manufacturing all types of dosage form

    is located.

    Intermediate sized and full scale production

    equipment is essential in evaluating the effects ofscale-up of research formulations and processes

    Equipments used should be made portable whereever possible. So that after use it can be stored inthe small store room.

    Space for cleaning of the equipment should be alsoprovided.

  • 8/3/2019 Pilot Scale Up Technique

    17/33

    08 June 2009 SRTM University, Nanded 17

    It should have two areas dividedas approved and unapprovedarea for active ingredient aswell as excipient.

    Different areas should providedfor the storage of the in-

    process materials, finished bulkproducts from the pilot-plant &materials from the experimentalscale-up batches made in the

    production.Storage area for the packingmaterial should also beprovided.

    Storage Area:-

  • 8/3/2019 Pilot Scale Up Technique

    18/33

    08 June 2009 SRTM University, Nanded 18

    4. Review of the formula:A thorough review of the each aspect offormulation is important.

    The purpose of each ingredient and its

    contribution to the final product manufactured onthe small-scale laboratory equipment should beunderstood.

    Then the effect of scale-up using equipment that

    may subject the product to stresses of differenttypes and degrees can more readily bepredicted, or recognized.

  • 8/3/2019 Pilot Scale Up Technique

    19/33

    08 June 2009 SRTM University, Nanded 19

    5. Raw materials:-

    One purpose/responsibility of the pilot-plant is the approval & validation of theactive ingredient & excipients raw

    materials.

    Raw materials used in the small scaleproduction cannot necessarily be therepresentative for the large scaleproduction

    Why?

  • 8/3/2019 Pilot Scale Up Technique

    20/33

    08 June 2009 SRTM University, Nanded 20

    6. Equipment:-

    The most economical and the simplest & efficient

    equipment which are capable of producingproduct within the proposed specifications areused.

    The size of the equipment should be such that

    the experimental trials run should be relevant tothe production sized batches.

    If the equipment is too small the process

    developed will not scale up,Whereas if equipment is too big then thewastage of the expensive active ingredients.

  • 8/3/2019 Pilot Scale Up Technique

    21/33

    08 June 2009 SRTM University, Nanded 21

    7. Production Rates:-

    The immediate as well as the future

    market trends/requirements areconsidered while determining theproduction rates.

  • 8/3/2019 Pilot Scale Up Technique

    22/33

    08 June 2009 SRTM University, Nanded 22

    8. Process Evaluation:-

    PARAMETERS

    Order of mixing ofcomponents Mixing

    speed

    Mixingtime

    Rate of addition ofgranulating agents,

    solvents,

    solutions of drug etc.

    Heating and cooling

    Rates

    Filters size(liquids)

    Screen size

    (solids)

    Drying temp.And drying time

  • 8/3/2019 Pilot Scale Up Technique

    23/33

    08 June 2009 SRTM University, Nanded 23

    Why to carry out process evaluation????

    The knowledge of the effects ofvarious process parameters as fewmentioned above form the basis forprocess optimization and validation.

  • 8/3/2019 Pilot Scale Up Technique

    24/33

    08 June 2009 SRTM University, Nanded 24

    9. Master Manufacturing Procedures:-

    The three important aspects

    Weight sheet Processingdirections Manufacturingprocedure

  • 8/3/2019 Pilot Scale Up Technique

    25/33

    08 June 2009 SRTM University, Nanded 25

    The weight sheet should clearly identify thechemicals required In a batch. To preventconfusion the names and identifying nos. for theingredients should be used on batch records.

    The process directions should be precise andexplicit.

    A manufacturing procedure should be writtenby the actual operator.

    Various specifications like addition rates, mixing

    time, mixing speed, heating, and cooling rates,temperature, storing of the finished productsamples should be mentioned in the batchrecord directions.

  • 8/3/2019 Pilot Scale Up Technique

    26/33

    08 June 2009 SRTM University, Nanded 26

    10. Product stability and uniformity:-

    The primary objective of the pilot plant isthe physical as well as chemical stability of

    the products.Hence each pilot batch representing thefinal formulation and manufacturing

    procedure should be studied for stability.Stability studies should be carried out infinished packages as well.

  • 8/3/2019 Pilot Scale Up Technique

    27/33

    08 June 2009 SRTM University, Nanded 27

    GMP CONSIDERATION

    Equipment qualification

    Process validation

    Regularly schedule preventative maintenance

    Regularly process review & revalidation

    Relevant written standard operating procedures

    The use of competent technically qualified personnel

    Adequate provision for training of personnel

    A well-defined technology transfer system

    Validated cleaning procedures. An orderly arrangement of equipment so as to ease material

    flow & prevent cross- contamination

  • 8/3/2019 Pilot Scale Up Technique

    28/33

    08 June 2009 SRTM University, Nanded 28

    Advantages

    Members of the production and quality controldivisions can readily observe scale up runs.

    Supplies of excipients & drugs, cleared by the

    quality control division, can be drawn from themore spacious areas provided to the productiondivision.

    Access to engineering department personnel isprovided for equipment installation, maintenanceand repair.

  • 8/3/2019 Pilot Scale Up Technique

    29/33

    08 June 2009 SRTM University, Nanded 29

    Disadvantages

    The frequency of direct interaction of theformulator with the production personnel in themanufacturing area will be reduced.

    Any problem in manufacturing will be directedtowards its own pilot-plant personnel's.

  • 8/3/2019 Pilot Scale Up Technique

    30/33

    08 June 2009 SRTM University, Nanded 30

    Important Questions

    What is the significance of pilot plant scaleup with routine production procedure ?

    What do you mean by pilot plant scale upand give examples ?

  • 8/3/2019 Pilot Scale Up Technique

    31/33

    08 June 2009 SRTM University, Nanded 31

    Reference

    The theory & practice of industrialpharmacy by Leon Lachman, Herbert A.Lieberman, Joseph L. kenig, 3rd edition,

    published by Varghese Publishing house.

    www.google.com

  • 8/3/2019 Pilot Scale Up Technique

    32/33

    08 June 2009 SRTM University, Nanded 32

  • 8/3/2019 Pilot Scale Up Technique

    33/33

    08 June 2009 SRTM University Nanded 33