+ All Categories
Home > Documents > Pipe Lay Barge - Solitaire

Pipe Lay Barge - Solitaire

Date post: 03-Apr-2018
Category:
Upload: jfisher2534
View: 261 times
Download: 7 times
Share this document with a friend

of 50

Transcript
  • 7/28/2019 Pipe Lay Barge - Solitaire

    1/50

    1

  • 7/28/2019 Pipe Lay Barge - Solitaire

    2/50

    2

    Solitaire Upgrades 2005

  • 7/28/2019 Pipe Lay Barge - Solitaire

    3/50

    3

    Introduction

    Elongated stinger

    Operational benefit

    Rollerbox design Aft ship reinforcements

    Tension and A&R upgrade Fabrication photos

    Contents

  • 7/28/2019 Pipe Lay Barge - Solitaire

    4/50

    4

    Introduction

  • 7/28/2019 Pipe Lay Barge - Solitaire

    5/50

    5

    Solitaire Picture

    SolitaireSolitaire

  • 7/28/2019 Pipe Lay Barge - Solitaire

    6/506

    Configuration December 2004

    stinger length : 110m

    tension capacity : 3 * 175mT

    A&R capacity : 420mT

  • 7/28/2019 Pipe Lay Barge - Solitaire

    7/507

    stinger elongation 110 m --> 140 m

    tension upgrade 525 mT --> 1050 mT

    A&R upgrade 420 mT --> 1000 mT

    Solitaire capacity upgrade

  • 7/28/2019 Pipe Lay Barge - Solitaire

    8/508

    Solitaire capabilityDeepwater Capability

    Wall Thickness based on X70 Steel and DNV Hydrostatic Collapse

    1000

    1500

    2000

    2500

    3000

    3500

    4000

    4500

    5000

    12 16 20 24 28 32 36 40 44 48OD [inch]

    WD[m]

    Solitaire, Stinger Length: 110m; Tension: 420mt

    Solitaire, Stinger Length: 140m; Tension: 420mt

    Solitaire, Stinger Length: 140m; Tension: 800mt

    Fabrication Limits of Pipe Mills

  • 7/28/2019 Pipe Lay Barge - Solitaire

    9/509

    2005

    Independence Trail(Gulf of Mexico)

    Solitaire - S-lay

    2750 metres

    Increase in water depth

  • 7/28/2019 Pipe Lay Barge - Solitaire

    10/5010

    wa

    terdepth(me

    tres)

    World-wide pipelay depth records

    (per year, per installation method )

    3000

    2500

    2000

    1500

    1000

    500

    0

    1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007

    R

    S

    S

    S

    S

    S

    S

    S

    S

    S

    S

    SS

    RR

    RR

    R

    J

    JJ

    J

    J

    J

    JJ

    J

    R

    1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006

  • 7/28/2019 Pipe Lay Barge - Solitaire

    11/5011

    3000

    2500

    2000

    1500

    1000

    500

    0

    1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007

    S-lay Reeled J-lay

    1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006

    Mensa

    Independence Trail

    Canyon Express Atwater Valley

    Ram Powell

    Diana

    Ursa

    Devil's Tower

    Blue Stream

    DianaDiana

    Atwater ValleyAtwater Valley

    Pipelines in water depths greater

    than 900 m

    waterdepth(metres)

  • 7/28/2019 Pipe Lay Barge - Solitaire

    12/5012

    Elongated stinger

  • 7/28/2019 Pipe Lay Barge - Solitaire

    13/5013

    Stinger elongation

    Enables optimum departure angles

    for large pipes in deep water.

    stinger length : 140m

    installation date : Q1 2005 present status : Installation

  • 7/28/2019 Pipe Lay Barge - Solitaire

    14/5014

    tension upgrade to 1050mT

    classification by Lloyds

    preserve high vessel workability

    preserve operational stinger radii

    preserve stinger radius adjustment system

    Design premises

  • 7/28/2019 Pipe Lay Barge - Solitaire

    15/5015

    Current stinger

  • 7/28/2019 Pipe Lay Barge - Solitaire

    16/5016

    110m stinger

  • 7/28/2019 Pipe Lay Barge - Solitaire

    17/5017

    New 140m stinger

  • 7/28/2019 Pipe Lay Barge - Solitaire

    18/5018

    New 140m stinger

  • 7/28/2019 Pipe Lay Barge - Solitaire

    19/5019

    Operational benefit

  • 7/28/2019 Pipe Lay Barge - Solitaire

    20/5020

    Operational benefit

    radius:

    120m

    length:

    110m

    dep. angle:

    58

  • 7/28/2019 Pipe Lay Barge - Solitaire

    21/50

    21

    Operational benefit

    radius:

    120m

    length:

    140m

    dep. angle:

    75

    tension:

    app. -25%

  • 7/28/2019 Pipe Lay Barge - Solitaire

    22/50

    22

    Rollerbox design

  • 7/28/2019 Pipe Lay Barge - Solitaire

    23/50

    23

    Rollerbox design

    height adjustment 10mm

    centre to centre ~8m

    4 pairs of V-rollers

    steel roller for A&R cable

    double seesaw

  • 7/28/2019 Pipe Lay Barge - Solitaire

    24/50

    24

    Rollerbox design

    height adjustment 10mm

    centre to centre ~8m

    4 pairs of V-rollers

    steel roller for A&R cable

    double seesaw

  • 7/28/2019 Pipe Lay Barge - Solitaire

    25/50

    25

    Aft ship reinforcements

  • 7/28/2019 Pipe Lay Barge - Solitaire

    26/50

    26

    Aft ship reinforcements

    Increases structural strength for planned upgrades.

    added buoyancy : 4000mT

    installation date : Q1 2005

    present status : installation

  • 7/28/2019 Pipe Lay Barge - Solitaire

    27/50

    27

    Solitaire outrigger buoyancy

    required steel : 1600mT

    added buoyancy : 4000mT (nett)extra advantage : less pitch motion

    disadvantage : more resistance

  • 7/28/2019 Pipe Lay Barge - Solitaire

    28/50

    28

  • 7/28/2019 Pipe Lay Barge - Solitaire

    29/50

    29

    Tension and A&R upgrade

  • 7/28/2019 Pipe Lay Barge - Solitaire

    30/50

    30

    Tension upgrade

    Enables installation of large pipes in deep water.

    tension capacity : 3 * 350mT

    installation date : Q4 2005

    present status : design & fabrication(contract awarded to SAS)

  • 7/28/2019 Pipe Lay Barge - Solitaire

    31/50

    31

    A&R upgrade

    Enables laydown of large pipes in deep water.

    A&R capacity : 1000mT

    installation date : September 2005

    (structural work in Q1 2005)

    present status : detailed engineering

    (winches and HPU alreadyinstalled this dock period)

    p

    Existing 420mT A&R winch remains operational

  • 7/28/2019 Pipe Lay Barge - Solitaire

    32/50

    32

    Powerpack & Winches

  • 7/28/2019 Pipe Lay Barge - Solitaire

    33/50

    33

    Overview

  • 7/28/2019 Pipe Lay Barge - Solitaire

    34/50

    34

  • 7/28/2019 Pipe Lay Barge - Solitaire

    35/50

    35

    Fabrication & Installationphotos

  • 7/28/2019 Pipe Lay Barge - Solitaire

    36/50

    36

    fabrication of new stinger sections

    at De Boer

    fabrication of new stinger sectionsat De Boer

  • 7/28/2019 Pipe Lay Barge - Solitaire

    37/50

    37

    fabrication of new stinger sections

    at De Boer

    fabrication of new stinger sectionsat De Boer

    30/1130/11

  • 7/28/2019 Pipe Lay Barge - Solitaire

    38/50

    38

    fabrication of new stinger sections

    at De Boer

    fabrication of new stinger sectionsat De Boer

  • 7/28/2019 Pipe Lay Barge - Solitaire

    39/50

    39

    arrival of new stinger section 1 at

    Keppel Verolme

    arrival of new stinger section 1 atKeppel Verolme

  • 7/28/2019 Pipe Lay Barge - Solitaire

    40/50

    4010/1110/11fabrication of stinger winches at Bodewesfabrication of stinger winches at Bodewes

  • 7/28/2019 Pipe Lay Barge - Solitaire

    41/50

    4117/1217/12coating of rollers at Lucolancoating of rollers at Lucolan

  • 7/28/2019 Pipe Lay Barge - Solitaire

    42/50

    4216/1216/12fabrication of new rollerboxes at Schaapfabrication of new rollerboxes at Schaap

  • 7/28/2019 Pipe Lay Barge - Solitaire

    43/50

    43 21/1221/12fabrication of sheaves at Soester Gieterijfabrication of sheaves at Soester Gieterij

  • 7/28/2019 Pipe Lay Barge - Solitaire

    44/50

    44

    front view of one of the four A&R 250 ttraction winchesfront view of one of the four A&R 250 ttraction winches

  • 7/28/2019 Pipe Lay Barge - Solitaire

    45/50

    45

    one of the four A&R storage drums(4000 m wire capacity 3 5/8 wire)one of the four A&R storage drums(4000 m wire capacity 3 5/8 wire)

  • 7/28/2019 Pipe Lay Barge - Solitaire

    46/50

    46

    installation of one of the four A&Rinstallation of one of the four A&R

  • 7/28/2019 Pipe Lay Barge - Solitaire

    47/50

    47

    newly built power pack forstorage winchesnewly built power pack forstorage winches

  • 7/28/2019 Pipe Lay Barge - Solitaire

    48/50

    48

    cantilever on transportcantilever on transport

  • 7/28/2019 Pipe Lay Barge - Solitaire

    49/50

    49

    Overview of Dock 7th of March 2005Overview of Dock 7th of March 2005

  • 7/28/2019 Pipe Lay Barge - Solitaire

    50/50

    Questions ?

    www.allseas.com


Recommended