    This data comes from the NERC database

    This workbook contains tables and figures from the Planned Outages section.The statistics are broken down by capacity and last stage blade length, and cover only

    200-1000 MW units. Where possible, units larger than 1000 MW have been shown separately.

    The statistics shown here are for the most recent 3 years of the NERC reporting period, 1996-1998.

    Name Type Description

    1 All Events worksheet Planned outages 200-1000 MW range - duration (day, week)

    2 Weeks chart x Cause group - all units from 200-1000 MWy Number of planned outages

    3 Days Detail chart x Duration (days) - 200-1000 MW units

    y Number of forced outages up to 100 days

    4 Summary worksheet Statistics summary by size group

    5 35 inches

    y Number of planned outages by week

  • 8/12/2019 Planned Outages 96-98

    2/27

    y Number of planned outages by week

    15 800-1000 MW worksheet Duration statistics by day and week for units with last stageblade length 25-35 inches, 800-999 MW capacity

    16 800-1000 MW (wk) chart x Duration (week) - units with capacity 800-999 MW,

    LSB length 25-35 inches

    y Number of planned outages by week

    17 >1000 MW worksheet Duration statistics by day and week for units with last stage

    above 1000 MW

    18 >1000 MW (wk) chart x Duration (week) - units with capacity above 1000 MW

    y Number of planned outages by week

  • 8/12/2019 Planned Outages 96-98

    3/27

    Planned Outages, 1996-1998

    Capacity 200-1000 MW

    Duration PO Events Duration PO Events

    days weeks

    0 46 0 259

    1 25 1 265

    2 29 2 246

    3 23 3 237

    4 46 4 159

    5 37 5 103

    6 53 6 947 48 7 84

    8 52 8 72

    9 54 9 41

    10 25 10 40

    11 29 11 27

    12 27 12 20

    13 30 13 15

    14 45 14 10

    15 49 15 5

    16 48 16 1

    17 23 17 7

    18 23 18 4

    19 21 19 2

    20 37 20 1

    21 37 21 2

    22 61 22 1

    23 33 23 124 23 24 1

    25 24 27 1

    26 26 28 127 33 31 1

  • 8/12/2019 Planned Outages 96-98

    4/27

    47 6

    48 11

    49 1650 12

    51 15

    52 10

    53 8

    54 8

    55 15

    56 5

    57 9

    58 1959 9

    60 12

    61 9

    62 9

    63 6

    64 4

    65 9

    66 6

    67 768 5

    69 4

    70 4

    71 5

    72 11

    73 5

    74 3

    75 8

    76 4

    77 3

    78 5

    79 7

  • 8/12/2019 Planned Outages 96-98

    5/27

    99 4

    100 2

    101 2104 1

    108 1

    109 3

    110 1

    115 1

    119 2

    121 1

    122 1

    123 1124 2

    127 1

    129 1

    132 2

    136 1

    139 1

    144 1

    149 1

    150 1155 1

    164 1

    173 1

    192 1

    197 1221 1

  • 8/12/2019 Planned Outages 96-98

    6/27

    0

    50

    100

    150

    200

    250

    300

    0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

    NumberofOu

    tages

    Duration (weeks)

    Planned Outages, 1996-1998

  • 8/12/2019 Planned Outages 96-98

    7/27

    0

    10

    20

    30

    40

    50

    60

    70

    0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 100

    NumberofOutages

    Duration (days)

    Planned Outages 1996-1998 (up to 100 days)

  • 8/12/2019 Planned Outages 96-98

    8/27

    Planned Outages for 1982-1998 Planned Outages for 1996-1998

    1982-1998 1996-1998Capacity (MW) 35 Capacity (MW) 35

    1000 0 11 11

    LSB Length (inches) LSB Length (inches)

  • 8/12/2019 Planned Outages 96-98

    9/27

    Planned Outages 1996-1998

    Capacity: 200-1000 MWLSB Length:

  • 8/12/2019 Planned Outages 96-98

    10/27

    0

    2

    4

    6

    8

    10

    12

    14

    0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

    NumberofEven

    ts

    Duration (weeks)

    Planned Outages 96-98, Capacity 200-1000 MW, LSB Length

  • 8/12/2019 Planned Outages 96-98

    11/27

    Planned Outages 1996-1998

    Capacity: 200-1000 MWLSB Length: >35 inches

    Duration Events Duration Events

    days weeks

    0 4 0 28

    1 1 1 37

    2 1 2 46

    3 3 3 314 8 4 13

    5 3 5 16

    6 8 6 14

    7 8 7 7

    8 7 8 15

    9 14 9 6

    10 1 10 9

    11 4 11 6

    12 2 12 2

    13 1 13 5

    14 10 14 1

    15 10 15 1

    16 10 17 2

    17 7 18 1

    18 3 22 1

    19 2 23 120 4 31 1

    21 5

    22 12

    23 1

    24 4

  • 8/12/2019 Planned Outages 96-98

    12/27

    48 2

    49 2

    50 1

    51 1

    52 2

    54 1

    56 2

    57 2

    58 4

    59 5

    60 2

    64 165 1

    67 3

    69 1

    70 2

    71 1

    73 2

    74 1

    75 2

    76 177 2

    78 2

    79 2

    86 1

    90 1

    93 1

    94 1

    95 2

    96 1

    98 1

    110 1

    119 1

  • 8/12/2019 Planned Outages 96-98

    13/27

    0

    5

    10

    15

    20

    25

    30

    35

    40

    45

    50

    0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30

    NumberofEven

    ts

    Duration (weeks)

    Planned Outages 96-98, Capacity 200-1000 MW, LSB Length >35 inches

  • 8/12/2019 Planned Outages 96-98

    14/27

    Planned Outages 1996-1998

    Capacity: 200-399 MW

    LSB Length: 25-35 inches

    Duration Events Duration Events

    days weeks

    0 19 0 70

    1 7 1 78

    2 8 2 76

    3 4 3 77

    4 8 4 36

    5 7 5 23

    6 17 6 29

    7 13 7 18

    8 12 8 18

    9 12 9 10

    10 10 10 9

    11 6 11 8

    12 10 12 4

    13 15 13 214 9 14 2

    15 18 15 2

    16 17 17 1

    17 6 18 2

    18 5 19 1

    19 9 21 120 12 24 1

    21 10

    22 1623 14

    24 8

    25 6

  • 8/12/2019 Planned Outages 96-98

    15/27

    46 5

    47 1

    48 3

    49 3

    50 151 3

    52 1

    53 2

    54 3

    55 5

    57 3

    58 2

    59 2

    60 5

    61 4

    62 2

    63 1

    64 1

    65 2

    66 2

    67 1

    68 169 2

    72 5

    73 2

    74 1

    76 1

    79 3

    80 1

    82 2

    83 286 2

    87 1

    89 1

  • 8/12/2019 Planned Outages 96-98

    16/27

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    NumberofEven

    ts

    Duration (weeks)

    Planned Outages 96-98, Capacity 200-399 MW, LSB Length 25-35 inches

  • 8/12/2019 Planned Outages 96-98

    17/27

    Planned Outages 1996-1998

    Capacity: 400-599 MW

    LSB Length: 25-35 inches

    Duration Events Duration Events

    days weeks

    0 13 0 94

    1 9 1 88

    2 13 2 65

    3 11 3 774 18 4 61

    5 11 5 30

    6 19 6 33

    7 17 7 33

    8 24 8 17

    9 18 9 15

    10 8 10 14

    11 9 11 9

    12 6 12 913 6 13 6

    14 12 14 5

    15 9 15 1

    16 8 17 3

    17 4 20 118 13 21 1

    19 6

    20 1321 17

    22 18

    23 11

    24 8

  • 8/12/2019 Planned Outages 96-98

    18/27

    44 3

    45 4

    46 5

    47 2

    48 4

    49 3

    50 4

    51 8

    52 5

    53 3

    54 3

    55 756 1

    57 3

    58 5

    60 3

    61 2

    62 3

    63 4

    64 2

    65 266 2

    67 2

    68 3

    70 1

    71 2

    72 6

    74 1

    75 3

    76 1

    77 1

    78 2

    79 1

  • 8/12/2019 Planned Outages 96-98

    19/27

    144 1150 1

  • 8/12/2019 Planned Outages 96-98

    20/27

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

    NumberofEvents

    Duration (weeks)

    Planned Outages 96-98, Capacity 400-599 MW, LSB Length 25-35 inches

  • 8/12/2019 Planned Outages 96-98

    21/27

    Planned Outages 1996-1998

    Capacity: 600-799 MW

    LSB Length: 25-35 inches

    Duration Events Duration Events

    days weeks

    0 8 0 49

    1 2 1 49

    2 5 2 39

    3 5 3 354 11 4 27

    5 13 5 25

    6 5 6 11

    7 9 7 21

    8 6 8 15

    9 9 9 6

    10 5 10 5

    11 7 11 2

    12 6 12 313 7 13 2

    14 7 14 2

    15 9 16 1

    16 10 17 1

    17 2 19 118 2 27 1

    19 4

    20 5

    21 4

    22 11

    23 6

    24 3

  • 8/12/2019 Planned Outages 96-98

    22/27

    44 2

    45 2

    46 2

    47 1

    49 7

    50 5

    51 3

    52 2

    53 2

    54 1

    55 1

    56 158 6

    59 2

    60 1

    61 2

    62 3

    63 1

    65 3

    66 1

    67 170 1

    71 1

    73 1

    75 1

    76 1

    79 1

    83 1

    84 1

    88 2

    94 1

    97 1

    101 2

  • 8/12/2019 Planned Outages 96-98

    23/27

    0

    10

    20

    30

    40

    50

    60

    0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

    NumberofEvents

    Duration (weeks)

    Planned Outages 96-98, Capacity 600-799 MW, LSB Length 25-35 inches

  • 8/12/2019 Planned Outages 96-98

    24/27

    Planned Outages 1996-1998

    Capacity: 800-999 MW

    LSB Length: 25-35 inches

    Duration Events Duration Events

    days weeks

    1 1 0 5

    2 1 1 3

    5 3 2 10

    7 1 3 58 2 4 15

    14 3 5 6

    15 1 6 5

    16 1 7 3

    17 3 8 5

    20 2 9 2

    22 2 10 3

    25 1 11 1

    27 2 12 128 5

    29 3

    30 3

    31 3

    34 1

    35 2

    36 1

    37 2

    39 1

    44 2

    46 1

    48 2

  • 8/12/2019 Planned Outages 96-98

    25/27

    0

    2

    4

    6

    8

    10

    12

    14

    16

    0 1 2 3 4 5 6 7 8 9 10 11 12

    NumberofEvents

    Duration (weeks)

    Planned Outages 96-98, Capacity 800-999 MW, LSB Length 25-35 inches

  • 8/12/2019 Planned Outages 96-98

    26/27

    Planned Outages 1996-1998

    Capacity: >=1000 MW

    LSB Length: >=25 inches

    Duration Events Duration Events

    days weeks

    1 1 0 1

    13 3 1 3

    15 2 2 3

    17 1 4 231 1 5 4

    32 1 6 1

    35 1 7 2

    41 3 8 1

    42 1 9 2

    49 1 10 151 1 12 2

    62 1

    63 165 1

    74 1

    84 185 1

  • 8/12/2019 Planned Outages 96-98

    27/27

    0

    1

    2

    3

    4

    5

    0 1 2 3 4 5 6 7 8 9 10 11 12

    NumberofEvents

    Duration (weeks)

    Planned Outages 96-98, Capacity >=1000 MW, LSB Length >=25 inches