TIER 1 PROJECT
AND BRIDGE STANDARDS, 2009 MUTCD, 2011 VIRGINIA SUPPLEMENT TO
AMENDED BY CONTRACT PROVISIONS AND THE COMPLETE ELECTRONIC
PDF VERSION OF THE PLAN ASSEMBLY.
THE MUTCD, 2011 VIRGINIA WORK AREA PROTECTION MANUAL AND AS
DEPARTMENT'S 2016 ROAD AND BRIDGE SPECIFICATIONS, 2016 ROAD
COUNTY LINE
DHV
V (MPH)
REVISED
STATE LINE
CITY,TOWN OR VILLAGERIGHT OF WAY LINEFENCE LINEUNFENCED PROPERTY LINEFENCED PROPERTY LINEWATER LINESANITARY SEWER LINEGAS LINEELECTRIC UNDERGROUND CABLETRAVELED WAYGUARD RAILRETAINING WALLRAILROADSBASE OR SURVEY LINE
LEVEE OR EMBANKMENTBRIDGESCULVERTSDROP INLETPOWER POLESTELEPHONE OR TELEGRAPH POLESTELEPHONE OR TELEGRAPH LINESHEDGETREESHEAVY WOODSGROUND ELEVATIONGRADE ELEVATION
CONVENTIONAL SIGNS
30
30
+50
DATUM LINE
DATUM LINE
173
175
T/Tg
E
6" W
8" S
4" G
PLPL
DEPARTMENT OF TRANSPORTATION
PLAN AND PROFILE OF PROPOSED
STATE HIGHWAY
Fr:
To:
SCALE
FUNCTIONAL CLASSIFICATION AND TRAFFIC DATA
D (%) (design hour)
T (%) (design hour)
WHERE OTHERWISE NOTED.
THE ORIGINAL APPROVED TITLE SHEET(S), INCLUDING ORIGINAL
SIGNATURES, ARE FILED IN THE VDOT CENTRAL OFFICE PLAN LIBRARY.
ANY MISUSE OF ELECTRONIC FILES, INCLUDING SCANNED SIGNATURES,
IS ILLEGAL AND ENFORCED TO THE FULL EXTENT OF THE LAW.
ALL CURVES ARE TO BE SUPERELEVATED, TRANSITIONED AND
WIDENED IN ACCORDANCE WITH STANDARD TC-5.11U, EXCEPT
DESIGN FEATURES RELATING TO CONSTRUCTION OR TO REGULATION
AND CONTROL OF TRAFFIC MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT.
THIS PROJECT IS TO BE CONSTRUCTED IN ACCORDANCE WITH THE
FOR SECTION NUMBERS)
(SEE TABULATION BELOW
674-029-358
Cell Revised 6/10/16
SIGNATURES AND THE OFFICIAL PLAN ASSEMBLY IN ELECTRONIC
AS AWARDED, HAS BEEN SEALED AND SIGNED USING DIGITAL
FORMAT IS STORED IN THE VDOT CENTRAL OFFICE PLAN LIBRARY,
INCLUDING ALL SUBSEQUENT REVISIONS, WILL BE THE OFFICIAL
CONSTRUCTION PLANS. FOR INFORMATION RELATIVE TO ELECTRONIC
FILES AND LAYERED PLANS, SEE THE GENERAL NOTES.
THE COMPLETE ELECTRONIC PDF VERSION OF THE PLAN ASSEMBLY
0 100 200
GEOPAK Computer Identification No. 110433
DESIGN PACKAGE (GEOPAK).
THIS PROJECT WAS DEVELOPED UTILIZING THE DEPARTMENT'S ENGINEERINGRic
e and
Associates (7
03) 968-3
200
Ric
e and
Associates (7
03) 968-3
200
674
SECTION
110499 N/A 0.1680.175 Prelim. Engr.
STATE
PROJECT
NO.
SECTIONEQUALITIES
FEET
LENGTH INCLUDINGFEDERAL AID
PROJECT NO.FEET FEETMILES MILES
LENGTH EXCLUDINGTYPE
PROJECTDESCRIPTIONBRIDGE(S) BRIDGE(S)
TYPE
CODE
UPC
NO.
BRIDGE
NO.
067
4-029-358
PLAN
P-101
ADT (2015)
ADT (2043)
-
-
Bria
n
Graha
m (V
olkert) (7
03) 642-8
100
885.00925.00
*
DESIGN SPEEDS.
HORIZONTAL AND VERTICAL CURVE
* SEE PLAN AND PROFILE SHEETS FOR
FAIRFAX COUNTY
Project Lengths are based on Hunter Mill Road (Route 674) Construction Baseline.
3 4
1
APPROVED FOR CONSTRUCTION
DISTRICT PLANNING AND INVESTMENT MANAGER
FOR CONSTRUCTION
DISTRICT PLANNING AND INVESTMENT MANAGER
DISTRICT PROJECT DEVELOPMENT ENGINEER
DISTRICT PROJECT DEVELOPMENT ENGINEER
SU
RV
EY
ED
BY,
DA
TE
DE
SIG
N
BY
SU
BS
UR
FA
CE
UTILIT
Y
BY,
DA
TE
STATEFEDERAL AID STATE
PROJECT PROJECTROUTE
VA.
PROJECT SHEET NO.
VIRGINIA
SIC SEMPER TYRANNIS
SHEET
NO.
COMMONWEALTH OF VIRGINIA
Copyright 2020, Commonwealth of Virginia
FOR INDEX OF SHEETS SEE SHEET 1B
d11049901.dgn
Plotted By: brenda.duong
9:16:14 AM
6/26/2020
1P
ROJE
CT
MA
NA
GE
R
DATE
DATE
DATE
RECOMMENDED FOR APPROVAL
DATE
APPROVED FOR RIGHT OF WAY ACQUISITION
DATE
DATE
RECOMMENDED FOR APPROVAL
FOR RIGHT OF WAY ACQUISITION
DISTRICT ENGINEER/ADMINISTRATOR
DISTRICT ENGINEER/ADMINISTRATOR
OVER COLVIN RUN
HUNTER MILL ROAD (ROUTE 674) BRIDGE REPLACEMENT
TO: 0.087 MILES NORTH OF COLVIN RUN
FROM: 0.098 MILES SOUTH OF COLVIN RUN
From: 0.098 Mi. South of Colvin Run
To: 0.087 Mi. North of Colvin Run
THESE PLANS ARE UNFINISHED
AND UNAPPROVED AND ARE NOT
TO BE USED FOR ANY TYPE
OF CONSTRUCTION OR THE
ACQUISITION OF RIGHT OF WAY.
P. H. PLANS
0.098 MILES SOUTH OF COLVIN RUN
0.087 MILES NORTH OF COLVIN RUN
Sta. 102
+00.0
0
Sta. 111+2
5.0
0
Vic
ente S. V
aleza, Jr., P.E. (7
03)2
59-3
256 (N
OV
A)
Route 606
Toll RoadTo Dulles Acc
ess
Rte. 674
Hunter Mill Road
B-643 Rte. 674 Bridge over Colvin RunBridge- -110433 N/A 40.00 0.010
Sta. 106+8
5.0
0
Sta. 106+4
5.0
0
B-643
101
105
110
11,000
8,000
-
Fairfax County Population 1,081,726 (2010 Census)
CONFORMING TO S&B-IIM-70.9
NOTE: THESE PLANS WERE DESIGNED FOR A SMALL BRIDGE REPLACEMENT PROJECT
FHWA 534 DATA 44010 (NFO) 0674-029-358
STP-BR09(295)
STP-BR09(295)
STP-BR09(295)
PROJ. 0674-029-358, P-101
Colvin Run
Colvin Run
Stream
Colvin Run
DESCRIPTION REFERENCE
POT. Sta. 106+65.00 Rte. 674
1A
1A
THESE PLANS ARE UNFINISHED
AND UNAPPROVED AND ARE NOT
TO BE USED FOR ANY TYPE
OF CONSTRUCTION OR THE
ACQUISITION OF RIGHT OF WAY.
P. H. PLANS
SCALE
0 0.5M 1M
ST
A.
111+25.0
0
ST
A.
102
+00.0
0
LOCATION MAPFAIRFAX COUNTY
P101
0674-029-358
PROPOSED PROJECT
2010 Census
Population 1,081,726
Fairfax County
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
d11049901a.dgn
Plotted By: brenda.duong9:16:27 AM
6/26/2020
PROJECT SHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
SURVEYED BY, DATE
DESIGN BY
SUBSURFACE UTILITY BY, DATE
PROJECT MANAGER
674
0674-029-358
Brian Graham P.E. (703) 642-8100 (Volkert, Inc.)
NO
VA
DIS
TRIC
T
DE
SIG
N
UNIT
(703) 259-3256 (NOVA) Vicente S. Valeza, Jr., P.E.
VDOT
VDOT
P101, B643
0674-029-358
1B
1B
THESE PLANS ARE UNFINISHED
AND UNAPPROVED AND ARE NOT
TO BE USED FOR ANY TYPE
OF CONSTRUCTION OR THE
ACQUISITION OF RIGHT OF WAY.
P. H. PLANS
TITLE SHEET
TYPICAL SECTIONS
DESCRIPTIONSHEET NO.
1A
4, 4A
2A
GENERAL NOTES
STATIONS
EROSION AND SEDIMENT CONTROL PLAN
1
PLAN AND PROFILE SHEETS HUNTER MILL RD. 100+00.00 to 107+25.00
PLAN AND PROFILE SHEETS HUNTER MILL RD.
INDEX OF SHEETS
1B INDEX OF SHEETS
SIGNING AND PAVEMENT MARKING PLANS
1G - 1G(1)
3, 3A, 3A(1)
107+25.00 to 111+49.32
SWPPP2C - 2C(3)
2D - 2E(1)
GEOMETRIC LAYOUT / CONSTRUCTION ALIGNMENT DATA SHEET
TOTAL CROSS SECTION SHEETS 13 (SEE CROSS SECTION SHEET NUMBER 1 FOR INDEX OF SHEETS)
1F SURVEY ALIGNMENT DATA SHEET
MAINTENANCE OF TRAFFIC PLAN1K - 1K(4)
2*
* NOT INCLUDED IN THIS SUBMISSION
LOCATION MAP
5(1) - 5(2)
6(1) - 6(3) BRIDGE PLANS
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
d11049901b.dgn
Plotted By: brenda.duong9:17:35 AM
6/26/2020
PROJECT SHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
SURVEYED BY, DATE
DESIGN BY
SUBSURFACE UTILITY BY, DATE
PROJECT MANAGER
674
0674-029-358
Brian Graham P.E. (703) 642-8100 (Volkert, Inc.)
NO
VA
DIS
TRIC
T
DE
SIG
N
UNIT
(703) 259-3256 (NOVA) Vicente S. Valeza, Jr., P.E.
VDOT
VDOT
P101, B643
0674-029-358
1F
1F
THESE PLANS ARE UNFINISHED
AND UNAPPROVED AND ARE NOT
TO BE USED FOR ANY TYPE
OF CONSTRUCTION OR THE
ACQUISITION OF RIGHT OF WAY.
P. H. PLANS
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
d11049901f.dgn
Plotted By: brenda.duong9:17:40 AM
6/26/2020
PROJECT SHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
SURVEYED BY, DATE
DESIGN BY
SUBSURFACE UTILITY BY, DATE
PROJECT MANAGER
674
0674-029-358
Brian Graham P.E. (703) 642-8100 (Volkert, Inc.)
NO
VA
DIS
TRIC
T
DE
SIG
N
UNIT
(703) 259-3256 (NOVA) Vicente S. Valeza, Jr., P.E.
VDOT
VDOT
P101, B643
0674-029-358
==========================================================================================
Point 107 N 7,037,778.8580 E 11,822,564.9100 Station 119+20.26 Iron Rod w/Cap
N 48° 43' 25" E Distance 195.89'
Point 106 N 7,037,649.6290 E 11,822,417.6900 Station 117+24.37 Iron Rod w/Cap
N 48° 05' 07" E Distance 429.99'
Point 105 N 7,037,362.3880 E 11,822,097.7200 Station 112+94.38 Iron Rod w/Cap
N 36° 51' 22" E Distance 338.56'
Point 104 N 7,037,091.4910 E 11,821,894.6500 Station 109+55.82 Iron Rod w/Cap
N 88° 58' 24" E Distance 335.61'
Point 103 N 7,037,085.4770 E 11,821,559.0900 Station 106+20.21 Iron Rod w/Cap
N 60° 51' 22" E Distance 323.70'
Point 102 N 7,036,927.8330 E 11,821,276.3700 Station 102+96.51 Iron Rod w/Cap
N 34° 21' 39" E Distance 296.51'
Point 101 N 7,036,683.0640 E 11,821,109.0190 Station 100+00.00 Iron Rod w/Cap
==========================================================================================
Survey Alignment (Stream Traverse)
Colvin Run
Asphalt
Asphalt029-1115
MON
16.5'
15.3'
33.5'
Grass
Bonnet Bolt)
(Chix 'X' On
Fire Hydrant
Hunter Mill Road
Nail
P. K.
Nail
P. K.
To Toll Road Cameron
To Baron
Of Pavement.
Approximately 15.4' From Edge
East Side Of Hunter Mill Road
The Station On The Left Or
Approximately 0.9 Miles To
South On Hunter Mill Road
And Hunter Mill, Proceed
Intersection Of Baron Cameron
To Reach The Monument From
Ground And Stamped 029-1115.
Concrete Flush With The
A Standard Disc Set In
Virginia Department of Transportation Horizontal Control
VDOT Project Coordinates (2014)
Coordinates (2014) to NAD 83 - U. S. Survey Feet
* Reverse this Procedure to convert VDOT Project
Project Information
VA State Plane Coordinates : NAD 83- U. S. Survey Feet
( Located above left )
Zones) by the Project Specific Combined Scale Factor.
* Multiply the Easting And Northing Values (For Both
Project Coordinates, use the following formula :
To convert Virginia State Plane Coordinates to VDOT
W
N
DETAILED SKETCH (Not to Scale)
Control Station I. D. : 029-1115 Date : 1997 (Established) 3-8-2017 (Superseded - VDOT)
East (X) : 11821982.59 ft.
North (Y) : 703594.35 ft.
Elevation : 255.473 ft.
Factor: 1. 000039802
Project Specific Combined Scale
Latitude : 38° 57' 50.35797"
Longitude : 77° 18' 32.97737"
Geoid Separation (N) :
Ellipsoid Height (h) :
Horizontal Datum : NAD 83 Year : 2017
Vertical Datum : NAVD88 Geoid : 12B
Azimuth to Station : is ° ' "
Control Based On: Static GPS Observation
NGS Opus Project Solution
East (X) : 11821512.07 ft.
North (Y) : 7036314.29 ft.
Ortho. Elevation (H) : 255.47 ft.
Zone : North
Project Number : 0674-029-340, P101,R201, B643
Route : 674 City/County : Fairfax
Originally Established By : Rice & Associates
LD-200 (REV. 10/2014)
LD-200 (REV. 10/2014)
Cha
mberlain
Drive
Hunter Mill Road
Asphalt
Run
To Colvin
To Baron Cameron
Asphalt SidewalkConc. Sidewalk
Fence
Wood.
Nail
P. K Nail
P. K
#W163
Guy PoleNail)
(P. K.
21.2'
40.3'
39.3'
029-1116
MON
Crest Of A Hill.
Hunter Mill Road Near The
The Right Or West Side Of
0.6 Miles To The Station On
South On Hunter Mill Road
Hunter Mill Road, Proceed
Of Baron Cameron And
Monument From Intersection
029-1116. To Reach The
Ground And Stamped
Concrete Flush With The
A Standard Disc Set In
Virginia Department of Transportation Horizontal Control
VDOT Project Coordinates (2014)
Coordinates (2014) to NAD 83 - U. S. Survey Feet
* Reverse this Procedure to convert VDOT Project
Project Information
VA State Plane Coordinates : NAD 83- U. S. Survey Feet
( Located above left )
Zones) by the Project Specific Combined Scale Factor.
* Multiply the Easting And Northing Values (For Both
Project Coordinates, use the following formula :
To convert Virginia State Plane Coordinates to VDOT
W
N
DETAILED SKETCH (Not to Scale)
Control Station I. D. : 029-1116 Date : 1997 (Established) 3-8-2017 (Superseded - VDOT)
East (X) : 11821576.03 ft.
North (Y) : 7038356.44 ft.
Elevation : 304.53 ft.
Factor: 1. 000039802
Project Specific Combined Scale
Latitude : 38° 58' 07.82517"
Longitude : 77° 18' 37.83510"
Geoid Separation (N) :
Ellipsoid Height (h) :
Horizontal Datum : NAD 83 Year : 2017
Vertical Datum : NAVD 88 Geoid : 12B
Azimuth to Station : is ° ' "
Control Based On: Static GPS Observation
NGS Opus Project Solution
East (X) : 11821105.53 ft.
North (Y) : 7038076.31 ft.
Ortho. Elevation (H) : 304.53 ft.
Zone : North
Project Number : 0674-029-340, P101,R201, B643
Route : 674 City/County : Fairfax
Originally Established By : Rice & Associates
LD-200 (REV. 10/2014)
LD-200 (REV. 10/2014)
1G
1G
ROADWAY ENGINEER
Springfield, Virginia
Volkert, Inc.
THESE PLANS ARE UNFINISHED
AND UNAPPROVED AND ARE NOT
TO BE USED FOR ANY TYPE
OF CONSTRUCTION OR THE
ACQUISITION OF RIGHT OF WAY.
P. H. PLANS
0
SCALE
50' 100'
POT30+00.00
PC30+62.14
PT30+90.39
31
POT31+35.86
D
1
2
3
D
D
POC 105+74.23 HUNTER MILL ROAD (ROUTE 674)
= 88°58'56"
POT 10+00.00 TRAIL 1
POC 105+74.23 HUNTER MILL ROAD (ROUTE 674)
= 89° 54'32"
POT 20+00.00 TRAIL 2
POC 108+29.92 HUNTER MILL ROAD (ROUTE 674)
2
3
= 90°00'00.00"
POT 30+00.00 ENTRANCE 3
CONSTRUCTION ALIGNMENT DATA SHEET
1
PO
T10
0+0
0.0
0
100
101
PC10
1+28.3
9
102
103
PT10
3+0
4.6
8
104
105
PC10
5+16.5
5
106
107
PT10
7+9
6.0
7
108
PC10
8+7
4.6
4
109
PR
C10
9+8
8.8
7
110
PT110+3
5.9
7
111
PO
T111+49.3
2
POT10+00.00
PC10+31.56
PT10+46.49
POT10+57.24
POT20+00.00PC20+05.15
PRC20+20.18
PT20+47.83
POT20+63.85
1 2
5 6 7
3
Curve HUNTERMILLROA_3
PI = 102+16.95
T = 88.55'
L = 176.29'
R = 750.00'
101+28.39PC =
PT = 103+04.68
Curve HUNTERMILLROA_6
PI = 106+57.23
T = 140.68'
L = 279.52'
R = 1,000.00'
105+16.55PC =
PT = 107+96.07
Curve HUNTERMILLROA_9
PI = 109+32.06
T = 57.42'
L = 114.23'
R = 450.00'
108+74.64PC =
PRC =109+88.87
Curve TRAIL_1_3
PI = 10+39.07
T = 7.51'
L = 14.93'
R = 55.00'
10+31.56PC =
PT = 10+46.49
Curve TRAIL_2_3
PI = 20+12.90
T = 7.75'
L = 15.04'
R = 25.00'
20+05.15PC =
PRC =20+20.18
Curve TRAIL_2_4
PI = 20+34.17
T = 13.98'
L = 27.65'
R = 75.00'
20+20.18PRC =
PT = 20+47.83
PI = 30+76.58
T = 14.44'
L = 28.25'
R = 55.00'
30+62.14PC =
PT = 30+90.39
8
Curve ENTRANCE3_3
PI = 110+12.44
T = 23.57'
L = 47.10'
R = 450.00'
109+88.87PRC =
PT = 110+35.97
4
Curve HUNTERMILLRO_10
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
d11049901g(00).dgn
Plotted By: brenda.duong9:17:57 AM
6/26/2020
PROJECT SHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
SURVEYED BY, DATE
DESIGN BY
SUBSURFACE UTILITY BY, DATE
PROJECT MANAGER
674
0674-029-358
Brian Graham P.E. (703) 642-8100 (Volkert, Inc.)
NO
VA
DIS
TRIC
T
DE
SIG
N
UNIT
(703) 259-3256 (NOVA) Vicente S. Valeza, Jr., P.E.
VDOT
VDOT
P101, B643
0674-029-358
ROADWAY ENGINEER
Springfield, Virginia
Volkert, Inc.
THESE PLANS ARE UNFINISHED
AND UNAPPROVED AND ARE NOT
TO BE USED FOR ANY TYPE
OF CONSTRUCTION OR THE
ACQUISITION OF RIGHT OF WAY.
P. H. PLANS
2
1
3
1G(1)
1G(1)
CONSTRUCTION ALIGNMENT DATA SHEET
5
6
7
TRAIL 1
CONSTRUCTION BASELINE
TRAIL 2
CONSTRUCTION BASELINE
HUNTER MILL ROAD (ROUTE 674)
CONSTRUCTION BASELINE
Ending chain HUNTERMILLROAD description
===============================================================================
Point 15 N 7,037,652.8935 E 11,821,746.9993 Sta 111+49.32
Course from PT HUNTERMILLRO_10 to 15 N 11° 25' 39.65" W Dist 113.3462
Chord Bear = N 8° 25' 44.64" W
Ahead = N 11° 25' 39.65" W
Back = N 5° 25' 49.63" W
C.C. N 7,037,452.6354 E 11,821,328.3777
P.T. Station 110+35.97 N 7,037,541.7943 E 11,821,769.4567
P.C. Station 109+88.87 N 7,037,495.2222 E 11,821,776.3580
Mid. Ord. = 0.6161
Long Chord = 47.0806
External = 0.6170
Radius = 450.0000
Length = 47.1021
Tangent = 23.5726
Degree = 12° 43' 56.62"
Delta = 5° 59' 50.01" (LT)
P.I. Station 110+12.44 N 7,037,518.6890 E 11,821,774.1271
Curve HUNTERMILLRO_10
*----------*
Curve Data
Chord Bear = N 12° 42' 09.62" W
Ahead = N 5° 25' 49.63" W
Back = N 19° 58' 29.61" W
C.C. N 7,037,537.8091 E 11,822,224.3383
P.T. Station 109+88.87 N 7,037,495.2222 E 11,821,776.3580
P.C. Station 108+74.64 N 7,037,384.0853 E 11,821,801.4092
Mid. Ord. = 3.6198
Long Chord = 113.9253
External = 3.6492
Radius = 450.0000
Length = 114.2318
Tangent = 57.4246
Degree = 12° 43' 56.62"
Delta = 14° 32' 39.98" (RT)
P.I. Station 109+32.06 N 7,037,438.0554 E 11,821,781.7925
Curve HUNTERMILLROA_9
*----------*
Curve Data
Course from PT HUNTERMILLROA_6 to PC HUNTERMILLROA_9 N 19° 58' 29.61" W Dist 78.5644
Chord Bear = N 11° 58' 02.03" W
Ahead = N 19° 58' 29.61" W
Back = N 3° 57' 34.45" W
C.C. N 7,036,968.6389 E 11,820,888.4050
P.T. Station 107+96.07 N 7,037,310.2472 E 11,821,828.2474
P.C. Station 105+16.55 N 7,037,037.6914 E 11,821,886.0181
Mid. Ord. = 9.7505
Long Chord = 278.6110
External = 9.8466
Radius = 1,000.0000
Length = 279.5201
Tangent = 140.6772
Degree = 5° 43' 46.48"
Delta = 16° 00' 55.16" (LT)
P.I. Station 106+57.23 N 7,037,178.0328 E 11,821,876.3039
Curve HUNTERMILLROA_6
*----------*
Curve Data
Course from PT HUNTERMILLROA_3 to PC HUNTERMILLROA_6 N 3° 57' 34.45" W Dist 211.8743
Chord Bear = N 10° 41' 35.53" W
Ahead = N 3° 57' 34.45" W
Back = N 17° 25' 36.60" W
C.C. N 7,036,878.1123 E 11,822,648.8583
P.T. Station 103+04.68 N 7,036,826.3229 E 11,821,900.6485
P.C. Station 101+28.39 N 7,036,653.4965 E 11,821,933.2832
Mid. Ord. = 5.1735
Long Chord = 175.8805
External = 5.2094
Radius = 750.0000
Length = 176.2861
Tangent = 88.5511
Degree = 7° 38' 21.97"
Delta = 13° 28' 02.14" (RT)
P.I. Station 102+16.95 N 7,036,737.9832 E 11,821,906.7632
Curve HUNTERMILLROA_3
*----------*
Curve Data
Course from HUNTERMILLROAD1 to PC HUNTERMILLROA_3 N 17° 25' 36.60" W Dist 128.3942
Point HUNTERMILLROAD1 N 7,036,530.9956 E 11,821,971.7356 Sta 100+00.00
===============================================================================
Feature: - 25 Scale Baselines
Beginning chain HUNTERMILLROAD description
4
Ending chain TRAIL_1 description
===============================================================================
Point 17 N 7,037,084.0622 E 11,821,824.5833 Sta 10+57.24
Course from PT TRAIL_1_3 to 17 S 68° 13' 00.00" W Dist 10.7471
Chord Bear = S 75° 59' 33.40" W
Ahead = S 68° 13' 00.00" W
Back = S 83° 46' 06.79" W
C.C. N 7,037,036.9778 E 11,821,854.9734
P.T. Station 10+46.49 N 7,037,088.0504 E 11,821,834.5630
P.C. Station 10+31.56 N 7,037,091.6528 E 11,821,849.0034
Mid. Ord. = 0.5057
Long Chord = 14.8830
External = 0.5104
Radius = 55.0000
Length = 14.9287
Tangent = 7.5105
Degree = 104° 10' 26.92"
Delta = 15° 33' 06.79" (LT)
P.I. Station 10+39.07 N 7,037,090.8376 E 11,821,841.5373
Curve TRAIL_1_3
*----------*
Curve Data
Course from 16 to PC TRAIL_1_3 S 83° 46' 06.79" W Dist 31.5624
Point 16 N 7,037,095.0787 E 11,821,880.3793 Sta 10+00.00
===============================================================================
Feature: - 25 Scale Baselines
Beginning chain TRAIL_1 description
Ending chain TRAIL_2 description
===============================================================================
Point 19 N 7,037,120.7001 E 11,821,937.9546 Sta 20+63.85
Course from PT TRAIL_2_4 to 19 N 70° 25' 55.42" E Dist 16.0184
Chord Bear = N 59° 52' 12.73" E
Ahead = N 70° 25' 55.42" E
Back = N 49° 18' 30.03" E
C.C. N 7,037,044.6667 E 11,821,947.9807
P.T. Station 20+47.83 N 7,037,115.3351 E 11,821,922.8614
P.C. Station 20+20.18 N 7,037,101.5339 E 11,821,899.0816
Mid. Ord. = 1.2707
Long Chord = 27.4946
External = 1.2926
Radius = 75.0000
Length = 27.6509
Tangent = 13.9842
Degree = 76° 23' 39.74"
Delta = 21° 07' 25.40" (RT)
P.I. Station 20+34.17 N 7,037,110.6515 E 11,821,909.6848
Curve TRAIL_2_4
*----------*
Curve Data
Chord Bear = N 66° 32' 18.41" E
Ahead = N 49° 18' 30.03" E
Back = N 83° 46' 06.79" E
C.C. N 7,037,120.4897 E 11,821,882.7819
P.T. Station 20+20.18 N 7,037,101.5339 E 11,821,899.0816
P.C. Station 20+05.15 N 7,037,095.6374 E 11,821,885.4955
Mid. Ord. = 1.1219
Long Chord = 14.8105
External = 1.1746
Radius = 25.0000
Length = 15.0361
Tangent = 7.7532
Degree = 229° 10' 59.22"
Delta = 34° 27' 36.77" (LT)
P.I. Station 20+12.90 N 7,037,096.4790 E 11,821,893.2029
Curve TRAIL_2_3
*----------*
Curve Data
Course from 18 to PC TRAIL_2_3 N 83° 46' 06.80" E Dist 5.1466
Point 18 N 7,037,095.0787 E 11,821,880.3793 Sta 20+00.00
===============================================================================
Feature: - 25 Scale Baselines
Beginning chain TRAIL_2 description
Ending chain ENTRANCE3 description
===============================================================================
Point ENTRANCE35 N 7,037,325.7386 E 11,821,685.6082 Sta 31+35.86
Course from PT ENTRANCE3_3 to ENTRANCE35 N 80° 32' 48.26" W Dist 45.4737
Chord Bear = S 84° 44' 21.06" W
Ahead = N 80° 32' 48.26" W
Back = S 70° 01' 30.39" W
C.C. N 7,037,372.5229 E 11,821,739.4977
P.T. Station 30+90.39 N 7,037,318.2698 E 11,821,730.4643
P.C. Station 30+62.14 N 7,037,320.8316 E 11,821,758.2861
Mid. Ord. = 1.8037
Long Chord = 27.9395
External = 1.8649
Radius = 55.0000
Length = 28.2490
Tangent = 14.4434
Degree = 104° 10' 26.92"
Delta = 29° 25' 41.35" (RT)
P.I. Station 30+76.58 N 7,037,315.8976 E 11,821,744.7116
Curve ENTRANCE3_3
*----------*
Curve Data
Course from ENTRANCE31 to PC ENTRANCE3_3 S 70° 01' 30.39" W Dist 62.1369
Point ENTRANCE31 N 7,037,342.0581 E 11,821,816.6850 Sta 30+00.00
===============================================================================
Feature: - 25 Scale Baselines
Beginning chain ENTRANCE3 description
8
ENTRANCE 3
CONSTRUCTION BASELINE
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
d11049901g(01).dgn
Plotted By: brenda.duong9:18:04 AM
6/26/2020
PROJECT SHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
SURVEYED BY, DATE
DESIGN BY
SUBSURFACE UTILITY BY, DATE
PROJECT MANAGER
674
0674-029-358
Brian Graham P.E. (703) 642-8100 (Volkert, Inc.)
NO
VA
DIS
TRIC
T
DE
SIG
N
UNIT
(703) 259-3256 (NOVA) Vicente S. Valeza, Jr., P.E.
VDOT
VDOT
P101, B643
0674-029-358
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
d11049901k(00).dgn
Plotted By: brenda.duong9:18:08 AM
6/26/2020
PROJECT SHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
SURVEYED BY, DATE
DESIGN BY
SUBSURFACE UTILITY BY, DATE
PROJECT MANAGER
674
0674-029-358
Brian Graham P.E. (703) 642-8100 (Volkert, Inc.)
NO
VA
DIS
TRIC
T
DE
SIG
N
UNIT
(703) 259-3256 (NOVA) Vicente S. Valeza, Jr., P.E.
VDOT
VDOT
P101, B643
0674-029-358TRAFFIC MANAGEMENT PLAN NOTES
advance and contractor shall provide adequate access during construction.
Property owners and businesses affected as result of proposed construction zones shall be notified in3.
Notification
Public Communications and Outreach Strategies
Temporary Traffic Control Plans Notes
Sequence of ConstructionTemporary Traffic Control Plans Notes Cont'd
TRAFFIC ENGINEER
Springfield, Virginia
Volkert, Inc.
1K
1K
en-route traveler information. The Traffic Operations Center will contact the VDOT District Public Affairs Manager.
work ensuring proper, timely and accurate communication to the media and general public which is critical in providing
one (1) month in advance of the start of construction and weekly updates by noon on Thursday for the following weeks
Project information will be given to the VDOT Traffic Operations Center (Northern Regional Operations - NRO) at least 1.
Schools Superintendent concerning all detours and road closures of any nature.
The Contractor shall coordinate with the Fairfax County Sheriff's Office, Department of Fire and Rescue, and the County 2.
g) Fairfax County Sheriff's Office - (703) 246-3227
f) District Work Zone Safety Coordinator: Kwame Acquah - (XXX) XXX-XXXX
e) District Traffic Engineer: Ivan Horodyskyj - (703) 259-2330
d) Area Construction Engineer: Chandraratne B. Basnayake - (XXX) XXX-XXXX
c) Construction Project Managers: To Be Determined
b) Project Inspector: To Be Determined
a) Transportation Operations Center: (703) 877-3449
Contractor to call:
Process of notification of incident to be followed is:5.
guardrails for the northbound lane east of Rte. 240.
Grade and construct shoulders, aggregate base and intermediate courses at full depth pavement section including the7.
Demolish the northbound Rte. 240 at Lickinghole Creek bridge. 6.
the bridge segment from 11' to 10', and access to private driveway entrances throughtout Phase I construction.
Maintain the existing traffic using portable traffic signals and dynamic electronic board, lane width transition at 5.
Adjust and relocate traffic signals and signs location as deemed necessary.
from the private driveway at Sta. 102+00 prior to initiating the lane closure operation with traffic control signals.
Contractor shall ensure adequate sight distances are provided on both northbound and southbound Rte. 240, and 4.
per TTC-25.2 of 2011 WAPM, Revision 2 (September 1, 2019).
two-way, two-lane traffic on Rte. 240 at Lickinghole Creek to lane closure operation using traffic control signals
and barriers, and provide temporary markings as shown on the temporary traffic control plans. Switch the existing
Close the northbound lane of Rte. 240 between Sta. 99+50 through Sta. 104+75 with group 2 channelizing devices3.
construction.
control signals operation. The private driveway at Sta. 102+00 (left) shall remain open for the entire duration of
left-right arrow for the private driveway at Sta. 102+00 (left) in preparation of the lane closure with traffic
Close Oak Drive at Sta. 104+75 (right) with barricades and provide the specified dynamic electronic board with 2.
and maintain erosion and sediment control measures throughout all construction phases.
TTC-53.0 as shown in the 2011 Virginia Work Area Protection Manual (WAPM), Revision 2 (September 1, 2019). Install
The contractor shall set the signing for lane closure operation with traffic control signals and trucks detour using 1.
guardrails for the southbound lane west of Rte. 240.
Grade and construct shoulders, aggregate base and intermediate courses at full depth pavement section including the7.
Demolish southbound Rte. 240 at Lickinghole Creek bridge. 6.
the bridge segment from 11' to 10', and access to private driveway entrances throughtout Phase II contruction.
Maintain the existing traffic using portable traffic signals and dynamic electronic board, lane width transition at 5.
Adjust and relocate traffic signals and signs location as deemed necessary.
from the private driveway at Sta. 102+00 prior to initiating the lane closure operation with traffic control signals.
Contractor shall ensure adequate sight distances are provided on both northbound and southbound Rte. 240, and 4.
(September 1, 2019).
and operate the lane closure operation using traffic control signals per TTC-25.2 of 2011 WAPM, Revision 2
At the time of closing the southbound lane, divert traffic onto northbound lane on Rte. 240 at Lickinghole Creek 3.
Rte. 240 between Sta. 99+50 through Sta. 104+81 as shown on the temporary traffic control plans,
Provide temporary markings for Phase II, relocate the portable traffic signals, and close the southbound lane of 2.
the traffic switch using flagging operation (TTC-23.2) as shown in 2011 WAPM, Revision 2 (September 1, 2019).
Place and connect barriers from southbound lane in Phase I to the northbound lane parapet in preparation of 1.
the guardrails for the proposed northbound lane of Rte. 674.
Grade and construct roadways, shoulders, aggregate base and intermediate courses at full depth pavement section including 6.
Access to existing trail for bicyclists and pedestrians shall be maintained at all times throughout construction.5.
as stop-controlled throughout construction.
Maintain the existing private driveway entrances at STA. 102+25.64 (right), STA. 102+40.81 (left), and STA. 108+30.16 (left) 4.
phase of construction.
and roadways in preparation of next phase of construction. Maintain existing signs and pavement markings throughout this
Utilize existing two-way, one-lane operation on Rte. 674 at Colvin Run to construct the eastern portion of proposed bridge 3.
existing guardrails between STA. 105+78.5 and STA. 109+4.5 throughout MOT Phase One (1).
Install concrete barriers and impact attenuators from STA. 102+93.0 through STA. 105+59.0 as shown on plans, and maintain 2.
construction phases.
Manual (WAPM), Revision 2 (September 1, 2019). Install and maintain erosion and sediment control measures throughout all
The contractor shall set the signing for Phase 1 as shown on plans using TTC-53.0 per 2011 Virginia Work Area Protection 1.
the guardrails for the proposed southbound lane of Rte. 674.
Grade and construct roadways, shoulders, aggregate base and intermediate courses at full depth pavement section including 7.
Demolish the existing Rte. 674 at Colvin Run bridge. 6.
throughout construction.
throughtout Phase 2 construction. Access to existing trail for bicyclists and pedestrians shall be maintained at all times
Maintain the existing traffic using portable traffic signals and DAD system, and access to private driveway entrances 5.
closure operation with traffic control signals. Adjust and relocate traffic signals and signs location as deemed necessary.
private driveway entrances at STA. 102+25.64 (right), STA. 102+40.81 (left), and STA. 108+30.16 (left) prior to initiating the lane
Contractor shall ensure adequate sight distances are provided on both northbound and southbound Rte. 674, and from the 4.
operation using traffic control signals per TTC-25.2 of 2011 WAPM, Revision 2 (September 1, 2019).
temporary traffic control plans. Switch the existing two-way, one-lane traffic on Rte. 674 at Colvin Run to lane closure
concrete barriers, group 2 channelizing devices and impact attentuators, and provide temporary markings as shown on the
Close the existing Rte. 674 bridge and portion of southbound lanes between Sta. 102+85.92 through Sta. 108+12.0 with 3.
operation. All private driveway entrances shall remain open for the entire duration of construction.
STA. 102+40.81 (left), and STA. 108+30.16 (left) in preparation of the lane closure with traffic control signals
Provide the Driveway Assistance Device (DAD) system for private driveway entrances at STA. 102+25.64 (right), 2.
2011 Virginia Work Area Protection Manual (WAPM), Revision 2 (September 1, 2019).
The contractor shall set the signing for lane closure operation with traffic control signals using TTC-53.0 as shown in the 1.
Construct raised medians and curbs for Rte. 674 between STA. 105+9.4 and STA. 107+79.19.5.
throughtout Phase 3 contruction.
Maintain the existing traffic using portable traffic signals and DAD units, and access to private driveway entrances 4.
(September 1, 2019).
and operate the lane closure operation using traffic control signals per TTC-25.2 of 2011 WAPM, Revision 2
At the time of closing the proposed northbound lane, divert traffic onto the newly constructed southbound lane of Rte. 674 3.
of Rte. 674 at Colvin Run between Sta. 103+2.7 through Sta. 109+10.42 as shown on plans,
Provide temporary markings for Phase 3, relocate the portable traffic signals, and close the proposed northbound lane 2.
of the traffic switch using flagging operation (TTC-23.2).
Relocate concrete barriers and impact attentuators from Phase 2 to Phase 3 configuration shown on plans in preparation 1.
the scheduled Rte. 674 road closure on Dulles Toll Road (Rte. 267).
available for use one week in advance of the construction, during the first week of construction, and during
The contractor shall have in place a minimum of four (4) portable changeable message sign (PCMS) boards4.
THESE PLANS ARE UNFINISHED
AND UNAPPROVED AND ARE NOT
TO BE USED FOR ANY TYPE
OF CONSTRUCTION OR THE
ACQUISITION OF RIGHT OF WAY.
P. H. PLANS
Phase II: Construct Second Lane Of Bridge (SB) And Shift Traffic To The Newly Constructed Bridge
Existing Traffic Operation
Phase I: Construct One-Lane Of New Bridge (NB) To The East Of Existing Bridge While Maintaining
Phase IV: MIlling/Overlay Operation, Signing And Pavement Marking, And Final Preparation
Remove all erosion and sediment control and temporary measures at the completion of the project.3.
Stripe Rte. 674 at Colvin Run as shown on the signing and pavement marking plans.2.
asphalt surface course.
Overlay Rte. 674 between Sta. 101+50.0 through Sta. 111+25.0 adjacent to the newly constructed bridge with 1.
approval.
necessary. The contractor shall submit the bridge closure and detour request to the Engineer for review and
Contractor shall perform the bridge closure with detour as shown on sheets 1K(3) and 1K(4) only when deemed11.
permission of the VDOT Engineer (per section 108.02 of the Road and Bridge Specifications).
Except as necessary to maintain traffic, work shall not be performed on Sundays and Holidays without the
Contractor shall perform work in the construction zone from Monday - Saturday from 8:00 A.M. to 5:00 P.M. 10.
This is in accordance with section 514 of the specification.
If the signs are not setup as a pay item, they shall be considered incidental to the price of other items.
adjusting, maintaining, and removing the signs and posts per the Specifications and Standard Details.
All construction signs shall be the responsibility of the contractor, including furnishing, installing,9.
least 48 hours prior to the beginning of work.
Contractor to call Northern Regional Operations (NRO) Traffic Operations Center (TOC): 703-877-3449 at 8.
Mailboxes shall be reset/available for use each day.
on plans. Emergency vehicles and postal vehicles must also have access to all properties at all times.
connections and entrances, minimum width shall be no less than existing conditions unless otherwise shown
Access and adequate sight distance to and from all properties shall be maintained at all times. For 7.
applicable notes.
Area Protection Manual, Revision 2 (September 1, 2019) i.e TTC-23.2, TTC-25.2, TTC-48.2, TTC-53.0 and
Contractor shall use Typical Traffic Control (TTC) application drawings shown in the 2011 Virginia Work 6.
Removal of existing pavement markings shall be completed according to Section 512.03 (l).5.
measured and paid for as regular excavation in accordance with Section 303 of the specifications.
item, the removal and salvage of existing surfaces and aggregate base and subbase material will be
utilized for M.O.T. prior to the use of commercial material. When not specified as a separate pay
construction and which is suitable for M.O.T, as determined by the Engineer, shall be salvaged and
Existing surface, aggregate base and subbase material that will be demolished or obliterated during 4.
of work, as directed by the Engineer.
All warning signs and temporary traffic control devices shall be promptly removed at the completion3.
for review and approval.
traffic control plan shall be signed and sealed by a Professional Engineer and submitted to VDOT
Any major changes in phasing will require approval of the Engineer. Any changes to the temporary2.
with the current edition of the 2011 Virginia Work Area Protection Manual, Revision 2 (September 1, 2019).
Work Zone Safety Coordinator to develop and monitor all traffic control devices and ensure compliance
The Contractor shall be responsible for providing one intermediate level and one basic level designated 1.
following:
approved or directed by the Engineer, the Contractor shall plan and execute the work in accordance with the
2011 Virginia Supplement to 2009 MUTCD Revision 1. The project will have a Type B TMP. Unless otherwise
2016 Road and Bridge Standards, 2011 Virginia Work Area Protection Manual, Revision 2 (September 1, 2019),
This project is to be constructed in accordance with the department's 2016 Road and Bridge Specifications,
Transportation Operations Plan
Detailed Transportation Operations Plan to be provided at next design submission.
Phase III: Build Median And Shift Traffic To The Second Lane (SB Lane) Of Newly Constructed Bridge
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
d11049901k(01).dgn
Plotted By: brenda.duong9:18:25 AM
6/26/2020
PROJECT SHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
SURVEYED BY, DATE
DESIGN BY
SUBSURFACE UTILITY BY, DATE
PROJECT MANAGER
674
0674-029-358
Brian Graham P.E. (703) 642-8100 (Volkert, Inc.)
NO
VA
DIS
TRIC
T
DE
SIG
N
UNIT
(703) 259-3256 (NOVA) Vicente S. Valeza, Jr., P.E.
VDOT
VDOT
P101, B643
0674-029-358
104
105
106
107
31
100
101 10
2
103
104
105
106
107
108
109
110 111
2' Paved Shoulder
31
100
101 10
2
103
104
105
106
107
108
109
110 111
31
100
101 10
2
103
104
105
106
107
108
109
110 111
THESE PLANS ARE UNFINISHED
AND UNAPPROVED AND ARE NOT
TO BE USED FOR ANY TYPE
OF CONSTRUCTION OR THE
ACQUISITION OF RIGHT OF WAY.
P. H. PLANS
TRAFFIC ENGINEER
Springfield, Virginia
Volkert, Inc.
0
SCALE
50' 100'
MOT PHASE 1
MOT PHASE 2
MOT PHASE 3
TO STOP
PREPARED
BE
AHEAD
ROAD
ONE LANE HERE ONSTOP
REDAHEAD
WORK
ROAD
15M P H
15M P H
48" x 48"
W20-4
48" x48"
W3-4
24" x30"
R10-6
60" x 18"
W16-VP3
48" x 48"
W3-3
48" x 48"
W20-1
30" x 30"
W13-1P
30" x 30"
W13-1P350 FEET
TEMPORARY TRAFFIC CONTROL PLAN - PHASE SEQUENCE
350' - 500'
1 2 3 4 5
350' - 500'350' - 500'350' - 500'
1 23
40' - 180'50' - 100'
350' - 500'350' - 500'350' - 500'350' - 500'
1 23
40' - 180'50' - 100'
350' - 500'350' - 500'
350' - 500'
350' - 500' 3 2 140' - 180'50' - 100'
and OperationPer Existing Lane Configuration MOT Phase One (1) To Operate
VA WAPM Revision 2.Control Signals In Accordance With A Two-Lane Roadway Using Traffic TTC-25.2 (Lane Closure Operation on MOT Phase Two (2) to Operate Per
MOT Phase One (1)Markings To Remain Throughout Existing Signs And Pavement
Zone Signs Per TTC-25.2Regarding Associated Work Refer To Signs Legend Above
Zone Signs Per TTC-25.2Regarding Associated Work Refer To Signs Legend Above
MOT Phase One (1)Markings To Remain Throughout Existing Signs And Pavement
Zone Signs Per TTC-25.2Regarding Associated Work Refer To Signs Legend Above
Zone Signs Per TTC-25.2Regarding Associated Work Refer To Signs Legend Above
Throughout MOT Phase One (1)Existing Guardrails To Remain
-ControlledExisting Stop
- ControlledExisting Stop
(2) OperationMOT Phase Two (DAD) As Part ofAssistance Device Proposed Driveway
(2) OperationMOT Phase Two (DAD) As Part ofAssistance Device Proposed Driveway
6 7
6 7
6 7
DAD System)
(As Part Of
24" x30"
R10-11
DAD System)
(As Part Of
36" x42"
HUNTER MILL RD (
ROUTE 674)
HUNTER MILL RD (ROUTE 674)
CO
LVIN
RU
NC
OL
VIN
RU
NC
OL
VIN
RU
N
CO
LVIN
RU
NC
OL
VIN
RU
N
CO
LVIN
RU
N
50' - 100'40' - 180' 350' - 500'
350' - 500'
3
350' - 500'
2
350' - 500'
1
LEGEND
Work Area
Temporary Traffic Control Signal
Impact Attenuator
Concrete Barrier
Driveway Assistance Device (DAD) System
6 7
6 7
TR
AIL
EXIS
TIN
G
TR
AIL
EXIS
TIN
G
TR
AIL
EXIS
TIN
G
TR
AIL
EXIS
TIN
GT
RAIL
EXIS
TIN
GT
RAIL
EXIS
TIN
G
ENTRANCE
AREA 6 DRIVEWAY
PARK MAINTENANCE
LAKE FAIRFAX
ENTRANCE
AREA 6 DRIVEWAY
PARK MAINTENANCE
LAKE FAIRFAX
ENTRANCE
AREA 6 DRIVEWAY
PARK MAINTENANCE
LAKE FAIRFAX
HUNTER MILL RD (
ROUTE 674)
HUNTER MILL RD (ROUTE 674)
HUNTER MILL RD (
ROUTE 674)
HUNTER MILL RD (ROUTE 674)
(3) OperationMOT Phase Three (DAD) As Part ofAssistance Device Proposed Driveway
VA WAPM Revision 2.Control Signals In Accordance With A Two-Lane Roadway Using Traffic TTC-25.2 (Lane Closure Operation on MOT Phase Three (3) to Operate Per
(3) OperationMOT Phase Three (DAD) As Part ofAssistance Device Proposed Driveway
BRIDGE B-645
BRIDGE B-645
B-645
BRIDGE
9
30" x 30"
W11-15
24" x 12"
W16-7PL
9 9
9
9
ROAD WORK
END
48" x24"
G20-2(V)
8
8
8
8
8
1
1
1
350' - 500'
350' - 500'
1
1
8
45
8
6 7
4 5
4 5
6 7
54
System
Driveway Assistance Device (DAD)
System
Driveway Assistance Device (DAD)
(Not Shown)MarkingsPavementTemporaryProposed
(Not Shown)MarkingsPavementTemporaryProposed
(Not Shown)MarkingsPavementTemporaryProposed
(Not Shown)MarkingsPavementTemporaryProposed
1K(1)
1K(1)
TAPER
TAPER
TAPER
TAPER
BUFFER
(Not Shown)MarkingsPavementTemporaryProposed
(Not Shown)MarkingsPavementTemporaryProposed
BUFFER
BUFFER
BUFFER
31
100
101 10
2
103
104
105
106
107
108
109
110 111
1000 F
TC
LO
SE
DR
OA
D
500 F
TC
LO
SE
DR
OA
D
R11-2
R11-2
500 F
T
CL
OS
ED
RO
AD
1000 F
T
CL
OS
ED
RO
AD
BA
RRIC
AD
ES
TYP
E III
BA
RRIC
AD
ES
TYP
E III
RO
AD
CLOSE
D
HUNTER MILL RD
(VA-674)
HUNTER MILL RD (VA-674)
RO
AD
CLOSE
D
W20-3
W20-3
500'
W20-3
500'
500'500'
W20-3
B-645
BRIDGE
ENTRANCE
AREA 6 DRIVEWAY
PARK MAINTENANCE
LAKE FAIRFAX
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
d11049901k(02).dgn
Plotted By: brenda.duong9:19:15 AM
6/26/2020
PROJECT SHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
SURVEYED BY, DATE
DESIGN BY
SUBSURFACE UTILITY BY, DATE
PROJECT MANAGER
674
0674-029-358
Brian Graham P.E. (703) 642-8100 (Volkert, Inc.)
NO
VA
DIS
TRIC
T
DE
SIG
N
UNIT
(703) 259-3256 (NOVA) Vicente S. Valeza, Jr., P.E.
VDOT
VDOT
P101, B643
0674-029-358
Wooden Posts (T
yp. )
Colvin Run
Colvin Run
Stream
THESE PLANS ARE UNFINISHED
AND UNAPPROVED AND ARE NOT
TO BE USED FOR ANY TYPE
OF CONSTRUCTION OR THE
ACQUISITION OF RIGHT OF WAY.
P. H. PLANS
1K(2)
TRAFFIC ENGINEER
Springfield, Virginia
Volkert, Inc.
1K(2)
0
SCALE
50' 100'
BRIDGE CLOSURE
TEMPORARY TRAFFIC CONTROL PLAN
NOTES:
1.
2.Ground Mounted Sign
LEGEND
Type B Warning Light
Denotes Barrier
for setting up work area shown on this sheet.
Area Protection Manual, Revision 2 (September 1, 2019)
Contractor shall refer to TTC-48.2 in the Virginia Work
Work Area Protection Manual, Revision 2 (September 1, 2019).
R11-2 shall be crashworthy as per the Virginia
BARRICADE
TYPE III
R11-2 (MOD)
TRAILCLOSED
TRAILCLOSED
BARRICADE
TYPE III
R11-2 (MOD)
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
d11049901k(03).dgn
Plotted By: brenda.duong9:19:27 AM
6/26/2020
PROJECT SHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
SURVEYED BY, DATE
DESIGN BY
SUBSURFACE UTILITY BY, DATE
PROJECT MANAGER
674
0674-029-358
Brian Graham P.E. (703) 642-8100 (Volkert, Inc.)
NO
VA
DIS
TRIC
T
DE
SIG
N
UNIT
(703) 259-3256 (NOVA) Vicente S. Valeza, Jr., P.E.
VDOT
VDOT
P101, B643
0674-029-358
267
7
Colvin Run
Colvin
Run
FairfaxLake
Anne
Lake
Baron
(Rte.
606)
Camero
nAv
e
SunsetHills
Rd
(Rte. 675)DullesTollRd
Rd
Toll
Dulles
Sunrise Valley Dr(Rte. 5320)
Wiehle
Ave
(Rte. 828)
Hunter
Mill
Rd
674)
(Rte.
Crowell Rd(Rte. 675)
Colvin
Rd
Run
TRAFFIC ENGINEER
Springfield, Virginia
Volkert, Inc.
1K(3)
1K(3)
NOT TO SCALE
DETOUR
NOTICE
RTE 674
FOLLOW
CLOSED IN
HUNTER MILL RD
1.0 MILE
AHEAD
DETOUR
1000 FT
CLOSED
ROAD
500 FT
CLOSED
ROAD
DETOUREND
CLOSED
ROAD
DETOUR
3
DETOUR
674
NORTH
12
DETOUR
674
NORTH
14
DETOUR
NORTH
674
13
13
14 13
1312 14
7
4
674
SOUTH
12
17
DETOUR
674
SOUTH
19
674
3
7
17
1716
17
16
6
7
18
DETOUR
NOTICE
RTE 674
FOLLOW
CLOSED IN
HUNTER MILL RD
2 MILES
5
5 7 18
17
with type 3 barricade
9
10
11
11
10
9
LOCAL TRAFFIC ONLY
ROAD CLOSED1 MILE AHEAD
with type 3 barricade
8
1
1
1
2
1
2
6
M3-15
2
M3-14
M3-35
18
M3-1
M3-32
DETOUR
674
SOUTH
M3-32
14
19
9
10
11
17
40
20
40
92.5
92.5
DETOUR
TEMPORARY TRAFFIC CONTROL PLAN
3
R11-3a8 60 x 30
M4-8
24 x 12
24 x 12
M4-8
M1-V2a 36 x 365
M6-1R
M1-V2a 36 x 36
M6-3
30 x 21
30 x 21
M4-8
M1-V2a
24 x 12
M6-3 30 x 21
13
NO.
SIGN
MAP
PANELSIZE
(INCHES) TOTAL
SF. QUANTITY
12
W20-2 48 x 487
48 x 605
30 x 15
30 x 15
30 x 15
36 x 36
W20-3 48 x 48 322
R11-2 48 x 30 404
W20-3 48 x 48 322
M4-8a 24 x 182 24
M1-V2a 36 x 36
M4-8
M1-V2a
M6-1R
24 x 12
36 x 36
30 x 21
30 x 15
4
PCMS 2 NA
48 x 60
48 x 60
M6-1L
M1-V2a
M4-8 30 x 15
24 x 12
36 x 36
30 x 21
M4-8
M1-V2a
M5-2L
24 x 12
36 x 36
30 x 15
30 x 21
TOTAL (SF) =
CONSTRUCTION
1 WEEK PRIOR
TO CLOSE CLOSED
Notes:
ROAD CLOSED
PROJECT AREA
1215
7
Exit 13
1 mile from
* Approximately 14
15
14
8
6
12
15
72
Exit 14
1 mile from
* Approximately
approximate.
Detour sign locations shown are
shown in sign no. 1 and 2.
The PCMS messages to be displayed are
1.
2.
3.
4.
Detour Route
Ground Mounted Sign
LEGEND
RT674 AT
COLVIN
RUN
FOLLOW
DETOUR
XX/XX/XX
CONSTRUCTION
1ST WEEK OF
TO CLOSE CLOSED
RT674 AT
COLVIN
RUN
FOLLOW
DETOUR
XX/XX/XX
2
CLOSURE
DURING ROAD
COLVIN
RUN
RT674 AT
RUN
COLVIN
RT674 AT
6
DETOUR
674
NORTH
M3-1
M4-8
M1-V2a
M6-2R
16
15
(INCHES)QUANTITY
TOTAL
SF. PANEL
SIZE
NO.
SIGN
MAP
DETOURFOLLOW
CLOSED IN
HUNTER MILL RD
2.5 MILES
RTE 674
NOTICE
PCMS 2 NA
AHEAD
CLOSED
ROAD
48 x 48 2W20-3
3
32
96
30 x 21
36 x 36
24 x 12
30 x 15
55.5
2
37
37
Traffic Direction
25
882
Exit 14
Exit 13
19
92.5
week of construction only.
the construction and during the first
be installed one week in advance of
two weeks only. Both PCMS units to
PCMS sign no. 1 to be installed for
offline mode when not in use.
Both of these PCMS units shall be in
closure and during the road closure.
weeks in advance of the scheduled road
PCMS sign no. 2 to be installed two
THESE PLANS ARE UNFINISHED
AND UNAPPROVED AND ARE NOT
TO BE USED FOR ANY TYPE
OF CONSTRUCTION OR THE
ACQUISITION OF RIGHT OF WAY.
P. H. PLANS
74
CONSTRUCTION
2 WEEKS PRIOR
20
20
with type 3 barricade
20 48 x 30 202CLOSED
TRAIL(MOD)
R11-2
ROADWAY ENGINEER
Springfield, Virginia
Volkert, Inc.
THESE PLANS ARE UNFINISHED
AND UNAPPROVED AND ARE NOT
TO BE USED FOR ANY TYPE
OF CONSTRUCTION OR THE
ACQUISITION OF RIGHT OF WAY.
P. H. PLANS
2A
2ATYPICAL SECTIONSNOTE: PAVEMENT WIDTHS VARY AT TAPERS.
SEE PLAN SHEETS AND CROSS SECTIONS
FOR PAVEMENT LENGTHS AND WIDTHS.
1
2
3
TYPE SM-9.5A
1.5" ASPHALT CONCRETE SURFACE COURSE
L
Finished Grade
Point of
B
STATION 102+75.00 TO STATION 102+87.33
4%
HUNTER MILL ROAD (RTE. 674)
BL
11' 11'
HUNTER MILL ROAD (RTE. 674)
Varies Varies
2'2'
(See Cross Section)
Varies
Finished Grade
Point of
Prop. Guardrail, 9' Post
Varies
Section)
(See Cross
2' to 4'
Varies
0' - 11'
NOT TO SCALE
1.5:1 1.5:1
Prop. Guardrail, 9' Post
2%2%
11' 11' 2'2'Varies
Cross Section)
(See
1.5:1
1.5:1
HUNTER MILL ROAD (RTE. 674)
STATION 106+45.00 TO STATION 106+85.00
Varies
Section)
(See Cross
BL
Finished Grade
Point of
HUNTER MILL ROAD (RTE. 674) BRIDGE B-643
STATION 106+85.00 TO STATION 107+79.20
STATION 105+09.43 TO STATION 106+45.00
4'
Varies
Prop. Guardrail, 9' Post
STATION 107+79.20 TO STATION 110+00.00
STATION 102+87.33 TO STATION 105+09.43
BL
Finished Grade
Point of
Varies
Varies Varies
Varies
0' - 11'
PAVEMENT
EXISTING
*1.5" MILL
** Station 102+00 to Station 102+75 - 1.5" MILL AND OVERLAY TO EXISTING PAVEMENT
5%
Varies
Aggr. 25 or 26
Asphalt Commercial
NOT TO SCALE
Crusher Run Aggr.
The type of entrance (I , II , III , IV) to be constructed
will be determined by the existing condition at the
TYPE IV
TYPE I
6" Crusher Run
Asphalt Conc. Type
4" Asphalt Conc. Base Course
BM-25.0
TYPE III
Asphalt
Asphalt Conc. Type
TYPE II
Concrete
Concrete Entrance Pavement
7" HES
4" Aggr. Base Mat'l. Ty. 1
PRIVATE AND COMMERCIAL ENTRANCES
4" Aggr. Base Mat'l. Ty. 1
6" Aggr. Base Mat'l. Ty. 1
No. 21B
SM-9.5A @ 220 Lbs. per S. Y. SM-9.5A @ 165 Lbs. per S. Y.
No. 21B
No. 21B
time of construction.
HUNTER MILL ROAD (RTE. 674)
STATION 110+50.00 TO STATION 111+25.00
0' to 8'
Gore Area Varies
4
TYPE BM-25.0A
4" ASPHALT CONCRETE BASE COURSE
COURSE TYPE IM-19.0A
2.5" ASPHALT CONCRETE INTERMEDIATE
(See Cross Section)
Varies 18'-21'
(See Cross Section)
Varies 18'-21'
TYPE I, SIZE NO. 21B
8" AGGREGATE BASE MATERIAL,
See Inset A
See Inset A
See Inset A
2
1
3
INSET A
4
11'2' - 4'
Varies
Shoulder
11' 1' - 3'
Varies
Shoulder
4'2'
1.5:1
5%
(See Cross Section)
Varies
Prop. St'd. GR-MGS2 or St'd. GR-FOA-5
STATION 105+90.25 TO STATION 106+45.00
STATION 106+85.00 TO STATION 107+12.50
3.5' to 8'
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
d11049902a.dgn
Plotted By: brenda.duong9:19:51 AM
6/26/2020
PROJECT SHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
SURVEYED BY, DATE
DESIGN BY
SUBSURFACE UTILITY BY, DATE
PROJECT MANAGER
674
0674-029-358
Brian Graham P.E. (703) 642-8100 (Volkert, Inc.)
NO
VA
DIS
TRIC
T
DE
SIG
N
UNIT
(703) 259-3256 (NOVA) Vicente S. Valeza, Jr., P.E.
VDOT
VDOT
P101, B643
0674-029-358
***Denotes information that is to be provided/completed by the contractor.
Denotes information that is to be provided/completed by the VDOT RLD.
SECTION I GENERAL INFORMATION
**
**
*
*
STORMWATER POLLUTION PREVENTION PLAN (SWPPP) GENERAL INFORMATION SHEET
**
Name Position
**
Responsibility
if there is 0.25 inches or more accumulation noted in the rain gage.
be noted in the log book and the rain gage emptied and replaced. An inspection is required
event, an observation of the rain gage shall be made and the observation information shall
additional rainfall until the conclusion of the rainfall event. At the conclusion of the rainfall
to be noted in the log book. The rain gage is not to be emptied but left to accumulate
If there is rainfall occurring at the time of the observation, the observation information is
required if there is 0.25 inches or more accumulation noted in the rain gage.
shall be noted in the log book and the rain gage emptied and replaced. An inspection is
If there is no rainfall occurring at the time of the observation, the observation information
RLD Certify the SWPPP (with date & sig.)
*
construction site.
that may generate a stormwater or non-stormwater discharge directly related to the
fuels or chemicals, concrete wash out areas, sanitary waste facilities and any other areas
and vehicle washing, maintenance, storage and fueling areas, storage areas for fertilizers,
borrow and disposal areas, construction and waste material storage areas, equipment
appropriate contract documents. Support facilities shall include, but not be limited to,
provided by the contractor and identified on the record set of plans or in other
Construction Permit coverage for this land disturbance (construction) activity shall be
4. The location of on-site support facilities that will be covered under the VPDES
July 1, 2019 and VDOT's approved Annual ESC and SWM Standards and Specifications.
Stormwater From Construction Activities (the VPDES Construction Permit) issued
comply with the requirements of the VPDES General Permit For Discharges Of
The information contained in the SWPPP General Information sheets is intended to
ACRONYMS
Specifications as approved by the DEQ.
Annual Erosion and Sediment Control and Stormwater Management Standards and
(construction) activity have been developed in accordance with VDOT's Approved
10. The ESC and SWM plans (where applicable) for this land disturbance
Position ResponsibilityVDOT Individuals
NPDES
only to Inspection Schedule 1.
Specifications except for Section 107.16(e) 4.an Inspection Requirements Rain gauge notes apply
follow (Select Schedule 1 or 2, if schedule #2 is used, void note #14) as defined in 2016 R&B
13. The ESC and P2 inspections for this land disturbing (construction) activity shall
Engineer
Dist. Hyd.
inspection in accordance with IIM-LD-256
NPDES coordinator responsible for the oversight
approval of ESC SWM plan modification(s).
responsible for the review & the coordination
District Hydraulic Engineer or designee(s)
permitted projects):
responsibility or the environmental matters for the project: (required only for
incorporated by reference into this SWPPP). These individual(s) has/have overall
form LD-445H for delegation of authority (form 445H for the project is hereby
the SWPPP General Information Sheets and Inspection Reports (C-107). Reference
"delegated authority" to sign all reports required by the construction permit including
(required for erosion and sediment control). The following individual(s) have
11. List the RLD and other responsible parties for the land disturbance activity:
Tidewater, Virginia in the Virginia Chesapeake Bay Preservation Act.
Preservation Area, or equal to or greater than 2,500 square feet in the area defined as
disturb an area equal to or greater than 10,000 square feet outside the Chesapeake Bay
construction plan set (or other such documents) for land disturbance activities that
The SWPPP General Information sheets are to be completed and included in the
RLD - Responsible Land Disturber
R&B - Road and Bridge
IIM - Instructional and Informational Memorandum
ESC - Erosion and Sediment Control
EPA - U.S. Environmental Protection Agency
DEQ - Department of Environmental Quality
BMP - Best Management Practice
CBPA - Chesapeake Bay Preservation Act
record set of plans (or other such documents)for the land disturbance (construction) activity.
(construction) activity. The updated/revised sheets shall be maintained with the designated
to reflect changes that may occur during the construction phase of the land disturbing
shown on the SWPPP General Information sheets is updated/revised as necessary in order
The VDOT RLD (as defined in the latest IIM 242) will ensure that the information
VSMP Authority stating coverage not needed)
Construction General Permit coverage letter: (List VPDES Permit # or Letter from
support activities located outside of VDOT right of way or easement in the form of the
5. Written Evidence of permit coverage shall be provided by the contractor for all
and maintained with the other SWPPP documents for this land disturbance activity.
identified on these SWPPP General Information Sheets. The names will be updated
accordance with IIM-LD-256 on these land disturbance construction activities as
12. The name of the VDOT individual(s) responsible for the oversight inspection in
required based on the amount of accumulated rainfall in the gage.
amount of accumulated rainfall in the gage, if any, and (5) whether or not an inspection is
(2) the time, (3) whether or not rainfall is occurring at the time of the observation, (4) the
book shall be maintained to record observation information which shall include (1) the date,
measurable storm event (i.e., 0.25 inches of rainfall or greater in a 24 hour period). A log
The rain gage shall be observed daily at " " to determine the occurrence of a
(List location of rain gage).
appropriate SWPPP documents for this land disturbance activity:
be provided by the contractor and identified on the record set of plans or in other
measurable storm event for the purposes of ESC and Pollution Prevention inspections will
14. The location of the on-site rain gage that will be used to determine the occurrence of a
shall notify the municipality with jurisdiction over erosion and sediment control activities.
responsibility of the contractor is discovered discharging into a MS-4, the contractor
17. If excessive loading of sediment from a land disturbing activity that is not the
shall initiate corrective actions no later than 5 business days after the initial investigation.
of the current Construction General Permit. If corrective action is necessary, the contractor
in accordance with the permits approved standards and specifications required by Part I.B
and ensure all erosion and sediment control best management practices are being implemented
the contractor shall investigate the area of concern at the site within 24 hours of discovery
local watershed with a sediment TMDL that allocates a WLA to VDOT's MS4, (see note #7)
expected from the project with an implemented ESC plan) that is discovered within a
16. If there is an excessive loading of sediment from the project (i.e. more than to be
VDOT LD-445I: AS&S Approval Form (when applicable)
VDOT C-107 Part I and Part II. All projects that require a permit or SWPPP.
VDOT LD-445H: Permitted projects only.
Water Quality Requirement (when applicable)
VDOT LD-445F: Emergency work projects (when applicable).
Non-CBPA with BMP projects that have a water quantity BMP.
VDOT LD-445D: Permitted projects, CBPA projects and Non-permitted,
VDOT LD-445C: Projects that require a permit, ESC Plan, or SWPPP.
VDOT LD-445A: Permitted projects only.
BMP and ESC projects > 10,000 s.f. but
2C(1)
***Denotes information that is to be provided/completed by the contractor.
Denotes information that is to be provided/completed by the VDOT RLD.
2C(1)
SECTION III POST CONSTRUCTION STORMWATER MANAGEMENT
ACRONYMS
RLD - Responsible Land Disturber
R&B - Road and Bridge
IIM - Instructional and Informational Memorandum
ESC - Erosion and Sediment Control
EPA - U.S. Environmental Protection Agency
DEQ - Department of Environmental Quality
BMP - Best Management Practice
CBPA - Chesapeake Bay Preservation Act
SWM - Stormwater Management
WLA - Waste Load Allocation
VESCP - Virginia Erosion and Sediment Control Program
VSMP - Virginia Stormwater Management Program
VPDES - Virginia Pollutant Discharge Elimination System
VDOT - Virginia Department of Transportation
TMDL - Total Maximum Daily Load
SWPPP - Stormwater Pollution Prevention Plan
Section IV.
identified in the applicable sections of the documents identified in the Note 1 of
6. A description of interim and permanent stabilization practices for the site are
SWPPP documents for this land disturbance (construction) activity.
108.03 of the VDOT R&B Specifications and shall be included with the other
shall be provided by the contractor in accordance with the current edition of Section
(e.g., grubbing, excavation, grading, utilities and infrastructure installation, etc.)
1. The intended sequence and timing of activities that disturb soils at the site
303.03 of the VDOT R&B Specifications.
operating conditions are identified in the current edition of Sections 107.16 and
sediment control measures and other protective measures in good and effective
8. A description and schedule of procedures to maintain vegetation, erosion and
installed prior to any grubbing operations or other earth moving activities.
Perimeter controls such as silt fence, diversion dikes, turbidity curtains, etc. shall be
12. The areas beyond the project's construction limits are to be protected from siltation.