Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment C93 3 January 2014
Transcript
Page 1: Planning and Environment Panel Reportdsewebapps.dse.vic.gov.au/Shared/ATSAttachment1.nsf/(attachment... · Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment

 

 

 

 

 

 

 

 

Planning and Environment Act 1987 

Panel Report  

Wodonga Planning Scheme 

Amendment C93 

 

 

 

 

3 January 2014 

    

Page 2: Planning and Environment Panel Reportdsewebapps.dse.vic.gov.au/Shared/ATSAttachment1.nsf/(attachment... · Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment

Wodonga Planning Scheme Amendment C93  Report of the Panel  3 January 2014 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Planning and Environment Act 1987 

Panel Report pursuant to Section 25 of the Act 

Wodonga Planning Scheme Amendment C93 

 

 

 

David Whitney, Chair 

 

Page 3: Planning and Environment Panel Reportdsewebapps.dse.vic.gov.au/Shared/ATSAttachment1.nsf/(attachment... · Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment

Wodonga Planning Scheme Amendment C93  Report of the Panel  3 January 2014 

 

 

Contents 

  Page 

1  Introduction ................................................................................................................ 1 

2  Gateway Island ........................................................................................................... 3 

3  Background ................................................................................................................. 4 3.2  What is Proposed? .................................................................................................. 6 3.3  Planning Context ..................................................................................................... 6 

4  Submissions .............................................................................................................. 16 

5  The Issues ................................................................................................................. 18 5.1  Should reference to the Master Plan should be removed or retained  in 

the planning scheme? ........................................................................................... 18 5.2  Is it appropriate to cap the number of accommodation units on Gateway 

Island until an emergency evacuation plan is prepared? ..................................... 21 5.3  Other matters ........................................................................................................ 28 

6  Conclusion and Recommendations ........................................................................... 29 

 

   

List of Figures 

  Page 

Figure 1  Google Earth image of Gateway Island. .................................................................. 3 

Figure 2  Galleries and workshops in Gateway Village. ......................................................... 4 

Figure 3  Landscaped gardens with Lincoln Causeway in background. ................................. 4 

Figure 4  Harveys Fun Park on Gateway Island. ..................................................................... 4 

Figure 5  Zoning of Gateway Island. ....................................................................................... 9 

Figure 6  Section of Master Plan showing areas for accommodation ................................. 12 

Figure 7  The areas on Gateway Island within the SUZ1. ..................................................... 13 

 

List of Tables 

  Page 

Table 1  Parties to the Panel Hearing .................................................................................... 2 

    

Page 4: Planning and Environment Panel Reportdsewebapps.dse.vic.gov.au/Shared/ATSAttachment1.nsf/(attachment... · Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment

Wodonga Planning Scheme Amendment C93  Report of the Panel  3 January 2014 

 

 

List of Abbreviations AWC  Albury Wodonga Corporation 

DEPI  Department of Environment and Primary Industries 

G‐MW  Goulburn‐Murray Water 

GIMPR  The Gateway Island Master Plan Review 2002 

LPPF  Local Planning Policy Framework 

MFEMP  Municipal Flood Emergency Management Plan 

MSS  Municipal Strategic Statement 

NECMA  North East Catchment Management Authority 

NERWA  North East Region Water Authority 

SPPF  State Planning Policy Framework 

 

 

Page 5: Planning and Environment Panel Reportdsewebapps.dse.vic.gov.au/Shared/ATSAttachment1.nsf/(attachment... · Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment

Wodonga Planning Scheme Amendment C93  Report of the Panel  3 January 2014 

Page 1 of 30 

1 Introduction 

Amendment C93 to the Wodonga Planning Scheme was prepared by the Wodonga Council as Planning Authority. 

As exhibited, the Amendment proposes to introduce controls to limit future accommodation development to nominated areas on Gateway Island.  In addition it: 

amends the Municipal Strategic Statement at Clause 21.08 by deleting the Gateway 

Island Master Plan; 

amends wording at Clauses 21.08‐2, 21.08‐3 and 21.08‐4 and corrects the numbering 

of figures; 

amends  Clause  21.15  by  removing  reference  to  the  Gateway  Island Master  Plan 

Review (Coomes Consulting Group 2002); 

amends  Schedule  1  to  the  Special  Use  Zone  to  require  development  to  be 

constructed  to withstand  the  impact  of  a  high  velocity  flood  event,  prohibits  the 

development of residential dwellings on the  island and requires that floor  levels are 

constructed at least 500mm above the 1% ARI flood level; and 

introduces a new Local Planning Policy, Clause 22.20 Development – Gateway Island. 

The amendment was prepared at  the  request of The North East Catchment Management Authority  (the proponent) and was authorised by  the  former Department of Planning and Community Development (DPCD) on 31 May 2013 (Authorisation No A02545). 

The amendment was placed on public exhibition between 29 June 2013 and 2 August 2013, with 7 submissions received.  Submissions from VicRoads, the CFA and the North East Region Water Authority (NERWA) had no objection to the proposed Amendment.  Goulburn‐Murray Water (G‐MW) had some minor advisory recommendations but also had no objection to the amendment.    The  Department  of  Environment  and  Primary  Industries  (DEPI)  pointed  to mapping anomalies in the amendment documentation. 

Two objecting submissions were as follows: 

North East Catchment Management Authority (NECMA) who requested: – the  removal of  the already  referenced Gateway  Island Project Environmental 

Management  Plan  and  that  reference  be  made  to  the  Murray  River Environmental  Plan No.  2  and  the  River Management  Plan, Wodonga  Reach Management Zone, March 2005; and 

– the following setback be included within Schedule 1 to the Special Use Zone: A minimum  of  30m wide  buffer will  be  applied  to  all major waterways  for  all development and applied through the creation of a reserve where practical and when subdivision  is proposed.   Existing vegetation  in waterways and wetlands will be retained. 

Habitat Town Planning on the following grounds: – there is no justification for the removal of the Gateway Island Master Plan from 

the MSS; – it is inappropriate to place an inferred or stated prohibition within the MSS; 

Page 6: Planning and Environment Panel Reportdsewebapps.dse.vic.gov.au/Shared/ATSAttachment1.nsf/(attachment... · Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment

Wodonga Planning Scheme Amendment C93  Report of the Panel  3 January 2014 

Page 2 of 30 

– the  grounds  for placing  a  limit on  the number  accommodation  rooms  is not justified and there should be no restriction to the number of rooms for tourist accommodation; 

– the ability to exclude mineral exploration from the Table of Uses is questioned; and 

– works should not be subject to a minimum floor level as stated in the Schedule at Section 3. 

At its meeting of 21 October 2013, Council resolved to refer the submissions to a Panel.  As a result,  a  Panel  to  consider  Amendment  C93  to  the  Wodonga  Planning  Scheme  was appointed  under  delegation  from  the  Minister  for  Planning  on  30  October  2013  and comprised David Whitney (Chair). 

A  Directions  Hearing  in  this matter was  considered  unnecessary.    The  Panel met  in  the offices of Wodonga City Council on 12 December 2013 to hear submissions in respect of the amendment.  Those in attendance at the Panel hearing are listed in Table 1. 

Submitter   Represented by 

Wodonga City Council  Mr Timothy Cheetham, Strategic Planner and Mr Bruce Ray Emergency Management Coordinator 

North East Catchment Management Authority Mr Tim Loffler 

Habitat Planning  Mr David Hunter 

Table 1  Parties to the Panel Hearing  

At the hearing, Council stated that the amendment seeks to: 

remove reference to an outdated strategic Master Plan for Gateway Island; 

amend existing  land use controls  to better pursue a  future envisaged outcome  for  the island outlined in a new local policy; and 

limit future accommodation development  in an  interim manner on nominated areas on the island while the issue of island evacuation due to flooding is resolved. 

The Panel undertook an unaccompanied inspection of Gateway Island following the hearing. 

In  reaching  its  conclusions and  recommendations,  the Panel has  read and  considered  the submissions and a range of other material referred to  it.   This  includes written submissions and verbal presentations.   The following chapters of this report discuss the  issues raised  in submission  relating  to  the  amendment  in  further detail, with  the Panel’s  conclusions  and recommendation provided in Chapter 4. 

Page 7: Planning and Environment Panel Reportdsewebapps.dse.vic.gov.au/Shared/ATSAttachment1.nsf/(attachment... · Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment

Wodonga Planning Scheme Amendment C93  Report of the Panel  3 January 2014 

Page 3 of 30 

2 Gateway Island 

Gateway  Island  is  located  within  the  Murray  River  Floodplain  approximately  12  km downstream  from  Lake  Hume.    It  is  approximately  500  hectares  in  area  and  is  located between the Murray River and the Wodonga Creek anabranch.  The island is traversed by a single  road  named  the  Lincoln  Causeway  which  links  Wodonga  with  Albury.    Lincoln Causeway was previously a section of the Hume Highway. 

The island comprises Crown Land and privately held land.  To the west of the causeway the island is host to a substantial gravel extractive industry.  Council has advised that the licences that apply to the extraction  industry have recently been extended to 2021 with options to operate till 2031.  On this side of the causeway there are also some water bodies which are used for water sports. 

 

Figure 1  Google Earth image of Gateway Island. 

East of the causeway there a  number of uses based around tourism including restaurants, a jazz club, art galleries and workshops, wood crafters, the Burraja Aboriginal Cultural Centre and a fun park.  A number of these uses are within ‘Gateway Village’.  In addition there is a masonry supplies outlet and fortnightly Farmers Market. 

Council’s broad vision for Gateway Island  is that development of the  island be tourism and recreation based. 

Page 8: Planning and Environment Panel Reportdsewebapps.dse.vic.gov.au/Shared/ATSAttachment1.nsf/(attachment... · Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment

Wodonga Planning Scheme Amendment C93  Report of the Panel  3 January 2014 

Page 4 of 30 

 

Figure 2  Galleries and workshops in Gateway Village. 

 

Figure 3  Landscaped gardens with Lincoln Causeway in background. 

 

Figure 4  Harveys Fun Park on Gateway Island. 

Page 9: Planning and Environment Panel Reportdsewebapps.dse.vic.gov.au/Shared/ATSAttachment1.nsf/(attachment... · Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment

Wodonga Planning Scheme Amendment C93  Report of the Panel  3 January 2014 

Page 5 of 30 

3 Background 

Mr Cheetham outlined the following as background to the amendment:  

A request was received from North East Catchment Management Authority (NECMA) on 3 December 2009, following an on‐site meeting with Council officers, to discuss the future development of Gateway Island in accordance with the “Gateway Island Master Plan”.  The plan was originally completed in 2002. 

NECMA stated  it supported the vision for the  island which was that upon completion of gravel extraction,  lakes for active water sports would be created with surrounding parklands.   This support was conditional  that development did not  include habitable development and caused no adverse environmental effects on the New South Wales side  of  the  Murray  River  or  on  the  river  system  itself.    NECMA  noted  that  until extraction was  completed  only  a  small  strip  of  land  between  Gateway  Village  and Harvey  Fun  Park was  open  for  development  and  that  this would  have  to  take  into account flooding and other environmental aspects. 

A recent extension of  licences to continue extraction operations has been negotiated with  the  land  owners  (Albury  Wodonga  Corporation  (AWC))  and  this  may  see extraction operations on the island continue until 2031 if options are exercised. 

NECMA was also concerned that Gateway Island presented a strategic risk in so far as it was subject to flooding, potentially subject to flood waters of high velocity and had limited points of access.  It believed that the combination of these issues presented an evacuation  risk  when  considering  tourism  and  accommodation  type  land  uses envisaged  by  the  Master  Plan  and  any  long  term  extension  of  long  term accommodation such as dependent persons units. 

In 2011 NECMA objected to a planning permit application seeking the development of eco‐accommodation and a function centre on land on the western side of the Lincoln Causeway.  This application was never proceeded with. 

Council resolved  to seek authorisation  from  the Minister  for Planning  to prepare  the Planning  Scheme  Amendment  C93  at  its  January  2013  meeting.    Ministerial Authorisation to prepare the Amendment was dated 31 May 2013 in accordance with section 8A(3) of the Planning and Environment Act 1987 (the Act). 

The Amendment was  exhibited  from  the  29  June  2013  and  concluded  on  2 August 2013.   Notice of  the Amendment was published  in  the Border Mail on 29  June 2013 and Government Gazette on 4 July 2013.  Seven (7) submissions were made, two (2) of which were objections to the amendment.  As part of post exhibition consultation with submitters  (particularly  the  objectors),  a  number  of  matters  raised  were  resolved resulting in alterations to the exhibited documentation. 

Council  resolved  to  proceed  with  the  Planning  Scheme  Amendment  C93  and authorised  officers  to  request  the  appointment  of  a  Planning  Panel  to  consider  the amendment as exhibited under Section 23(1)(b) of the Planning and Environment Act 1987 in October 2013. 

   

Page 10: Planning and Environment Panel Reportdsewebapps.dse.vic.gov.au/Shared/ATSAttachment1.nsf/(attachment... · Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment

Wodonga Planning Scheme Amendment C93  Report of the Panel  3 January 2014 

Page 6 of 30 

3.1 What is Proposed? 

Amendment C93  applies  to  land on Gateway  Island which  is within  the  Special Use  Zone Schedule 1 (SUZ1).  The amendment proposes to: 

amend  the Municipal  Strategic  Statement  at  Clause  21.08  by  deleting  the Gateway Island Master Plan; 

amend the wording at Clauses 21.08‐2, 21.08‐3 and 21.08‐4 and correct the numbering of figures; 

amend Clause 21.15 by removing reference to the Gateway Island Master Plan Review (Coomes Consulting Group 2002); 

amend Schedule 1 to the Special Use Zone to require development to be constructed to withstand  the  impact of a high velocity  flood event, prohibit  the development of residential dwellings on the island and require that floor levels are constructed at least 500mm above the 1% ARI flood level; and 

introduce a new Local Planning Policy, Clause 22.20 Development – Gateway Island. 

3.2 Planning Context 

(i)  State policy 

Council’s submission to the Panel responded to relevant clauses in the SPPF as follows: 

Clause  10.04  Integrated  decision  making.    Council  stated  that  the  proposed amendment  is a practical  response  to a number of  issues across a  range of policies.  The  Gateway  Island  Master  Plan  is  considered  to  be  out  of  date  and  no  longer reflective  of what  development  has  occurred  on Gateway  Island.    In  addition,  it  is apparent that the existing extractive  industry on the western side of the Causeway  is likely  to  continue  for many  years.    Finally,  greater  research  and  risk  assessment  of potential  flooding  of  the  island  has  raised  awareness  of  the  need  for  future development, particularly tourism and accommodation type uses, to be considered in the  context  of  disaster/flood  event  management.    These  issues  of  supporting economic  land  uses  (including  transition  of  uses),  responding  to  potential  flooding implications  and  removing  an  out  dated master  plan  responds  to  a  broad  range  of policy and is considered to be an appropriate response in this instance. 

Clause 11 Settlement.  Council stated that the proposed amendment implements the objectives of Clause 11 as  it anticipates  future development of Gateway  Island and a transition from  its current extractive based  industry to one of primarily tourism.   The amendment  seeks  to  prohibit  broader  residential  development  on  the  island  and ensures  that as  future  tourism and  recreational opportunities come  forward, certain key  issues  (flooding  and  response  procedures)  are  addressed  prior  to  substantial development taking place. 

Clause  13.02  Floodplain  Management.    Council  stated  that  the  risk  management associated with evacuation of a future significant tourism precinct is one of the driving principles  in bringing this amendment forward.   The capping of accommodation units and  consideration of development within  the  floodplain and  future  consideration of the  natural  river  system  and  its  importance  in  any  development  proposal,  properly supports this policy. 

Page 11: Planning and Environment Panel Reportdsewebapps.dse.vic.gov.au/Shared/ATSAttachment1.nsf/(attachment... · Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment

Wodonga Planning Scheme Amendment C93  Report of the Panel  3 January 2014 

Page 7 of 30 

Clause  14.02  Water.    Council  stated  that  the  amendment  provides  for  proper coordination and consideration of catchment management authorities and  the  flows of the Murray River and its implications on future use and development on the island.  

Clause 15.01 Urban Environment.   Council  stated  that  the amendment provides  for proper consideration of  the preservation of  life and  safety of  the community,  in  the event of a major flood and catastrophic events such as the collapse or destruction of infrastructure. 

Clause 16 Housing.   Council  stated  that  the proposed  amendment  seeks  to make  a dwelling  a  prohibited  land  use  under  Schedule  1  to  the  Special  Use  Zone.    The environmental factors applicable to the island (flooding, extractive industries), the risk management  factors  associated with  that  and  the  future  vision  for  the  island being predominantly  recreation,  leisure  and  tourism, does not  lend  itself  to  an  integrated form  of  development  which  includes  residential.    In  such  a  context,  the  risk management implications of allowing a typical residential outcome on the land would be unacceptable and it is appropriate to prohibit this form of development. 

(ii)  Local policy 

Council’s submission to the Panel responded to relevant clauses in the LPPF as follows:   

Clause  21.01  Planning  for  the  Future.    This  clause  seeks  to  protect  and maintain environmental assets  including  the Murray River.   Council  stated  that  the proposal supports  this  policy  through  implementing  decision  guidelines  in  relation  to environmental considerations appropriate in a Riverina environment.  

Clauses  21.03–2  &  21.03‐3  Context  for  the  Municipal  Strategic  Statement encourages  Wodonga  to  be  an  attractor  to  those  seeking  an  improved  lifestyle including employment, recreation and tourism assets.    In addition the Murray River and  its  floodplain provide a strong  landscape element and sense of  identity  for the City of Wodonga.   Council stated that the amendment supports this broad vision by providing a more definitive process  for  the achievement of  the goals  identified  for Gateway  Island, being a  future  tourism and  recreation hub of  State economic and social significance and consideration of the Murray River and overland flow of flood water (environmental).  

21.05‐2 Issue – Albury Wodonga  identifies Gateway Island as an opportunity to  link the  cities  and  provide  employment  opportunities.    Council  stated  that  the amendment  does  not  take  away  from  this  vision,  instead  strengthening  it  by introducing a Gateway Island specific local policy and providing greater clarity on the issues  and  way  forward  through  the  removal  of  an  outdated  Master  Plan  and clarification on use and development through Schedule 1 to the Special Use Zone. 

Clause  21.06‐3  Environment  seeks  that  the  environment  and  its  resources  be managed  in  a practical  and  sustainable manner  recognising Wodonga’s  location  in the  upper  catchment  of  the Murray  River.    Council  stated  that  the  amendment supports  this  policy  through  introducing  the  need  to  consult  the  Department  of Environment and Primary  Industries where future development adjoins Crown Land and  implementation  of  environmental  protection measures  form  both  policy  and zoning considerations.  

Clause 21.06‐6 Economic and Social Development seeks to strengthen and diversify the economic base of Wodonga, including through tourism and the attraction of new 

Page 12: Planning and Environment Panel Reportdsewebapps.dse.vic.gov.au/Shared/ATSAttachment1.nsf/(attachment... · Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment

Wodonga Planning Scheme Amendment C93  Report of the Panel  3 January 2014 

Page 8 of 30 

investment.   Council  stated  that  the proposed  amendment  supports  this policy by recognising  the  existing  extractive  industry  whilst  seeking  to  manage  a  future transition  to  the  envisaged  tourism  and  recreational  outcomes  at  appropriate locations.  

Clause  21.08‐2  Gateway  Island  identifies  Gateway  Island  as  offering  a  significant opportunity to provide a tourism, cultural and recreational focal point for the wider Albury Wodonga region.   It  is envisaged that when fully developed, the  island could attract in excess of 200,000 visitors each year and be a top attraction within Victoria.  This clause also currently introduces Figure 4 – Gateway Island Master Plan.  

Council  stated  that  it  is  this  clause  which  is  subject  to  review  as  part  of  the amendment.    The  Master  Plan  is  considered  to  be  out  of  date  and  no  longer reflective of development that has occurred over time within the precinct.  With the additional  issues of flooding and risk management,  it  is considered good practice to remove  the Master Plan entirely  from  the planning  scheme  including  reference  to specific  land  use  outcomes  and  locations  associated  with  it.    The  amendment updates Clause 21.08 and  refines  the discretion afforded  to  the  types of  land uses envisaged  for  the area and  refers back  to Schedule 1 of  the applicable Special Use Zone.   Council believes that until such time as an updated Master Plan  is prepared, this is an appropriate outcome.  

It is to be noted that under this Clause the strategic actions include:  

– Land use and development will be  regulated by  the application of a Special Use Zone and guided by the adopted master plan for Gateway Island.  

– The  Gateway  Island  Project  Environmental Management  Plan  provides  the structure  for  ongoing  environmental  management  of  Gateway  Island including environmental protection measures which are to be applied to any proposed development.  

– Industrial development with  the exception of extractive  industry will not be supported on Gateway Island.  

– Permanent residential development will be strongly discouraged on Gateway Island.  

– Commercial  and  retail development must demonstrate  a  strong  link  to  the themes and core tourism functions of Gateway Island.  Commercial uses, that serve primarily a retail focus and potentially weaken the primacy role of the Wodonga CBA, will not be supported. 

Clause 21.09 Environment and Natural Resources highlights Council’s commitment to environmental  initiatives  (including  flooding  related)  and  to  support  NECMA  in  its implementation of  the North East Regional Catchment Strategy.   Council  stated  that the proposed amendment  supports  this policy  including working  in partnership with NECMA  to  ensure  practical measures  in  reducing  flooding  risk  including  a  cap  on accommodation units and minimum floor levels and construction requirements. 

Clause  21.11‐03  Tourism  The  Wodonga  Council  recognises  the  importance  that tourism plays in the local and regional economy.  The planning scheme seeks to assist in  the development  and  improvement of  tourism opportunities  that have  regard  to environmental  values.    Council  stated  that  the  amendment  supports  this  policy through prohibiting  inappropriate development and  identifying the desired transition from current extractive industry to one based on tourism and recreation.  In addition it 

Page 13: Planning and Environment Panel Reportdsewebapps.dse.vic.gov.au/Shared/ATSAttachment1.nsf/(attachment... · Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment

Wodonga Planning Scheme Amendment C93  Report of the Panel  3 January 2014 

Page 9 of 30 

argued  that  the  amendment  supports  the  Council’s  objective  of  maintaining  the primacy of the CBA in its retail hierarchy by discouraging retail development that may challenge that primacy. 

Clause 21.15 Reference Documents.  This clause states that the direction and policies that  form part of the planning scheme have been  influenced by a number of studies and strategies.  The Gateway Island Master Plan Review is listed under this clause as a document of particular relevance. 

(iii)  Zones 

The zoning of Gateway Island comprises a range of zones  including the Public Conservation and Resource Zone, the Public Park and Recreation Zone, the Farming Zone and the Special Use Zone Schedule 1.   

 

Figure 5  Zoning of Gateway Island. 

On  the plan,  the  land coloured dark green  is within  the Public Conservation and Resource Zone.  Land coloured mid green is within the Public Park and recreation Zone.  Land coloured light green is within the Farming Zone.  The land that sits on either side of Lincoln Causeway coloured  lime green  is  in the Special Use Zone Schedule 1.   It  is the  land within the Special Use Zone Schedule 1 (SUZ1) to which the amendment applies. 

The purposes of the SUZ1 are: 

To  implement  the  State  Planning  Policy  Framework  and  the  Local  Planning  Policy Framework including the Municipal Strategic Statement and Local Planning Policies. 

To  recognise  the  state  significance of Gateway  Island as a  tourism,  recreational and environmental resource and as the gateway to Victoria. 

To  provide  for  a  range  of  uses  and  development  compatible with  the  strategy  for Gateway  Island  and  the  environmental,  cultural,  recreational  and  entertainment themes identified in the Gateway Island project reports. 

Page 14: Planning and Environment Panel Reportdsewebapps.dse.vic.gov.au/Shared/ATSAttachment1.nsf/(attachment... · Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment

Wodonga Planning Scheme Amendment C93  Report of the Panel  3 January 2014 

Page 10 of 30 

To  ensure  that  future development  in  the  zone  recognises  its  location on  the River Murray  Floodplain,  the  flooding  characteristics  of  the  floodplain  and  the  need  to safeguard the integrity of the river. 

While  the  last of  these purposes  relates  to  the  flood potential of  land on  the  island  it  is arguable  that  this  purpose  is  not matched  adequately  enough  by  the  provisions  of  the Schedule which: 

under  the use of  land  decision  guidelines  requires  consideration  to be  given  to  the purpose  of  the  zone,  the Gateway  Island  local  planning  policy  (Clause  22.05‐2),  the recommendations  and  findings  of  the  Gateway  Island  Project  Reports  and implementation plans  and  compliance with  any Design Guidelines  and development control plans for the area; and 

under  the  subdivision  and  Buildings  and  works  decision  guidelines  requires consideration to be given to the Gateway Island Local Planning Policy (Clause 22.05‐2) and  the preferred  layout  identified  in  the Gateway  Island Master Plan and Gateway Island Project Reports. 

It  is  significant  that  these  decision  guidelines  refer  to  the Gateway  Island  Local  Planning Policy (Clause 22.05‐2) which is a clause that simply does not exist.  The Panel has traced the history of the Wodonga Planning Scheme since the introduction of the new format planning scheme in 1999.  In so far as it has been able, it has found that with the introduction of the new format scheme Schedule 1 to the Special Use Zone has always referred to Clause 22.05‐2.  The planning scheme at that stage contained only a Clause 22.05 Land Conservation and Management and this clause made no specific reference to Gateway Island. 

Clause 22.05 was removed from the scheme following a review of the MSS and local policies by Amendment C57 in December 2008. 

The reference to Clause 22.05‐2  in SUZ1  is  in  itself a reason to review the provisions of the Schedule. 

Under  the  Schedule provisions  it  is  significant  that  accommodation  is  a  Section 2, permit required, use and it is this use which lies central to the issues raised by Amendment C93.  

(iv)  Overlays 

The whole of Gateway Island is covered by a Flood Overlay (FO). 

The purposes of the FO are: 

to  implement  the  State  Planning  Policy  Framework  and  the  Local  Planning  Policy Framework, including the Municipal Strategic Statement and local planning policies; 

to  identify waterways, major floodpaths, drainage depressions and high hazard areas which have the greatest risk and frequency of being affected by flooding; 

to ensure that any development maintains the free passage and temporary storage of floodwater,  minimises  flood  damage  and  is  compatible  with  flood  hazard,  local drainage conditions and the minimisation of soil erosion, sedimentation and silting; 

to  reflect  any  declarations  under Division  4  of  Part  10  of  the Water  Act,  1989  if  a declaration has been made; 

to protect water quality and waterways as natural  resources  in accordance with  the provisions  of  relevant  State  Environment  Protection  Policies,  and  particularly  in 

Page 15: Planning and Environment Panel Reportdsewebapps.dse.vic.gov.au/Shared/ATSAttachment1.nsf/(attachment... · Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment

Wodonga Planning Scheme Amendment C93  Report of the Panel  3 January 2014 

Page 11 of 30 

accordance with Clauses 33 and 35 of the State Environment Protection Policy (Waters of Victoria); and 

to  ensure  that  development  maintains  or  improves  river  and  wetland  health, waterway protection and flood plain health. 

 Under  the provisions of  the FO permits are required  for subdivision and  for buildings and works (with some minor exceptions).   Where a local floodplain development plan has been developed for the area and has been incorporated into the scheme, an application must be consistent with the plan. 

However where a local floodplain development plan for the area has not been incorporated into  the  scheme,  an  application  must  be  accompanied  by  a  flood  risk  report  to  the satisfaction  of  the  responsible  authority,  which  must  consider  the  following,  where applicable: 

the State Planning Policy Framework and the Local Planning Policy Framework; 

the existing use and development of the land; 

whether the proposed use or development could be located on flood‐free land or land with a lesser flood hazard outside this overlay; 

the susceptibility of the development to flooding and flood damage; 

the potential flood risk to life, health and safety associated with the development; 

flood risk factors to consider include: - the  frequency,  duration,  extent,  depth  and  velocity  of  flooding  of  the  site  and 

accessway; - the flood warning time available; - the danger to  the occupants of  the development, other  floodplain residents and 

emergency personnel if the site or accessway is flooded; - the  effect  of  the  development  on  redirecting  or  obstructing  floodwater, 

stormwater  or  drainage water  and  the  effect  of  the  development  on  reducing flood storage and increasing flood levels and flow velocities; and 

- the effects of the development on river health values  including wetlands, natural habitat, stream stability, erosion, environmental flows, water quality and sites of scientific significance. 

Further  the  FO  requires  that  an  application  be  referred  to  the  relevant  floodplain management authority under Section 55 of the Act unless in the opinion of the responsible authority  the  proposal  satisfies  requirements  or  conditions  previously  agreed  in  writing between the responsible authority and the floodplain management authority. 

Before deciding on an application the responsible authority must consider, as appropriate: 

the  State  Planning  Policy  Framework  and  the  Local  Planning  Policy  Framework, including the Municipal Strategic Statement and local planning policies; 

the local floodplain development plan or flood risk report; 

any comments of the relevant floodplain management authority; and 

the  Victorian  River  Health  Strategy  (2002)  and  any  relevant  regional  river  health strategy and associated wetland plan. 

Page 16: Planning and Environment Panel Reportdsewebapps.dse.vic.gov.au/Shared/ATSAttachment1.nsf/(attachment... · Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment

Wodonga Planning Scheme Amendment C93  Report of the Panel  3 January 2014 

Page 12 of 30 

(v)  The Gateway Island Master Plan Review 2002 (GIMPR) 

This document replaced a 1997 version taking  into account a number of regional and  local developments  including  the  extension  of  licences  to CSR  for  the  extraction  of  gravel  and sand from the island.  The plan included amongst the shortcomings of the earlier plan: 

despite having a vision for accommodation the plan provided for no dwellings or other forms of  accommodation.   Concerns  for  the  implications of  flooding had  influenced both DNRE and NECMA  to  foreclose on  the option of accommodation on  the  island; and 

the Master Plan did not adequately address flooding issues as they might impact upon Albury or have regard to the Wodonga Rail Bypass and  internal Arterial Road  impacts on overall floodplain management. 

The GIMPR claimed to be a staged 20 year strategy in which the balance between extraction and quarrying progressively gives over to an outcome that  is a combination of commercial, residential, recreational, educational and environmental attractions. 

The plan is not an Incorporated Document in the Wodonga Planning Scheme but is listed in Clause 21.15 as a Reference Document. 

The  Panel  notes  that  the Master  Plan  concentrates  largely  on  the  area west  of  Lincoln Causeway where  the major  emphasis  of  development will  occur  following  the  extraction operations of CSR.  It nominates an area as a Commercial and Accommodation Precinct and a second area as a potential building envelope for commercial/ residential use.  This second area would appear to the Panel to lie outside the SUZ1. 

This can be seen on the following two plans. 

 

Figure 6  Section of Master Plan showing areas for accommodation 

Page 17: Planning and Environment Panel Reportdsewebapps.dse.vic.gov.au/Shared/ATSAttachment1.nsf/(attachment... · Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment

Wodonga Planning Scheme Amendment C93  Report of the Panel  3 January 2014 

Page 13 of 30 

 

Figure 7  The areas on Gateway Island within the SUZ1. 

(vi)  The Gateway Island Flood Emergency Review (Molino Stewart 2010) 

This review was undertaken for NECMA following its concerns about life safety risks of those on  the  island  and whether  it was  feasible  to  accommodate  a  proposed  200  bed  tourist accommodation  development  given  warning  times  and  evacuation  routes.    The  review stated  that  the  Council  wanted  to  sell  a  parcel  of  land  on  the  eastern  side  of  Lincoln Causeway for the purpose of tourist accommodation. 

The Molino  review outlined  the history of major  flooding of  the  island which occurred  in 1867, 1870, 1916, 1917, 1931, 1956, 1974, and 1975.  Further, flooding concerns occurred in 1996 when  levels  in  Lake  Hume were  reduced  as  a  dam wall  safety measure  following movements in the dam wall.  It was also stated that as the island was in the Murray River’s main floodway it was to be expected that velocities of flood waters would be high across the island in all floods that overtop it. 

The review stated that the risks associated with flooding were: 

access to and  from Gateway  Island could be hazardous  in  floods and evacuation was required before routes were cut; 

if people did not evacuate or  left  the  island  too  late,  they could be stranded  in high hazard floodwaters which would pose a serious risk to life; and 

the current river course of the Murray River Channel could change across its floodplain due to natural geological processes. 

The  review  warned  that  substantial  growth  in  evacuation  traffic  would  occur  if developments outlined in the Master Plan were to go ahead.  In this regard it recommended that: 

an evacuation plan be prepared for the whole island which is based on the latest flood hydrography, dam  failure and road survey data and  is developed  in conjunction with 

Page 18: Planning and Environment Panel Reportdsewebapps.dse.vic.gov.au/Shared/ATSAttachment1.nsf/(attachment... · Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment

Wodonga Planning Scheme Amendment C93  Report of the Panel  3 January 2014 

Page 14 of 30 

the Bureau of Meteorology to ensure warning times are realistic and that the Bureau understands what trigger levels it should be forecasting to;  

the  plan  needs  to  consider  the  time  needed  for  emergency  service  personnel  to mobilise and a decision made as to whether that is practical and desirable before it can forecast that evacuation routes will be cut; 

each existing and new business develop a flood response plan which is consistent with the overall flood evacuation plan for the whole island; 

building floor levels for new developments be built above the 1% flood level; 

there is a rising pedestrian path provided from the ground floor of new developments to the Lincoln Causeway; and 

total  development  does  not  exceed  the  evacuation  capacity  of  the  existing  roads taking  into account  the  time  realistically needed by emergency  service personnel  to mobilise. 

The  review  also  concluded  that  before  an  evacuation  plan  for  the  island  is  prepared,  no more than 200 accommodation beds should be approved so that the vehicles evacuating the island would be unlikely to increase over current numbers. 

(vii)  The Gateway Island Project Environmental Management Plan 

The  Gateway  Island  Project  Environmental Management  Plan  provides  the  structure  for ongoing environmental management of Gateway Island  including environmental protection measures which are to be applied to any proposed development.  The Plan is mentioned in the list of strategic actions under Clause 21.08‐2. 

The plan, prepared in 1997 was intended for incorporation in the Wodonga Planning Scheme but this has not occurred.    It was prepared to provide a  framework to ensure the ongoing protection  of  the  unique  floodplain  environment which  is  a  core  attraction  of  the  total Gateway  Island  concept.    The  plan  included  a  series  of  environmental  performance requirements in relation to: 

pollution control in surface waters; 

air quality; 

noise; 

soil erosion control; 

land filling and landscaping impacts on flooding; 

heritage and archaeology; 

waste minimisation and disposal; 

environmental responsibilities for contractors and tenants; 

dangerous goods handling and storage strategy; and 

vegetation establishment. 

(viii)  Council’s Emergency Management responsibilities 

Council’s submission states: 

The  City  of Wodonga  has  emergency management  responsibilities  as  defined within Section  20  of  the  Emergency Management  Act  1986  and  Part  6  of  the  Emergency Management  Manual  Victoria  2013.    One  requirement  is  that  Council  prepare  an emergency management plan.  Part 6 of the Emergency Management Manual Victoria (2013) Specific Hazard Planning states: 

Page 19: Planning and Environment Panel Reportdsewebapps.dse.vic.gov.au/Shared/ATSAttachment1.nsf/(attachment... · Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment

Wodonga Planning Scheme Amendment C93  Report of the Panel  3 January 2014 

Page 15 of 30 

The Plan need not incorporate the arrangements to deal with specific hazards such as fire,  flood,  storm  etc.   However, where  they  are  identified  as  priority  risks,  hazard‐specific  plans  should  be  developed  as  sub‐plans.    Sub‐plans  detail  the  relevant prevention and response arrangements, and are referenced in the MEMPlan.  Where a risk is not as significant, the MEMPlan itself may well contain hazard‐specific plans and information for that risk. 

The Gateway Island Precinct Evacuation Plan will be a sub‐plan of the City of Wodonga Municipal Flood Emergency Management Plan (MFEMP).  Subsequently, the MFEMP is a sub‐plan of the City of Wodonga MEMPlan. 

Council advised that  it has engaged an Emergency Management consultant (Mr Bruce Ray) who has commenced a draft of the Evacuation Plan (or sub‐plan).  Mr Ray who appeared at the hearing advised that he expected the plan to be completed by the first quarter of 2014. 

Page 20: Planning and Environment Panel Reportdsewebapps.dse.vic.gov.au/Shared/ATSAttachment1.nsf/(attachment... · Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment

Wodonga Planning Scheme Amendment C93  Report of the Panel  3 January 2014 

Page 16 of 30 

4 Submissions 

The Amendment  generated  seven  submissions  from  the Department of  Environment  and Primary  Industries  (DEPI),  VicRoads,  CFA,  North  East  Water,  Goulburn‐Murray  Water, NECMA and Habitat Planning.  Only NECMA and Habitat Planning objected to aspects of the amendment. 

DEPI whilst having no objection to the amendment drew the Council’s attention to a minor mapping error which Council has undertaken to correct.   Goulburn Murray Water similarly had  no  objection  to  the  amendment  but  made  some  advisory  recommendations.    It suggested  that  a  decision  guideline  be  included  requiring  all  buildings  to  be  located  a minimum of 50 metres  from  the Murray River and Wodonga Creek and  its anabranch and that  a  further  decision  guideline  be  added  for  subdivision  requiring  that  any  proposed development must occur  in accordance with a Council approved  stormwater management plan.    The  plan must  be  prepared  in  accordance  with  the  principles  described  in  Urban Stormwater:  Best  Practice  Environmental Management  (Victorian  Stormwater  Committee, 1999) and be to the satisfaction of Council.    It  is to be noted that Goulburn Murray Water advised  that  the  recommendations were merely  advisory  and  to  be  utilised  at  Council’s discretion.   They were not  intended  to be  interpreted as  conditional  requirements  to  the amendment. 

NECMA  expressed  concern  about  reference  to  the Gateway  Island  Project  Environmental Management  Plan  in  Clause  21.08  stating  that  it was  not  a  document with which  it was familiar.  It suggested this reference be removed and that reference be made instead to the Murray  River  Regional  Environmental  Plan  No  2  of  New  South Wales  and  to  the  River Management  Plan,  Wodonga  Reach  Management  Zone  March  2005.    Council  has determined to retain reference to the Gateway  Island Project Environmental Management Plan  and  include  reference  to  the  approved  waterway management  plan.    NECMA  has advised that it accepts this response. 

NECMA also requested that the Schedule to the SUZ should include a 30 metre wide setback to all major waterways for all development and that existing native vegetation be retained.  Council advised that the 30 metre setback was already included in Clauses 14 and 21 of the planning scheme and repetition was unnecessary.  While this aspect of the NECMA objection was  not withdrawn,  it was  not  a matter  pursued  at  the  hearing.    The  Panel  agrees with Council’s response. 

Habitat Planning, a  town planning and environmental assessment consulting  firm objected to the amendment on several grounds as follows: 

the  grounds  for  removing  the  Gateway  Island  Master  Plan  from  the  Municipal Strategic Statement (MSS) are not  justified and hence references to the Master Plan should be retained; 

it  is  inappropriate to place an  inferred or stated prohibition within the MSS (e.g. use of phrases “will not be encouraged”, “will not be supported” and “will be prohibited”); 

the  grounds  for  placing  a  limit  on  the  number  of  rooms  are  not  justified  and consequently there should be no restriction with proposals considered on their merits; 

the ability to exclude  ‘mineral exploration’ and  ‘mining’  in Schedule 1 to the Special Use Zone (SUZ) is questioned; and 

Page 21: Planning and Environment Panel Reportdsewebapps.dse.vic.gov.au/Shared/ATSAttachment1.nsf/(attachment... · Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment

Wodonga Planning Scheme Amendment C93  Report of the Panel  3 January 2014 

Page 17 of 30 

‘Works’ should not be subjected to a minimum level in Section 3.0 of Schedule 1 to the SUZ. 

In subsequent discussion with Habitat Planning, Council accepted the concerns expressed in the 2nd, 4th and 5th dot points above and agreed to modify the amendment accordingly.  The Panel  concurs with  Council’s  action  in  relation  to  these  aspects  of  the  Habitat  Planning submission. 

It remains therefore that two issues require resolution: 

whether reference to the Master Plan should be removed or retained in the planning scheme; and  

whether  it  is  appropriate  to  cap  the number of  accommodation units on  the  island until an emergency evacuation plan is prepared. 

Page 22: Planning and Environment Panel Reportdsewebapps.dse.vic.gov.au/Shared/ATSAttachment1.nsf/(attachment... · Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment

Wodonga Planning Scheme Amendment C93  Report of the Panel  3 January 2014 

Page 18 of 30 

5 The Issues 

5.1 Should  reference  to  the Master Plan should be  removed or  retained  in the planning scheme?  

(i)  What is the Issue? 

As  stated  earlier  in  this  report  the Gateway  Island Master  Plan  Review  replaced  a  1997 version  taking  into  account  a  number  of  regional  and  local  developments  including  the extension of licences to CSR for the extraction of gravel and sand from the island.  The plan included amongst the shortcomings of the earlier plan: 

despite having a vision for accommodation the plan provided for no dwellings or other forms of  accommodation.   Concerns  for  the  implications of  flooding had  influenced both DNRE and NECMA  to  foreclose on  the option of accommodation on  the  island; and 

the Master Plan did not adequately address flooding issues as they might impact upon Albury or have regard to the Wodonga Rail Bypass and  internal Arterial Road  impacts on overall floodplain management. 

The GIMPR claimed to be a staged 20 year strategy in which the balance between extraction and quarrying progressively gives over to an outcome that  is a combination of commercial, residential, recreational, educational and environmental attractions. 

The plan is not an Incorporated Document in the Wodonga Planning Scheme but is listed in Clause 21.15 as a Reference Document.   It  is mentioned  in Council’s MSS at Clause 21.08‐2 which currently includes Figure 4 from the Master Plan document and outlines the four main precincts in which recreational, tourism, leisure and business activities are to be encouraged. 

Further  the  clause  states  under  Strategic Actions  that  land  use  and  development will  be regulated by the application of a Special Use Zone and guided by the adopted Master Plan for Gateway Island. 

The  Master  Plan  is  also  mentioned  in  the  Use  of  land  Decision  Guidelines  under  the provisions of Schedule 1 to the Special Use Zone. 

(ii)  Submissions 

Mr Hunter disclosed that while Habitat Planning had made a submission on  its own behalf, Habitat Planning had acted for  landowners on the  island and  in particular  in respect to the application for the eco tourism project that had not been proceeded with. 

It was his submission that whilst the proposed Local Policy titled  ‘Development – Gateway Island’  maintains  support  for  “leisure,  recreation  and  tourism  businesses  including accommodation“  on  Gateway  Island,  the  proposed  policy  lacked  the  spatial  context  and detail of the revised Master Plan.  He submitted that the revised Master Plan is an extensive and thoroughly researched land use strategy based on a number of relevant specialist reports addressing  earthworks,  vegetation,  geotechnical,  flooding  and  economics.    It  has  been endorsed by all stakeholders on Gateway Island  including Department of Natural Resources and  Environment,  North  East  Catchment  Management  Authority,  Gateway  Island Implementation Committee, Regional Parklands, Albury Wodonga Development Corporation, 

Page 23: Planning and Environment Panel Reportdsewebapps.dse.vic.gov.au/Shared/ATSAttachment1.nsf/(attachment... · Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment

Wodonga Planning Scheme Amendment C93  Report of the Panel  3 January 2014 

Page 19 of 30 

City of Albury, City of Wodonga, CSR and the Murray Darling Basin Commission.   It  is noted that  other  than  NECMA,  no  other  stakeholder  has  expressed  their  support  for disenfranchising the revised Master Plan. 

Mr Hunter’s submission continued as follows: 

The  current Wodonga  Council  Plan  2013‐2014  to  2016‐2017  (“the  Council  Plan”)  is developed  around  three  key  areas,  one  of  which  is  Planning  for  growth  and development.  Under this title there are a number of actions Council has committed to in order to achieve their strategies.   Each of these actions  is set for completion within the  first,  second,  third or  fourth  year of  the Council Plan.    The action  to  “develop a strategic plan for Gateway Village and Gateway Lakes precinct”  is slated for the third year being 2015‐2016 and to be “presented to councillors by June 2016”. 

Given  that Council  is  to complete a new strategy  for Gateway  Island  in  the next  two and a half years, it raises the question as to why the current revised Master Plan needs to be discarded in the meantime.  It is our view that the revised Master Plan remains a relevant  planning  document  for  future  development  on  Gateway  Island  and  should remain so until it is replaced. 

It was Mr Hunter’s opinion  that  the appropriate  time  to  remove  reference  to  the  revised Master Plan was when a replacement had been completed and adopted.  He added that by not doing so would leave a vacuum of clear strategic direction and some loss of control for Council in determining development proposals on Gateway Island in the short term.  Under the current planning regime, the revised Master Plan provides Council (as well as VCAT) with the  ability  to  ensure  no  inappropriate  development  is  undertaken  on  this  strategically important strip of land between Wodonga and Albury. 

Mr Cheetham on behalf of the Council submitted as follows: 

In  its simplest form the amendment  identifies that the current Gateway Island Master Plan is outdated and whilst doing so acknowledges that the current extractive industry will be in situ for a considerable period of time.  It further acknowledges that whilst the future tourism and recreation outcome remains an important high order strategic goal for  the Council and community,  it  is  in an area geographically prone  to  flooding and management  of  a  human  population  in  such  a  location  should  be  properly  thought through  before  significant  development  proceeds.    These  core  principles  of  the amendment are at  the heart of proper and orderly planning and are  supported by a broad policy base at both the State and Local  level through economic facilitation and protection, environmental consideration and risk and human safety considerations.  To put  in place what  is essentially a more conservative approach to development on the island  whilst  an  evacuation  plan  is  resolved  and  a  new  master  plan  prepared  is considered appropriate. 

Mr Loffler on behalf of NECMA provided a detailed submission outlining the flood history of Gateway  Island,  the  island’s  exposure  to  flood  and  the  Authority’s  assessment  as  to  the minimum extent of planning control that that should apply to development on the island. 

Whist  this  submission  did  not  specifically  address  the Master  Plan  and  its  place  in  the planning  scheme,  it provided up  to date  flood  information and  the need  for an extremely cautious  approach  to  development  on  the  island.    It  can  be  inferred  from  the  NECMA submission  that  development  contemplated  by  the Master  Plan  could  potentially,  in  the 

Page 24: Planning and Environment Panel Reportdsewebapps.dse.vic.gov.au/Shared/ATSAttachment1.nsf/(attachment... · Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment

Wodonga Planning Scheme Amendment C93  Report of the Panel  3 January 2014 

Page 20 of 30 

Authority’s view, pose unnecessary risk  in the absence of an evacuation plan for the  island that is based on up to date flood information. 

The  submission  stated  that  the  recent  Albury  City  to  Greater  Hume  Flood  Study  had reviewed  the  level  and  extent  of  flooding  for  a  wide  range  of  flood  events  taking  into account recently completed major infrastructure improvements (Hume Freeway and Railway bypasses) and had suggested that flood  levels were up to 200mm higher than the declared levels currently used for planning purposes. 

Mr  Loffler  stated  that  the  presence  of  upstream  storages  did  little  to mitigate  the  flood potential for Gateway  Island as they are not operated to provide flood mitigation.   Rather, they pose additional  risks by virtue of potential dam  safety  incidents  (as happened  in  the 1996  flood which  led  to  the  need  to  release water  from  Lake Hume  due  to  dam  safety concerns).   He stated that  in a probable maximum flood (PMF) situation flood  levels would reach RL156.4 metres AHD or about 3.5 metres depth.   Dam break scenarios would add a massive 10 metres  flood wave depth.   Given  that  the  island  is  in  the Murray River’s main floodway  it could be expected  that velocities would be high across  the  island  in all  floods which overtop it.  Warning times are typically 8 – 12 hours, although as little as 2 hours for a sunny day failure. 

He added that Gateway Island will be almost completely inundated in a 100 year flood event where  the  shallowest  inundation will be around  the Gateway Village area.   However,  the declared 100 year ARI (average recurrence interval) of RL153.5 metres AHD in the Gateway Village area will result in inundation to 0.5 – 0.8 metres depth. 

Mr  Loffler  stated  that  NECMA’s  primary  concern  is  the  safety  risks  associated  with  all flooding of  those on  the  island and  in particular how  this  risk can be managed  if a  tourist accommodation development proceeds. 

(iii)  Discussion and Findings 

The Panel has considered the various submissions and finds that the submission by Habitat Planning has some merit  in  its concern that the removal of reference to the Master Plan  in the planning scheme will  leave a void  in respect to some of the detailed strategic direction for  the  island  depicted  in  the  plan.    However,  if  the  Council  considers  the Master  Plan outdated, ostensibly in response to updated flood data and the need for future development to be considered in the context of the need for emergency evacuation from the island, then it  is  important  that  the presence of  reference  to  the Master Plan  in  the planning  scheme does not give rise to inappropriate development expectations prior to the preparation of an evacuation plan and any consequent revision of the Master Plan. 

The  Panel  accepts  that  the  amendment,  based  on  the  concerns  of  NECMA,  takes  an extremely  cautious  approach.    However,  there  is  little  doubt  that  following  recent emergency  situations  across  the  nation  such  as  severe  flooding  and  fire,  it  is  entirely appropriate  that planning  schemes  take  a precautionary approach where  risks  to  life  and property are concerned. 

Removal  of  reference  to  the Master  Plan will  not  alter  the  policy  imperative  of making Gateway Island a focus of tourism, recreation and leisure.  And it will not remove the ability for  development  providing  tourist  accommodation  to  be  considered.    It  will  however, remove the ability to use an outdated document as the basis for supporting a development which may pose an unacceptable risk. 

Page 25: Planning and Environment Panel Reportdsewebapps.dse.vic.gov.au/Shared/ATSAttachment1.nsf/(attachment... · Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment

Wodonga Planning Scheme Amendment C93  Report of the Panel  3 January 2014 

Page 21 of 30 

5.2 Is it appropriate to cap the number of accommodation units on Gateway Island until an emergency evacuation plan is prepared? 

(i)  What is the Issue? 

Amendment C93 arose as a result of concerns by NECMA regarding a proposal to develop a tourist accommodation  facility on Gateway  Island.   As a consequence,  the amendment,  in recognising the concerns about the ability to evacuate people from the island in the event of a flood, seeks to prohibit permanent accommodation on the  island and cap the number of tourist accommodation units until such time as an evacuation plan  for the  island has been prepared. 

As exhibited the amendment seeks to restrict the number of rooms on Gateway  Island  for tourist accommodation to 200.   The restriction  is expressed  in the fifth dot point of Clause 22.20‐3 in proposed Local Policy for ‘Development – Gateway Island’, the third dot point of the purpose of Schedule 1 to the SUZ and the land use table in the schedule as a condition against ‘accommodation’ in Section 2. 

(ii)  Submissions 

In its submission to the Panel, Council stated that following the request by NECMA to amend the planning scheme, Council met and discussed the authority’s concerns  in greater detail.  As an outcome NECMA advised that it would accept amongst other things, the following: 

Schedule  1  to  the  Special  Use  Zone  to  be  amended  to  prohibit  future  residential development; and 

a limit of 200 ‘accommodation rooms’ be included in the zone provisions and this is to be limited to the eastern side of the Lincoln Causeway and on part lot TP314029 at the western side of the Causeway. 

In response to the Habitat Planning submission that there were insufficient grounds to place a  limit on accommodation rooms, Council determined to maintain a cap of 200 rooms and stated  that  there  would  be  flexibility  on  this  cap  moving  forward  when  an  emergency evacuation plan was adopted.  The Panel notes however that whilst maintaining reference to the cap in Schedule 1 to the Special Use Zone, it decided to remove reference to the cap in the  Development  –  Gateway  Island  policy  (the  fifth  dot  point  of  Clause  22.20‐3  of  the amendment as exhibited). 

Council’s submission stated: 

Council has directed  its Project Manager – Emergency Management Mr. Bruce Ray to undertake and prepare for approval the Gateway Island Precinct Evacuation Plan.  This plan is required to address the issue of evacuation procedures in the event of flooding that will  anticipate  the  potential  future  tourism  based  population  on  the  island,  in terms of hotel room numbers.  It is the absence of this plan that is the driver for the 200 room cap on accommodation units.   The completion and  implementation of this plan will  ultimately  drive  any  future  changes  in  the  cap  or,  indeed,  the  need  for  a  cap moving forward. 

Council’s submission concluded as follows: 

... ... that whilst the future  tourism and recreation outcome remains an important high order  strategic  goal  for  the  Council  and  community,  it  is  in  an  area  geographically 

Page 26: Planning and Environment Panel Reportdsewebapps.dse.vic.gov.au/Shared/ATSAttachment1.nsf/(attachment... · Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment

Wodonga Planning Scheme Amendment C93  Report of the Panel  3 January 2014 

Page 22 of 30 

prone to flooding and management of a human population in such a location should be properly  thought  through  before  significant  development  proceeds.    These  core principles of the amendment are at the heart of proper and orderly planning and are supported by a broad policy base at both the State and Local  level through economic facilitation  and  protection,  environmental  consideration  and  risk  and  human  safety considerations.   To put  in place what  is essentially a more  conservative approach  to development on the island whilst an evacuation plan is resolved and a new master plan prepared is considered appropriate. 

Mr  Ray  advised  the  Panel  that  the  Gateway  Island  Precinct  Evacuation  Plan  was  being developed as a result of the recommendations contained in the Molino Report.  In summary, those recommendations required amongst other things:  

an evacuation plan with triggers for evacuation;  

existing and new businesses to develop a flood response plan;  

changes to building floor levels above the 1% annual exceedance probability (AEP); 

installation of rising pedestrian pathways  from ground  floor of new developments to Lincoln Causeway; and,  

total development to not exceed evacuation capacity of existing roads. 

It was his belief that limits on room‐based accommodation can best be considered in light of the formal approval of the evacuation plan which he stated was expected in the first quarter of 2014. 

Mr  Loffler  on  behalf  of  NECMA  stated  that  the  Authority  supported  the  amendment  as exhibited in so far as it prohibited residential development and, in the absence of an overall evacuation  plan,  limited  tourist  accommodation  to  200  rooms  to  ensure  that  evacuation procedures can be adequately planned for and executed in the event of a catastrophic flood event  on  the  island.    He  added  that  the  intent  of  the  cap  was  to  ensure  that  total development  did  not  exceed  the  evacuation  capacity  of  the  existing  roads  taking  into account the time realistically needed by emergency personnel to mobilise. 

It was NECMA’s view that the 200 room limit could be removed following the development of an agreed overall evacuation plan for Gateway  Island should this demonstrate a greater evacuation capacity. 

Mr Hunter’s written  submission pointed  to an apparent  confusion on  this  issue.    It noted that under  the purpose of Schedule 1  to  the SUZ,  it was stipulated  that  the  restriction on rooms  for  tourist  accommodation  essentially  applies  to  land  on  the  eastern  side  of  the Lincoln Causeway.  As exhibited the purpose states inter alia: 

To  limit  tourist accommodation  to a  total  of  200  rooms  on  the  land  east  of  Lincoln Causeway,  between  Gateway  Village  and  Lot  2  LP48376  and  on  part  of  Crown Allotment B46 Parish of Wodonga located between the south boundary of that lot and 80m north of the southern boundary, until the approval of an overall evacuation plan for Gateway Island. 

Mr Hunter assumed that that there was no restriction on such rooms elsewhere in the SUZ as it applies to Gateway Island (e.g. the western side of the Lincoln Causeway) but noted that the  restriction  in  the  land use  table against  ‘accommodation’ and  ‘motel’  simply makes a broad  reference  to Gateway  Island  as  the  area  to which  the  room  limit  applies.    In  this regard he sought clarification of Council’s intentions. 

Page 27: Planning and Environment Panel Reportdsewebapps.dse.vic.gov.au/Shared/ATSAttachment1.nsf/(attachment... · Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment

Wodonga Planning Scheme Amendment C93  Report of the Panel  3 January 2014 

Page 23 of 30 

Mr Hunter  submitted  that  if  it was Council’s  intention  to exclude  the western  side of  the Lincoln Causeway  from consideration of tourist accommodation development then Habitat Planning would strongly object on the following grounds: 

The  revised Master Plan clearly supports such development on  this  land and  in  fact, prefers the western side of the Lincoln Causeway to the eastern side. 

The land on the western side is no more constrained for development than the eastern side (e.g. flooding). 

The  attributes  of  land  on  the  western  side  are  more  amenable  to  a  tourist accommodation development than the eastern side because of existing vegetation and wetland features. 

Council is conflicted because it is the owner of land on the eastern side. 

Mr Hunter pointed  to  the  fact  that Council was  committed  to  the preparation of both an emergency  evacuation  plan  and  a  new  strategic  plan  for  Gateway  Island  and  that  the emergency  evacuation  plan  is  to  be  presented  to  Councillors  by mid  2014.    It  was  his submission that it makes little sense to introduce a specific control in to the planning scheme via an amendment process that effectively will become  immediately redundant.   He was of the opinion that a more appropriate planning response would be to complete both the new strategy and evacuation plan and then undertake an amendment to the planning scheme to reflect those changes. 

In further support of his opposition to the restrictions on accommodation rooms proposed to be introduced Mr Hunter directed the Panel’s attention to the following conclusion in the Molino report: 

Evacuation modelling suggests that there would be ample time to evacuate the existing Gateway  Island  Developments  along  with  the  proposed  hotel/motel  providing  the emergency  services are  ready  to  issue  the  evacuation order  in  sufficient  time.    Even were the full development for Gateway Island to proceed, and the development on the west  failed  to evacuate  to  the north,  there  should  theoretically be  sufficient  time  for everyone to evacuate ahead of the floodwaters  if the emergency services are already mobilised beforehand. 

In light of that conclusion and the immanent preparation of the emergency evacuation plan, Mr Hunter could not understand why  it was deemed necessary to  introduce controls  in to the planning  scheme  that  limit  the  amount of  tourist  accommodation on Gateway  Island based on evacuation during a flood. 

He added: 

In regards to the flooding threat, the Panel should be aware that unlike unconstrained watercourses  catering  for  large  catchments,  flooding  on  Gateway  Island  is  highly predictable and to some extent controllable.   The uninhibited catchment upstream of Gateway  Island  is  in  fact  very  small  because  of  the  near  presence  of  Hume Weir.  Flooding on Gateway  Island  is  in  fact  largely dictated by  the amount of water being released  from  Lake  Hume.    Except  when  Lake  Hume  is  full  or  close  to  full,  flows generated by major rain events in the upstream catchment are generally contained by the  lake.   With  this  in mind,  there  is  considerable  forewarning  of  potential  flooding downstream of the weir wall and even then the flooding is ‘controlled’. 

Page 28: Planning and Environment Panel Reportdsewebapps.dse.vic.gov.au/Shared/ATSAttachment1.nsf/(attachment... · Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment

Wodonga Planning Scheme Amendment C93  Report of the Panel  3 January 2014 

Page 24 of 30 

(iii)  Discussion and findings 

It  is  the Panel’s opinion  that despite  the  fact  that  flooding on Gateway  Island might  to  a degree be predictable and to an extent controllable, it would be unsound planning to ignore the threat of flooding or to allow development to an extent that evacuation of the island at a time of  flood  could not be guaranteed.   And  it would be unsound  to  ignore  the  fact  that flooding of the island had previously occurred as a result of the emergency release of waters from Lake Hume which became necessary following the discovery of movements in the dam wall itself. 

The  Panel  understands  the  concerns  of  NECMA  and  the  Council  regarding  the  flooding potential  of Gateway  Island.    It  also  understands  the  basis  for  adopting  a  precautionary approach in framing appropriate planning policy and controls for the island.  Were people’s safety  to  be  put  at  risk  unnecessarily  through  the  approval  of  inappropriate  levels  of development,  it would  be  the  Council  as  the  responsible  planning  authority who would largely be held accountable. 

The Panel  also  can understand Mr Hunter’s  view  that  the  amendment  is unnecessary  (or premature) as an evacuation plan for the island appears imminent and Council is committed to the preparation of a revised Master Plan. 

In discussing this issue at the hearing, the Panel expressed its concern about the wording of the purpose of Schedule 1 to the SUZ in so far as that purpose attempted to define the areas to which  a  cap on  accommodation beds would  apply.    It  appeared  to  the Panel  that  the wording was not in the form of a ‘purpose’ and in addition its reference to particular lots and Crown allotments made  it difficult for readily appreciate the  land to which the room  limits applied.    This  was  borne  out  by  Mr  Hunter’s  initial  confusion  as  to  whether  or  not restrictions applied to land to the west of Lincoln Causeway. 

The Panel expressed the view that the zone purpose should be simply worded to express the fact  that one of  the purposes of  the Schedule was  to ensure  the  safety of visitors on  the island by limiting tourist accommodation until the approval of an overall evacuation plan for the  island.   The Panel considered that reference to particular areas of the  island should be included elsewhere in the Schedule and possibly with the inclusion of an accompanying plan. 

In  this  regard  it  invited  the  Council,  in  conjunction with  NECMA  to  consider  alternative options  for wording  the  Schedule  to achieve  the desired outcome with greater  clarity.    It directed the Council to  forward  its alternative to Mr Hunter  for his consideration and that the parties forward their responses to the Panel. 

The  Panel  has  now  received  the  Council’s  revised  wording  and  the  comments  from Mr Hunter.  It is clear that the parties are still in disagreement. 

Council’s proposal included two options for the wording of the Schedule purpose as follows: 

Option 1 (NECMA preference): 

To limit tourist accommodation within the Special Use Zone to a total of 200 rooms, prior to the approval by  the  relevant authorities, of an emergency  flood evacuation plan.   The 200 rooms are limited to that land shown hatched on the Tourism Accommodation Plan attached to this schedule.  (NECMA preference) 

   

Page 29: Planning and Environment Panel Reportdsewebapps.dse.vic.gov.au/Shared/ATSAttachment1.nsf/(attachment... · Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment

Wodonga Planning Scheme Amendment C93  Report of the Panel  3 January 2014 

Page 25 of 30 

Option 2 (Council preference): 

To ensure that tourist accommodation at Gateway Island is limited to land shown as hatched on the Tourism Accommodation Plan attached to this schedule.  

To  ensure  that  tourist  accommodation  on  land  shown  as  hatched  on  the  Tourism Accommodation Plan attached  to  this schedule  is  limited  to a  total of 200 rooms unless an emergency flood evacuation plan is approved by the relevant authorities.   

The plan referred to in both options is shown below. 

 

Council  also  provided  options  for  the  rewording  of  the  condition  attached  to ‘accommodation’ in Section 2 of the Table of uses in the Schedule to the SUZ. 

As exhibited, the wording of the condition is as follows: 

Total accommodation  room numbers  for Gateway  Island must not  exceed  200 rooms (prior to the approval of an overall evacuation plan for Gateway Island). 

   

Page 30: Planning and Environment Panel Reportdsewebapps.dse.vic.gov.au/Shared/ATSAttachment1.nsf/(attachment... · Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment

Wodonga Planning Scheme Amendment C93  Report of the Panel  3 January 2014 

Page 26 of 30 

The options provided by Council were: 

Option 1 (Council preference): 

Any tourist accommodation may only be developed on land shown as hatched on the Tourism Accommodation Plan attached to this schedule.   Prior to the approval of an emergency flood evacuation plan, tourist accommodation within the Special Use Zone on  Gateway  Island  must  not  exceed  200  rooms.    Following  the  approval  of  the emergency flood evacuation plan the 200 room limit may be exceeded in accordance with the emergency flood evacuation plan, but only in the land shown as hatched. 

Option 2 (NECMA preference): 

Prior to the approval of an emergency flood evacuation plan, tourist accommodation within  the  special  use  zone  on Gateway  Island must  not  exceed  200  rooms.    Any tourist  accommodation may  only  be  developed  on  land  shown  as  hatched  on  the Tourism Accommodation Plan attached  to  this schedule.   Following  the approval of the emergency flood evacuation plan the 200 room limit may be exceeded, dependent on the evacuation limits identified by the evacuation plan, but only in the land shown as hatched on the Tourism Accommodation Plan attached to this schedule. 

Whilst  the  Panel  did  not  specifically  seek  changes  other  than  in  relation  to  the  Schedule purpose, it has considered the above options and the Habitat Planning response. 

Habitat  Planning  responded  by  stating  that  as  it was  unable  to  reach  a  consensus with Council on  the  issue  it maintained  its objection.    It  stated  that  the  issue  that continues  to concern  us  is  what  is  now  clearly  Council’s  and  NECMA’s  intentions  to  exclude  without justification the northern part of Lot B46 from having the same opportunity as other land on Gateway Island for accommodation until an evacuation plan is introduced. 

Habitat Planning’s response stated amongst other things that no evidence or submission has been  made  to  the  Panel  justifying  the  exclusion  of  the  northern  part  of  Lot  B46.    No investigations  have  been  undertaken  or  analysis  made  by  either  NECMA  or  Council  in instigating  the  amendment  other  than  a  flood  risk  report  commissioned  by  NECMA  (the Molino report) in direct response to a planning permit application by the owner of Lot B46 for accommodation on Gateway Island.  While this was true, Habitat Planning neither provided nor called evidence to support its claims in this regard. 

Habitat Planning continued by stating that it was concerned that by nominating certain land as  ‘no accommodation’,  the Schedule  to  the SUZ will become a de  facto planning  control used  in  the ongoing assessment of planning permit applications even after  the evacuation plan has been adopted. 

The Panel has some difficulty in understanding this concern as the Schedule to the SUZ is a planning  control.    And  it  will  continue  in  the  ongoing  assessment  of  planning  permit applications after the approval of an evacuation plan.  But it is clear to the Panel that the 200 room limit is intended to apply only until such time as an evacuation plan is approved. 

However, what  is not clear to the Panel (and Habitat Planning),  is the basis for nominating part only of Crown Allotment B46  as  an  area  suitable  for  tourist  accommodation.    There appears nothing on the flooding maps provided by Mr Loffler that would suggest that only the nominated portion of  the Crown Allotment  is  suitable  for  tourist  accommodation.    It appears  from  the documentation provided  that a cap on  rooms  is  to be  introduced as an 

Page 31: Planning and Environment Panel Reportdsewebapps.dse.vic.gov.au/Shared/ATSAttachment1.nsf/(attachment... · Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment

Wodonga Planning Scheme Amendment C93  Report of the Panel  3 January 2014 

Page 27 of 30 

interim measure  principally  to  ensure  that  the  total  development  on  the  island  does  not exceed the evacuation capacity of existing roads. 

The Panel acknowledges that changes to the planning scheme are warranted in view of the updated  research  and  flood  potential  risk  assessment which  has  raised  awareness  of  the need  for  future  development,  particularly  tourism  and  accommodation  type  uses,  to  be considered in the context of disaster/ flood event management. 

Council  has  taken  a  precautionary  approach  by  proposing  to  prohibit  permanent accommodation on the island and limiting to 200 rooms, tourist accommodation on parts of the  island  (as shown hatched on  the Tourist Accommodation Plan provided subsequent  to the Panel hearing) until such time as an evacuation plan  for the  island  is approved.   While this  seems  sensible  in  the  Panel’s  opinion,  the  Panel  cannot  see  the  basis  for  restricting development west of the causeway to a section only of part Crown Allotment B46.  Surely, if the flooding potential of the balance of the allotment is no greater than that of the portion included,  then  it  is not  so much  the area  that  is hatched  that  is  important but  rather  the ability of  the  road network  to enable evacuation  and  this  is  controlled by  the number of accommodation units rather than the extent of the nominated land. 

However  the  wording  it  has  proposed  in  respect  to  the  condition  pertaining  to ‘accommodation’  in  Section  2  of  the  Table  of  uses  in  the  Schedule,  suggests  that  it  is Council’s intention to restrict tourist accommodation to those areas even after the approval of  the evacuation plan.   Should  this be  the case  then such a  restriction may unnecessarily prejudice the preparation of a revised Master Plan. 

In respect to the cap on tourist accommodation rooms it is the Panel’s opinion that: 

a  cap  of  200  tourist  accommodation  rooms  can  be  justified  until  such  time  as  an overall evacuation plan for Gateway Island is approved. 

Council’s decision  to  remove  reference  to  the 200  tourist accommodation  room  cap from the Development – Gateway Island policy at Clause 22.20‐3 is supported. 

The third dot point in the purpose of Schedule 1 to the SUZ should be reworded.  The Panel  considers  that  the wording  should  a  slight  variation  of  the  Council  preferred option to read as follows: 

To  ensure  that  tourist  accommodation  on  land  shown  as  hatched  on  the  Tourism Accommodation Plan attached to this schedule is limited to a total of 200 rooms until an emergency flood evacuation plan is approved by the relevant authorities. 

The condition pertaining to  ‘accommodation’ and  ‘motel’  in Section 2 of the Table of uses in Schedule 1 to the SUZ should be amended to read as follows: 

Prior to the approval of an emergency flood evacuation plan for Gateway Island, tourist accommodation may only be developed on land shown as hatched on the Tourism Accommodation Plan attached to this schedule and must not exceed 200 rooms.  

The Tourist Accommodation Plan prepared by Council following the hearing should be included in Schedule 1 to the SUZ but should be amended to include the whole of Lot TP314029 (CA B46) in the hatched area in which the limit of 200 rooms is to apply prior to the approval of an emergency flood evacuation plan. 

The decision to prohibit permanent occupation on the island by including ‘dwelling’ in Section 3 of the Table of uses in Schedule 1 to the SUZ is supported. 

Page 32: Planning and Environment Panel Reportdsewebapps.dse.vic.gov.au/Shared/ATSAttachment1.nsf/(attachment... · Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment

Wodonga Planning Scheme Amendment C93  Report of the Panel  3 January 2014 

Page 28 of 30 

5.3 Other matters 

Council has proposed a number of other modifications  to aspects of  the planning  scheme provisions  that  relate  to Gateway  Island.   Some of  these have been  further modified post exhibition as a  result of consultation with submitters.   The Panel  is mindful  that while  the changes proposed to the planning scheme remove reference to the Revised Master Plan and place  limitations on accommodation on  the  island,  it  is  the Council’s desire  to continue  to promote Gateway  Island as offering a significant opportunity to provide a tourism, cultural and recreational focal point for the wider Albury Wodonga region. 

Specifically other changes proposed under the amendment relate to the following: 

Changes  to  the  wording  of  Clause  21.08  which  are  designed  largely  to  remove reference to the outdated Master Plan.  The Panel supports these changes. 

The  introduction of  a new Clause 22.20 Development – Gateway  Island  in  the  LPPF which is a policy to apply to use and develop land on the island for leisure, recreation and  tourism businesses  including accommodation.   The  introduction of  this policy as amended post exhibition is supported. 

A proposal to require the finished floor levels of all new development to be a minimum 500mm above the 1:100 ARI flood levels.  This provision is supported. 

Reference to the new Clause 22.20 Development – Gateway Island in the Buildings and works and Subdivision decision guidelines sections of the schedule is variously referred to as both ‘Clause 22.20 Development of accommodation‐ Gateway Island’ and ‘Clause 22.20  Gateway  Island  Local  Planning  Policy’.    Reference  to  this  Clause  should  be consistent. 

Other inconsequential changes to the provisions of Schedule 1 to the SUZ about which there has been no concern are supported by the Panel. 

The Panel also notes that the amendment proposes to remove the Gateway  Island Master Plan Review from the list of documents in Clause 21.15 Reference Documents.  While this is supported  it would appear that several other documents could be referred to as reference documents  in  the  proposed  new  Clause  22.20.    These  include  the  Lustig  Report  (already mentioned  in the clause) and also the Molino Report  in view of  it providing a great deal of the basis behind the proposed amendment. 

Page 33: Planning and Environment Panel Reportdsewebapps.dse.vic.gov.au/Shared/ATSAttachment1.nsf/(attachment... · Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment

Wodonga Planning Scheme Amendment C93  Report of the Panel  3 January 2014 

Page 29 of 30 

6 Conclusion and Recommendations 

The Panel concludes that Amendment C93 should be adopted subject to the modifications proposed  by  Council  post  exhibition  and  the  further modifications  recommended  in  this report.  

In  reaching  this  conclusion  the  Panel wishes  to  state  that  it  considered  that  there was  a degree of merit  in  several of  the  concerns  expressed by Habitat Planning  in  its objecting submission to the amendment.  The Panel understood the concern that the amendment was prepared at a time when Council had committed to the preparation of a revised Master Plan for Gateway Island and when the finalisation of an emergency evacuation plan for the island was well underway.  However, the Panel is also cognisant of the fact that the finalisation of plans,  particularly where  consultation  and  agreement  by multiple  authorities  is  required, can, and regularly do, fail to meet timeline expectations.  

The  Panel  also  acknowledges  that  the  planning  scheme  already  contains  a  number  of measures with  regard  to concerns about  flooding.   These  include  the presence of a Flood Overlay over the whole of the island which requires amongst other things, applications to be accompanied by a flood risk report to the satisfaction of the responsible authority. 

Regardless of the timing of the revised Master Plan and the emergency evacuation plan, and the  provisions  of  the  Flood Overlay,  the  Panel  does  not  believe  that  the  Council  can  be criticised  for  taking  a  precautionary  approach  in  ensuring  that  its  planning  scheme  can respond to emergency situations that might arise from flooding.   For this reason therefore, the amendment warrants support. 

With regard to the concern expressed about the  land west of Lincoln Causeway designated for  tourist  accommodation,  the  Panel  agrees  with  the  concerns  expressed  by  Habitat Planning.    The  thrust  of  the  planning  scheme  changes  (originally  sought  by  NECMA) appeared more about the ability of the road network to enable evacuation from the island, than it was about the specific land from which evacuation may have been required at a time of emergency.  In the absence of any evidence to demonstrate the need to restrict this area the  Panel  has  suggested  modifications  to  the  proposed  wording  of  critical  sections  of Schedule 1 to the SUZ and the plan proposed to be inserted into that schedule. 

Finally,  the Panel wishes  to express  its appreciation  to  the parties  for  the comments  they provided  following  the hearing  in  their  responses  to  the Panel’s  request  for  assistance  in finalising the content of Schedule 1 to the SUZ. 

The Panel recommends that: 

1 Amendment C93 to the Wodonga Planning Scheme be adopted as exhibited subject to: 

a) The third dot point in the purpose of Schedule 1 to the SUZ should be reworded as follows: 

To ensure that tourist accommodation on land shown as hatched on the Tourism Accommodation Plan attached to this schedule is limited to a total of 200 rooms until  an  emergency  flood  evacuation  plan  is  approved  by  the  relevant authorities. 

Page 34: Planning and Environment Panel Reportdsewebapps.dse.vic.gov.au/Shared/ATSAttachment1.nsf/(attachment... · Planning and Environment Act 1987 Panel Report Wodonga Planning Scheme Amendment

Wodonga Planning Scheme Amendment C93  Report of the Panel  3 January 2014 

Page 30 of 30 

b) The  condition pertaining  to  ‘accommodation’ and  ‘motel’  in  Section 2 of  the Table of uses in Schedule 1 to the SUZ should be amended to read as follows: 

Prior to the approval of an emergency flood evacuation plan for Gateway Island, tourist accommodation may only be developed on  land shown as hatched on  the Tourism Accommodation Plan attached  to  this  schedule and must not exceed 200 rooms. 

c) The  Tourist  Accommodation  Plan  prepared  by  Council  following  the  hearing should be included in Schedule 1 to the SUZ but should be amended to include the whole of Lot TP314029 (CA B46)  in the hatched area  in which the  limit of 200 rooms  is to apply prior to the approval of an emergency flood evacuation plan. 

d) Reference  to  the  new  Clause  22.20  Development  –  Gateway  Island  in  the Buildings  and  works  and  Subdivision  decision  guidelines  sections  of  the schedule  is  variously  referred  to  as  both  ‘Clause  22.20  Development  of accommodation‐  Gateway  Island’  and  ‘Clause  22.20  Gateway  Island  Local Planning Policy’.  Reference to this Clause should be consistent. 

e) Consideration being given to including the Lustig Report and the Molino Report as  reference  documents  in  the  proposed  new  Clause  22.20  in  view  of  these reports providing a great deal of the basis behind the proposed amendment. 


Recommended