+ All Categories
Home > Documents > PLD report Dec-16

PLD report Dec-16

Date post: 14-Apr-2017
Category:
Upload: prateek-rai
View: 108 times
Download: 5 times
Share this document with a friend
19
This is a proprietary document of Kirloskar Brothers Limited 1 6/12/22 Prepared by:- Prateek Rai
Transcript
Page 1: PLD report Dec-16

This is a proprietary document of Kirloskar Brothers Limited 1May 3, 2023

Prepared by:- Prateek Rai

Page 2: PLD report Dec-16

This is a proprietary document of Kirloskar Brothers Limited 2May 3, 2023

Cumulative MTBF & MTTR

Apr-

16

May

-16

Jun-

16

Jul-1

6

Aug-

16

Sep-

16

Oct

-16

Nov

-16

Dec

-16

0

10

20

30

40

50

13.96

21.1028.20

34.10 34.2036.40 36.15 37.51

33.14

25

MONTHS

DAY

S

TAR-GET - 25

MTBF Trend

GOODAp

r-16

May

-16

Jun-

16

Jul-1

6

Aug-

16

Sep-

16

Oct

-16

Nov

-16

Dec

-16

02468

1012141618

4.60 3.40 3.60 3.30 3.90

7.13 7.67 8.07

14.27

1.50

MONTHS

HOURS

TARGET – 1.5MTTR Trend

GOOD

Page 3: PLD report Dec-16

This is a proprietary document of Kirloskar Brothers Limited 3May 3, 2023

PLD Equipment – Maintenance Performance

Apr

-16

May

-16

Jun-

16

Jul-1

6

Aug

-16

Sep-

16

Oct

-16

Nov

-16

Dec

-16

10

20

30

17.85

17.82 22.76 23.7022.62

20.76

13.88

20.4521.80

25

MONTHS

DAYS

TARGET - 25 MTBF Trend

GOOD

Apr

-16

May

-16

Jun-

16

Jul-1

6

Aug

-16

Sep-

16

Oct

-16

Nov

-16

Dec

-16

0

2

4

6

8

10

12

4.803.20

2.823.24

5.676.62

11.06

4.54

9.37

1.50

MONTHS

HOURS

TARGET – 1.5

MTTR Trend

GOOD

18

19

20

21

22

23

24

2524.2

20.2

FY 2015-16FY 2016-17

Days

012345678

1.82

5.70

FY 2015-16FY 2016-17

Hours

Page 4: PLD report Dec-16

This is a proprietary document of Kirloskar Brothers Limited 4May 3, 2023

Foundry Equipment – Maintenance Performance

Apr-

16

May

-16

Jun-

16

Jul-1

6

Aug-

16

Sep-

16

Oct

-16

Nov

-16

Dec

-16

0

5

10

15

20

25

30

17.5216.50

21.8217.87

16.69

22.82

20.17 21.85 24.0225

MONTHS

DAY

S

TARGET - 25

MTBF Trend

GOOD

Apr-

16

May

-16

Jun-

16

Jul-1

6

Aug-

16

Sep-

16

Oct

-16

Nov

-16

Dec

-16

0

2

4

6

8

10

0.81

2.40

0.80 1.23

2.781.28

6.23

3.08

9.80

1.50

MONTHS

HOURS

TARGET – 1.5MTTR Trend

GOOD

Page 5: PLD report Dec-16

This is a proprietary document of Kirloskar Brothers Limited 5May 3, 2023

SMPD Equipment – Maintenance Performance

Apr-

16

May

-16

Jun-

16

Jul-1

6

Aug-

16

Sep-

16

Oct

-16

Nov

-16

Dec-

16

05

1015202530

25

20.25 13.73 15.87 16.08 13.4918.22 18.02 18.18

20.82

MONTHS

DAY

S

TARGET - 25

MTBF Trend

GOOD

Apr-

16

May

-16

Jun-

16

Jul-1

6

Aug-

16

Sep-

16

Oct

-16

Nov

-16

Dec-

16

02468

1012141618

10.7 5.8

4.74.6

8.9

15.5

4.73.0 1.8

1.50

MONTHS

HOURS

TAR-GET – 1.5

MTTR Trend

GOOD KVBT 65-Geometrical accuracy problemBoth ball screw repaired & bearing replaced

Miven 500(RKB)-Turret indexing problem

Page 6: PLD report Dec-16

This is a proprietary document of Kirloskar Brothers Limited 6May 3, 2023

LPD Equipment – Maintenance Performance

Apr-

16

May

-16

Jun-

16

Jul-1

6

Aug-

16

Sep-

16

Oct

-16

Nov

-16

Dec

-16

0

10

20

30

40

50

15.78

23.2330.58 37.14

37.68

21.2416.11

21.03

21.6325

MONTHS

DAY

S

TAR-GET - 25

MTBF Trend

GOODAp

r-16

May

-16

Jun-

16

Jul-1

6

Aug-

16

Sep-

16

Oct

-16

Nov

-16

Dec

-16

0

6

12

18

24

2.93 1.44 2.973.88 5.34 3.07

21.60

5.37

15.60

1.50

MONTHS

HOURS

TARGET – 1.5MTTR Trend

GOOD SK 40- Spindle gear box gear worn out.New gear & bearing fitted

Page 7: PLD report Dec-16

This is a proprietary document of Kirloskar Brothers Limited 7May 3, 2023

7

Preventive maintenance

Aug-

16

Sep-

16

Oct

-16

Nov

-16

Dec

-16

0102030405060

47 4840 38

4347 4843

3846

PM

Plannedachieved

MONTHS

MACHINE

Aug-16 Sep-16 Oct-16 Nov-16 Dec-160

10

20

30

40

50

60

1116

2614

9

18

7

9

8

10

Breakdown monitoring of PM m/cs

Nov-16 m/csOct-16 m/csSep-16 m/csAug-16 m/cs

Page 8: PLD report Dec-16

This is a proprietary document of Kirloskar Brothers Limited 8May 3, 2023

8

Bar chart-MTBF

DOOSAN HMC(RKB)

HELLER 250(DB) MIVEN 500(KPD) DYNA 100(KPDS) MIVEN 500(DB)0.002.004.006.008.00

10.0012.0014.0016.0018.00

4.38 4.615.83

12.40 12.60

Top m/c With lowest MTBF(SMPD)

Days

Turret indexing problemSet indexing proxy & pressure setting

YOUJI 2000(ATPD)

KBL 120 CNC WOTON RAPID

VW 4 AXIS MACHINE

CARANAGI0.00

2.00

4.00

6.00

8.00

10.00

12.00

3.51

6.85 7.278.18 8.27

Top m/c With lowest MTBF(LPD)

Days

I/o channel probSMPS changed

GF MIXER K-LINE SAND PLANT 28CFT SUPERTUMBLAST SHOT BLAST

BMD MOULDING DRAG CIF NEW SAND PLANT0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

1.13

3.55 3.634.15 4.21

Top m/c With lowest MTBF(Foundry)

Days

Sand accumulation prob

Main chain driving shaft damageShaft & spockit changed

427 belt damageBelt changed427 belt damage

Belt changed

Spindle speed problemReplaced speed changing coil

Machine stabilizer problemCheck stabilizer & repaired

Sliding door problemReplaced door bearing

Page 9: PLD report Dec-16

This is a proprietary document of Kirloskar Brothers Limited 9May 3, 2023

9

Bar chart-MTTR

KBL 46” V

TL

MAZA

K MULT

IPLEX

DOOSAN HM

C(SC)

HELLE

R 250 (KPD)

MKL C

-600(DB)

1

6

11

16

21

2624.16

6.53 6.06 5.11 4.13

Top m/c With lowest MTTR(SMPD)

Days

Door jamming problemadjusted flow control valve

Hydraulic pump problemReplaced hydraulic pump

MOULDING M/C NO-1 FAME SHAKE OUT CUPOLA FURNACE NO 1 RAW MATERIAL FEEDING SYSTEM FOR CUPOLA

PLATE CONVEYOR IN CIF-30.00

20.00

70.00

120.00

170.00

220.00

270.00235.35

157.00

27.06 27.069.45

Top m/c With lowest MTTR(FOUNDRY)

Days

STANKO VBM CARANAGI VBM TITAN 3300 VBM KBL 120 CNC YOUJI 2000(ATPD)

0.00

50.00

100.00

150.00

200.00

250.00

300.00

259.24

115.16

10.50 9.17 7.01

Top m/c With lowest MTTR(LPD)

Days

I/o channel probSMPS changed

Spindle rotating problem

Page 10: PLD report Dec-16

This is a proprietary document of Kirloskar Brothers Limited 10May 3, 2023

Oil consumption

Apr-

16

May

-16

Jun-

16

Jul-1

6

Aug-

16

Sep-

16

Oct

-16

Nov

-16

Dec

-162350

245025502650275028502950305031503250

2478

2854

2584

2893

2795

3019

2612

25402677

2800

3150

PLD

ConsumptionTARGETBench mark

LITE

RS

0

1000000

2000000

3000000

4000000 3663300

2821980

1770353

FY 14-15 FY 15-16 FY 16-17

Oil cost in Rs

10006000

110001600021000260003100036000410004600051000 45830

37800

24451

FY 14-15 FY 15-16 FY 16-17

Oil in liters

Page 11: PLD report Dec-16

This is a proprietary document of Kirloskar Brothers Limited 11May 3, 2023

11

Coolant oil consumption

0

5000001000000150000020000002500000300000035000004000000

3354978 3351559

2075131

Coolant oil cost in Rs

FY 14-15 FY 15-16 FY 16-17

0

500010000150002000025000300003500040000

31610

22855

13694

Coolant oil in liters

FY 14-15 FY 15-16 FY 16-17

Apr-

16

May

-16

Jun-

16

Jul-1

6

Aug-

16

Sep-

16

Oct

-16

Nov

-16

Dec-

16

500

1000

1500

2000

2500

1486

801

1330

1527.1

1836

1506.716

1825.2 1881.4

150117001900

PLD

ConsumptionTargetBench mark

LITE

RS

Page 12: PLD report Dec-16

This is a proprietary document of Kirloskar Brothers Limited 12May 3, 2023

Power consumption

Apr-1

6

May

-16

Jun-

16

Jul-1

6

Aug-

16

Sep-

16

Oct-

16

Nov-

16

Dec-

16

1000000110000012000001300000140000015000001600000170000018000001900000

1320276

15094031555571 1589122

15481731636559 1621182 1640358

1775961

1497657

1422774

PLD

Consu...

KW

H

10000003000000500000070000009000000

110000001300000015000000170000001900000021000000

17677583 18132649

14196605

Power consumption in KWH

FY 14-15 FY 15-16 FY 16-17

10000020100000401000006010000080100000

100100000120100000140100000

111788470 109096400

127476360.350817

Power consumption in Rs

FY 14-15 FY 15-16 FY 16-17

Page 13: PLD report Dec-16

This is a proprietary document of Kirloskar Brothers Limited 13May 3, 2023

Power consumption

Apr-

16

May

-16

Jun-

16

Jul-1

6

Aug-

16

Sep-

16

Oct

-16

Nov

-16

Dec-

16

50000

100000

150000

200000

250000

168420191651184222

189609 199918

232630

153983

178104

163632

SMPD Actual consump-tionExpected consumption

KWH

Apr-

16

May

-16

Jun-

16

Jul-1

6

Aug-

16

Sep-

16

Oct

-16

Nov

-16

Dec-

16

460000510000560000610000660000710000760000810000860000910000

699824

653189

870946

721641

694737

715493

731532

795914864502

Foundries

Actual consump-tionExpected consumption

KWH

FOUNDRY

Ap

r-16

May

-16

Jun-

16

Jul-1

6

Aug-

16

Sep-

16

Oct

-16

Nov

-16

Dec-

16

100000

120000

140000

160000

180000

200000

220000

147475158655

156329159450

143485154892

114069120844

140611

LPD Actual consump-tionExpected consumption

KWH

Apr-

16

May

-16

Jun-

16

Jul-1

6

Aug-

16

Sep-

16

Oct

-16

Nov

-16

Dec-

16

20000

30000

40000

5000060000

70000

80000

90000

29832

41263 43378

2767020603

5520161089

50178 48157

MONTHS

HRC

KWH

Page 14: PLD report Dec-16

This is a proprietary document of Kirloskar Brothers Limited 14May 3, 2023

Cont..

Apr-

16

May

-16

Jun-

16

Jul-1

6

Aug-

16

Sep-

16

Oct

-16

Nov

-16

Dec-

16

20000

25000

30000

35000

40000

45000

50000

55000

24780

3225035337

31738319513726136774

33007

47264

MONTHS

KWH

Pump testing

Apr-

16

May

-16

Jun-

16

Jul-1

6

Aug-

16

Sep-

16

Oct

-16

Nov

-16

Dec-

16

140000

160000

180000

200000

220000

240000

155475

176718161764

179422186708

202614189442

196630202869

MONTHS

Com-pres-sor

KWH

CompressorAp

r-16

May

-16

Jun-

16

Jul-1

6

Aug-

16

Sep-

16

Oct

-16

Nov

-16

Dec

-16

6000

6500

7000

7500

8000

8500

9000

9500

10000

7043 70977314 7379 7215

7673

8293

90539494

MONTHS

Street light

KWH

Apr-

16

May

-16

Jun-

16

Jul-1

6

Aug-

16

Sep-

16

Oct

-16

Nov

-16

Dec-

16

30000

80000

130000

180000

230000

280000

330000

380000

87746

248580

96281

272213263556230795

326000

256628299432

MONTHS

Com-pres-sor K

WH

Others

Page 15: PLD report Dec-16

This is a proprietary document of Kirloskar Brothers Limited 15May 3, 2023

15

Pareto chart for power consumption

Foundrie

s

Compressor

OtherSM

PDLP

D

Res & co

m complex HRC

Pump testi

ng

Stree

t ligh

t0

100000200000300000400000500000600000700000800000900000

1000000

0.00

20.00

40.00

60.00

80.00

100.00

120.00864502

202869 171534 163632 140611 12789848157 47264

9494

Power consump-tioncummulative

Page 16: PLD report Dec-16

This is a proprietary document of Kirloskar Brothers Limited 16May 3, 2023

16

Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-160

1000

2000

3000

4000

5000 41394630

30603874

4519

3090 3350 30853628

3128

Consumption pattern per million

Units/million saleBench mark

KWH

Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-160.0

100.0200.0300.0400.0500.0600.0700.0800.0900.0

1000.0

717.2636.9

486.4572.5

467.2533.9

657.4529.7 526.2

863

Consumption pattern per pump

Units/pump saleBench mark

KWH

Electricity consumption pattern

Page 17: PLD report Dec-16

This is a proprietary document of Kirloskar Brothers Limited 17May 3, 2023

17

• Titan 2700 vertical screw nut replaced by new one & hard limit dog position corrected to seize heavy oil leakage. • Titan CNC lubrication pressure low alarm problem corrected by replacing PLC card.• Carnaghi CNC Z ball screw was jammed. Ball screw repaired & fitted in machine. • 9B Lathe new rack & pinion fitted.• Spm boring contractor replaced.• FN3 milling noise problem solved.• Kws 500 new telescopic cover fitted. • Norton grinder gear box piston was damaged, New piston was prepared in house and fitted in machine.• Woton stabilizer starting in auto mode work completed.• VBM-150(MF) spindle disc spring replaced.• New sliding rack & pinion fitted in 9B lathe• Dyna-65 x & z axis ball screw overhauled.• NFF furnace lied cover repair & refitted.• Supetumblast machine main chain driving shaft and sprocket changed.• Tata shakeout overhauled.• GF mixer gear box hollow shaft changed.• K-Line sand plant Magnet belt changed.• 426 idler pulley remove, rework & fitted.• 436 belt drive end pulley remove rework & fitted.• 427 belt replaced• 116 belt replaced• cupola no 1 CI bricks lining done• Arp BMD 1300 cope new scraper ring & guide bar bush fitted.

Major work

Page 18: PLD report Dec-16

This is a proprietary document of Kirloskar Brothers Limited 18May 3, 2023

18

Improvement

• Stanko VBM gear box & spindle motor overhauled.• Youji 2000 motor overloading ,ATC over travelled & lubrication pressure problems are permanently solved.• Pensotti CNC lubrication made functional.• 52” VTL panel reconditioning work started.• 437 Elevator Belt replaced by light weight SS fabricated Bucket in K-line.• Omega Sand Mixer(HF) arm made motor driven for movement.• Teflon scraper inserted to minimize sand contact to Table of BMD ARPA1300 & KBMD 450 Molding Machines.• Doosan(SC) oil leakage arrested.• Emergency stop problem solved in mazak multiplex.• Miven 500(DB) oil leakage from pump arrested.• KWS-500(SC) oil leakage arrested.

Page 19: PLD report Dec-16

This is a proprietary document of Kirloskar Brothers Limited 19May 3, 2023

Encon

• Replacement of 30 nos of 67W PL lamps with 30 nos of 30W LED lamps.• Rescheduling of heavy foundry and HRC to maximize “A” zone utilization.• Introduction of cold washing