+ All Categories
Home > Documents > PL1004 – Field Install GuidePL1004 – Field Install Guide Description: Shower assembly using a...

PL1004 – Field Install GuidePL1004 – Field Install Guide Description: Shower assembly using a...

Date post: 01-Apr-2021
Category:
Upload: others
View: 4 times
Download: 0 times
Share this document with a friend
2
PL1004 – Field Install Guide Description: Shower assembly using a Shower Elbow and a 5/8” copper insert at the wall. Parts: PR3000: Copper extension 1/2 pipe x 1/2 male thread x 5 inches long copper pipe 12 inch by 1/2 inch diameter PLM10100: Flow Sensor 2063 PPG After 9 26 2017 PLM11100: Shower elbow PLM11101: Shower ring nut PLM12107: Escutcheon for meter white PLM17106: Chrome bezel for shower and tub PLM16203 Compression kit: Washer PLM16203 Compression kit: Ferrule PLM16203 Compression kit: O-ring PLM16203 Compression kit: Brass nut PLM16203 Compression kit: Brass retaining collar
Transcript
Page 1: PL1004 – Field Install GuidePL1004 – Field Install Guide Description: Shower assembly using a Shower Elbow and a 5/8” copper insert at the wall. Parts: PR3000: Copper extension

PL1004 – Field Install Guide

Description: Shower assembly using a Shower Elbow and a 5/8” copper insert at the wall.

Parts:

PR3000:Copper extension 1/2 pipe x 1/2 male thread x 5 inches long copper pipe 12 inch by 1/2 inch diameter

PLM10100:Flow Sensor 2063 PPG After 9 26 2017

PLM11100:Shower elbow

PLM11101:Shower ring nut

PLM12107:Escutcheon for meter white

PLM17106:Chrome bezel for shower and tub

PLM16203Compression kit:Washer

PLM16203Compression kit:Ferrule

PLM16203Compression kit:O-ring

PLM16203Compression kit:Brass nut

PLM16203Compression kit:Brass retaining collar

Page 2: PL1004 – Field Install GuidePL1004 – Field Install Guide Description: Shower assembly using a Shower Elbow and a 5/8” copper insert at the wall. Parts: PR3000: Copper extension

Installation

Assembly order for compression fitting (above) Correct orientation of PLM10100 (above)

Assembly Instructions – field

(A) Assemble parts 1 thru 7 using thread sealant on all threaded connections

(B) The copper pipe must be bottomed out into PLM10100 while tightening


Recommended