PROJECT IMPROVING MINE WATER MANAGEMENT FOR THE FITZROY BASIN: FINAL REPORT ON THE EFFECTIVENESS OF THE 2012-2013 PILOT MINE WATER RELEASE & EVALUATION OF MARKET BASED MECHANISMS (PARTS A & B, DELIVERABLES 3 AND 5) ED fufi STATE OF QUEENSLAND (ACTING THROUGH) DEPARTMENT OF STATE PLANNING MAY 2013 MARSDEN JACOB \SC)OCIATES
Transcript
Page 1: PLANNING MAY 2013 - parliament.qld.gov.au · underground (long-wall) mining (7) techniques to extract coal. The type of coal is mine specific and includes: coking, thermal and PCI

PROJECT

IMPROVING MINE WATER MANAGEMENT FOR THE

FITZROY BASIN:

FINAL REPORT ON THE EFFECTIVENESS OF THE

2012-2013 PILOT MINE WATER RELEASE & EVALUATION OF

MARKET BASED MECHANISMS (PARTS A & B, DELIVERABLES

3 AND 5)

I"'REr~ ED fufi

STATE OF QUEENSLAND (ACTING THROUGH) DEPARTMENT OF STATE DEVELOPMEN~INFRASTRUCTURE&

PLANNING

MAY 2013

MARSDEN JACOB \SC)OCIATES

Page 2: PLANNING MAY 2013 - parliament.qld.gov.au · underground (long-wall) mining (7) techniques to extract coal. The type of coal is mine specific and includes: coking, thermal and PCI

DOCUMENT CONTROL

DOCUMENT TITLE Improving Mine Water Management For The Fitzroy Basin: Final Report On The Effectiveness Of The 2012-2013 Pilot Mine Water Release & Evaluation Of Market Based Mechanisms (Parts A & B, Deliverables 3 & 5)

PROJECT MANAGER 0 . Droop

AUTHOR(S) 0. Droop (G&S) I P. Jacob (MJA)

CLIENT State of Queensland (acting through) Department of State Development, Infrastructure and Planning

CLIENT CONTACT Jacquie Edwards- Project Manager

CLIENT REFERENCE DSDIP-2005-13

SYNOPSIS This report details our assessment of the effectiveness of the 2012/13 pilot mine water release scheme and evaluation of market-based mechanisms, such as salinity trading, for application to the Fitzroy Basin.

REVISION HISTORY

REVISION# DATE EDITION BY APPROVED BY

5/13 0. Droop I P Jacob 0 Droop (G&S)/ P Jacob (MJA)

DISTRIBUTION

REVISION NUMBER

Distribution 2 3 4 5 6 7 8 9 10

DSDIP

G&S file

Brisbane dney Melbourne a 1d reg1ons

www.access.gs

Agriculture. Water. Environment

Page 3: PLANNING MAY 2013 - parliament.qld.gov.au · underground (long-wall) mining (7) techniques to extract coal. The type of coal is mine specific and includes: coking, thermal and PCI

MARSDEN JACOB

EXECUTIVE SUMMARY

Gilbert and Sutherland Pty Ltd (G&S) and Marsden Jacob Associates (MJA) have been engaged by the Queensland Department of State Development, Infrastructure and Planning to assess the potential for improved mine water management within the Fitzroy River Basin.

This report summarises outcomes of Parts A and B of that engagement, which comprised:

Part A : Assessment of the effectiveness of the 2012/13 Pilot mine release scheme (including inventory of current mine Legacy water volumes and quality) ; and

Part B: Evaluation of Market-based mechanisms for application to the Fitzroy Basin.

Based on our assessment of the regulatory, operational and hydrological conditions within the Fitzroy Basin since 2008 (the point from which legacy water inventories began becoming an issue) the major contributing factors to the current state of legacy water include:

• Climatic conditions since the 2007/08 wet season, including above average rainfall and specific, short-duration flood events; and

• Post-2008 regulatory changes (in the form of modified Environmental Approval release conditions) , which further limited the ability of mines to release during subsequent flow events.

The post 2008 change in regulatory conditions altered the individual mine water balance of those mines with release being a key component of their approved mine water management plan , by reducing mine water release opportunities. This in combination with above average rainfall conditions over recent years has lead to the accumulation of excess water on site. As such, options to return to a sustainable long-term mine water management balance need to involve changes to one or both of these regulatory and operational factors .

SSOCIATE<:. +GILEERI SU1l£RlAN)

3

Page 4: PLANNING MAY 2013 - parliament.qld.gov.au · underground (long-wall) mining (7) techniques to extract coal. The type of coal is mine specific and includes: coking, thermal and PCI

4

+GILEERI SlJT1-ERlAN) MARSDEN JACOB nSSOCIATES

Comparison of release opportunity shows significant mine water management improvement under Pilot conditions for the relatively few/small release events to date.

Comprehensive assessment of the releases undertaken against the amended Environmental Authority (EA) conditions determined that the releases from pilot mines met all conditions significant to potential environmental harm and other release-related conditions in the EAs.

Review of the monitoring information to date indicates:

1. Mine operators ' managed releases within all required regulatory flow and water quality limits; and

2. There were no measured effects on salinity levels from downstream of Isaac/Connors confluence.

The Pilot Scheme was evaluated as being successful in terms of :

Improving mine water release opportunities;

• Achieving compliance with all regulatory conditions ; and

• The absence of material effects on salinity levels downstream of Pilot Scheme participant mine sites.

As a key component of the overall study, we reviewed the role that Market Based Instruments (MBI) could play in managing both legacy and long-term operational mine water within the Fitzroy River Basin. Based on the characteristics of the Fitzroy Basin, three types of MBI's were considered to have the potential to deliver cost­effective mine water management outcomes. These were cap and trade, and bubble trading, with auctions as a complementary strategy to either of these two MBI's.

Detailed hydrological modelling was undertaken coupled with economic analysis to evaluate whether the necessary pre­conditions were currently in place to make progression to a MBI cost effective. Based on this analysis, it was concluded that a key pre-requisite "the need for a cap on releases" was not present at a basin-scale at this stage.

However, these pre-conditions may in future be met in some sub­catchments as new mines develop. A significant point of note is that based on our assessment, basin and catchment-scale salinity behavior within the Fitzroy Basin appears characterised by diffuse sources of salts, potentially both natural in origin as well as

AGRICULTURE WATER ENVIRONMENT

Page 5: PLANNING MAY 2013 - parliament.qld.gov.au · underground (long-wall) mining (7) techniques to extract coal. The type of coal is mine specific and includes: coking, thermal and PCI

MARSDEN JACOB

influenced by previous and current catchment management practices. This being the case, a clear understanding of the comparative contributions and characteristics of both point- and non-point source salinity will be an important factor in ensuring well­founded salinity management within the Fitzroy Basin into the future. Ongoing data collection and additional monitoring at key locations, data analysis and water quality model refinement will therefore be critical to improve knowledge of catchment salt loads in preparation for when these pre-conditions may be met and ensure timely implementation of clear and strategic Fitzroy Basin salinity planning.

Conclusions and recommendations

In summary, in terms of the application of MBI's to salinity management within the Fitzroy Basin, we conclude that:

• Key pre-requisites for a trading scheme to deliver beneficial outcomes are not yet present;

• Extension of pilot-type conditions to other mines is currently the most cost-effective solution for both the management of legacy water and long-term mine water; and

• That in the future some form of salinity trading scheme may be an appropriate cost-effective solution, with several discrete areas (e.g. Roper Creek, Upper Isaac) relatively close to meeting the pre-requisites.

Whilst our assessment has demonstrated that the Fitzroy Basin as a whole is not currently "at capacity" in terms of salt load at a catchment/subcatchment scale, there is an opportunity to enhance the management of mine water release and therefore water quality outcomes within the Fitzroy Basin . These enhanced mine water management arrangements should help address both legacy and long-term mine water balance, whilst maintaining a controlled and managed system.

The components of this improved management framework should include:

• a well-defined and transparent water quality monitoring, assessment and reporting framework (parameters, locations, criteria);

<:; OCIA E<.. +GILBERI SU1l£RlAN)

5

Page 6: PLANNING MAY 2013 - parliament.qld.gov.au · underground (long-wall) mining (7) techniques to extract coal. The type of coal is mine specific and includes: coking, thermal and PCI

6

+GILEERI SlJT1-ERI.AN) MARSDEN JACOB

SSOCIATEC.

extension of modified regulatory based release conditions (Pilot-style conditions) to other mines; and

improved stakeholder support, including: information exchange and support to mine operators to optimize mine water management outcomes and release opportunities; improved understanding of impacts across all stakeholders.

We recommend that these measures be encapsulated within a formal Fitzroy Basin Salinity Management Strategy.

AGRICULTURE VtATE-R cf\1VIRONMENT

Page 7: PLANNING MAY 2013 - parliament.qld.gov.au · underground (long-wall) mining (7) techniques to extract coal. The type of coal is mine specific and includes: coking, thermal and PCI

MARSDEN JACOB

CONTENTS

S<:>OC IAH-~ +GILBEHI SUT1-ERI.AN)

Introduction .............. ........... ... ....................... ..... ..... .... ...... 8

2 Mine water balance/inventory ...... ...... ....... ......... ...... ..... .... 9

2.1 Discussion and conclusions .............................................. 9

3 Evaluation of 2012/2013 Pilot Scheme ... .... .... ...... .... ... ... 12

3.1 Pilot conditions .......... .................................... .................. 12

3.2 Mine water management outcomes ................................ 12

3.3 Regulatory compliance .................................................... 13

3.4 Monitoring and water quality outcomes ........................... 13

3.5 Evaluation outcomes ....................................................... 14

4 Role of market based Instruments ..... .. ... ......... ......... ..... . 15

4.1 Overview .......... ............... .... .. ....... ............ .... ... ... .... ..... .... 15

4.2 Hydrological modelling ................................... ................. 15

4.3 Assessment framework ........................ ........................... 16

4.4 Key findings ................. .. ................ ............... ................... 17

4.5 Conclusions ....... ..... ........... .. ..... ........ ... .... ....... ................. 20

5 Outcomes and recommendations ..... ...... ...... ...... ..... .... ... 21

5.1 Key outcomes .......................................... ........................ 21

5.2 Way forward ...................... ............................. .............. ... 21

7

Page 8: PLANNING MAY 2013 - parliament.qld.gov.au · underground (long-wall) mining (7) techniques to extract coal. The type of coal is mine specific and includes: coking, thermal and PCI

+GILSERI SUTl£Rl.AN) MARSDEN JACOB

1 Introduction

A<;SOLIAfEC

Gilbert and Sutherland Pty Ltd (G&S) and Marsden Jacob Associates (MJA) have been engaged by the Queensland Department of State Development, Infrastructure and Planning to assess the potential for improved mine water management within the Fitzroy River Basin.

This is the final report for Parts A & B summarising works undertaken towards and outcomes of:

Part A: Assessment of the effectiveness of the 2012/13 Pilot mine release scheme and

Part 8: Evaluation of Market-based mechanisms for application to the Fitzroy Basin.

The report has the following structure:

Section 2 - Summary of the Fitzroy Basin mine water balance and legacy water inventory.

Section 3 - Summary of an evaluation of the Pilot Scheme from a water quality and mine water management perspective.

Section 4 - Section 5- MBI options, and pre­requisites and scenario assessment.

Section 5 - Summary of study outcomes and recommendations.

8 AGRICULTURE WATER ENVIRONMENT

Page 9: PLANNING MAY 2013 - parliament.qld.gov.au · underground (long-wall) mining (7) techniques to extract coal. The type of coal is mine specific and includes: coking, thermal and PCI

MARSDEN JACOB SSOCIATE"S +GILEERI SUTHJU.AN)

2 Mine water

balance/inventory

There are currently 36 operational coal mines in the Fitzroy Basin (March 2013), as depicted on Drawing 1 (at the end of this section) and distributed as follows:

Nogoa/Mackenzie catchment: 16

Isaac River catchment: 13

Connors River catchment: 3

Dawson River catchment: 3

Callide River catchment: 1

These mines use either open-cut (29) or underground (long-wall) mining (7) techniques to extract coal. The type of coal is mine specific and includes : coking, thermal and PCI (pulverised coal injection).

As a key element of the overall understanding of the current status of mine water in the Fitzroy Basin, mine-specific data was obtained from all operating coal mines within the Basin with regards 'legacy water' volume and salinity . For the purposes of this study, legacy water has been defined as all mine-affected water stored on-site in excess of normal mine water management capacity and currently, or with the potential to , adversely impact mine operations.

Legacy water volume and salinity data was obtained for each mine for two periods: (i) prior to the wet season (nominally 1 November 2012), and (ii) end of March 2013, providing a clear picture of the change in legacy water conditions at a basin-scale, down to specific mines.

At the time of reporting , 22 of 36 operating coal mines in the Fitzroy Basin reported holding Legacy water:

9 (of 16) -Mackenzie sub-catchment

9 (of 13)- Isaac sub-catchment

1 (of 3) -Connor sub-catchment

2 (of 3) -Dawson sub-catchment

1 (of 1) - Callide catchment

There is currently around 250 gigalitres of legacy water in assessed Fitzroy Basin coal mines. Typical electrical conductivity (EC) of legacy water is around 5,000 micro-siemens per centimetre (f!S/cm), with substantial variability across mine sites and also between mines.

Figure 1 depicts legacy water volumes by catchment. For many mines, the volume of legacy water increased over the 2012/13 wet season as indicated by the generally higher volume in March 2013 compared with November 2012. Almost all mines across the Basin showed a general increase in water storage over 2012/13 Wet Season - with the exception of two Pilot Scheme mines.

2.1 Discussion and conclusions

There are three (3) key factors influencing the ability of mines to effectively manage their mine water balance. These are:

Regulatory: the rules and conditions within which they are required to operate and release. This regulatory framework defines the level of protection of downstream/in-stream values and characteristics ;

Operational: the mine-specific infrastructure and management arrangements in place on individual mines which dictate the level of release capability; and

Hydrological: the natural climatic and stream flow characteristics that influence all real­world, actual opportunities for release.

Based on our assessment of the regulatory, operational and hydrological conditions within the Fitzroy Basin since 2008 (the point at which legacy water inventories started to become problematic) the major contributing factors to the current state of legacy water include:

Climatic conditions since the 2007/08 wet season, including above average rainfall and specific, short-duration extreme flood events ; and

Post-2008 regulatory changes (in the form of modified Environmental Approval (EA) release

9

Page 10: PLANNING MAY 2013 - parliament.qld.gov.au · underground (long-wall) mining (7) techniques to extract coal. The type of coal is mine specific and includes: coking, thermal and PCI

+GILEEHI SliTlERI.JN) MARSDEN JACOB ASSOCI A ~E.S

conditions) which constrained the ability of mines to release water during subsequent flow events.

The change in regulatory conditions altered the individual mine water balance of those mines with release comprising a key component of their approved mine water management plan. This change, in combination with above average

130,000

November 2012

120,000 March-2013

110,000

100,000

90,000

~ 80,000

~ .. s 70,000 ~ .. .. 2J ., 60,000 ., ~ 0

"' 50,000 ., a:

40,000

30,000

20,000

10,000

0

Comet Connors Dawson

rainfall conditions over recent years, has lead to the accumulation of excess water on-site.

Options to return to a sustainable long-term mine water management balance need to involve changes to either one or both of these regulatory and operational factors.

Don River Isaac MacKenzie Nogoa

Figure 1 - Reported legacy water volume (by catchment)

10 AGRICULTURE WATER ENVIRONM£:.NT

Page 11: PLANNING MAY 2013 - parliament.qld.gov.au · underground (long-wall) mining (7) techniques to extract coal. The type of coal is mine specific and includes: coking, thermal and PCI

a.. <( 2

,---l--j >-1-

:J <( () 0 ...J

• oJ

"iii c 0 ·c;,

Page 12: PLANNING MAY 2013 - parliament.qld.gov.au · underground (long-wall) mining (7) techniques to extract coal. The type of coal is mine specific and includes: coking, thermal and PCI

+GILEERI SUTl£RlAN) MARSDEN JACOB ASSOCIATE~

3 Evaluation of 2012/2013

Pi lot Scheme

In late 2012, the Queensland government initiated a program that permitted pilot releases of water into the Fitzroy River catchment from four (4) BHP-Billiton Mitsubishi Alliance (BMA) coal mines located in the Isaac River catchment.

At the time of preparing this report, sampling, data collection, analyses and reporting associated with the 2012/13 Enhanced Environmental Monitoring Program (EEMP) (involving a series of weekly and monthly rounds of data collection, as well as post­Wet Season water quality and fish survey tasks) was not complete. This report is therefore based on the information available to date.

Evaluation of the Pilot Scheme has been undertaken from the perspective of the level of improved opportunity for release as well as the maintenance of monitored water quality outcomes and compliance with the regulated release conditions.

3.1 Pilot conditions

The Department of Environment and Heritage Protection (DEHP) issued amended EAs to four coal mines located in central Queensland to conduct a pilot release of mine water during the 2012-13 wet season. The four mines provided with approval to take part in this pilot are the BHP Billiton Mitsubishi Alliance's (BMA) mines:

Goonyella Riverside

Peak Downs

Saraji

Norwich Park.

These mines are all located in the Isaac River catchment.

The Pilot Scheme was structured to provide for improved release opportunities whilst maintaining a controlled and managed form of release. Amendments in the EAs took the form of modification to the downstream limit on electrical conductivity within the Isaac River and other

12

receiving waters, as well as changes in the flow rate triggers defining the commencement and cessation of release events.

An important point to note is that the amended conditions adopted for the Pilot Scheme maintained the requirement for release under flow event conditions only, thereby ensuring a controlled and managed change.

3.2 Mine water management outcomes

Comparison of release opportunity under Pilot and non-Pilot conditions shows significant mine water management improvement under relatively few/small release events to date. Specific changes in legacy water volume over the 2012/13 wet season for the pilot mines were as follows:

Goonyella-Riverside- 17% reduction;

Peak Downs - a 12% reduction; and

Saraji and Norwich Park - no net reduction.

Closer analyses of the conditions for, and outcomes of, release during the flow events indicate that the absence of improvement in legacy water volumes for Saraji and Norwich Park is a combination of:

1. Hydrological: specific flow conditions within the ephemeral streams into which these mines release experienced over the period of the Pilot; and

2. Operational: An apparent inherent conservatism on the part of the mine operators due to the risk of being penalised for breaching regulatory conditions, as well as (potentially) release rate limitations.

Independent of legacy water drawdown outcomes over the period, our assessment indicates that the Pilot conditions improved release opportunity by between 25% and 1 00% over non-amended conditions, with the variability in improvement dependent on the operational characteristics of the mine and specific behavior of each release event.

AGRICULTURE WATER ENVIRONMENT

Page 13: PLANNING MAY 2013 - parliament.qld.gov.au · underground (long-wall) mining (7) techniques to extract coal. The type of coal is mine specific and includes: coking, thermal and PCI

MARSDEN JACOB +GILI£RI SlJT1-ERl.AN)

3.3 Regulatory compliance

Comprehensive assessment of the releases undertaken against the amended EA conditions determined that the releases met all conditions significant to potential environmental harm and other release-related conditions in the EAs governing the participant coal mines.

3.4 Monitoring and water quality outcomes

Downstream water quality was monitored by the Department of Natural Resources and Mines (DNRM), including an EEMP which defined sampling and analysis for a range water quality parameters at seven monitoring locations, prior to, during and following Pilot release events.

Review of the monitoring information to date indicates:

1. Mine operators' managed releases within all required regulatory flow and water quality limits;

2. There were no measured effects on salinity levels downstream of Isaac/Connors confluence; and

3. Short-term effects were only noted for the Isaac River at Deverill.

On the basis of the available information, we identify the following general outcomes regarding the effect on water quality as measured by EC due to Pilot Scheme mine water releases:

Isaac River at Deverill -attributable effect. The monitoring location immediately downstream of Pilot Scheme participant mines and size of flow event volumes providing opportunity to release leads to EC levels elevated above what would be background levels without release . The effects were relatively short duration (i.e. period of release) with EC levels following release periods reducing to levels not inconsistent with pre­release levels;

Connors River at Pink Lagoon - 'no attributable effect'. No Pilot Scheme releases were made upstream of this location;

Isaac River at Yatton - 'no attributable effect'. Flow and EC levels at Yatton were generally very similar to those recorded for the Connors River. There were no observable differences that would indicate effect due to Pilot Scheme mine water releases;

MacKenzie River upstream Isaac confluence - 'no attributable effect'. No Pilot Scheme releases were made upstream of this location;

MacKenzie River downstream Isaac confluence- 'no attributable effect'. EC levels and behaviour at Coolmaringa were generally very similar to those recorded for the Isaac River, with some indication of increased salinity above those recorded at Yatton; and

Fitzroy River- 'no attributable effect'. EC levels and behaviour at the Fitzroy River monitoring location were generally very similar to those recorded for the MacKenzie River, with evidence of significant contribution of flows from catchments other than the MacKenzie/Isaac/Connors.

Parameters, other than EC, showed similar outcomes in terms of no attributable impact due to Pilot mine water releases, and the majority showed levels below adopted guideline values. For example, petroleum hydrocarbons were not detected at any sites and have not been reported to date in any samples.

Those parameters that showed one or more levels higher than the adopted guideline values were reviewed further and the following general outcomes are noted:

Dissolved oxygen (DO) exhibited a high degree of variability across the Basin prior to the wet season (or releases). DO values during the wet season were generally higher compared with the pre-event sample with no apparent relationship to pilot mine water release;

Levels of dissolved copper (Cu) were generally uniform across the basin prior to the wet season (or releases), ranging from <0.5 (i.e. below detection) to 1.0f.lg/L. Levels during flow events were also consistent across the

13

Page 14: PLANNING MAY 2013 - parliament.qld.gov.au · underground (long-wall) mining (7) techniques to extract coal. The type of coal is mine specific and includes: coking, thermal and PCI

+Gil.EERI SU11£RlAN) MARSDEN JACOB <-<:,OCIA E')

locations sampled and indicate no specific relationship to pilot mine water releases. Levels immediately downstream of Pilot participant mines varied between 0.6f!g/L and 2.6uf!g/L and across the wider (and downstream) catchment between 0.6f!g/L and 5.6f!g/L;

Levels of dissolved manganese (Mn) exceeded the adopted guideline level for aquaculture at various locations during monitoring, for both pre- and post-release samples. Levels varied significantly both between sample locations and also at individual locations, with no consistent pattern. A significant point to note is that dissolved manganese levels in the Isaac River downstream of the pilot mines remained below adopted irrigation and environmental protection guidelines levels for all post-release sampling;

Total aluminium (AI} exhibited a high degree of variability across the Basin over the period sampled, with no consistent pattern between recorded levels downstream of pilot mines and those elsewhere in the Basin;

Similar to total aluminium, levels of total iron (Fe) exhibited a high degree of variability across the Basin over the period of sampling, with no consistent pattern between recorded levels downstream of pilot mines and those elsewhere in the Basin. There is no apparent pattern in Fe levels to indicate impact due to pilot mine water releases; and

Total manganese showed reasonably consistent levels across the Basin, with generally similar recorded levels at all locations for each sampling event. There is no apparent pattern to indicate a relationship to pilot mine water releases.

The observations above are intended to provide informative insight into the conditions as recorded during the November 2012 to March 2013 period.

14

All electrical conductivity data is publicly available through the DNRM water monitoring portal1 and once validated, all monitoring results from the enhanced monitoring program, undertaken to support the pilot, are available at the Fitzroy River website.2

As well as detailed data, a summary of the monitoring results from each sampling event is also provided at the Fitzroy River website.

3.5 Evaluation outcomes

The Pilot Scheme was evaluated as being successful in terms of:

Improving mine water release opportunities, particularly when other mines across the Basin showed general increase in water stored over 2012/13 Wet Season . Assessment indicates improved release opportunity of between 25% and 100% over non-amended conditions for release events experienced during the assessment period ;

Achieving compliance with all regulatory conditions ; and

The absence of material effects on salinity levels downstream of Pilot Scheme participant mine sites.

Furthermore, the full water management benefit from the Pilot Scheme may not have been realised due to :

Conservatism on the part of the mine operators against the risk of being penalised for breaching regulatory conditions ; and

Mine re lease infrastructure/operational limitations (e .g. release capacity) .

1 Electronic access to the Department of Natural Resources

and Mines water monitoring portal is available at <http ://watermonitoring .derm.qld .gov.au/host.htm> 2 . . . . . .

V1 s1t http :1/www. f1tzroynver. qld .gov. au/mon 1ton ng-program .html.

AGRICULTURE WATER ENVIRONMENT

Page 15: PLANNING MAY 2013 - parliament.qld.gov.au · underground (long-wall) mining (7) techniques to extract coal. The type of coal is mine specific and includes: coking, thermal and PCI

MARSDEN JACOB SSOCIA~E"S +GILBERI SUTl£RI.AN)

4 Role of market based Instruments

4.1 Overview

As a component of the overall study, we reviewed the role that market-based instruments (MBis) could play in managing both legacy and long-term operational mine water within the Fitzroy River Basin.3 MBis are policy tools that encourage behavioural change through market signals rather than through explicit directives. There are three categories of MBis :

Quantity-based (cap and trade, bubble and offsets) ;

Price-based (auction, subsidies and taxes); and

Market friction (product differentiation and labelling).

There are several pre-requisites for MBis, particularly quantity-based instruments. However, when considering saline water management in the Fitzroy Basin there are two key pre-requisites:

Clear and demonstrable link between the rights specified and the environmental outcomes sought (the Cap); and

Significant number of potential market participants with heterogeneous characteristics.

Subject to these key pre-requisites being met, our analysis has identified three MBis with the potential to deliver cost-effective mine water management outcomes in the Fitzroy Basin :

Cap-and-trade MBis have relevance to the Fitzroy Basin because they provide a tool to manage total salinity within a cap, while allowing flexibility for different market participants (coal mines) to optimise releases of saline water across operations;

3 Companion document by Marsden Jacob Associates

"Background Paper- MBis Case Studies and Implications for the Fitzroy Basin", April 2013.

4.2

Bubble trading schemes could potentially be used to increase flexibility in the Fitzroy Basin . Bubble trading schemes appear to have most relevance to geographically constrained areas in the catchment where there is a cluster of mines that would benefit from the ability to coordinate and more efficiently manage salt across the different mines, while acting as a group; and

Auctions could complement either cap-and­trade or bubble scheme alternatives. Auctions can be used to facilitate the allocation of salinity credits according to each auction participant's estimation of value. This MBI has been successfully used in the Hunter River Salinity Trading Scheme to manage market power issues and help create an opportunity for new market entrants to acquire credits.

Hydrological modelling

Our assessment approach was based on modelled outcomes for a range of scenarios (discussed in Section 4.3). The scenarios were assessed using a hydrological model and high­level economic assessment.

The hydrological model uses the whole-of-basin Fitzroy Integrated Quantity-Quality Model (lOOM) with a water quality (salinity) component included. Pre-existing modelling was upgraded or otherwise modified to provide individual, mine-specific water balance simulation for operational coal mines across the Basin. It utilised approximately 120 years of daily data (1889-2007),representing spatial variation (in terms of climate, hydrology, water allocation and use, etc) across the Basin.

The characteristics of each individual mine-site (such as mine water system catchment area, release capacity, current stored water volume and EC) were based on :

(i) data provided/confirmed by relevant company personnel ; and

(ii) estimated data where company feedback was unavailable within the timeframe of the study.

15

Page 16: PLANNING MAY 2013 - parliament.qld.gov.au · underground (long-wall) mining (7) techniques to extract coal. The type of coal is mine specific and includes: coking, thermal and PCI

+GILEERI SUTl£RLAK) MARSDEN JACOB ASC:.OCIATlS

Simulation of mine-specific release was based on:

(i) ensuring consistency with current environmental approvals (EAs) as provided by the DEHP, including Transitional; Environmental Program (TEP)/Temporary Emissions Licence (TEL) conditions where currently applicable; and

(ii) representation by an 'aggregated' release point where more than one is specified in the current EA.

Consequently, we could simulate point-source contribution to in-stream salinity due to mine water release on a mine-by-mine basis.

The model's representation of river salinity levels was based on flow-EC relationships as developed (by DSITIA) for all available contributing sub­catchment areas within the Fitzroy Basin.

The current model configuration inherently includes diffuse-source contribution to in-stream salinity (both natural and man-induced). However, these estimates are not simulated as an explicit , discrete process. Similarly, other potential point­source contributions to in-stream salinity (e.g. town wastewater treatment plant releases) are not currently simulated as an explicit, discrete process. The overall contribution of these point sources to in-stream salinity is likely to be minor.

4.3 Assessment framework

The modelling was used to answer the over­arching project question: Can current water release arrangement be improved in a manner that enhances economic, social and environmental outcomes?

A stepped methodology (shown in the figure below) was used to assess the scenarios and explore the impact on legacy and business-as­usual water.

Key issues in the assessment framework, included :

16

Hydrological constraints: Are there any hydrological constraints, i.e., releases that are limited by the duration and frequency of release events?

Operational constraints : Are there any operational constraints , i.e. , releases that are limited by the size of pumps and location of storages at the mines?

Regulatory constraints: Are there any regulatory constraints, i.e., releases that are limited by the salinity levels at the release point, in the tributary, river, or at the Rockhampton Barrage?

Economic: Is there likely to be a net public benefit?

Trading Scheme: Are the critical pre-requisites met? Is there a clear and demonstrable link between the rights specified and the environmental outcomes sought (the Cap)? Are there a large number of potential market participants with differing characteristics?

Stakeholders: Mines- Do changes improve the current arrangements? Environmental -Are existing environmental outcomes preserved or improved? Community - Are salinity outcomes likely to be acceptable to water consumers (irrigators and potable users)?

Governance: Do the arrangements improve transparency and accountability?

Modelling was undertaken for four scenarios, including:

Base Case: This scenario assumes current EAs apply to all mines and is the scenario against which other scenarios are compared to understand the incremental impact of relaxing conditions around the EAs.

Scenario A: Under this scenario Pilot-style conditions are assumed to apply to all mines.

Scenario B: This scenario assumes Pilot-style conditions for all mines combined with increased mine releases. Under this option, mine releases were assumed to increase to a maximum of either double the current pump rate or 5 m3/s which ever was the higher.

Scenario C: This scenario assumes Pilot-style conditions and increased mine development. This scenario was modelled to identify how close

AGRICULTURE WATER ENVIRONMENT

Page 17: PLANNING MAY 2013 - parliament.qld.gov.au · underground (long-wall) mining (7) techniques to extract coal. The type of coal is mine specific and includes: coking, thermal and PCI

MARSDEN JACOB SSOc.IA fES +GIIBERI SUT1£RI.AN)

different sub-catchments are to the point where a 'cap on releases' needs to be implemented. This was achieved by iteratively simulating and assessing the salinity impacts of increasing levels of mine development within key mining areas of the Fitzroy Basin. The level of increase was defined in terms of additional hectares of mine disturbed area coupled with an assumption of similar disturbed area/mine water capture characteristics as that shown generally across the Basin . Pilot-style flow and EC cond itions were enforced and the level of increased development was determined as that point at which release opportunities were being significantly constrained compared with current development level assessment outcomes.

4.4 Key findings

The key findings from our assessment are summarised below:

Base Case- current EA's: Mine water is not in balance for most mines under existing EA conditions (Figure 2). Mines are unable to release sufficient water to balance mine water inflows, with main constraint to release due to 'end-of­pipe ' or other release-point conditions .

Scenario A - Pilot-style conditions for all mines: Pilot-style conditions would result in a significant improvement in Basin-wide water management outcomes for both legacy water and

• Base Ca se: Current environmenta l approva ls (EAs):

long-term mine water balance. The gains are not equal for all mines; with some mines benefitting more than others, depending on location, release capacity etc.

Scenario 8 - Pilot-style conditions and increased mine release rate : This scenario, whereby mine releases were increased to maximum of either doubled current pump rate or 5 m3/s, confirmed that several mines appear to have operational constraints. These mines could potentially improve release and mine water management outcomes with operational and/or infrastructure modifications.

Scenarios A and B both improved legacy and mine water management without the need for trading across mines. More importantly, the modelling revealed that a key MBI pre-requisite, "the need for a cap on releases", is not currently present in the Fitzroy Basin. While relaxing the regulatory constraints may result in localised salinity impacts, the impacts at sub-catchments and end-of-catchment scales were small and did not result in critical thresholds being exceeded.

Scenario C - Pilot-style conditions and increased mine development: Our results indicated that the Fitzroy Basin currently is not at capacity in terms of salt load either at the sub­catchment or whole-of-catchment level. This result is illustrated in Figure 3 for the Isaac River sub-catchment which shows that simulated

•Long- term mine wate r ba lance (bas in-wide and il lustrahve case studies). •Legacy water (bas in-wide and il lustrative case studies). J

•Scenario A: What is the incremental impact of pilot cond itions being applied across all m ines, in terms of their: •long-term water ba lance> • legacy water?

•Scenario B: What is the incrementa l 1m pact of pi lo t condihons and relaxed mine outlet assumptions (eg pumping capac ity ) on their: • long-term water balance?

• legacy water?

•Scenari o C: When does a growth constraint (sa lt load carrying capacity) on new mine development emerge under Pilot (no legacy) arrangements'

•Tra ding Scheme : •Are key trading scheme pre- requ isites currently or likely to be met in t he future? • Is the t rading scheme likely to deliver a net incre menta l benefit>

J

)

17

Page 18: PLANNING MAY 2013 - parliament.qld.gov.au · underground (long-wall) mining (7) techniques to extract coal. The type of coal is mine specific and includes: coking, thermal and PCI

+GILEERI SlJTl£RI.AN) MARSDEN JACOB .;,c:;oc IAfF'

- ::..l.t'IIJ U•'o

OJ

E "' 0 J:..::..: .;..;8 u "' OJ bJl r:l .... 0

u 1Sb9 J92~ l'ol3 '0

Figure 2- Simulated long-term mine water storage

salinity outcomes for Scenarios A and B remain consistent with both the Base Case outcomes as well as the defined Water Quality Objectives (WOO's) of the Fitzroy Basin Freshwater Aquatic

Ecosystem Water Quality Guidelines (DERM 2011 ). Figure 4 shows that with increased mine development (Scenario C), simulated salinity levels at the Fitzroy Barrage remain below 600 EC at all times and below 400 EC for more than 95% of days across the 120 year simulation period.

However, iterative assessment of 'potential mine development ' indicates that MBis may be warranted in the future at:

18

Roper Creek - The assessment found that Roper Creek may be close to the point where a 'cap on releases ' could be required. Thus Roper Creek might benefit from either a cap­and-trade or bubble scheme MBI in the near future. Feasibility will be dependent on localised constraints , such as tributary water quality outcomes and the number and nature of market participants ;

Upper Isaac - Depending on the location of future development, additional release similar to that for (say) 3 to 4 mines could lead to

:.94Y 1%9 1~/9 l !..J9

significant competition for release under the EA type approach. Under this scenario the Upper Isaac may benefit from either a cap and-trade or bubble scheme MBI ; and

Blackwater Creek - Future development lead ing to additional re lease similar to that for (say) 1 or 2 mines could lead to significant competition for release under EA type approach . Under this scenario Blackwater Creek may benefit from either a cap-and-trade or bubble scheme MBI.

When development reaches a point that it is necessary to establish a cap on saline water emissions (to preserve environmental and social values), it is anticipated that the benefits from a trading scheme will quickly exceed the cost of establishing a trading scheme.

Assessment of a range of alternative options to manage salt, demonstrated that the benefits4

could readily be in the range of $20-100 million (in

4 Benefits in this sense refers to the avoidance of future costs

or the capacity for future mine expansion. The MBI would allow coal mining companies through the market to find the most cost-effective way to manage or remove salt.

AGRICULTURE WATER ENVIRONMENT

Page 19: PLANNING MAY 2013 - parliament.qld.gov.au · underground (long-wall) mining (7) techniques to extract coal. The type of coal is mine specific and includes: coking, thermal and PCI

MARSDEN JACOB S OCIATtS +GILBERI SUT1-ERI.RD

present value terms), resulting from reduced capital and operating expenditure (e.g. desalination facilities at the mine, pipeline, pumps and associated labour) and increased economic returns from mining expansion. It should be noted that these are estimates only, and detailed studies on specific options including the location and nature of investment would be required to fully quantify the benefits. In comparison, the cost of establishing a trading scheme is estimated to be

in the order of $16-20 million (present value cost over 30 years). These costs included capital costs (monitoring equipment and network), policy and regulatory costs, and recurrent expenditure on network operation, maintenance and infrastructure replacement.

Dawson and the remainder of Nogoa/Mackenzie do not appear to have potential for competition for release , resulting in the need for a 'cap on releases' in the medium-term.

Simulated EC - Isaac R @Yatton

1:.1:_

E ~-J GL ·~·

: :J .! ::.•',, bJ '

% da)•s e--.ceed e d

Figure 3 - Simulated Electrical Conductivity (Isaac River at Yatton)

f·J,_ I I 11 1e - I::Ol ' .I I~ "'

::w~

19

Page 20: PLANNING MAY 2013 - parliament.qld.gov.au · underground (long-wall) mining (7) techniques to extract coal. The type of coal is mine specific and includes: coking, thermal and PCI

+GIL.t£RI SUT1-ERI.AN) MARSDEN JACOB SSOCIAnS

Simulated EC- Fitzroy Barrage

l..:iG ::•

.!:.);, ,.. ,_,:.; ~u . _._,

Figure 4- Simulated Electrical Conductivity (Fitzroy Barrage)

4.5 Conclusions

In terms of the application of MBI's to salinity management within the Fitzroy Basin, we conclude that:

20

Key pre-requisites for a trading scheme to deliver beneficial outcomes are not yet present;

Extension of pilot style conditions to other mines is currently the most cost-effective solution for both the management of legacy water and long-term mine water ;

Extending pilot style conditions to other mines may result in localised salinity impacts, but impacts at sub-catchment and catchment levels is very small as illustrated by Figures 3 and 4, showing comparative simulated salinity levels in the Isaac River at Yatton and within the Fitzroy River Barrage respectively. Further, simulated salinity levels within the Barrage remain below 600 flS/cm (well below

recommended Australian and International drinking water quality guidelines) under all modeled scenarios;

Mine operators appear to be releasing less than the optimal volumes of saline water, because they are either concerned about receiving fines or penalty notices or do not have adequate infrastructure capacity (e.g . pumps and pipelines) to fully exploit release events; and

That in the future some form of salinity trading scheme may be appropriate. If the pre­requisites are met for a trading scheme it will likely be considerably more cost-effective than the next best alternative.

Several discrete areas (e.g. Roper Creek and Upper Isaac) are relatively close to meeting the key pre-requisites (defined above) for a trading scheme.

AGRICULTURE WATER ENVIRONMENT

Page 21: PLANNING MAY 2013 - parliament.qld.gov.au · underground (long-wall) mining (7) techniques to extract coal. The type of coal is mine specific and includes: coking, thermal and PCI

MARSDEN JACOB '-'- < lA +GILEERI SUT1-ERl.AN)

5 Outcomes and recommendations

5.1 Key outcomes

Our assessment indicates that current mine water management conditions (i.e. significant "Legacy water") is due to the combination of:

modified EA release conditions post-2008, in particular "end-of-pipe" water quality requirements; and

coincident period (i.e. 2009-2013) of above average rainfall/runoff conditions.

The combination of these factors led to a significant reduction in the ability of mines to release during a period of above average mine water inflows.

Extension of pilot style conditions to other mines is currently the most cost-effective solution. These changes would deliver substantial benefits from both legacy water drawdown and long-term mine water balance perspectives.

Whilst the key pre-requisites for a trading scheme to deliver beneficial outcomes are not yet present, several discrete areas (e.g. Roper Creek, Upper Isaac) are relatively close to meeting these pre­requisites. In effect, the Fitzroy River system is not currently capacity constrained from a salt load perspective, but constraints would likely emerge in some sub-catchments if there was additional mine development without reduction in salt load from other sources.

Fitzroy Basin hydrological/salinity assessment indicates that local water quality constraints are likely to be limiting to mine release opportunity, rather than catchment/basin-scale water quality characteristics. Moreover, relaxing regulatory constraints (e.g . shifting from 'end-of-pipe ' to down-stream monitoring) may result in localised salinity impacts, but impacts at the sub-catchment and catchment levels are estimated to be immaterial.

Legacy water problems appear to have been primarily caused by the changes to EAs

post-2008 and the consequent shift in water balance of operating mines. Technical assessment indicates that relaxing regulatory constraints has the potential to have a marked positive impact on legacy water volumes over time compared with current EA conditions. However the rate of legacy water drawdown will depend ultimately on operational investment/readiness and the climatic and streamflow conditions experienced.

Our analysis indicates that mine operators appear to be releasing less than the permitted release volumes, most likely because they:

operate conservatively e.g. are concerned about receiving fines or penalty notices; and/or

have operational constraints e.g. do not have adequate infrastructure capacity to fully exploit release event opportunity.

5.2 Way forward

Whilst our assessment has demonstrated that the Fitzroy Basin as a whole is currently "not at capacity" in terms of salt load at a catchment/sub­catchment scale there is an opportunity to enhance the management of mine water release and therefore water quality outcomes within the Basin .

The components of this improved management framework include:

a well-defined and transparent water quality monitoring, assessment and reporting framework (parameters, locations, criteria);

extension of modified regulatory release conditions (pilot-style conditions) to other mines; and

improved stakeholder support, including: information exchange and support to mine operators; optimise mine water management outcomes and release opportunities; and improve understanding of impacts across all stakeholders.

We recommend that these measures be encapsulated within a formal Fitzroy Basin Salinity Management Strategy.

21

Page 22: PLANNING MAY 2013 - parliament.qld.gov.au · underground (long-wall) mining (7) techniques to extract coal. The type of coal is mine specific and includes: coking, thermal and PCI

Recommended