REPORT IN MANAGEMENTPlan and Planning Tools
TTh 10:30-12:00
Source: Samuel Certo
What is PLAN? Plan is a specific action proposed to help the
organization achieve its objectives. Rational managers are crucial to the
development of an organization plan. › A critical plan of the management of any
organization is developing logical plans and then taking the steps necessary to put the plans into action.
› Regardless of how important experience-related intuition may be to managers successful management actions and strategies typically are based on reason.
Dimensions of plans
Repetitiveness
Time
Scope Level
According to Kast and Rosenzweig.. REPETITIVENESS is the extent to which
the extent plan is used over and over again.› Non-repetitive are plans which are designed
for one situation that is relatively short term in nature.
› Repetitive are plans which are designed to be used after time for long term recurring situations.
TIME is the length of time the plan covers.› Strategic plan covers long period of time.› Tactical plan covers short period of time.
SCOPE is the portion of the total management system at which the plan is aimed. › Some plans are design to cover the entire
management system: the organizational environment, inputs, process and outputs. This plans are called Master Plan.
› Other plans are designed to cover only a portion of management system.
› “The greater the portion of the management system that a plan covers, the broader the plan’s scope is said to be.
LEVEL is the level of the organization at which the plan is aimed.› Top level plans (top management)› Middle and lower plans (middle and lower
management)› Plans designed for any level of the organization
have some effect on all other levels since they are interdependent.
Types of planOrganization
al Plans
Standing Plans
PoliciesProcedures
Rules
Single-Use Plans
ProgramsBudget
Two types according to Repetitiveness Dimension Standing Plans are used over and over
again because they focus on the organizational situations that occur repeatedly.› Policy is a standing plan that furnishes broad
guidelines for taking action consistent.› Procedure is a standing plan that outlines a
series of related actions.› Rule is a standing plan that designates
specific action. To be effective? They must consistent and
mutually supportive.
Single-Use Plans are used only once- or, at most, several times--- because they focus on unique or rare situations within the organization.› Program is a single-use plan designed to carry
out a special project within an organization. The project exist to achieve some purpose that, if
accomplished, will contribute to the organization’s long term success. It is not intended to remain in existence over entire life.
› Budget is a single-use financial plan that covers a specified length of time. It details how fund will be obtained or spent. They are also Strategies for organizational control.
Why plans fail? (study by K.A. Ringbakk)
Corporate planning is not integrated into total management system.
There is a lack of understanding of the different steps of the planning process.
Managers at different levels in the organization have not properly engaged in or contributed to planning activities.
Responsibility for planning is wrongly vested solely in the planning department.
Management expects that plans developed will be realized with little effort.
In starting formal planning, too much is attempted at once.
Management fails to operate by the plan.
Financial projections are confused with planning.
Inadequate inputs are used in planning. Management fails to grasp the overall
planning process.
Planning Areas Input Planning is the development of
proposed action that will furnish sufficient and appropriate organizational resources for established organizational objectives.› Two factors in this area:
1. Plant Facilities Planning2. Human Resource Planning
DefinitionPlant Facilities
Planning Human Resource
Planning It involves determining the type of buildings and equipment an organization needs to reach its objectives.
Site selection is a major part of this determination. It is deciding where a plant facility should be located. Foreign Location is one factor that significantly influences site selection.
It involves reflecting on organizational objectives to determine overall human resource needs; existing human resource inventory for the net human resource needs to seek appropriate members to meet this.
Human resource is another area of concern to input planners. Organization objectives can’t be obtained without appropriate personnel.
Steps of Weighing Process
Deciding on a set of variables critical to obtaining an appropriate site.
Assigning each of these variables a weight reflecting its relative importance.
Ranking alternative sites according to how
Questions that personnel planners should try to answer: What types of people does the organization
need to reach its objectives? How many of each type are needed? What steps should the organization take to
recruit and select such people? Can present employees be further trained to
fill needed positions? At what rate are employees being lost to
other organizations?› Future needs for human resources are influenced
mainly by employee turnover, the nature of the present workforce and the rate of growth of organization.
Planning Tools These are techniques managers
can use to help develop plans.
The most important of these tools are:› Forecasting› Scheduling
Forecasting V.S. Scheduling
• Qualitative (jury of executive opinion, sales force)
• Quantitative (moving average, regression, product stages)
Forecasting
• Gantt Charts• Program Evaluation and
Review Technique (PERT)Scheduling
Forecasting It is the process of predicting future
environmental happenings that will influence the operation of the organization.
The importance of forecasting lies his ability to help managers understand the future makeup of the organizational environment, which, in turn, helps them formulate more effective plans.
It is a imprecise science according to recent survey.
How does it works? (William C. House, Insect Control Services Company)
Establish relationships between industry sales and national economic and social indicators.
Determine the impact government restrictions on the use of chemical pesticides will have on the growth of chemical, biological and electromagnetic energy pest-control markets.
Evaluate sales growth potential, profitability, resource required, and risks involved in each of its market areas (commercial, industrial, institutional, governmental and residential).
Evaluate the potential for expansion of marketing efforts in domestic geographical areas as well as in foreign countries.
Determine the likelihood of technological breakthroughs that would make existing product line obsolete.
Type of forecast
Sales Forecast is a prediction of how high or low sales of the organization’s products or services will be over the period of time under consideration.› It is the key forecast of organizations because
it serves as the fundamental guideline for planning.
› Only after the sales forecast has been completed can managers can decide. Sales forecasting is considered the key
organizational forecast.
Methods of Forecasting
QUALITATIVE METHOD› Jury of Executive Opinion Method of
sales forecasting is straight forward. A similar, more recently developed forecasting method, called DELPHI METHOD also gathers, evaluates, and summarizes expert opinions as the basis for a forecast, but the procedure is more formal than that for the jury of executive opinion.
The BASIC DELPHI METHOD employ the following steps: Various experts are asked to answer,
independently and in writing, a series of questions about the future of sales or whatever other area is being forecasted.
A summary of all the answers is then prepared. No expert knows how any other expert answered the questions.
Copies of the summary are given to the individuals experts with the request that they modify their original answers if they think it necessary
Another summary is made of these modifications, and copies again are distributed to the experts. This time, however, expert opinions that deviated significantly from the norm must be justified in writing.
A third summary is made of the opinions and justifications and copies are once again distributed to the experts. Justifications in writing for all answers is now required.
The forecast is generated from all of the opinions and justifications that arise from Step 5.
> Sales Force Estimation Method It is a sales forecasting technique that predicts future sales by analyzing the opinions of sales people as a group.
It is considered to be valuable management tool and is commonly used in business and industry throughout the world
QUANTITATIVE METHOD› Moving Average
It utilizes historical data to predict future sales level.
› Regression Method predicts future sales by analyzing the
historical relationships between sales and time.
› Product Stages Method It Predicts future sales by using the product
life cycle better to understand the history and future of the products.
› Product Life Cycle It is the five stages through which most
products and services pass.
Scheduling
It is the process of formulating a detailed listing of activities that must be accomplished to attain an objective, allocating the resources necessary to attain the objective, and setting up and following time tables for completing the objective.
It is the integral part of every organizational plan.
Grantt Charts It is a scheduling device developed by
Henry L. Gantt. It is essentially a bar graph with time on
the horizontal axis. It is used for scheduling resources,
including management system inputs such as human resources and machines.
The main weakness of the Grantt Chart is that it does not Contain any information about the interrelationship of tasks to be performed.
Program Evaluation and Review Technique (PERT) It is a technique that involved partly from the
Grantt chart, is a scheduling tool that emphasize the interrelationship of tasks.
It is a network of project activities showing both the estimate of time necessary to complete each activity and the sequence of activities that must be followed to complete the projects.
This scheduling tool was developed in 1935 for designing and building Polaris Submarine Weapon System.
Steps in Designing PERT Network List all the activities/ events that must
be accomplished for the project and the sequence in which these activities/ events should be performed.
Determine how much time will be needed to complete each activity/ event.
Identify the critical path.
ACTIVITIES › These are specified sets of behaviour
within a project. EVENTS
› These are the completions of major project tasks.
CRITICAL PATH OF A PERT NETWORK› It is the sequence of events and activities
requiring the longest period of time to complete. This is called critical because a delay on completing this sequence results in a delay in completing the entire project.
THE ENDThank you!