POMMS(Plant Operation and Maintenance Management System)
Keun-Tae Kim,Korea East-West Power Co., Ltd
8/3/2019 Plant Operation and Maintenance Management System Korea
2/45
EWP Who we are ?
Threat & Strategy
What we need to win ?
POMMS Configuration & Functions
Conclusion
Presentation Summary
8/3/2019 Plant Operation and Maintenance Management System Korea
3/45
. EWP Who we are ?
One of Gen Companies
as KEPCO group
6 Sites
39 Units
9,501MW,
Capacity Factor : 60.6%
Efficiency : 39.91%
Il San CC
Dang Jin TPP
Dong Hae TPPCFBC
Ul SanTPP & CC
Ho Nam TPP
Pumped-Storage
1,750 Units
71,989MW,
Capacity Factor : 66.7%
Efficiency : 39.82%
8/3/2019 Plant Operation and Maintenance Management System Korea
4/45
. EWP Who we are ?
Base LoadModdle LoadPeak LoadRenewable
CoalO ilLNGHydraulicSo lar
47.36%23.15%
29.47% 0.02%
22.10%
22.10% 51.57%
7.37% 0.01%
Fuel Portfolio
Load Portfolio
8/3/2019 Plant Operation and Maintenance Management System Korea
5/45
. Threat and Strategy
Saturation of economic growth & power consumption
High cost fuel as time passes
Extreme competition among generation companies
Penetration electric market by domestic & overseas IPP
Try to retrofit old power plant instead of building new power plant
How to survive at this environment ?
8/3/2019 Plant Operation and Maintenance Management System Korea
6/45
Increase Generation Capacity
- Reduce forced outage hour by optimization work schedule
- Prevent unforced outage by Early warning system Decrease maintenance cost
- Purchase material by statistically control BOM
- Light maintenance cost by optimization PM activities- Over haul cost by moving from TBM to CBM
How to monitor output ? by NERC Index
. Threat and Strategy
/
8/3/2019 Plant Operation and Maintenance Management System Korea
7/45
. What we need to win ?
How to increase competitiveness ?
Do we need any management system ?
What kind of management system ?
Other companies ?
- ERP for what ? Asset management
- PI for what ? Monitoring & Early warning System- Other method ? Preventive & Predictive maintenance
What we need is
- Economic decision making support system based on reliability- Statistical plant maintenance management system
- Predictable condition analysis and guide system
8/3/2019 Plant Operation and Maintenance Management System Korea
8/45
R C M
Work Schedule ControlMaterial, HR & Time
Real Time Calculation BLR, TBN, G/T, HRSG
Current Status NERC Index
H Q
. POMMS Configuration & Functions
Sites
To/From ERP
Air FlowPrssure Flow Temp
Contractor
Performance Management Plant Information Sys Plant Maintenance SysEfficiency Management
Real Time from DCS Statistical, Historical
Light & Heavy work DWG, Material, Cost
Short term Maintenance Less than 1 year MTBF EPRI & INI DB
Long Term Maintenance Longer than 3 Years Boiler & TBN On / Off line RBI
R B I
Cost Time Analysis
Target Equipment, Time & RangeMaintenance Planningbased on Condition
8/3/2019 Plant Operation and Maintenance Management System Korea
9/45
8/3/2019 Plant Operation and Maintenance Management System Korea
10/45
POMMS
Plant Performance Management1Plant Information System2
Plant Efficiency System3
RCM / RBI / Cost-Time5
. POMMS Configuration & Functions
Plant Maintenance Management Sys4
8/3/2019 Plant Operation and Maintenance Management System Korea
11/45
1. Plant Performance Management (Enterprise)
8/3/2019 Plant Operation and Maintenance Management System Korea
12/45
1. Plant Performance Management (Site)
8/3/2019 Plant Operation and Maintenance Management System Korea
13/45
1. Plant Performance Management (NERC Index)
Operating
Reliability
Maintenance
8/3/2019 Plant Operation and Maintenance Management System Korea
14/45
2. Plant Information System (Overall Status)
8/3/2019 Plant Operation and Maintenance Management System Korea
15/45
2. Plant Information System (PMS Interface)
8/3/2019 Plant Operation and Maintenance Management System Korea
16/45
2. Plant Information System (for Gen Expert)
8/3/2019 Plant Operation and Maintenance Management System Korea
17/45
2. Plant Information System (for TBN Expert)
8/3/2019 Plant Operation and Maintenance Management System Korea
18/45
2. Plant Information System (for I&C Expert)
8/3/2019 Plant Operation and Maintenance Management System Korea
19/45
2. Plant Information System (Speed Regulation)
8/3/2019 Plant Operation and Maintenance Management System Korea
20/45
3. Plant Efficiency Management System (TPP)
8/3/2019 Plant Operation and Maintenance Management System Korea
21/45
3. Plant Efficiency Management System (CC)
8/3/2019 Plant Operation and Maintenance Management System Korea
22/45
3. Plant Efficiency Management System (Report)
8/3/2019 Plant Operation and Maintenance Management System Korea
23/45
4. Plant Maintenance Management System
8/3/2019 Plant Operation and Maintenance Management System Korea
24/45
4. PMS - Work Order Management
Light Maintenance ~OH = Work Order
8/3/2019 Plant Operation and Maintenance Management System Korea
25/45
4. PMS - Work Order Level
Up, Cause, FF, FS, SF, SS for All W/O
8/3/2019 Plant Operation and Maintenance Management System Korea
26/45
4. PMS Operator Shift Report
All Team Managers Should look at this
8/3/2019 Plant Operation and Maintenance Management System Korea
27/45
4. PMS Post Accident Management
Correcting Order & Feedback by Work Order, No Paper
8/3/2019 Plant Operation and Maintenance Management System Korea
28/45
4. PMS PM - Maintenance
8/3/2019 Plant Operation and Maintenance Management System Korea
29/45
4. PMS PM - Measurement
8/3/2019 Plant Operation and Maintenance Management System Korea
30/45
4. PMS - FMEA
8/3/2019 Plant Operation and Maintenance Management System Korea
31/45
4. PMS Menu Table
/ /
8/3/2019 Plant Operation and Maintenance Management System Korea
32/45
5. RCM / RBI / Cost-Time
POMMS
Circulating type CBMA
RCM AnalysisB
RBI Analysis
C
Cost-Time AnalysisD
CBM StrategicE
A Ci l i CBM
8/3/2019 Plant Operation and Maintenance Management System Korea
33/45
A. Circulating type CBM
RCMRBITrendPerformance
Cost-Time Work Order Design
O/H & LightMaintenance
BM & CM
8/3/2019 Plant Operation and Maintenance Management System Korea
34/45
B RCM
8/3/2019 Plant Operation and Maintenance Management System Korea
35/45
B. RCM
Before
- Do Light PM for all equipment
- Limit : Maintenance Resource (HR, Material, Budget)After
- Run to Fail Equipment Breakdown Maintenance
- Concentrating resources on core equipments
- Maximize ROI
RCM Living
- Interval : 2 Years
- Tool for the improvement PM & putting off PM Interval
C RBI Analysis
8/3/2019 Plant Operation and Maintenance Management System Korea
36/45
On-LineStress Analysis
Risk= PoF(t) CoF
Risk100
9080
7060
50
4030
20
10
Time
Design Info Inspection InfoPoF Cal
C. RBI Analysis
Final S/HFinal R/HSteam PipeMSVHP TBN
Temp Pr Load
100
200
300
400
500
1 2 300 4 5
NDTReplica
Material Inform
C RBI Analysis
8/3/2019 Plant Operation and Maintenance Management System Korea
37/45
4
3
2
1
AB
CD
E
Design Info
InspectionData
Operating info
RiskAssessment
C. RBI Analysis
5
DJ TPP #1
Steam Turbine
HP Turbine
LP Turbine
IP Turbine
HP Diaphragm
HP Inner Casing
HP Nozzle Box
HP Blade
HP Rotor
Boiier
Next Inspect Risk Rate
92 M 1 E
106 M 2 C
HP Diaphragm
138 M 2 DHP Inner Casing
98 M 2 D
HP Nozzle Box
92 M 1 DHP Blade
112 M 1 E
HP Rotor
Next O/H time : 92 M Later
C RBI Analysis
8/3/2019 Plant Operation and Maintenance Management System Korea
38/45
C. RBI Analysis
Before
- Time Based Maintenance (TBM) for O/H
- Loss of resources and decrease of income
After
- Depend on the condition of TBN & BLR
(A Class : HP TBN, B & C Class : BLR)
- Increase income & reliability
- Decrease maintenance cost
D Cost Time Analysis
8/3/2019 Plant Operation and Maintenance Management System Korea
39/45
D. Cost-Time Analysis
Conclusion
8/3/2019 Plant Operation and Maintenance Management System Korea
40/45
Operation & Performance ParadigmB
Maintenance Paradigm
C
POMMS CenterD
. Conclusion
EWP CBM Master PlanA
A EWP CBM Master Plan
8/3/2019 Plant Operation and Maintenance Management System Korea
41/45
A. EWP CBM Master Plan
Investment
Review Planning Kick-Off Completion CBM begins CBM
2004. 9 2005. 1 2005. 6 2006 2007 2008.12 2009. 1 ~ 2013.122014. 1~
Design, Construction & Test
Cost Saving 4 mil $ + 1.6 mil$/Unit + 2.3 mil$/Unit +
TBM CBM TBM RCM (HN)
RBI (DJ)
RCM (Trip/RB) RCM (All)
RBI (Boiler)
RBI (TBN-Test)
RBI(TBN/BLR)
Change O/H Ref EOH for TPP BLR TBN
CC ST & HRSG
Cost Center Profit Center
B Operation & Performance Paradigm
8/3/2019 Plant Operation and Maintenance Management System Korea
42/45
Single Angle Monitoring (Central Control Room)
Paper Based Work & Analysis
360 Angle Monitoring & Analysis Infra (CEO ~ Employee)
Web Based Work, Report & Analysis
B. Operation & Performance Paradigm
First Aid SpecialGeneral
Expert
Patient
EngineerOperatorPlant
Cost Saving
= 4 mil $ +
C Maintenance Paradigm
8/3/2019 Plant Operation and Maintenance Management System Korea
43/45
Abolition all paper Works
CMMS EffortlessReal time process Timeless
Standardization Simple
C. Maintenance Paradigm
Organization Equipment
Design
Information
Procedure
Permission
Project Control
Material
Drawing
Budget
Analysis
Labor
Paper
Individual
Different
22 Steps
No Tool
Disconnected
Disconnected
Disconnected
Cant
Closed
Computer
Database
Unification
Max 10 Steps
Real Time
Interfaced
Interfaced
ERP Interface
Can
Open
TagRed/Yellow/Blue Red
Cost Saving ? ?
D POMMS Center
8/3/2019 Plant Operation and Maintenance Management System Korea
44/45
Post Accident Managet
Plan / Actual Managet
Performance Managet Equipment reinforcement
Early Warning System
Data Cleansing
Provide technical advicefor special fields
Life time assessment
Analysis Operating &Maintenance result
Real time trend Analysis Technical Support RBI & RCM Analysis O/H Support
D. POMMS Center
Tech Expert Teamen Operating TeamGen Planning Team
Outsourced ExpertR & D Resources
EWPProfit Center
8/3/2019 Plant Operation and Maintenance Management System Korea
45/45
Thank You
Any Question ?