Planetary Sciences Subcommittee of NAC MEP Update
Doug McCuistion Director, Mars Exploration Program
26 January 2011
3
Program News
• New Mars Program Scientist – Dr. Mitch Schulte reports in February
• Joint Program Documentation
– Executive Program Plan ready for signature cycle mid-February – Memorandum of Understanding to State Department by March
• NASA Program Implementation Review (PIR)
– Occurs every other year to evaluate and re-authorize the MEP – Scheduled for April/May – Review Board Chair (Dennis Andryuck/GSFC) aboard
• Team and Terms of Reference being developed
• Mars Program Update forum at National Air & Space, Jan 13th
3
4
Mars Program Update From “Follow the Water” to “Seeking Signs of Life”
4
A public forum at the National Air and Space Museum (NASM) on January 13, 2011, to review the evidence of water on Mars, current Mars missions and future Mars activities.
Three panels were moderated by Dr. John Grant (NASM Chair, Center of Earth and Planetary Studies):
1) Follow the Water: What Have We Found? 2) How Do We Do It? Status of Current Missions 3) Seeking Signs of Life: What Will the Future Bring?
Planetary Science Division panelists included Doug McCuistion, Michael Meyer and Mary Voytek. Other panel members included Jack Mustard (Brown University), Steve Squyers (Cornell University), Marcello Coradini (ESA) and Jennifer Eigenbrode (GSFC).
Standing room attendance at the event was over 200, including students from Stuart-Hopson Middle School and the Whittier Education Campus STEM School. The event was carried live on NASA TV and on Livestream. As of Jan. 24 Livestream reported over 98,000 viewer minutes, and 4425 viewers on http://youtube.com/nasatv.
The Mars Update Program was carried live and is archived at http://www.livestream.com /mars
5
Mars Exploration Program Missions
• Mars Odyssey – orbiter and its subsystems and the THEMIS, HEND & NS continue to perform.
• Mars Reconnaissance Orbiter – orbiter and its subsystems are performing nominally
• Mars Express – spacecraft operations are nominal—extended mission through 2012.
• Mars Exploration Rover Project – Spirit – Spirit remains silent, no communication has been received since Sol 2210
(March 22, 2010). It is likely that Spirit has experienced a low-power fault and has turned off all sub-systems. Probability of recovery is diminishing.
– Opportunity –Opportunity is headed toward Endeavor Crater. Total odometry 26.7km (about 16.6 miles)
• Mars Science Laboratory – Rover fully assembled and environmental test begins with vibe on 14 February.
• Mars Atmosphere and Volatiles Evolution (MAVEN) – Passed KDP-C and officially in Implementation Phase (Phase C)
• 2016 TGO – Passed ESA’s System-PDR in December 2010; KDP-A for NASA portion scheduled for March 30th.
• 2018 Dual Rovers – Design concept trade studies still underway
5
7
The MSL-Curiosity Rover Mission
Rover Width: 2.8 m Height of Deck: 1.1 m Ground Clearance: 0.66 m Height of Mast: 2.2 m
DAN
REMS
ChemCam Mastcam
RAD
MAHLI APXS Brush Drill / Sieves Scoop
MARDI
Objectives:
•Assess the biological potential of the site by investigating any organic and inorganic compounds and the processes that might preserve them
•Characterize geology and geochemistry, including chemical, mineralogical, and isotopic composition, and geological processes
•Investigate the role of water, atmospheric evolution, and modern weather/climate
•Characterize the spectrum of surface radiation
Curiosity’s primary scientific goal is to explore and quantitatively assess a local region on Mars’
surface as a potential habitat for life, past or present
8
MSL Development Progress • Overall status:
– On track for shipment of spacecraft to KSC in June, and on-time launch in November/December launch window. Current technical issues in-family for this phase of development.
• SA/SPaH Development – Organic contamination of drill bit identified during manufacturing process – Drill force sensor anomalous performance
• SAM – Series of Wide Range Pump problems associated with bearing design and materials resolved – SAM now fully integrated into rover
• Rover Battery – Contamination of percussive weld bead on header/picket assembly – Pursuing rebuilding and reworking header assemblies for flight/flight spares
• Budget – Unacceptably low project reserves going in to FY 2011 – Agency PMC approved augmentation in Dec ‘10 to restore budget reserve posture to ensure successful
development/test completion; reserves partially held by HQ
• Lessons Learned – Numerous IG and GAO reviews/audits underway – Internal NASA Lessons Learned activity jointly with OCE will start up soon
9
Curiosity Milestones
• Environmental test sequence begins: 14 Feb, 2011
• Call for Participating Scientist proposals – ~18 expected selections – 4 ½ years duration – Proposals due March 22, 2011
• Launch Site Selection:
– Last workshop in May; early summer down-select
• Launch Window opens: Nov. 25, 2011
• Landing on Mars: Aug. 2012 9
11
Candidate Landing Sites
Eberswalde Crater (24°S, 327°E, -1.5 km) contains a clay-bearing delta formed when an ancient river deposited sediment, possibly into a lake.
Gale Crater (4.5°S, 137°E, -4.5 km) contains a 5-km sequence of layers that vary from clay-rich materials near the bottom to sulfates at higher elevation.
Mawrth Vallis (24°N, 341°E, -2.2 km) exposes layers within Mars’ surface with differing mineralogy, including at least two kinds of clays.
Holden Crater (26°S, 325°E, -1.9 km) has alluvial fans, flood deposits, possible lake beds, and clay-rich sediment.
12
R9.0B
`
MSL ATLO Schedule: FY’11
Cruise Stage
Descent Stage
Oct ’10 Dec ’10 Feb ’11 Apr ’11 Jun ’11 Aug ’11 Oct ’11
Stac
k Ve
hicl
e Ve
hicl
e Fu
elin
g Fi
nal M
P M
easu
rem
ents
De-
Stac
ked
Vehi
cle
Func
tiona
l Tes
ting
MM
RTG
Ele
ctric
al C
heck
out
Pack
, Shi
p, U
npac
k
Vehi
cle
Clo
seou
t
Mar
gin
Mar
gin
Pack, Ship
Veh
icle
C
lose
out
Mar
gin
Rover
PARts
Vibe
R8A
ST9:Destacked Commence LV
Encapsulation
R9.0A
Support DS
Re-Integ D
eSta
cked
Fun
ctio
nal T
estin
g
Turre
t
Pete
’s M
argi
n
RVR Function Testing
#2
CSA
s
FM R
BAU
Surface STT
RIP
A SA
M
A-R
BAU
CBE Delivery Date
DIM
U
R9.3A R9.2A
Rew
ork
EIP
MOB Rework FM RCE-A Install FM RCE-B Install RREU Swap (DS2RVR) RPAM HPCU Rework RAD Install ChemCam BU Install
Rew
ork
Perio
d 1
DPA
Ms
SAM Install & EIP RBAU Install & EIP ChemCam BU Rework (CC) RIPA Install, Loading & EIP HazCam Covers Install Mobility Energy Absorber Install
RVR “Rework” Period 1 RVR “Rework” Period 2
RR
EU B
oard
s
BU
D
ZMC Install (TBR) FMRBAU Install
RVR “KSC Closeout” Period 2
Func
t
RVR
/ D
S Fi
t Che
ck
PDV
Func
tiona
l Tes
ting
Cam
Cal
Rew
ork
Perio
d 2
Hol
iday
DeS
tack
ed F
unct
iona
l Tes
ting
Pete
’s
Mar
gin
RA
Red
eliv
ery
Dril
l
Dril
l Tu
rret &
R
egre
ssio
nt R
VR M
P
D
eSta
cked
Fun
ctio
nal T
estin
g
Ship
: 5/1
1/11
Ship
: 6/2
2/11
ST6 ST8B ST7B ST5b ST8A ST8C ST7A
PWR Functional Bus Transient EDL EMI / EMC
PDV Functionals:
EMC
R9.1A
R8B
Multiple Shift Activity
Using PARTs RCE
15
2013 MAVEN
• MAVEN was confirmed on October 4, 2010 – Phase C began on November 1, 2010 – All Phase C/D contracts signed – Establishing EVM baselines
• Green on all metrics – Risks include HEPS card single point failures and testing, FSW staffing at
Lockheed, issues identified in JUNO and GRAIL ATLO • Starting to build and test instrument, spacecraft and ground systems
hardware and software – Engineering models, test articles, etc.
• Education and Public Outreach Implementation Plan on track • Responsibility
– PI: Bruce Jakosky, LASP – Project Mgt: Dave Mitchell, GSFC – Partners: GSFC, Lockheed Martin, LASP, SSL Berkeley, JPL
Technical Last This Month Month
G G
Programmatic Last This Month Month
G
Cost Last This Month Month
G
Overall Last This Month Month
G
Schedule Last This Month Month
G G G G G
16
Joint Mars Exploration Program A New Kind of SMD International Partnership
This is a partnership between programs – Historically, partnership with ESA is on a single mission basis – Quid pro quo is balanced across multiple missions, not within a single
mission – Leadership of missions is negotiated and alternated – Partnership leverages resources, enabling increased mission content and
launch frequency over a period of years – Sharing risk and responsibility of technology developments (within ITAR) – Each mission’s risks and successes affect future missions, regardless of
who is the “mission lead” • Intertwined critical paths • Technology and schedule risk
Overall risk posture increases when partnering at program level
–but– The benefits outweigh the risks
17
NASA-ESA Joint Mars Program Management Structure Program Initiation and Mission Formulation
• Management structure established – Joint Mars Executive Board—meets regularly – Joint Engineering Working Group(s) for future mission concepts – Joint Mars Architecture Review Team (jMART) established
• Bi-Lateral (Dr. Southwood and Dr. Weiler)—meets regularly
• 2016 mission project office established within Mars Program Office at JPL
– ESA orbiter mission under ExoMars Program Office • Overall governance, documentation, review and approval processes, etc.,
maturing – Presented to NASA Agency Program Management Council in Oct ‘10
• MSR working group established in April 2010
17
18
2016 ExoMars/Trace Gas Orbiter (TGO)
Mission Overview—ESA Mission Lead; NASA Science Lead: Detect, characterize, and locate sources of atmospheric trace gases and isotopes Provide telecommunications relay to/from surface assets [ESA objective] Demonstrate European capability to perform EDL
NASA roles/deliverables 4 Orbital science instruments – MATMOS, EMCS, MAGIE, HiSCI Science-Relay-Aerobraking (SRA) Ops Facility & Science Center) Electra UHF Relay Radio Launch vehicle and services; Atlas-V 431-class performance Project Categorization: Category 2 ($250M-$1B; Medium Priority)
ESA roles/deliverables Orbiter Spacecraft bus EDL demonstrator module (EDM mass ≤ 600kg including margin) Science instrument for orbiter (Belgium)
Implementation details Joint orbital science team Joint mission operations; ESA/ESOC leads S/C ops; NASA leads science, relay, and
aerobraking (SRA) ops Shared ground network support; ~50/50 guideline DSN and ESA Network support
Key Milestones KDP-A: March’11 KDP-B: July’11; KDP-C/Confirmation Review: Feb’12 Jan’16: Launch from KSC Oct-Nov ‘16: Deploy EDL Demo (EDM) followed by MOI and aerobraking start Mar-Jun’17: Start 1 Mars year of science observations in 400 km circular orbit Jan’19: Start Relay phase for 2018 rover
MATMOS Solar occultation Fourier transform IR spectrometer
NOMAD Occultation + mapping IR, Vis, UV spectrometer (supplied by EU)
EMCS Thermal IR spectrometer
MAGIE Wide-angle Vis-UV camera
HiSCI High resolution , colour, stereo camera
19
• Locate atmospheric source regions to further characterize the surface/subsurface sources
– Identify possible locales for future surface/subsurface exploration
=> These goals can be summarized as: Detection, Characterization, Localization
2016 ExoMars/Trace Gas Orbiter (TGO) Science Objectives
19
• Detect and survey trace gases and their isotopologues in the Mars atmosphere in order to understand the nature of their subsurface/surface sources: Biochemical and geochemical?
– Including but not limited to H2O, HO2, H2O2, NO2, N2O, CH4, C2H2, C2H4, C2H6, H2CO, HCN, H2S, OCS, SO2, HCl, CO, O3
– Confirm their presence and variability over all Mars seasons – not just methane!
• Characterize the processes by which methane, other trace gases, and aerosols interact and are possibly removed from the atmosphere − H2O, CO2, ice and dust aerosol
20
2018 Dual Rovers Mission
Touchdown Through Initial Deployments Stand-Up and Egress
Sky Crane Maneuver
Cruise stage & aeroshell separation • Mars 2018 is 2nd mission of NASA-ESA Joint Mars Exploration Program
– Delivers to Mars surface the ESA ExoMars Rover and a proposed NASA Sample & Caching Rover
– NASA to provide launch/cruise/EDL for both rovers • Current conceptual design would maximize use of MSL-heritage Launch, Cruise, and EDL systems
• Mars 2018 Project is currently in Pre-Phase A – Working towards Mission Concept Review & issuance of
Formulation Authorization Document, in conjunction with Key Decision Point A (KDP-A) in late 2011/early 2012 • Note: ESA Rover has been under development for > 4 years. The
ESA ExoMars Project considers the rover maturity to be at PDR (Phase B->C transition) level
• Key Milestones – Apr. ‘11: NASA/ESA Interface Requirements Doc., Version 1 – Nov. ’11: Mission Concept Review (leads to KDP-A Jan. ’12) – KDP-A: Jan. ’12; KDP-B: Apr. ’13; KDP-C: Sep. ’14
ESA ExoMars Rover
NASA Rover
21
Mars Program Upcoming Events—FY11
MSL
2016/ETGO
1/26-27
MAVEN
Operating Missions
Program and Future Mission
Activities
January February March
Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4 Week 1 Week 2 Week 3 Week 4
CMC @ JPL
DPMC KDP-A @
HQ SRR @ JPL
01/19-21
TBD TBD
MAVEN QSR/PSG LASP IBR
03/31-4/1
MARS 2016 OWST MEETING @
JPL
03/15-16
MEX PHOBOS FLYBY
01/09
MEX RADIO SCIENCE TEAM
MEETING
03/14-15
2018 Architecture Update to ESA
01/15-16
2018 NASA-ESA Interface WKSHP
@JPL
2/7-10
E2E-ISAG Face-to-Face
(Tentative)
03/21-25 01/25
EXEC BOARD
02/15-16
2016 KDP-A
03/28
NASA-ESA BILAT
03/29-31
Radiological Contingency Planning Meeting
01/25-27
Radiological Contingency Planning Table-top Exercise
03/1-4
Ground Operations Review
03/7
Decadal Release @LPSC
03/07
PCA/PGM Plan
03/14
JMART #1
02/17-18
SIAD CONCEPT REVIEW
2/10
JPL Quarterly
1/31
JPEP TELECON PCA REVIEW
1/27
PSS
MSR Ground Rules/Assumptions WKSHP
FPR
1/19