Suisu
n Vall
ey R
d
Leveroni Rd
Napa St
8th S
t
Silverado Trl
Monticello RdDry Creek Rd
Wooden Valley Rd
Oak Knoll
Ave
Big Ranch Rd
Trower Ave
Jefferson St
TrancasSt
Soscol Ave
Hagen RdRedwood
Rd
3rdAv
e1st StCoombsville
Rd
Old S
onom
a Rd
Imola Ave
Airport
Rd
AmericanCanyon Rd
Shilo
h Rd
Birds Landing Rd
Pleasants
Valley Rd
Lewi
s Rd
Leis
ure
Town
Rd
VacaValley Rd
Foothill Dr Hawkins Rd
Peab
ody R
d
Binghampton Rd
Fry Rd
Elmira Rd
Merchant St
Brow
ns V
alley
Rd
Air Base Pkwy
Texas St
Texa
s St
Cement Hill Rd
Walt
ers R
d
Tabor Ave
Suns
etAv
e
Travis Blvd
Cordelia Rd
Beck
Ave
Gord
onVa
lley R
d
MankasCorner Rd
Abern
athy
Rd
OliverRd
RockvilleRd
Green Valley Rd
Ascot
Pkwy
Redwood St
Tennessee St
Springs RdSolano
Ave Benicia Rd
Lake Herma n Rd
2nd S
t
Gibson Canyon Rd
Red Top Rd
CordeliaRd
Columbus Pkwy
Marine WorldAfrica
Napa CountyAirport
Nut TreeAirport
TravisAFB
Yountville
Napa
AmericanCanyon
Vacaville
Fairfield
SuisunCity
Vallejo
Benicia
Sonoma
SearsPoint
BigBend
Schellville
Vineburg
BirdsLanding
Denverton
Montezuma
Dozier
Binghamton
CircleOaks
VichySprings
Rockville
Cordelia
NAPACOUNTY
SOLANOCOUNTY
Planned Improvements for Interstate 80Through Solano County Between Vallejo and Vacaville
Tennessee St toAmerican Canyon RdSol-80 PM 3.9 to PM 8.1Pavement Rehabilitation andInstall Median BarrierConstruction: Winter 2008 – Summer 2009
Truck Climbing LaneProjectSol-12 PM 1.5 to PM 2.8Add One Lane in the WB
Construction:Winter 2008 – Summer 2008
American Canyon Rdto 680/80 SeparationSol-80 PM 8.1 to PM 12.9Pavement Rehabilitation andInstall Median BarrierConstruction:Summer 2008 – Fall 2009
Red Top Rd to East of Air Base PkwySol-80 PM 11.4 to PM 20.1HOV Lanes andInstall Median BarrierConstruction:Spring 2008 – Fall 2009
Red Top Rd to East of Air Base PkwySol-80 PM 11.4 to PM 20.1T.O.S., Ramp MeteringImprovementsConstruction:Spring 2010 – Fall 2010
Rte 12 East to East of Air Base PkwySol-80 PM 15.4 to PM 20.1Pavement Rehabilitation
Construction:Spring 2009 – Fall 2009
East of Air Base Pkwyto Leisure TownSol-80 PM 20.1 to PM 30.6Pavement Rehabilitation
Construction:Spring 2008 – Fall 2009
DISTRICT 4 | A/V MULTIMEDIA GRAPHICS SVCS | CT1866 | 013008
Planned Improvements:Location, Descriptionand Project Timeline