SI. No. Category
(i)
(ii)
(iii)
(iv)
(v)
For a load of 100kw to 300 kw or the plotsize of 300 sq. meter to 1000 sq. meter
For a load of 100kw to 300 kw or the plotsize of 300 sq. meter to 1000 sq. meter
For a load above 300kw to 700 kw or the plotsize of 1000 sq. meter to 2000 sq. meter
For a load above 700kw to 1500 kw or the plot size of 2000 sq. meter to 4000 sq. meter
Cases not covered above
Installation of one number of 11kv PoleMounted Distribution Transformer
Description Minimum Size (Meters)
Installation of one number of 11kv PlinthMounted Distribution Transformer
Installation of one number of 11kv PlinthMounted Distribution Transformer
Installation of two number of 11kv PlinthMounted Distribution Transformer
4Mx 4M
8Mx 5M
9Mx 5M
10Mx 8M
Actual size based onload requirement
5
BRPL
BRPL
BRPLBRPL
BRPL
Rajdhani Power Limited.
39999707
.
CIN : U40109DL2001PLC111527,
This manual helps you with applying to BRPL for a permanent new electricity connection. As an Applicant for such a connection, youneed to fill up the following forms and submit specified documents as per of your application.
Space Requirement
The minimum space required to be provided by the developer / applicantfor installation of distribution transformers shall be as under :
Please fill details as applicable.
6CIN : U40109DL2001PLC111527,
The charges payable by you to BSES for New connection depends on the Tariff Category and sanctioned load :
(i) Advance Consumption Deposit / Security Deposit depending on your Sanctioned load and tariff category, as Specified in Table 1 below :
Charges payable for New Connection
(ii) In case area / Colony is electrified, the SLD charges shall be payable by all the consumer irrespective ofwhether it is electrified or Unelectrified area, The SLD charges as given in Table no. 2 would be leviable.
TABLE - 2
1
S.No. Type of area
I
II
III
i
ii
iii
IV
V
VI
2 3
Sanctioned Load
Electrified Area
Un-electrified Area
Upto 5 KW
6KW - 150KW
151KW-200 KW/ 215 KVA
Upto 4 KW
(Other than Agriculture)
5KW - 10KW
(Other than Agriculture)
11KW - 200 KW/ 215 KVA
(Other than Agriculture)
Upto 4 KW
(Agriculture)
5 KW - 10 KW
(Agriculture)
11KW - 200 KW/ 215 KVA
(Agriculture)
Amount (Rs.)
4 5
Road RestorationCharges
Total
3000
Maximum of 25000 (3000+ 500 per KW or KVA)
25000 + 400 per KW orKVA
8000 per KW
12000 per KW
20000 per KW or KVAas may be
1600 per KW
2400 per KW
4000 per KW or KVAas may be
Actual RR chargesfor service line
Actual RR charges for service line
Actual RR charges for service line
Actual RR charges for service line
Actual RR charges for service line
Actual RR charges for service line
Actual RR charges for service line
Actual RR charges for service line
Actual RR charges for service line
4+5
4+5
4+5
4+5
4+5
4+5
4+5
4+5
4+5
TABLE - 3OTHER MISCELLANEOUS CHARGES
S. No. Description Charges (Rs.)1234iii5iii6iiiiiiiv
Non-refundable registration cum processing fee of EHT and HT connectionField Inspection to be scheduled on a holiday for the LicenseeSecurity towards pre-payment meterOne time non-refundable charges for temporary connectionsLT SupplyHT SupplyShifting of meter and service line 1 on the same premisesSingle phase connection Three phase connection Installation Inspection Fee other than at the time of energising new connectionUpto 5 kWMore than 5kW upto 10 kWMore than 10 kWHT Installation
10005003000
250 per KW(Max 25000)
1000 per KW
5001000
1202004001000
S. No.
(1)
1
(i)
(ii)
(iii)
2
3
4
5
6
7
8
9
10
Domestic
Upto 2kW
Above 2kW upto 5kW
Above 5kW
Non-Domestic
Industrial
Agriculture
Public Lighting
Railway, DMRC, DIAL DJB
Mushroom Cultivation
Advertisement and Hoardings
Charging stations for E-Rickshaw/E-vehicle
Tariff Category (as per Tariff Order) Security Deposit for Permanent Connection(Rs. Per kW or per kVA as the case may be)
600
900
1200
4500
4500
300
3000
3000
600
4500
2500
Security Deposit for Temporary Connection(Rs. Per kW or per kVA as the case may be)
3000
S. No.
1 Refundable Security towards pre paymentmeter
Any Other Category not Speci?ed above To be decided by commission
Tariff Category (as per Tariff Order)
(2) (3)
7iii8iii9iiiiiiiv10
Special Meter Reading chargesLT connectionHT connectionCharges for reconnection in case of change of occupancy or temporary disconnection Single phase connectionThree phase connectionMeter testing chargesSingle phaseThree phaseCT meterHT meterCopy of duplicate bill (> one)
50200
200500
2005001000400020
Code 6. Charging of E-Rickshaw / E-Vehicle
6.1
6.2
Charging Stations for E-Rickshaw / E-Vehicle on Single
Delivery point
Charging E-Rickshaw / E-Vehicle at own premises other
than Charging Station
7CIN : U40109DL2001PLC111527,
9
To : M/s. BSES Rajdhani Power Limited (Name of the Licensee)
with your mains (As per CEA measures relating to safety and electric supply) regulation 2015 was tested by us on date .........................and
the installation resistance as per regulation 34 was ................................. mega ohms.
ELCB (as per regulation 42) found installed : Yes ( ) NO ( ) Make : ............................ Capacity : ............................
Licensed wiring Contractor Name, Seal & Signature
As per CEA guideline Regulation 14 Suitable cut out should be provided at the consumer premises.As per CEA guideline Regulation 16 earth terminal on consumer premises.As per CEA guideline Regulation 42 earth leakage circuit breaker whose maximum earth leakage thershold for tripping should notexceed 30 milli amp. for domestic connection and 100 milli amp. for all other installation.
Inspection Report
Reg. No.........................................................................
Signature of AMPS/DGM (Licensee)
(This Installation Test Report is to be certified by a Licensed Electrical Contractor. This is for reference of consumer.)