Bamtec Carpet Reinforcement = Savings in steel of up to 35% = Savings in fixing time and costs of up to 75% = Programme acceleration and security = Free design & detailing service NEXT PAGE www.hy-ten.co.uk Contact Information
Transcript
Page 1: placement methods B a m tecC rp R i nfo - Hy-Ten Group Ltd€¦ · PLANS 1 w placement methods T REINFORCEMENT B : 27 kg/m2 108.5 kg/m3 A B a m tecC rp R i nfo =Savings in steel of

PLANS

1

placement methodsT

REINFORCEMENTB

: 27 kg/m2 108.5 kg/m3

A

Bamtec Carpet Reinforcement

=Savings in steel of up to 35%

=Savings in fixing time

and costs of up to 75%

=Programme acceleration and security

=Free design & detailing service

NEXT PAGEwww.hy-ten.co.ukContact Information

Page 2: placement methods B a m tecC rp R i nfo - Hy-Ten Group Ltd€¦ · PLANS 1 w placement methods T REINFORCEMENT B : 27 kg/m2 108.5 kg/m3 A B a m tecC rp R i nfo =Savings in steel of

Contents

www.hy-ten.co.ukContact Information

Introduction to Hy-Ten

Introduction to Bamtec

Benefits of using Bamtec

Principal Contributors

Design and Detailing

Manufacture

Installation Process

Projects & Case Studies

Summary

Page 3: placement methods B a m tecC rp R i nfo - Hy-Ten Group Ltd€¦ · PLANS 1 w placement methods T REINFORCEMENT B : 27 kg/m2 108.5 kg/m3 A B a m tecC rp R i nfo =Savings in steel of

Introduction to Hy-Ten

www.hy-ten.co.ukContact Information

Hy-Ten is a leading stockist and fabricator of concrete reinforcement bar,

mesh and accessories.

The company has a UK network of 9 manufacturing centres from which it

provides an innovative, rapid and cost effective service to building and

civil engineering contractors throughout the UK, Eire & the World.

Hy-Ten is the exclusive British Isles and UAE manufacturer and supplier of

Bamtec - concrete slab reinforcement that comes in a roll. The most

efficient concrete reinforcement system available, Bamtec reduces site

fixing costs by up to 75% and reduces tonnage requirements by up to 35%.

One of our most significant innovations is the HT Coupler - a friction

welded reinforcement coupler that is CArEs approved and offers

substantial benefits in terms of cost, quality and lead time.

The company also manufactures and distributes gabions and land

reinforcement, industrial welded mesh, security fencing, structural

steelwork, steel lintels and sheet piling.

The Hy-Ten Group is based at richmond, surrey, UK and currently has an

annual turnover of £75 million. The Group was founded in 1958 and

celebrated its 50th anniversary in 2008.

For more details on our products and services, visit www.hy-ten.co.uk

Page 4: placement methods B a m tecC rp R i nfo - Hy-Ten Group Ltd€¦ · PLANS 1 w placement methods T REINFORCEMENT B : 27 kg/m2 108.5 kg/m3 A B a m tecC rp R i nfo =Savings in steel of

Introduction to Bamtec

www.hy-ten.co.ukContact Information

Bamtec is the most sophisticated slab reinforcement system available today and has already

helped to accelerate programmes and reduce costs on many sites throughout the British Isles and

worldwide.

Because the Bamtec system combines finite element analysis, integrated detailing software and

robotic manufacturing, it is the only system that can provide finite element curtailed prefabricated

reinforcement. This results in material savings of up to 35% compared to cut & bent reinforcement.

Bamtec carpets are delivered to site in lengths of up to 15 metres and roll out distances of up to

35 metres. The carpets are delivered pre slung to facilitate fast site off loading and movement and

once positioned are simply and easily rolled out, reducing fixing costs by up to 75% compared to

conventional loose bar.

The reinforcing bars within each carpet can be of varying diameters (from 8mm to 32 mm), varying

lengths and at varying centres to suit the slab design. This allows Bamtec to deal with variable load

requirements, non rectangular slabs, slab openings etc.

Bamtec - Introduction

ClICk HERE to see introduction to Bamtec

Page 5: placement methods B a m tecC rp R i nfo - Hy-Ten Group Ltd€¦ · PLANS 1 w placement methods T REINFORCEMENT B : 27 kg/m2 108.5 kg/m3 A B a m tecC rp R i nfo =Savings in steel of

Benefits of Bamtec / Principal Contributors

www.hy-ten.co.ukContact Information

The benefits of using this unique, patented system are:

• Material saving up to 35%

• savings in fixing times and costs of up to 75%

• Programme acceleration and security

• Free Design and Detailing service

(included in Bamtec cost per tonne)

• Health & safety benefits including

• Less Tying of reinforcement

• reductions in rsI

• reductions in back injuries

• CO2 reduction

• Elimination of site errors and wastage

• reduced requirement for checking insitu fixed material

• Deskilling of site installation

• Quality Control

Supplier, Detailing & Project Co-ordination / Management and Manufacture

Engineering Design

Software Solution

Page 6: placement methods B a m tecC rp R i nfo - Hy-Ten Group Ltd€¦ · PLANS 1 w placement methods T REINFORCEMENT B : 27 kg/m2 108.5 kg/m3 A B a m tecC rp R i nfo =Savings in steel of

Design & Detailing

www.hy-ten.co.ukContact Information

Option 1: Utilising the engineer’s initial design model, Hy-Ten can undertake a full slab design

using our powerful finite element software (sofistik). Our software also automatically

details the reinforcement.

Once the design and detailing have been checked and approved, our software

produces schedules that are transferred electronically to one of our Bamtec

manufacturing robots.

The combination of powerful F.E.design, integrated detailing, fully automated carpet

manufacture plus the inclusion of our unique non-standard bar diameters (14,18,22mm)

means Hy-Ten can supply complex reinforcement configurations that give up to 35%

material savings over standardized cut and bent reinforcement. It also means fast,

cost efficient and accurate design and detailing.

Hy-Ten include the cost of design and detailing in the Bamtec cost / tonne. Accordingly,

utilizing this option allows engineers / customers to enjoy free design and detailing.

Option 2: Alternatively, where a full design has already been carried out, Hy-Ten's design office

can undertake a redesign of your flat slab requirements utilising the consulting

engineer's original loading specifications.

Our Bamtec redesigns are also up to 35% lighter than the cut and bent alternative.

Option 3: Hy-Ten can redetail the existing cut and bent configuration to suit Bamtec. This option

does not provide material savings, but does enable customers to benefit from the

speed with which Bamtec can be installed.

PLANS

1

placement methodsT

REINFORCEMENTB

: 27 kg/m2 108.5 kg/m3

A

Engineering Design Software Solution

Page 7: placement methods B a m tecC rp R i nfo - Hy-Ten Group Ltd€¦ · PLANS 1 w placement methods T REINFORCEMENT B : 27 kg/m2 108.5 kg/m3 A B a m tecC rp R i nfo =Savings in steel of

Manufacture

www.hy-ten.co.ukContact Information

Hy-Ten manufacture Bamtec at Bootle in liverpool, Wallingford in Oxfordshire and Dubai UAE.

In total Hy-Ten currently has 5 Bamtec manufacturing robots.

Operating both from coil and stock bar, the robots weld standard CArEs approved reinforcement

bars to continuous 1mm thick metal strips at 1.5 metre centres to produce the Bamtec carpets

that will be rolled out on site.

The Bamtec robots can weld any bar diameter required from 8mm to 32mm (including our unique

non-standard diameters - 14, 18, 22mm) and any bar length required from 1.7 metres to 15metres.

The bars within each carpet can be of varying diameter and length and at varying centres and

positions relative to one another.

Carpets can be of varying size (up to 15 metres wide and 30 metres long) and of varying weight

(up to 2 tonnes).

This versatility allows us to supply very complex and variable reinforcement configurations for a

multitude of construction applications in carpets that are quickly and easily rolled out on site.

Furthermore, the process is fully automated, the robots working to information transferred from our

sofistik design and detailing software, thereby ensuring that the bars are positioned in exactly the

configuration required by the engineer's design.

Page 8: placement methods B a m tecC rp R i nfo - Hy-Ten Group Ltd€¦ · PLANS 1 w placement methods T REINFORCEMENT B : 27 kg/m2 108.5 kg/m3 A B a m tecC rp R i nfo =Savings in steel of

Installation Process

www.hy-ten.co.ukContact Information

The installation of Bamtec carpets is substantially quicker and requires fewer site personnel than

the fixing of traditional reinforcement, resulting in reduced fixing costs and shorter site programmes.

All the carpets arrive on site pre-slung for easy off loading and site movement.

Instead of the time consuming traditional method of positioning and tieing each individual

reinforcement bar, Bamtec carpets (incorporating bars already welded in the correct position

relative to eachother) are moved into starting position by crane and then simply rolled out. The

carpets do not need to be tied to one another.

Hy-Ten can provide couplers on column bars at soffit level. This means that columns are not an

obstruction to the rolling of carpets. This enables us to supply larger and fewer carpets, thereby

speeding up the installation process.

Hy-Ten design and produce shear rails which can be used in conjunction with Bamtec to further

improve the rate of construction. (ClICk HERE)

A typical time saving from the use of Bamtec in a concrete frame building is 3-5 days per floor.

To assist installation, Hy-Ten provide site personnel with a rollout plan and an overview plan.

The rollout plan shows the exact position and rollout direction of each carpet.

Furthermore, Hy-Ten's technical staff provide comprehensive on-site training to demonstrate to

customers' personnel how to best install Bamtec carpets to get the maximum benefit out of the

system's fast installation attributes.

You can also download guidance on the offloading and installing of Bamtec from our website

www.hy-ten.co.uk (ClICk HERE)

Bamtec - Installation Animation

ClICk HERE to see how Bamtec is installed on site

Page 9: placement methods B a m tecC rp R i nfo - Hy-Ten Group Ltd€¦ · PLANS 1 w placement methods T REINFORCEMENT B : 27 kg/m2 108.5 kg/m3 A B a m tecC rp R i nfo =Savings in steel of

Projects and Case Studies

www.hy-ten.co.ukContact Information

Hy-Ten Steel Channel

Case Study:Manchester Joint Hospitals

Hy-Ten Steel Channel

Case Study:Addenbrookes Hospital,Cambridge

Hy-Ten Steel Channel

Case Study:Australian Wind Farms

Page 10: placement methods B a m tecC rp R i nfo - Hy-Ten Group Ltd€¦ · PLANS 1 w placement methods T REINFORCEMENT B : 27 kg/m2 108.5 kg/m3 A B a m tecC rp R i nfo =Savings in steel of

Summary

www.hy-ten.co.ukContact Information

• Material & labour Savings

• Programme Acceleration

• Free Design & Detailing

• Quality Control

• Deskilling on Site

• Health & Safety Benefits

Page 11: placement methods B a m tecC rp R i nfo - Hy-Ten Group Ltd€¦ · PLANS 1 w placement methods T REINFORCEMENT B : 27 kg/m2 108.5 kg/m3 A B a m tecC rp R i nfo =Savings in steel of

www.hy-ten.co.uk

Contact Details

Main sales Office

12 The Green, richmond, surrey TW9 1PX

Tel: +44 (0)20 8940 7578 Fax: +44 (0)20 8332 1757

Email: [email protected]

North West Works, Bridle road, Bootle, Merseyside L30 4UG

Tel: +44 (0)151 525 1745 Fax: +44 (0)151 523 2252

Email: [email protected]

East Midlands Works, Newark storage Ind. Estate, Bowbridge road,

Newark, Nottinghamshire NG24 4EQ

Tel: +44 (0)1636 700418 Fax: +44 (0)1636 605179

Email: [email protected]

Dorset Works, 2 Holton road, Holton Heath Trading Park

Poole, Dorset BH16 6LT

Tel: +44 (0)1202 624733 Fax: +44 (0)1202 624796

Email: [email protected]

West Midlands Works, Unit 54, Wellington Industrial Estate

Bean road, Coseley, West Midlands WV14 9EE

Tel: +44 (0)1902 670097 Fax: +44 (0)1902 673323

Email: [email protected]

Middlesex Works, Gresham road, staines, Middlesex TW18 2BJ

Tel: +44 (0)1784 463551 Fax: +44 (0)1784 466758

Email: [email protected]

Kent Works, Chatham Docks, Chatham, Kent ME4 4sW

Tel: +44 (0)1634 280504 Fax: +44 (0)1634 280491

Email: [email protected]

scotland Works (Central rebar Ltd), Unit 11, riverbank

Kelliebank Industrial Estate, Alloa FK10 1NU

Tel: +44 (0)1259 215129 Fax: +44 (0)1259 215129

Email: [email protected]

Dubai Works, (Hy-Ten LLC), Unit D5, Dubai Industrial City,

PO Box 390751, UAE

Tel: 800 044 0667 – Toll Free M: +971 (0) 5061 61831

Email: [email protected]

1

2

3

5

6

7

8

94

Uk Contact:

Richard Webster. Director

M: +44 (0) 774 833 4535

E: [email protected]

UAE Contact:

Mazen Abdel Ghani. sales Manager

M: +971 (0) 5061 61831

E: [email protected]


Recommended