Continuous Improvement Platforms Boosting Operating Performance Resource Planning, Scheduling and COQ www.cresultsconsulting.com cResults / ERD confidential 1 Resource Planning, Scheduling, Cost of Quality and Efficiency Management for QC Laboratories www.smart-qc.com Batch Record Release Management and Overall QA Scheduling & Efficiency Management www.cmanageefficiency.com By an IPS affiliate
Transcript
Page 1: Platforms - smart-qc.comsmart-qc.com/pdf/smartqcpresentation2011.pdf · QC Planning and Scheduling Goals KPI – measure progress toward Operation Excellence QC cResults / ERD confidential

Continuous Improvement Platforms

Boosting Operating Performance

Resource Planning, Scheduling and COQ

www.cresultsconsulting.com

cResults / ERD confidential 1

Resource Planning, Scheduling,

Cost of Quality and Efficiency

Management for QC Laboratories

www.smart-qc.com

Batch Record Release Management

and Overall QA Scheduling &

Efficiency Management

www.cmanageefficiency.com

By an IPS affiliate

Page 2: Platforms - smart-qc.comsmart-qc.com/pdf/smartqcpresentation2011.pdf · QC Planning and Scheduling Goals KPI – measure progress toward Operation Excellence QC cResults / ERD confidential

Table of Contents

Short Introduction

Managing Labs Operation

Frequent Asked Questions by our management team

QC Planning and Scheduling Goals

KPI – measure progress toward Operation Excellence QC

cResults / ERD confidential 2

KPI – measure progress toward Operation Excellence QC

and QA

Smart-QC Cycle Time Tracking

Smart-QC Integration with LIMS.

Case Studies

Efficiency & Service Level

Reduce Cost & Cycle Time

Page 3: Platforms - smart-qc.comsmart-qc.com/pdf/smartqcpresentation2011.pdf · QC Planning and Scheduling Goals KPI – measure progress toward Operation Excellence QC cResults / ERD confidential

Introduction to Smart-QC

What is Smart-QC?

Smart-QC is a web based resource planning and scheduling, efficiency management and COQ software solution designed specifically for QC laboratories.

It was designed to effectively manage the dynamic and complex QC environment.

cResults / ERD confidential

Why QC Lab?

The lab is one of the most complex environments in terms of number of products, methods, equipment, size and hence requires an advanced platform to improve visibility, enhance & automate the scheduling practices and help improve the overall performance.

3

Page 4: Platforms - smart-qc.comsmart-qc.com/pdf/smartqcpresentation2011.pdf · QC Planning and Scheduling Goals KPI – measure progress toward Operation Excellence QC cResults / ERD confidential

What are the drivers?

In today's business environment, operational challenges such as Cycle Time Reduction, Improved Efficiency, Right First Time, and Schedule Adherence are recognized as imperative issues that we are targeting to enhanced by using Smart-QC.

Introduction to Smart-QC

cResults / ERD confidential

What activities are being covered by Smart-QC?

Smart-QC covers ALL activities performed in the lab:

– This includes the basic activities such as tests and auditsyet it also includes non-test related activities such as training, meetings, investigations, cleaning, etc.. So Smart-QC will provide a holistic view of ALL activities performed in the lab.

4

Page 5: Platforms - smart-qc.comsmart-qc.com/pdf/smartqcpresentation2011.pdf · QC Planning and Scheduling Goals KPI – measure progress toward Operation Excellence QC cResults / ERD confidential

Smart-QC At Glance

Capacity planning for both analysts and instruments (“What if Analysis” ���� assess impact of Volume & Mix Changes, Automation / IS, Process Changes)

Receive Incoming Samples from LIMS, maximize

campaigning opportunities (i.e., Stability & FG) at the

method level, Auto Schedule based Analysts Qualification, Proficiency & Availability.

Scheduling

Planning

cResults / ERD confidential 5

Proficiency & Availability.

Track Efficiency and Monitor ALL other lab activities

Cost of Quality (COQ) ���� Cost per product, Cost per Test, Overhead and Indirect Cost Allocation and complete lab budget linked to a selected forecast (i.e., 2009; 2010)

Provide Real time Dashboard of Lab throughput, Efficiency, Cycle Time and On-Time delivery, and various reports and Key Performance Indicators (i.e., Backlog, Projection, Overtime)

COQ

Dashboard

Page 6: Platforms - smart-qc.comsmart-qc.com/pdf/smartqcpresentation2011.pdf · QC Planning and Scheduling Goals KPI – measure progress toward Operation Excellence QC cResults / ERD confidential

Determine Resource Requirements for a given Forecast (Week, Month, Quarter, Year).

Additional Resources, Shift Structure, Allocation (internal / External), Cross Training, Special Project, Campaign Optimization etc.

(1) Do I have sufficient resources

(CAPACITY) ?

(2) How do we schedule

Managing Labs Operation: Strategic Level

and Daily Operation

Action Plan

“What if” Analysis

Resource

Planning

cResults / ERD confidential 6

Optimization etc.

(3) Monitoring / Reporting / KPI and

Cost of Quality(DASHBOARD)

Optimized Lab Performance based on Sample Arrival, Due Dates & Resources availability.

Track you COQ & Efficiency Improvements Opportunities

(2) How do we schedule samples / tests to

analysts (SCHEDULING) ?

Daily / Weekly

Schedule

KPI / Report

COQ

Page 7: Platforms - smart-qc.comsmart-qc.com/pdf/smartqcpresentation2011.pdf · QC Planning and Scheduling Goals KPI – measure progress toward Operation Excellence QC cResults / ERD confidential

INTRODUCTION: Today’s Challenges: Frequent Asked Questions by our management team

What is the impact of volume changes, mix changes, new product introduction on the QC laboratories?

What is the training road map to best meet future demands?

What is the expected work-load based on the new schedule?

What is the impact of a second and third shift?

What percent of time does the analyst spend on admin., preparation, set-ups, calculations?

cResults / ERD confidential 7

Which automation project has a significant ROI?

What is the analyst value added vs. non value added percentage?

What is the campaign effect on QC efficiencies?

Who should perform these tests ,when, in what order?

What is the expected overtime / backlog this month?

How many tests were completed, what was my analyst’s efficiency, what was my turn-around time and schedule adherence?

What are my KPIs showing me?

What is the resource cost of quality?

Page 8: Platforms - smart-qc.comsmart-qc.com/pdf/smartqcpresentation2011.pdf · QC Planning and Scheduling Goals KPI – measure progress toward Operation Excellence QC cResults / ERD confidential

Standardized planning and budgeting to ensure adequate number of equipment and analysts to meet customers demands.

Robust “What if” Analysis to assess impact of volume & mix changes, validation activities, method transfer, and more on lab resources

Automate scheduling to improve the overall management of tests and samples in the lab and eliminate manual and time consuming scheduling effort.

QC Planning and Scheduling Goals

cResults / ERD confidential 8

Enhance communication & visibility for all functions, hence reduce the email/phones/inquiry about sample status

Improve campaigning & efficiency throughout the labs

Provide clear prioritized schedule (R/Y/G) and expectations (Standard) for the users

Improve overall QC Lab transparency

Improve turn-around time and service level by more robust and automated scheduling algorithm

Continuous improvement platform to help identify and communicate efficiency losses & improvement opportunities.

Page 9: Platforms - smart-qc.comsmart-qc.com/pdf/smartqcpresentation2011.pdf · QC Planning and Scheduling Goals KPI – measure progress toward Operation Excellence QC cResults / ERD confidential

Automate key performance indicators & dashboard

Measure efficiency & accomplishments during the week

Analyst score-card highlights previous week efficiency, accomplishments, and non-test activities.

Overall efficiency by analyst / work center enables each lab manager to monitor progress and identify areas of improvements

Enhance overall analyst accountability and ownership by

QC Planning and Scheduling Goals

cResults / ERD confidential

Enhance overall analyst accountability and ownership by showing their activities completion against standards.

Consolidate ALL manual / MS Excel / MS Access based systems with ONE business tool that addresses ALL QC operational needs

9

Page 10: Platforms - smart-qc.comsmart-qc.com/pdf/smartqcpresentation2011.pdf · QC Planning and Scheduling Goals KPI – measure progress toward Operation Excellence QC cResults / ERD confidential

What should we expect from Smart-QC?Analyst View

Your weekly schedule will be automatically generated

Your schedule will optimize your workload, and campaigning opportunities

You will be able to account for all of your activities including testing, auditing, meetings, investigations, cleaning, and other

cResults / ERD confidential 10

testing, auditing, meetings, investigations, cleaning, and other

You will have a real-time visual list and status of your weekly goals and accomplishments.

You will be able to see detailed status and information about samples and test with a couple of clicks.

You will have a chance to communicate any issues/delaysrelated to your assignments so improvement actions can be generated.

Page 11: Platforms - smart-qc.comsmart-qc.com/pdf/smartqcpresentation2011.pdf · QC Planning and Scheduling Goals KPI – measure progress toward Operation Excellence QC cResults / ERD confidential

Track and Manage ALL Activities in the Lab

EH&S Training, GMP Training,

Communication, Holidays, On the Schedule, Track and Manage Tests, Audit

Plan, Schedule and Track Non-Test Related Activities

cResults / ERD confidential 11

Job Training, Performance

Review, Vacations, Personal DayManage Tests, Audit and Approval

Non-Test Related Activities (i.e., Instrument Qualification,

Change Control, Analytical Data

Trending, General Cleaning,

Investigations, Method Transfer,

Method Validation Review &

Support, Special Projects)

Resource

Support

25%

Facility

Support

28%

Test Related

(HOT)

47%

Page 12: Platforms - smart-qc.comsmart-qc.com/pdf/smartqcpresentation2011.pdf · QC Planning and Scheduling Goals KPI – measure progress toward Operation Excellence QC cResults / ERD confidential

Meaningful KPI –

measuring the progress

An effective labs’ structurethat support the business goals

Efficient Layout / Material Flow and Work Method / Make or Buy

Meaningful KPI –measuring the

progress

Reviewers performance,guidelines and harmonization

Clear roles and responsibilities(Mfg./Pkg./QA/QC)

Smart-QC & cME KPI – measure progress toward Operation Excellence QC and QA

QA Release Optimization QC Efficiency Improvement

cResults / ERD confidential 12

and Work Method / Make or Buy

Effective coordination & alignmentwith Mfg. / Planning / purchasing

Automation and adequate resources level(Instruments and Analysts)

Systems: LIMS / Data Acquisition / Planning / Daily Scheduling / Test Allocation / Training

Detailed Labs’ standards as a foundation for effective planning and Scheduling of the Labs’ resources

(Mfg./Pkg./QA/QC)

Value added vs. Non Value added reviews (Stage / Full Review)

Right First Time documentation –awareness, standardization, training, and

accountability

Investigation Closure improvement, early detection and determination, effective root

cause and CAPA

Batch Record design Streamlining (Layout, Clarity, Simplicity, and Standardization)

Page 13: Platforms - smart-qc.comsmart-qc.com/pdf/smartqcpresentation2011.pdf · QC Planning and Scheduling Goals KPI – measure progress toward Operation Excellence QC cResults / ERD confidential

Scheduling Complexity ���� Campaigning Effect on QC Efficiency

150 � 95 � 77

(1) � (2) � (3)

Total Analysts:

Campaign Size:

Example:Example:

20 samples a day (all labs)

6 tests per sample

10 day turnaround time

The number of tasks that need to

scheduled and scheduled and

cResults / ERD confidential 13

be scheduled and scheduled and

managed managed are: 1,200 1,200 !!!!!! ((20*6*10)20*6*10)

150

9577Cost Model

Page 14: Platforms - smart-qc.comsmart-qc.com/pdf/smartqcpresentation2011.pdf · QC Planning and Scheduling Goals KPI – measure progress toward Operation Excellence QC cResults / ERD confidential

ERP

Samples for IP / FG / RM / Micro / Stability.

LIMS

Planning & Scheduling -- LIMS -- ERP

Usage Decision

Samples AND Tests

cResults / ERD confidential 14

Key Performance Indicators

Schedule / Analyst

Efficiency Management Platform

Strategic Planning

COQ

Page 15: Platforms - smart-qc.comsmart-qc.com/pdf/smartqcpresentation2011.pdf · QC Planning and Scheduling Goals KPI – measure progress toward Operation Excellence QC cResults / ERD confidential

S0 E3S1 E1 S2 E2 S3

Q1 (Batch & Assigned)

Q2(Pending for

Audit)

Q3(Pending for

Approval)

Queue Time

Smart-QC Cycle Time Tracking

Overall Sample Cycle Time

cResults / ERD confidential 15

E3

Arr

iva

l o

f th

e S

am

ple

-P

lan

nin

g

Sta

rt o

f B

atc

h 1

ou

t o

f N

En

d P

os

t R

un

Sta

rt A

ud

it

En

d A

ud

it

Sta

rt A

pp

rova

l

En

d A

pp

rova

l

Process / Test

P1 P2 P3

Hand On Time (~20%-40% of CT)

Longest Test

Page 16: Platforms - smart-qc.comsmart-qc.com/pdf/smartqcpresentation2011.pdf · QC Planning and Scheduling Goals KPI – measure progress toward Operation Excellence QC cResults / ERD confidential

Case Studies

Case Study-1: Campaigning Effect on Efficiency

Case Study-2: Efficiency Gain: Earned Hrs. Since Smart-

QC Kick off (3 clients)

cResults / ERD confidential 16

Page 17: Platforms - smart-qc.comsmart-qc.com/pdf/smartqcpresentation2011.pdf · QC Planning and Scheduling Goals KPI – measure progress toward Operation Excellence QC cResults / ERD confidential

Case Study

� During 2008 average campaign size was:

2.5 tests

� Since the deployment of Smart-QC began in Jan-21, campaign size

1 ���� 2 ���� 3 ���� 4

65 ���� 42 ���� 35 ���� 31

Campaign Size:Analysts Required:

Avg. Campaign 2.5 (2008) ���� 4.2 since Smart-QC was implemented

Case Study-1: Campaign Effect

cResults / ERD confidential 17

Jan-21, campaign size is averaging:

4.2 tests

� This represents about

20% efficiency gain

Lower campaign size in 2008 was due to lack of robust scheduling tool and process. Planning required significant rush samples to be released which reduced overall flexibility.

Page 18: Platforms - smart-qc.comsmart-qc.com/pdf/smartqcpresentation2011.pdf · QC Planning and Scheduling Goals KPI – measure progress toward Operation Excellence QC cResults / ERD confidential

Case Study-2.1: Efficiency Gain: Earned

Hrs. Since Smart-QC Kick off

223.2

258.1267

279.2 282.6

240

260

280

300

Eff

icie

ncy [

%]

Earned Hrs. Per WeekSince Smart-QC Go-Live

Earned Hrs. increases by

cResults / ERD confidential 18

192.5

212.5

223.2

180

200

220Eff

icie

ncy [

%]

Earned Hrs

Earned Hrs = Sum of ALL Test related activities times the STD

Earned Hrs. increases by

almost 50%

Page 19: Platforms - smart-qc.comsmart-qc.com/pdf/smartqcpresentation2011.pdf · QC Planning and Scheduling Goals KPI – measure progress toward Operation Excellence QC cResults / ERD confidential

42.4%

36.4%41.3%

59.7%63.6%

55.4%

40.8%

72.6%

93.8%

83.1%

70.1%

30.0%

40.0%

50.0%

60.0%

70.0%

80.0%

90.0%

100.0%

300

400

500

600

700

800

900

1,000

Ax

is T

itle

Efficinecy & Earned Hrs for past 12 wks

Case Study-2.2: Efficiency Gain: Earned

Hrs. Since Smart-QC Kick off

cResults / ERD confidential

27.1%

0.0%

10.0%

20.0%

30.0%

0

100

200

300

Axis Title

Earned Hrs Efficiency

19

Earned Hrs = Sum of ALL Test related activities times the STD

The average efficiency for the last 4 weeks is 79.9% while the first 4 weeks of

that 12 weeks period was 36.8%

Page 20: Platforms - smart-qc.comsmart-qc.com/pdf/smartqcpresentation2011.pdf · QC Planning and Scheduling Goals KPI – measure progress toward Operation Excellence QC cResults / ERD confidential

Case Study-2.3: Efficiency Gain: Earned

Hrs. Since Smart-QC Kick off

Week Date Avail Hrs Unavail HrsNon Test

HrsRemaining Hrs Earned Hrs Unaccounted Hrs

% Earn Hrs Of

OverallEfficiency

35 29-Aug-10 1,718 323 461 934 655 279 38.1% 70.1%

34 22-Aug-10 1,712 270 582 861 715 145 41.8% 83.1%

33 15-Aug-10 1,552 220 397 934 876 58 56.4% 93.8%

32 8-Aug-10 1,535 217 411 906 658 248 42.9% 72.6%

31 1-Aug-10 1,522 237 402 883 360 523 23.7% 40.8%

30 25-Jul-10 1,521 174 433 914 507 407 33.3% 55.4%

cResults / ERD confidential 20

30 25-Jul-10 1,521 174 433 914 507 407 33.3% 55.4%

29 18-Jul-10 1,557 120 612 825 525 301 33.7% 63.6%

28 11-Jul-10 1,529 189 665 675 403 272 26.3% 59.7%

27 4-Jul-10 1,535 321 479 736 303 432 19.8% 41.3%

26 27-Jun-10 1,914 250 586 1,077 292 786 15.2% 27.1%

25 20-Jun-10 1,906 315 617 974 354 620 18.6% 36.4%

24 13-Jun-10 1,902 319 603 980 415 565 21.8% 42.4%

Standard Smart-QC Report: The average efficiency for the last 4 weeks is 79.9% while the first 4

weeks of that 12 weeks period was 36.8%

Page 21: Platforms - smart-qc.comsmart-qc.com/pdf/smartqcpresentation2011.pdf · QC Planning and Scheduling Goals KPI – measure progress toward Operation Excellence QC cResults / ERD confidential

SMART-QC Coming Soon to

your Lab

cResults / ERD confidential

Web Site: www.smart-qc.comEmail: [email protected] Web Site: www.cresultsconsulting.comContact Info: Rafi Maslaton; 1-732-748 1990 ext. 250