+ All Categories
Home > Documents > Plan Bengaluru 2020 1

Plan Bengaluru 2020 1

Date post: 08-Apr-2015
Category:
Upload: ananyaankush
View: 406 times
Download: 0 times
Share this document with a friend
39
Transcript
Page 1: Plan Bengaluru 2020 1
Page 2: Plan Bengaluru 2020 1

Index

Roads , Traffic Management & Transportation

Water & Sanitation

Urban poor

Policing, Law & Order and Enforcement

Education & Health

Heritage & Environment

Citizen Centric Governance

City Facilities

Power

Airports & Railway

Page 3: Plan Bengaluru 2020 1

Introduction“Bangalore has the potential to become the No. 1 City in India and an internationally prominent metropolis. To make this possible , we need to adopt a new urban planning model, upgrade our infrastructure , improve the social facilities and create a better environment for good quality of life. In other words, we must re-invent Bangalore.”

Challenge is to ensure that growth flows into a spatial plan, else it results in chaos and encroachment and inability for municipal services to plan their investments in capacity expansion and newcoverage.Planning has been identified as THE major issue facing our city –as far back as 1997 as the two quotes from a report by the Committee on Urban Management of Bangalore city, 1997.

“Planning is by far the most important tool for coping with the increasing demands made by the growth of city on Housing, infrastructure and amenities. In the absence of proper planning,the city experiences infrastructural inadequacies and degeneration and the authorities are driven to finding ‘ad-hoc’ solutions and crisis management from time to time in respect of many of citiesrequirements, to meet which advance action has not been taken”

“Planning is important for raising public confidence and morale. Furthermore, planning helps to smoothen the relationship betweenthe elected representatives and the officials in charge of city.Residents of the city routinely – and quite rightly 0 blame the ‘absence of planning’ or ‘poor planning’ for everything from congestion on roads to poor sanitation and water supply.”

Page 4: Plan Bengaluru 2020 1

DEMOGRAPHIC PROFILE

POPULATION PLAN ESTIMATES - IN LAKHS

Present Estimates: 2021

BMA: 103 lakh as per Revised Master Plan6 LPA’s: 47 lakhsAPZ-1: 10 lakhsTotal BMR: 160.00 lakhs

AREA 1996 2011 2021

BMA 51.00 76 90.00

BMR 71.62 109.36 130.00

Page 5: Plan Bengaluru 2020 1
Page 6: Plan Bengaluru 2020 1

VARIOUS PLANNING AREAS WITHIN BMR

Areas within BMR Area in Sq.Kms.

BDA 1219.50BMICAPA 426.24RCUDA 63.06Anekal LPA 402.30Nelamangala LPA 735.00Magadi LPA 501.52Hoskote LPA 535.00Kanakapura LPA 412.78BIAAPA 792.00

APZ-I (excluding RCUDA & BMICAPA) 462.50All IZ’s in BMR 2455.00TOTAL BMR 8005.00

IMPORTANT INFORMATION OF ALL IMP’S(Area in Hectares)

Name of the LPA LPA Area in Sq.Kms

Conurbation area as per provisional

ANEKAL 402.3 21,547.00

NELAMANGALA 735.00 7,046.00HOSKOTE 535.00 14,713.00

MAGADI 501.52 10,307.00KANAKAPURA 412.78 10,182.00BIAPPA 792.00 12,636.00

Page 7: Plan Bengaluru 2020 1

Kickoff meeting held on 10th September, 2008

Immediate / Priority Objectives to be completed in six months; Medium / Long Term Objectives to be completed 12 months or above;

Plans have to be submitted by all the following participating agencies.Agency Name Action Report

StatusProgress

BBMP Commissioner Received No action

BDA Commissioner Received No action

BMTC MD Received No action

KSRTC MD Not Received Submission by 18-10-08

BTP DCP Received No action

BWSSB Chairperson Received No action

Housing & Slum Clearing board

Principal Secretary

Not Received No deadline given

Namma Metro MD Not Received No deadline given

High Speed Rail Link MD Not Received 2-3 weeks

BESCOM MD Received No action

Working Groups

Page 8: Plan Bengaluru 2020 1
Page 9: Plan Bengaluru 2020 1

Road, Traffic Management & Transportation

Objectives Progress

Strengthen BMLTA and make it responsible for Transportation Planning for BMR. DULT to prepare a draft Bill, defining structure, scope, function and mandate of the BMLTA – due within 15 days

The draft Bill is under finalization

Commission CTTS Agreed

Examine all Laws, Acts and prepare comprehensive list of Legislative amendments

Dr. Ravindra would prepare a table for the same

Complete review of all Mega/Medium Transportation projects and finalize blue print with BMLTA

The draft Bill is under finalization

Financing / Investment plan of Bangalore Metropolitan regional projects.

Land Acquisition/substitution from Railway/ DefenceMinistry

The Hon’ble Chief Minister has agreed to take up all such issues directly with the respective Ministry and informed all departments to submit details to get the clearances.

Planning / Governance / Strategic

Immediate / Priority Objectives - by December 2008

Immediate / Priority Objectives - by January 2008

Objectives Progress

Review 1st Draft of Structure Plan

Review 1st Draft of CTTS

Page 10: Plan Bengaluru 2020 1

Road, Traffic Management & Transportation

Objectives ProgressBruhath Bangalore Mahanagara Palike (BBMP)All road humps on main roads are to be removed by 30th

September 2008

Road Widening Race Course RoadBellary Road Sarjapura Main RoadNagarabhavi Main Road Madiwala Village Panchayath RoadByrasandra Road from Hosur Road to Jayanagar T BlockBull Temple RoadSevashram RoadShampura Main RoadTannery Road

ITBT Roads workIndiranagar 100 Ft RoadKoramangala 80 Ft Road Kaggadassapura Main Road ST bed

35 Bus bays

Model Ward to be developed. Identified of this model ward to be done

The model ward to be undertaken in 4 wards and the theme to be jointly developed by all the civic agencies with Principal Secretary to coordinate the effort. Details to be submitted within the next 15 days.

Bangalore Development Authority (BDA)All road humps on main roads are to be removed by 30th September 2008

Construction of Grade separatorAgara and Ibulr junction (two flyover)Magadi Road and Chord Road Ready for inauguration by Nov/Dec

08

Infrastructure Projects – Repairs / Capacity Expansion / AdditionImmediate / Priority Objectives - by December 2008

Page 11: Plan Bengaluru 2020 1

Road, Traffic Management & Transportation

Objectives Progress

Bangalore Development Authority (BDA)Construction of ORR connecting

Mysore Road to Magadi Road

Grade separator – Foundation stone / Ground braking ceremony

HSR layout junctionBellundar junctionDevarabeesanahalli junctionKadubeesanahalliMahadevapura junctionKalyannagar junctionHennur junctionVeeranapalya junction

Construction of 8 lane peripheral ring road - Foundation stone/ Ground braking ceremony

BOT pattern

Bangalore Traffic Police (BTP)

80 Traffic Surveillance Camera

Factual Actuated Signals Signboards - 1000

Bangalore Metropolitan Transport Corporation (BMTC)

New buses – 100

Namma Metro

BMRCL should present alternate Traffic Management Plan in particular for the underground section (Majestic etc) to the Task Force for each stage starting October 2008 to November 2008

BMRCL to give the alternative plan in close consultation with BMTC, KSSIDC & IG, Traffic.

Immediate / Priority Objectives - by December 2008

Page 12: Plan Bengaluru 2020 1

Road, Traffic Management & Transportation

Objectives Progress

Bruhath Bangalore Mahanagara Palike (BBMP)

Road Widening

Palace Road Hosur Road

230 High Raised Pedestrian crossing

Precast segmental box Underpass

At Maharani’s college

Construction

Flyover at Yeshwanthpura circleROB on Wheelers Road near ITCPedestrian Subway at City MarketPedestrian Subway at Vijayanagar Bus standUnderpass at 21st Main near Forum MallUnderpass near Garuda MallUnderpass at 46th Cross near Ragi GuddaTemple

Bangalore Development Authority (BDA)

BDA to meet the project cost of ORR from out of its own resources. Ground breaking ceremony – Jan 2009

Namma Metro

BMRCL to circulate a note on the possibilities of commercial exploitation in the stations and along the corridor to the Task force.

After Mid term review – BMRCL to furnish the final financing structure to Task Force.

Infrastructure Projects – Repairs / Capacity Expansion / AdditionImmediate / Priority Objectives - by March 2009

Page 13: Plan Bengaluru 2020 1

Road, Traffic Management & Transportation

Objectives Progress

High Speed Rail Link

Viability gap proposal presentation to GOK for final decision

Bangalore Metropolitan Transport Corporation (BMTC)

Traffic Transit and Transportation Management would be completed by 1st

January, 2009.

The work is entrusted to the land Army. Committee has insisted BMTC to complete the work on time.

Bangalore Traffic Police (BTP)

Need to empower officers to collect fines –proposal to authorize ASI sent to Govt for approval380 Vehicle Actuated Signals5 Enforcement Camera 20 VMS20000 SignboardsTMC building constructionTMC Technology50 junction improvement5 interceptors for enforcement

Principal Secretary has agreed to clear this proposal

Immediate / Priority Objectives - by March 2009

Page 14: Plan Bengaluru 2020 1

Road, Traffic Management & Transportation

Objectives ProgressBruhath Bangalore Mahanagara Palike (BBMP)Sky Walks with escalator

Hosur Lasker Road, Airport Road Kamaraja Road Residency Road (DBOT basis)Raja Ram Mohan Roy RoadRichmond Road Race Course RoadCommissionerate Road (DBOT basis)

Road Widening

Hosur Lasker Road Sheshadri Road Kasthuraba Road

Construction of Underpass

Hennur Main RoadTagore circle & KR RoadNagavara Junction

Construction of bridge over storm water drain

Galli Anjaneya Road

Signal free movement

along Hosur Road from Silk Board to Vellara junction

Multilevel Car Parking under Swiss Challenge method

Four truck terminals DoddaballapuraNelamangalaHoskote & Devanahalli

Infrastructure Projects – Repairs / Capacity Expansion / AdditionMedium Term Objectives - April 2009 - 2012

Page 15: Plan Bengaluru 2020 1

Road, Traffic Management & Transportation

Objectives Progress

Bangalore Development Authority (BDA)

Make ORR 100% Signal free - February 2010

ORR to be completely signal free and a plan for implementation over the next 18 months.

Construction of ORR Connecting Mysore Road to Magadi Road including underpass at Bangalore Mysore Railway line

Grade separator – CompletionHSR layout junctionBellundar junctionDevarabeesanahalli junctionKadubeesanahalliMahadevapura junctionKalyannagar junctionHennur junctionVeeranapalya junction

Construction of Grade separator and ORR junctionMagadi Road

Medium Term Objectives - April 2009 - 2012

Page 16: Plan Bengaluru 2020 1

Water & Sanitation

Page 17: Plan Bengaluru 2020 1

Road, Traffic Management & Transportation

Objectives ProgressFinancing plan for BWSSB Meeting has been scheduled on

16th October, 2008. The out come will be discussed in the next meeting however the draft plan will be prepared for the subsequent meeting.

Jurisdiction of BWSSB to be extended to Metropolitan Region.

Dual Water Pipeline Policy to be

finalized

The Committee is schedule to meet shortly and finalize the proposal in consultation with other members of the committee.

Rain Water Harvesting Legislation Draft cabinet note has been prepared and sent to Principal Secretary UD. Principal Secretary UD informed the Chair that the note has been sent to Law and Parliamentary to vet the Draft law amendment.

Ground Water Regulation Legislation

Lake Policy to be finalized After detailed deliberation on the various issues that emerged in forming a workable policy for Lakes, the committee felt that the Heads of BBMP, BDA, BMA, BMARD, Irrigation Department, Forest Department and Revenue Department must meet and discuss and prepare a comprehensive policy framework to protect and preserve the lakes. Principal Secretary UD to chair the meeting. The Minister for BWSSB mentioned that BWSSB would be interested in utilizing the water from the lakes and not involved in the policy decision of the committee

Planning / Governance / Strategic

Immediate / Priority Objectives - by December 2008

Page 18: Plan Bengaluru 2020 1

Water & Sanitation

Objectives ProgressProviding Cauvery water to the former CMC wards

Ward No. 23 & 24 of the erstwhile Yelahanka CMC (3500 house holds).

Ward No. 7, 11 & 13 of the erstwhile Dasarahalli CMC (4000 house holds)Ward No. 4 & 15 (P) of the erstwhile Byatarayanapura CMC (2000 house holds)Ward No. 25, 26 & 32 of the erstwhile Dasarahalli CMC (4000 house holds)Ward No. 4, 5, 6 & 16 of the erstwhile Rajarajeshwarinagara CMC (6000 house holds)Ward No. 1 to 7 of the erstwhile Kengeri CMC (1200 house holds)

Ward No.11,19 & 26 to 31 of the erstwhile Bommanahalli CMC (7000 house holds)Ward No. 26, 28 to 31 of the erstwhile Rajarajeshwarinagara CMC (4300 house holds)

Procurement of Combination Machines and setting up of R.W.H. Theme Park

Procurement of 15 Nos. of 6,000 litres capacity Combination Machines (to carry 3,000 litres of water or 3,000 litres of sewage) to be mounted on suitable chassis to be supplied by the Board

Rain Water Harvesting Theme Park at Jayanagar

Rain Water Harvesting to Cauvery Bhavan, ‘D’ BlockSetting up of R. W. H. Theme Park

Rain Water Harvesting Theme Park at JayanagarAmendment to Board Resolution to make Rain Water Harvesting CompulsoryProject to introduce 24 x 7 Water Supply

Providing water supply network, feeder mains & sewerage net work in the former C.M.C. Areas

Providing Water Supply distribution network in Bommanahalli CMC under GBWASP2.50 Km of 250/200mm dia pipeline in ward no. 3,5 & 65.0 Km of 100mm dia pipeline in Banneraghatta road

Providing Water Supply distribution network in Dasarahalli CMC under GBWASP · 2.75 Km of 100 mm dia in National Highway portion ·1.10Km of 200/300/450mm dia pipeline National Highway

Providing Water Supply distribution network in KR Puram CMC under GBWASP · 0.50Km of 150mm dia inside Railway Local shed area

Providing Water Supply distribution network in Mahadevapura CMC Under GBWASP · 2.40Km of 150mm dia along Railway track near Hoodilevel Crossing to Sonnamangala

Immediate / Priority Objectives - by December 2008

Infrastructure Projects – Repairs / Capacity Expansion / Addition

Page 19: Plan Bengaluru 2020 1

Water & Sanitation

Objectives ProgressProviding water supply network, feeder mains & sewerage net work in the former C.M.C. Areas

Providing Water Supply distribution network in Bommanahalli CMC under GBWASP2.50 Km of 250/200mm dia pipeline in ward no. 3,5 & 65.0 Km of 100mm dia pipeline in Banneraghatta roadProviding Water Supply distribution network in Dasarahalli CMC under GBWASP · 2.75 Km of 100 mm dia in National Highway portion 1.10Km of 200/300/450mm dia pipeline National Highway ·Providing Water Supply distribution network in KR Puram CMC under GBWASP 0.50Km of 150mm diainside Railway Local shed areaProviding Water Supply distribution network in Mahadevapura CMC Under GBWASP · 2.40Km of 150mm dia along Railway track near Hoodi level Crossing to Sonnamangala.

Providing Feeder Mains under GBWASP

Hegganahalli GLR to Kammagondanahalli - 8.50 Km ranging from 1100 to 600mm dia pipeline – crossing of NH road by trench less method is under progress [Hegganahalli, Srigandanagar, Rajagopalanagara, Ganapathinagar Dugalamma L/O Parvathinagara, Laxmidevinagar, Jallahalli Road.] Kothanur dinne GLR to Hulimavu – 1.40Km of 1200mm dia to 1000m pipeline, [Hulimavu, Bannerghatta Road, MICO L/O]Nayanappanahalli to Viratanagar – 2.50Km of 1000 to 600mm pipeline is under progress. 400mt rock cutting is under progress. [IIMB back side, Belekallahalli]Nayanappanahalli to Begur tank - 2.20Km of 600mm dia pipeline, 200 mts. rock portion is under progress [Nayanappanahalli,Kodichikkanahalli, Devrachikkanahalli, Hogasandra]Providing Under ground drainage facilities to erstwhile R.R.Nagar CMC area (Zone 5B)

Immediate / Priority Objectives - by December 2008

Page 20: Plan Bengaluru 2020 1

Water & Sanitation

Objectives ProgressGKVK GLR to Nagavara – 12.50Km of pipeline dia ranging from 1200mm to 800mm. 40m length Railway crossing and 180m crossing of NH4 crossing by trench less method under progress.[Vidyaranyapura, Sahakaranagar, CanaraBankL/O, Byatarayanapura, Kodigehalli, Dasarakhalli Nagavara]

Providing Under ground drainage facilities to erstwhile Byatarayanpura CMC area -(Zone 2A) Providing Sewerage System to erstwhile ByatarayanpuraCMC are Zone 2C) Providing Under ground drainage facilities to erstwhile Mahadevpura CMC area (Zone 3B) Providing Under ground drainage facilities to erstwhile K.R.Puram CMC area (Zone 3E)Providing Under ground drainage facilities to erstwhile Bommanahalli CMC area (Zone 4B)Providing Under ground drainage facilities to erstwhile Bommanahalli CMC area (Zone 4C)Providing Under ground drainage facilities to erstwhile Bommanahalli CMC area (Zone 4D)Providing Under ground drainage facilities to erstwhile Dasarahalli CMC area (Zone 7A) Providing Under ground drainage facilities to erstwhile Dasarahalli CMC area ( Zone 7C) Providing Under ground drainage facilities to erstwhile R.R.Nagar CMC area (Zone 5B)

Providing water supply network, feeder mains & sewerage net work in the former C.M.C. Areas

Providing Water Supply distribution network in Bommanahalli CMC under GBWASP2.50 Km of 250/200mm dia pipeline in ward no. 3,5 & 65.0 Km of 100mm dia pipeline in Banneraghatta roadProviding Water Supply distribution network in DasarahalliCMC under GBWASP · 2.75 Km of 100 mm dia in National Highway portion ·1.10Km of 200/300/450mm dia pipeline National HighwayProviding Water Supply distribution network in KR PuramCMC under GBWASP · 0.50Km of 150mm dia inside Railway Local shed areaProviding Water Supply distribution network in Mahadevapura CMC Under GBWASP · 2.40Km of 150mm dia along Railway track near Hoodi level Crossing to Sonnamangala.

Immediate / Priority Objectives - by December 2008

Page 21: Plan Bengaluru 2020 1

Water & Sanitation

Objectives ProgressProviding Feeder Mains under GBWASP

Hegganahalli GLR to Kammagondanahalli - 8.50 Km ranging from 1100 to 600mm dia pipeline –crossing of NH road by trench less method is under progress [Hegganahalli, Srigandanagar, Rajagopalanagara, Ganapathinagar Dugalamma L/O Parvathinagara, Laxmidevinagar, Jallahalli Road.] Kothanur dinne GLR to Hulimavu – 1.40Km of 1200mm dia to 1000m pipeline, [Hulimavu, Bannerghatta Road, MICO L/O]Nayanappanahalli to Viratanagar – 2.50Km of 1000 to 600mm pipeline is under progress. 400mt rock cutting is under progress. [IIMB back side, Belekallahalli]Nayanappanahalli to Begur tank - 2.20Km of 600mm dia pipeline, 200 mts. rock portion is under progress [Nayanappanahalli,Kodichikkanahalli, Devrachikkanahalli, Hogasandra]GKVK GLR to Nagavara – 12.50Km of pipeline diaranging from 1200mm to 800mm. 40m length Railway crossing and 180m crossing of NH4 crossing by trench less method under progress.[Vidyaranyapura, Sahakaranagar, CanaraBank L/O, Byatarayanapura, Kodigehalli, Dasarakhalli Nagavara]Providing Under ground drainage facilities to erstwhile Byatarayanpura CMC area -(Zone 2A) Providing Sewerage System to erstwhile Byatarayanpura CMC are Zone 2C) Providing Under ground drainage facilities to erstwhile Mahadevpura CMC area (Zone 3B) Providing Under ground drainage facilities to erstwhile K.R.Puram CMC area (Zone 3E)Providing Under ground drainage facilities to erstwhile Bommanahalli CMC area (Zone 4B)Providing Under ground drainage facilities to erstwhile Bommanahalli CMC area (Zone 4C)Providing Under ground drainage facilities to erstwhile Bommanahalli CMC area (Zone 4D)Providing Under ground drainage facilities to erstwhile Dasarahalli CMC area (Zone 7A) Providing Under ground drainage facilities to erstwhile Dasarahalli CMC area ( Zone 7C) Providing Under ground drainage facilities to erstwhile R.R.Nagar CMC area (Zone 5B)

Immediate / Priority Objectives - by December 2008

Page 22: Plan Bengaluru 2020 1

Water & Sanitation

Objectives ProgressReplacement of major leaking lines

600 mm dia CI pipeline by MS pipeline from Kamakshipalya Tank bund to KHB Bus stop along Magadi road600 mm dia CI pipeline by MS pipeline at Tumkur road at 4 places27” dia CI /PSC pipeline by MS pipeline at Rajkumar road Rajajinagar at 3 locations400 mm dia CI pipeline by 450 mm dia MS pipeline from Sirsi circle to 9 ML, GLR along Binny Mill road600 mm dia PSC pipeline by MS pipeline from Hama Sagara Hotel to Havanur circle in Basaveshwranagar600 mm dia CI pipeline by MS pipeline from Beggars colony upto 5th block GLR Nagarabhavi600 mm dia pipeline by MS pipeline at Bellaryroad to Side Palace Compound.300 mm dia CI pipeline by MS pipeline at Sanjayangar main road300 mm dia CI pipeline by MS pipeline at 5th

main Ganganahalli200 mm dia CI pipeline at Bellary road near HMT Bhavan300 mm dia CI pipeline at BEL road600 mm dia PSC/ CI pipeline by MS pipeline from Millers road along Bore Bank road uptoPottery town675 mm dia PSC / CI pipeline by 700 mm diaMS pipeline Manipal Centre upto Aero Engine along Ulsoor main road & Old Madras road uptoGLR600 mm dia pipeline by MS pipeline from Benneganahally bridge upto ITPL along White Field 300 mm dia CI pipeline by MS pipeline 100’ ring road 17th main Koramangala from St Johns college to 50’ road signal

Immediate / Priority Objectives - by December 2008

Page 23: Plan Bengaluru 2020 1

Water & Sanitation

Objectives ProgressReplacement of major leaking lines

300 mm dia CI pipeline by MS pipeline 100’ ring road 17th main Koramangala from St Johns college to 50’ road signal

300 mm dia Sarjapura road from St John signal to Kuduremukh colony

450 mm dia pipeline by MS pipeline from 1st main Koramangala & Sarjapur road upto 17th main Koramangala along service road

450 mm dia PSC pipeline by MS pipeline at 46th

cross from 5th block Jayanagar to 9th block Jayanagar450 mm dia PSC pipeline by MS pipeline at Someswaranagar main road

300 mm dia CI pipeline by MS pipeline at Housrroad from NIMHANS to VIGNANA Hospital

450 mm dia PSC pipe line by MS pipeline at BTS road, Opposite to PWD Quarters

450 mm dia PSC/CI pipeline by MS pipeline from D’souza circle up to ISRO along Victoria Road & Old Air port road600 mm dia PSC pipeline by MS pipeline at 100’ring road BTM 2nd stage

300 mm dia CI pipeline by DI pipeline at 46th cross from Field office to 24th main under J.P Nagar

200 mm dia PVC pipeline by DI pipeline at 14th

cross, JP Nagar II phase300 mm dia pipeline @ Kastuabangar ChamarajpetReplacing 675 mm dia PSC /CI pipeline with MS at 30th main, Banashankari II Stage

600 mm dia PSC/CI line by MS pipeline from Balabrooie gate to Mount Carmel College along Palace road27’ PSC line by MS pipeline running along Rajbhavan road & Cubbon road,

600mm dia water supply line by MS pipeline along Millers road.

Immediate / Priority Objectives - by December 2008

Page 24: Plan Bengaluru 2020 1

Water & Sanitation

Objectives ProgressReplacement of major leaking lines

600 dia wate600 mm dia water supply feeder line in Bellary Main road from Pafrom Palace road to Giriyas Centre600 mm dia MS line in place of leaking 600 mm dia PSC line (2nd Stage line) from SouthendCircle up to Dwarakanath Bhavan KR RoadReplacement of 450 mm dia CI line by MS line at the junction of Victoria Road & Cambell Road in front of Life Style upto Toyota ShowroomShifting of water and sanitary lines due to road widening, construction of under passes, metro etcShifting of 300 mm dia NP3 Class S & S RCC pipeline at Bellary road at CBI road junction to Sanjaynagar road cross & 5th main road Ganganagar to 5th main roadShifting of 100 & 150 mm dia CI line Ananda Raofly over to KR circleShifting of 450 mm dia MS & 200, 150, 100 mm dia water supply lines in lieu of existing water supply lines at RC college junction along Race course roadShifting of 100mm, 200 mm dia DI water supply lines in lieu of existing water supply lines at RC college junction along Race course roadShifting of 100mm, 150 mm, 200mm, 450 mm diaDI water supply lines at Ananda Rao circle to Basaveshwara circleShifting of 600 mm dia MS water supply line in lieu of existing water supply lines at RC college upto Maharanis college circle Shifting of 600 mm dia MS water supply line in lieu of existing water supply lines from Maharanis college circle to Old central jail.Shifting of existing water supply line by 450 mm dia MS water supply line at Palace road and Sheshadri road junction in lieu of existing water supply lines

Immediate / Priority Objectives - by December 2008

Page 25: Plan Bengaluru 2020 1

Water & Sanitation

Objectives ProgressShifting of water and sanitary lines due to road widening, construction of under passes, metro etc

Shifting of existing water supply line by 450 mm dia MS water supply line at Palace road in lieu of existing water supply lines Shifting of existing water supply line by 250 mm dia MS water supply line in lieu of existing water supply lines at RC college to Maharanis college circleShifting of 100 mm, 150 mm & 200 mm dia water supply pipelines at Sheshadri roadShifting of 200 mm & 100 mm dia water supply lines to the foot path of 80 ft. Road on either sides of footpath from IIPM to Kalavathi KalyanaMantapa junctionShifting of 225 mm dia SW pipe line to the footpath of 80ft Road on either sides of footpath from IIPM to Kalavathi Kalyana Mantapa

Major improvement works Providing water supply facilities to Begur Village Ward No. 11 BommanahalliProviding & laying and linking of 300 mm diaFeeder Main line on CBI Road, in Ganga Nagar area coming under R.T. Nagar S/stn.,Providing 300 mm dia & 225 mm dia SW line in Austin Town

Rehabilitation of trunk sewers in K&C Valley To convey the sewage to the K & C Valley STP and to avoid the flow into the SWD, which leads to Bellandur tank the following works proposed

Replacement of 900/1200mm dia by 1800mm diasewerline at 14th Main HSR for a length of 180 RMTReplacement of 900/1200mm dia by 1800mm diasewerline at Agaram for a length of 85 RMTReplacement of 900/1200 by 1800mm diasewerline across the HSR Ring Road by Trenchless for a length of 50 RMTReplacement of 900/1200mm dia by 1800mm diasewerline for a length of 215 RMT at Cambridge Layout, IndiranagarWork of realignment of 900mm dia RCC sewer line at Gangadhara Chetty Road near Ulsoor Lake for a length of 200 RMT

Immediate / Priority Objectives - by December 2008

Page 26: Plan Bengaluru 2020 1

Water & Sanitation

Objectives ProgressRehabilitation of trunk sewers in K&C Valley

To convey the sewage to the K & C Valley STP and to avoid the flow into the SWD, which leads to Bellandur tank the following works proposed

Work of rehabilitation of 1800 / 2000 mm diaoutfall sewer line at Challaghatta Village for a length of 50 RMT

Providing and laying 450/600/800mm dia sewer from Magrat Road to Infant Jesus Church along Victoria Road for a length of 2000 RMT

Rehabilitation of trunk sewers in V Valley

Work of RCC wet well at Kempambudhi Lake for segregation of sewage in SWD to avoid ingression into the Kempambudhi Lake

Integrated water Management (Reuse of Lake Water), Environment action plan works & CWSS Stage – IV, phase - II

Vrishabhavathi Valley -180 MLD/105 MLD/135 MLD

Lakes Bellandur - 60 MLD

Nagavara 30 MLD

Kalkere/ Raja Canal 20 MLD

Kengeri - 30 MLD- Rs.100.00 Crores K.R.Puram - 20 MLDK&C Valley - Varthur - 300 MLD- Rs.900.00

Crores Koralur - 50 MLDJakkur, Begur, Puttenahalli (JP Nagar), Madavara, Doddabommasandra, Voderahalli, Hulimavu, Dorkere etc.

Immediate / Priority Objectives - by December 2008

Page 27: Plan Bengaluru 2020 1

Water & Sanitation

Infrastructure Projects – Repairs / Capacity Expansion / Addition

Objectives ProgressProviding Cauvery water to the former CMC wards

Commissioning of Cauvery water supply to ward No. 1, 2 & 18 of the erstwhile K. R. Puram CMC (2600 house holds)

Procurement of Combination Machines and setting up of R.W.H. Theme ParkProcurement of 15 Nos. of 6,000 litres capacity Combination Machines (to carry 3,000 litres of water or 3,000 litres of sewage) to be mounted on suitable chassis to be supplied by the BoardRain Water Harvesting Theme Park at JayanagarRain Water Harvesting to Cauvery Bhavan, ‘D’Block

Setting up of R. W. H. Theme Park Project to introduce 24 x 7 Water Supply

Replacement of major leaking lines600 mm dia CI pipeline by MS pipeline from Kamakshipalya Tank bund to KHB Bus stop along Magadi road600 mm dia CI pipeline by MS pipeline at Tumkur road at 4 places27” dia CI /PSC pipeline by MS pipeline at Rajkumar road Rajajinagar at 3 locations400 mm dia CI pipeline by 450 mm dia MS pipeline from Sirsi circle to 9 ML, GLR along Binny Mill road600 mm dia PSC pipeline by MS pipeline from Hama Sagara Hotel to Havanur circle in Basaveshwranagar600 mm dia CI pipeline by MS pipeline from Beggars colony upto 5th block GLR Nagarabhavi600 mm dia pipeline by MS pipeline at Bellaryroad to Side Palace Compound.300 mm dia CI pipeline by MS pipeline at Sanjayangar main road300 mm dia CI pipeline by MS pipeline at 5th

main Ganganahalli200 mm dia CI pipeline at Bellary road near HMT Bhavan300 mm dia CI pipeline at BEL road

Immediate / Priority Objectives - by March 2009

Page 28: Plan Bengaluru 2020 1

Water & Sanitation

Objectives ProgressReplacement of major leaking lines

600 mm dia PSC/ CI pipeline by MS pipeline from Millers road along Bore Bank road upto Pottery town675 mm dia PSC / CI pipeline by 700 mm dia MS pipeline Manipal Centre upto Aero Engine along Ulsoor main road & Old Madras road upto GLR600 mm dia pipeline by MS pipeline from Benneganahallybridge upto ITPL along White Field 300 mm dia CI pipeline by MS pipeline 100’ ring road 17th main Koramangala from St Johns college to 50’ road signal

300 mm dia Sarjapura road from St John signal to Kuduremukhcolony450 mm dia pipeline by MS pipeline from 1st main Koramangala& Sarjapur road upto 17th main Koramangala along service road

450 mm dia PSC pipeline by MS pipeline at 46th cross from 5th

block Jayanagar to 9th block Jayanagar450 mm dia PSC pipeline by MS pipeline at Someswaranagarmain road300 mm dia CI pipeline by MS pipeline at Housr road from NIMHANS to VIGNANA Hospital450 mm dia PSC pipe line by MS pipeline at BTS road, Opposite to PWD Quarters450 mm dia PSC/CI pipeline by MS pipeline from D’souza circle up to ISRO along Victoria Road & Old Air port road600 mm dia PSC pipeline by MS pipeline at 100’ ring road BTM 2nd stage.300 mm dia CI pipeline by DI pipeline at 46th cross from Field office to 24th main under J.P Nagar.200 mm dia PVC pipeline by DI pipeline at 14th cross, JP Nagar II phase.300 mm dia pipeline @ Kastuabangar Chamarajpet.Replacing 675 mm dia PSC /CI pipeline with MS at 30th main, Banashankari II Stage.600 mm dia PSC/CI line by MS pipeline from Balabrooie gate to Mount Carmel College along Palace road.27’ PSC line by MS pipeline running along Rajbhavan road & Cubbon road600mm dia water supply line by MS pipeline along Millers road

600 dia wate600 mm dia water supply feeder line in BellaryMain road from Pafrom Palace road to Giriyas Centre

600 mm dia MS line in place of leaking 600 mm dia PSC line (2nd Stage line) from Southend Circle up to DwarakanathBhavan KR RoadReplacement of 450 mm dia CI line by MS line at the junction of Victoria Road & Cambell Road in front of Life Style upto Toyota Showroom

Immediate / Priority Objectives - by March 2009

Page 29: Plan Bengaluru 2020 1

Water & Sanitation

Objectives ProgressShifting of water and sanitary lines due to road widening, construction of under passes, metro etc

Shifting of 600 mm dia MS water supply line in lieu of existing water supply lines from Maharanis college circle to Old central jail. Shifting of existing water supply line by 450 mm dia MS water supply line at Palace road and Sheshadri road junction in lieu of existing water supply lines. Shifting of existing water supply line by 450 mm dia MS water supply line at Palace road in lieu of existing water supply lines. Shifting of existing water supply line by 250 mm dia MS water supply line in lieu of existing water supply lines at RC college to Maharanis college circleShifting of 200 mm & 100 mm dia water supply lines to the foot path of 80 ft. Road on either sides of footpath from IIPM to KalavathiKalyana Mantapa junction.

Rehabilitation of trunk sewers in K&C Valley To convey the sewage to the K & C Valley STP and to avoid the flow into the SWD, which leads to Bellandur tank the following works proposed

Work of 1200mm dia by 1800mm dia sewerlineat Central Silk Board for a length of 35 RMT

Replacement of 900/1200mm dia by 1800mm dia sewerline at Indiranagar for a length of 30 RMT.Replacement of 900/1200mm dia by 1600mm dia sewerline for a length of 30 RMT at Adharsha Theater

Replacement of 300/450/600mm dia by 600mm dia sewerline for a length of 700 RMT from Jaraganahali lake to 100 feet Ring RoadReplacement of 900/1200mm dia by 1800mm dia sewerline for a length of 170 RMT from Shastrinagar up to Cambridge Layout

Public tapsRemoval of public taps

Replacement of old water meters

There are 5,40,000 house service connections in the city. All these connections are provided with water meters. As a policy matter it is decided to replace the working water meters for more than 7 years period at the Board’s cost to i ll i

Immediate / Priority Objectives - by March 2009

Page 30: Plan Bengaluru 2020 1

Water & Sanitation

Objectives ProgressWorks to be completed in the former C.M.C. Areas for providing water supply network, feeder mains & sewerage net

Hoodi GLR to ITPL main road – 2.0 Km of 800mm dia pipeline. 1.0Km is balance, permission awaited from PWD. [Hoodi road, ITPL road.]Hoodi Jn to Hope farm Jn – 1.9Km of 700 to 600mm dia 1.90Km pipeline is pending, BDA permission is awaited. [Hope farm surroundings]ORR at Bangalore University to Kengeri – 2.51Km of 1000 to 600mm dia pipeline, 1.65Km of 1000mm, 0.25Km of 900mm dia, 0.16Km of 800mm dia and 0.96m of 600mm dia are balance. BDA permission is awaited.[Ullala, Mariyappanapalya, Basaveswara L/O, Doddabasthi, KengeriProviding Under ground drainage facilities to the area under erstwhile Kengeri TMC - Amount put to tender Rs. 2553.00 LakhsProviding Under ground drainage facilities to the area under erstwhile Yelahanka CMC – Amount put to tender Rs. 2030.00 Lakhs

Providing Cauvery water to former CMC wards

Commissioning of Cauvery water supply to Ward No. 9 & 10 of the erstwhile Bommanahalli CMC (5000 house holds);Commissioning of Cauvery water supply to Ward No. 9,10,14,15,16 of erstwhile of Dasarahalli CMC (4500 house holds);Commissioning of Cauvery water supply to Ward No. 22 & 24 of erstwhile of Dasarahalli CMC (2000 house holds);

Sinking of Bore wells in former CMC areas

Installation of 100 Sodium hypochlorite equipments

Replacement of major leaking lines

200 mm dia pipeline by DI pipeline at Shakambarinagar, Kanakapura road.450mm dia MS water supply line at 46th Cross, Jayanagar.

Shifting of pipelines in view of Road widening

450 mm dia , 300 mm dia NP3 RCC pipeline in place of existing 450 mm dia SW line (shifting ) and 225 mm diaSW line from SWD to RON INN all along the proposed Ring road. 400 mm dia RCC NP3 sewer line along 6th cross from 6th main to 4th main in SR Nagara and linking it to the existing 600 mm dia RCC sub main

Immediate / Priority Objectives - by March 2009

Page 31: Plan Bengaluru 2020 1

Water & Sanitation

Objectives ProgressShifting of pipelines in view of Road widening

9” dia UGDF to BDA L/o 3rd block, 6th block and Income Tax layout Ravi GYM Nagarabhavi.

300 mm dia SW sanitary pipeline inplace of 150 mm dia & 175 mm dia pipeline from Thimmiah road along Narayana Pillaistreet upto Nala road.300 mm dia SW sanitary pipeline inplace of 150 mm dia & 175 mm dia pipeline from Thimmiah road along Mackhan road uptoNala road.9” dia SW line from 80th cross to 82 cross near CWSS pipeline road, 58th cross to 66th cross, 1st stage Kumarswamy L/o.6” diaSW line Kumaraswamy L/o 6” dia by 9” dia SW line at 2nd & 4th

main Kumarswamy L/o, 2nd stage.water supply lines which are passing through UGD manholes adjacent to UGD manholes of water supply at Byrappa block, 14th cross, Shastrinagar225 mm dia SW line inplace of 6” dia SW line and reconstruction of damaged manholes at 1st & 2nd cross and 2nd

main 3rd cross, 3rd main 1st cross 6th main Ashwathakatte main road Kasthribanagar and providing 260 mm dia HDPE storm water drain at 8th and 10th main Kasthribanagar Chamarajpet.6” dia 9” dia SW line at Vinobha Badavane Nagendra block S/s.300 mm dia NP3 class S & S RCC line in storm water drain below the flyover across Airport road, HAL 2nd stage DomlurS/s.Water supply & UGD facilities to Kakatheya nagar, NaiduLayout.

Replacement of corroded pipelines100 mm dia DI line inplace of corroded 80 mm dia corroded CI pipe line at Dr. Rajkumar road, 10th C, D, E, F & G road and 75th

A B C crosses and 14th A & B cross 6th block, Rajajinagar.

100 mm dia DI line in place of corroded 80 mm dia corroded CI PVC pipeline at 10th , 12th & 13th main & cross roads K.P.Agrahara.100 mm dia DI pipeline at 3” dia corroded CI line in 6th , 7th , 8th , 11th A , 15th crosses and part of 4th main SR nagar ward No.77 100 mm dia DI pipeline inplace of 3” dia corroded CI line in II III, VI, VII main SR Nagar ward No. 77

Rehabilitation of trunk sewers in V - ValleyProviding 450mm dia line at Food Corporation of India Layout, Vijayanagar for a length of 450 RMT to convey the sewage to V. Valley STP and to avoid flow in SWD.Providing 450mm dia line at Hampinagar, RPC Layout for a length of 490 RMT to convey the sewage to V. Valley STP

Providing 450mm dia line at Dhobighat at Kempambudhi Lake for a length of 450 RMT to convey the sewage to V. Valley STP

Work of 900/1200mm dia line to convey the sewage generated from upstream area of Nayandanahalli lake for a length of 1700 RMT to avoid ingression of sewage into Nayandanahalli Lake

Immediate / Priority Objectives - by March 2009

Page 32: Plan Bengaluru 2020 1

Water & Sanitation

Objectives ProgressRehabilitation of trunk sewers in K&C – Valley

Providing and laying 1200mm dia NP4 class sewer across JC Road near Cargo Tarpaulin complex by trenchless technology for a length of 80 RMT to convey the sewage to K & C Valley STP.

Providing and laying 1200mm dia RCC sewer to link to existing 900mm dia sewer across HSR Ring Road by the side of Agaram Lake for a length of 20 RMT to convey the sewage to K & C Valley STP

Providing and laying 450mm dia NP3 class sewer line by shifting existing damaged 400mm dia sewer running below the building to along the road at Siddapura of Someshwaranagar, Wilson Garden for a length of 450 RMT to convey the sewage to K & C Valley STPProvidng and laying 900mm dia NP3 class RCC sewer line by shifting existing damaged NP2 class 900mm Dia sewer running below the buildings along Diwakar Hospital, J.P. Nagar for a length of 206 RMT to convey the sewage to K & C Valley STPProviding and laying 450mm dia submain via Hutchins road from Devis Road to Pottery Road for a length of 380 RMT to convey the sewage to K & C Valley STP

Rehabilitation of trunk sewers in Hebbal Valley

Providing and laying 450mm dia submain at MLA Layout, Ganganagar for a length of 513 RMT to convey sewage to Hebbal Valley STP.

Providing and laying 450mm dia sub-main Krishnappa Layout to Sanjayanagar for a length of 500 RMT to convey sewage to Hebbal Valley STP.

Providing and laying 450mm dia submain at Kariyannanapalya for a length of 350 RMT to convey sewage to Hebbal Valley STP.

Extension of 450mm dia submain in 80 feet Road Sanjayanagar for a length of 500 RMT to convey sewage to Hebbal Valley STP.

Providing and laying 450mm dia submain from Ambedkar Medical College to DevarajeevanahalliMain Road for a length of 2800 RMT to convey sewage from BBMP area to Hebbal Valley STP.

Immediate / Priority Objectives - by March 2009

Page 33: Plan Bengaluru 2020 1

Water & Sanitation

Objectives ProgressIntegrated water Management (Reuse of Lake Water), Environment action plan works & CWSS Stage – IV, phase - II

Vrishabhavathi Valley -180 MLD/105 MLD/135 MLD

Lakes Bellandur - 60 MLD

Nagavara 30 MLD

Kalkere/ Raja Canal 20 MLD

Kengeri - 30 MLD- Rs.100.00 Crores K.R.Puram - 20 MLDK&C Valley - Varthur - 300 MLD- Rs.900.00

Crores Koralur - 50 MLDJakkur, Begur, Puttenahalli (JP Nagar), Madavara, Doddabommasandra, Voderahalli, Hulimavu, Dorkere etc.

Immediate / Priority Objectives - by March 2009

Page 34: Plan Bengaluru 2020 1

Water & Sanitation

Objectives ProgresProviding Cauvery water to the former CMC wards

Procurement of Combination Machines and setting up of R.W.H. Theme Park

Procurement of combination machines

Setting up of R. W. H. Theme Park

Providing water supply network, feeder mains & sewerage net work in the former C.M.C. Areas

Replacement of major leaking lines

Shifting of water and sanitary lines due to road widening, construction of under passes, metro etc.

Major improvement works

Replacement of corroded pipelines

Rehabilitation of trunk sewers in K&C Valley

Rehabilitation of trunk sewers for abating sewage flow into K&C Valley

Model ward – BBMP ward No. 100 (Sanjaynagar) selected to make it as Model ward for water supply & sanitary system

Construction of New GLRs in BBMP area

Sinking of Bore wells in the former CMC areas

Rehabilitation of trunk sewers in V Valley

Rehabilitation of trunk sewers in K&C Valley

Rehabilitation of trunk sewers in HebbalValley

Integrated Water Management (Reuse of lake water), Environment action plan works

Infrastructure Projects – Repairs / Capacity Expansion / AdditionMedium Term Objectives - April 2009 -2012

Page 35: Plan Bengaluru 2020 1

Water & Sanitation

Objectives ProgressProcurement of Combination Machines

Procurement of 45 Nos. of 6,000 litres capacity Combination Machines (to carry 3,000 litres of water or 3,000 litres of sewage) to be mounted on suitable chassis to be supplied by the Board

Major improvement worksProviding under ground drainage facilities to Peenya Ward No. 11 of Dasarahalli

Replacement of Corroded pipelinesReplacement of corroded pipes in Bharathinagar area.

Replacing 110 mm dia PVC line by 100 mm dia DI pipe to avoid contamination at Austin Town.

Rehabilitation of trunk sewers for abating sewage flow into K&C Valley:

Providing 1200 mm dia NP 3 class sewer inplace of existing 900 mm sewer from Krishnappa Garden to Silk Board at MadivalaProviding and laying 600 mm dia NP 3 class from Akkipetcircle to Super Talkies, Cotton pet including pipe laying by trenchless technology of 100 Rmt

Replacing existing 450 mm dia NP 2 class pipe at Puttenahalli from Sharada Layout to Ganesha Temple by 600 mm dia NP 3 class RCC pipe due to existing invert levels and sewage entry in to Jaraganhalli lake

Providing 1200 mm dia NP 3 class sewer by replacing the existing 900 mm dia NP2 class sewer in order to avoid over loading of the existing sewer in J P Nagar from Manthri Apartments to Ranka Apartments on BannerghattaroadReplacing existing 450 mm dia NP 2 class pipe at Taverekere by 450 mm dia NP 3 class RCC pipe due to the crown corrosion of the existing pipeline Providing and laying 600 mm sewer from Agaram to Agaram Pump house to convey the sewage generated in HSR layoutProviding 50 MLD pumping station to pump the sewage generated in Koramangala and ST Bed areas and entering in to Bellandur lake by intercepting the SWD to K & C Valley STP including providing Civil, Mechanical, Electrical equipment and rising mainStrengthening of the existing 1500 mm dia NP 2 class existing sewer at ISRO layout after the detail conditional assessment of the existing pipeline Providing and laying 900 mm dia NP 3 class inplace of existing 600 mm dia NP 2 class pipe in SWD from Wheelers Road to Gandhi gram Pottery town through

Medium Term Objectives - April 2009 -2012

Page 36: Plan Bengaluru 2020 1

Water & Sanitation

Objectives ProgressModel Ward

BBMP ward No. 100 (Sanjayanagar) has been selected to make it as Model ward for water supply & sanitary system. In the first instance it is proposed to lay feeder main, identification and regularization of unauthorized water supply connection and laying of sanitary lines in lieu of Old / Silted smaller dia sanitary lines.

Construction of New GLRs in BBMP area

Ten ground level reservoirs at an approximate cost of Rs. 50.00 Crores has been proposed for construction at various locations of BBMP area. Tenders are invited for the same with the last date for requisition of E-Tender forms upto 10.11.2008 and submission on 12.11.2008

Replacement of major leaking lines600 mm dia pipeline by MS pipeline from Mekri circle upto CJF400 mm dia CI pipeline by MS pipeline inside Defence Bellary road

Shifting of pipelines in view of Road wideningShifting 700 mm dia MS pipeline from HGR S/s uptoGuard street / Cubbon road junction along Infantry road.Shifting of 600 mm dia MS water supply line feeding to HalasurShifting of 250 mm dia MS water supply line from 4 MG reservoir at HGR Shifting of 200 mm dia MS water supply outlet line from OHT across Sankey road Shifting of 300 mm dia MS water supply inlet line OHT across Sankey roadShifting of 600 mm dia MS water supply line feeding to IndiranagarShifting of 100 mm dia MS water supply line

Shifting 700 mm dia MS water supply line in IndiraGandhi musical fountain premises and linking it to 675 mm PSC line along Sankey roadShifting of 450 mm, 150 mm & 100 mm dia water supply pipelines at 24th main, 15th cross, J. P. NagaraShifting of 9” & 12” dia UGD pipelines at 24th main, 15th cross, J. P. NagaraShifting of 450 mm, 300 mm, 250 mm and 100 mm water supply pipelines and valves at Kadirenahalliand Ring road junction.Shifting of 9” dia UGD pipeline at Kadirenahalli and Ring road junction.

Medium Term Objectives - April 2009 -2012

Page 37: Plan Bengaluru 2020 1

Water & Sanitation

Objectives ProgressShifting of pipelines in view of Road widening

Shifting of 600 mm, 450 mm, 300mm, 150 mm & 100 mm dia water supply pipelines and valves at Checkpost of Hosur road (Sarjapura road) infront of Koramangala S/s.

Shifting of 150 mm, 100 mm dia DI water supply line at Hosur road HP petrol bunk to Bharat Petrol bunk

Shifting of 9” dia SW line with 12” dia RCC line at Hosurroad main road HP petrol bunk to Bharat Petrol bunk

Shifting of 300 mm dia SW line from Shooly circle to Adugodi police station along Luskar road

Shifting of different dia of MS/CI/DI water supply line from Shoolay circle to opp NDRI all along Laskar Hosur road

Shifting of 4” dia, 6”dia, 12” dia, 18” dia & 24” dia CI line by MS line for widening of Hosur road

Shifting of 457 mm dia MS feeder main in place of existing 450 mm dia CI/ PSC line from Chandra layout Reservoir up to Bangalore University gate via Mysore road

Major improvement works100 mm dia DI line in place of damaged 110 mm dia PVC line at MCT slum attached to Sanjayanagar slum.

12” dia SW line from Siddanna lane to Avenue road junction along Nagarthrpet main road

250 mm dia feeder main from Ramakrishna Ashrama to Kempegowda main road along Hayavadana road , Syndicate bank circle to improve W/S to Bhavaninagar.300 mm dia SW sanitary pipe line inplace of 6” dia SW P/L along road way & B.No.18th street, Shivajinagar.

450 mm dia RCC NP3 class sanitary from murugon pillaistreet along Nala road linking it to the existing 600 mm dialine at Armstrong road .450 mm dia NP3 class S & S RCC pipeline at Cholanayakanahalli from Hospital at sub main.

80 mm dia PVC providing and laying 100 mm dia & 150 mm dia DI pipe at Old Byappanahalli, Jeevanahalli park area & surrounding areas.300 mm dia water supply line from 2nd cross to 100’ road Ejipura main road to improve water supply to Ejipura area.

300 mm dia SW line from J K.Pura main road to 1st main Vinayakanagar

Medium Term Objectives - April 2009 -2012

Page 38: Plan Bengaluru 2020 1

Water & Sanitation

Objectives ProgressIntegrated water Management (Reuse of Lake Water), Environment action plan works & CWSS Stage – IV, phase – II

Vrishabhavathi Valley -180 MLD/105 MLD/135 MLD

Lakes Bellandur - 60 MLD

Nagavara 30 MLD

Kalkere/ Raja Canal 20 MLD

Kengeri - 30 MLD- Rs.100.00 Crores K.R.Puram - 20 MLDK&C Valley - Varthur - 300 MLD- Rs.900.00

Crores Koralur - 50 MLDJakkur, Begur, Puttenahalli (JP Nagar), Madavara, Doddabommasandra, Voderahalli, Hulimavu, Dorkere etc.

Medium Term Objectives - April 2009 -2012