PLTU 2 x PLTU 2 x 33 MW MWNIAS SELATANNIAS SELATAN
SITE SELECTIONSITE SELECTION withwith
PLN CABANG NIAS and PLN EnjiniringPLN CABANG NIAS and PLN Enjiniring
1166-2-200 March March 2010 2010
Peta GPSPeta GPSPULAU NIASPULAU NIAS
LOKASI IPP PLTU NIAS 2x7 MW
FOTO LOKASI IPP FOTO LOKASI IPP PLTU NIAS 2x7 MWPLTU NIAS 2x7 MWGUNUNG SITOLI UTARAGUNUNG SITOLI UTARA
LOKASI 2PLTU NIAS SELATAN
2x3 MW
LOKASI 1PLTU NIAS SELATAN
2x3 MW
FOTO LOKASI 1FOTO LOKASI 1DESA SIWALUBANUADESA SIWALUBANUA
FOTO LOKASI 2FOTO LOKASI 2DESA TETEZOUDESA TETEZOU
LOKASI ALT 1 PLTU NIAS SELATAN
2x3 MW
LOKASI 3PLTU NIAS SELATAN
2x3 MW
FOTO LOKASI 3 DAN ALT - 1FOTO LOKASI 3 DAN ALT - 1DESA BALOHODESA BALOHO
LOKASI 3PLTU NIAS SELATAN
2x3 MW
LOKASI ALT - 1PLTU NIAS SELATAN
2x3 MW
LOKASI ALT 2 PLTU NIAS SELATAN
2x3 MW
FOTO LOKASI ALT - 2 FOTO LOKASI ALT - 2 GUNUNG SITOLI IDANOIGUNUNG SITOLI IDANOI
LOKASI ALT 3 PLTU NIAS SELATAN
2x3 MW
FOTO LOKASI ALT - 3FOTO LOKASI ALT - 3DESA BOZIHONADESA BOZIHONA
Rencana Lokasi PLTURencana Lokasi PLTU
IPP
PLTU NIAS 2x7 MW
LOCATION 1 LOCATION 2 LOCATION 3
Village Desa AfiaDesa
SiwalubanuaDesa Tetezou
Desa Baloho (Teluk)
Sub District
Gunung Sitoli Utara
Lahusa Lahusa Teluk Dalam
DistrictKota Gunung
SitoliNias Selatan Nias Selatan Nias Selatan
Coordinate
N1 24 08.6 E97 32 31.2
N0 48 21.0 E97 54 26.8
N0 45 56.3 E97 53 26.0
N0 33 33.5 E97 48 17.2
• DIUSULKAN OLEH PLN WILAYAH SUMUT
• LOKASI DI GUNUNG SITOLI UTARA UNTUK RENCANA IPP; PLTU NIAS 2x7 MW
• LOKASI 1,2 DAN 3 UNTUK PLTU NIAS SELATAN 2x3 MW
Summary of Site SelectionSummary of Site Selection
ASPECTSIPP
PLTU NIAS 2x7 MW
LOCATION 1 LOCATION 2 LOCATION 3
Technical 69.20 64.04 64.95 65.22
Socio-Economic 32.00 26.00 30.00 32.00
Environmental 37.90 35.90 34.90 39.90
TOTAL 139.10 125.94 129.85 137.12
Rencana Lokasi Rencana Lokasi Alternatif PLTUAlternatif PLTU
DI SURVEY OLEH PLN CABANG NIAS DAN PLN E
UNTUK RENCANA PLTU NIAS SELATAN 2x3 MW
ALTERNATIF
1 ALTERNATIF
2ALTERNATIF 3
Village Desa Baloho Desa Simanere Desa Bazihona
Sub District
Teluk DalamGunung Sitoli
IdanoiHidanogawo
District Nias Selatan Gunung Sitoli Nias
Coordinate
N0 32 56.0 E97 48 34.8
N1 12 18.5 E97 40 47.1
N1 05 54.7 E97 49 53.4
Summary of Site SelectionSummary of Site Selection
ASPECTS ALT 1 ALT 2 ALT 3
Technical 65.02 65.42 59.62
Socio-Economic 32.00 40.00 28.00
Environmental 39.90 36.90 33.90
TOTAL 136.92 142.32 121.52
diskusidiskusi
• DARI EMPAT (4) LOKASI YANG DIUSULKAN OLEH PLN WILAYAH SUMUT, PADA DI DESA AFIA,
KECAMATAN GUNUNG SITOLI UTARA, AKAN DIPERGUNAKAN UNTUK IPP PLTU NIAS 2x7 MW.
• UNTUK PLTU NIAS SELATAN 2x3 MW, BERDASARKAN PEMBOBOTAN, LOKASI 3 (DESA
BALOHO, KECAMATAN TELUK DALAM) LEBIH LAYAK DIBANDINGKAN LOKASI 1 DAN 2, AKAN
TETAPI SECARA VISUAL, KONDISI LAUT DI LOKASI 3 TERDAPAT BARRIER TERUMBU KARANG
(± 500 M DARI GARIS PANTAI), YANG DIKHAWATIRKAN DAPAT MENGHAMBAT AKSES COAL
BARGE, SEHINGGA PLN-E BERINISIATIF UNTUK MENCARI LOKASI ALTERNATIF DI SEKITAR
LOKASI 4.
• DARI HASIL SURVEY DIPEROLEH LOKASI ATERNATIF 1 (± 1.5 KM DARI LOKASI 3) YANG
SECARA VISUAL KEBERADAAN TERUMBU KARANG LEBIH SEDIKIT DIBANDINGKAN LOKASI 3.
• DARI PENJELASAN DIATAS DAPAT DISIMPULKAN BAHWA UNTUK PLTU NIAS SELATAN 2x3
MW, LOKASI ALTERNATIF 1 LEBIH LAYAK DIBANDINGKAN LOKASI 3 MESKIPUN SECARA
PEMBOBOTAN LOKASI ATERNATIF 1 (136.92) LEBIH SEDIKIT DIBANDINGKAN LOKASI 3
(137.12).
diskusidiskusi
• PADA SITE SURVEY KALI INI PLN-E JUGA MENDAPAT MASUKAN DARI PLN CABANG NIAS
UNTUK MENCARI ALTERNATIF LOKASI PLTU DENGAN MEMPERTIMBANGAN BEBAN
PENDISTRIBUSIAN KEBUTUHAN LISTRIK DI PULAU NIAS, DENGAN HARAPAN LOKASI PLTU
NIAS SELATAN 2x3 MW DAPAT DIPINDAHKAN KE LOKASI TERSEBUT, SEHINGGA DIPEROLEH
LOKASI ALTERNATIF 2 DAN 3.
• SECARA VISUAL DAN PEMBOBOTAN, LOKASI ALTERNATIF 2 (DESA SIMANERE, KECAMATAN
GUNUNG SITOLI IDANOI) LEBIH LAYAK UNTUK LOKASI PLTU NIAS SELATAN 2x3 MW.
• PRAKIRAAN TOTAL KEBUTUHAN AIR PLTUAIR PENDINGIN = 1.200 m3/hariAIR DEMIN & SERVICE = 20 m3/hari
• PRAKIRAAN TOTAL KEBUTUHAN BATUBARASELAMA 1 HARI = 120 TonSELAMA 1 BULAN = 3600 Ton
PRAKIRAAN KEBUTUHAN LAHAN UNTUK COAL YARDAKTIVE STORAGE SELAMA 10 HARI = 0,07 HaDEAD STORAGE SELAMA 1 BULAN = 0,02 Ha
• PRAKIRAAN ABU YANG DIHASILKANSELAMA 1 TAHUN = 2.500,00 TonLUAS LAHAN YANG DISEDIAKAN = 0,04 Ha
INFORMASI UMUMINFORMASI UMUMPltu 2x3 MWPltu 2x3 MW
KONDISI PEMBANGKIT MARETKONDISI PEMBANGKIT MARET 20 201010PLTD GUNUNGSITOLIPLTD GUNUNGSITOLI
TPS MAMPU
DGS-1 DEUTZ BA12M816W 7106144 560 450
DGS-2 DEUTZ BA12M816W 7106150 560 400
DGS-3 CUMMINS KTA-50G-3 25285070 D 2883 1,005 800
DGS-4 DEUTZ KHD BV 8M 628 7208762 1,224 - Usulan ATTB
DGS-5 CUMMINS KTA-50G-3 25287111 D 2974 1,005 800
DGS-6 DEUTZ KHD BV 8M 628 7208762 1,224 - Rusak
DGS-9 DEUTZ MWM BV 8M 628 62808010330 1,530 950
DGS-10 DEUTZ MWM BV 8M 628 62808010331 1,530 1,100
DGS-11 DEUTZ MWM BV 8M 628 62808010333 1,530 - Rusak
DGS-12 CUMMINS KTA-50G-3 25287113 D 2985 1,005 - Pemeliharaan
DGS-13 CUMMINS KTA-50G-3 25285069 D 2880 1,005 800
JUMLAH 12,178 5,300
No MEREK
DAYA (KW)
KETERANGANTYPE NO. SERI JANUARI
Nyalakan Irit Awasi Selebihnya
Catatan :DGS-7 & DGS-8 sudah di usulkan menjadi material ATTB rusak karena gempa
KONDISI PEMBANGKIT MARETKONDISI PEMBANGKIT MARET 20 201010PLTD TELUK DALAMPLTD TELUK DALAM
TPS MAMPU
DTD-1 CUMMINS KTA-50G-3 25287112 D 2976 1,005 800
DTD-2 DAIHATSU 6DS-26D 6264166 750 400
DTD-3 MTU 12 V 4000 661 526101981 1,095 800
DTD-4 DAIHATSU 6PSHTC-26D 6264135 530 400
DTD-5 DAIHATSU 6PSHTC-26D 6264136 - - Usulan ATTB
JUMLAH 3,380 2,400
KETERANGANTYPE NO. SERI JANUARINo MEREK
DAYA (KW)
Nyalakan Irit Awasi Selebihnya
TYPE NO. SERI
TPS MAMPU
DTD-1 DEUTZ F10L413F 7113086 100 80 DTD-2 DEUTZ F10L413F 6711900 100 80 DTD-3 DEUTZ F10L413F - 100 80 DTD-4 DEUTZ F10L413F 94103D0160 100 - RusakDTD-5 DEUTZ F10L413F 84103AO020 100 80
JUMLAH 500 320
JANUARINo MEREK
DAYA (KW)
KETERANGAN
KONDISI PEMBANGKIT MARETKONDISI PEMBANGKIT MARET 20 201010PLTD PULAU TELLOPLTD PULAU TELLO
Nyalakan Irit Awasi Selebihnya
UNITMESIN DAYA (kW)
KETMerk Type No.Seri TPSG MPU
PLTD GUNUNGSITOLI 5MW
1 SWD 9FHD240 70481-2 1268 1014 DLM PLKS
2 SWD 9FHD240 70481-1 1268 1014 DLM PLKS
3 SWD 9FHD240 70546 1268 1014 DLM PLKS
4 SWD 9FHD240 70481-3 1268 1014 DLM PLKS
5 SWD 6FFHD 703893 1114 890 DLM PLKS
6 SWD 6FFHD 70389-2 1114 890 DLM PLKS
JUMLAH 7300 5836
PLTD GUNUNGSITOLI 3MW
1 CTRPILAR 750 450 OPERASI
2 CUMMINS 750 450 OPERASI
3 MTSHBISI 800 0 GANGGUAN
4 PARKINS 1000 600 OPERASI
5 PARKINS 1000 0 GANGGUAN
6 CUMMINS 800 450 OPERASI
JUMLAH 5100 1950
PLTD TELUK DALAM 3MW
1 CUMMINS KTA 50-G1 33125558 800 640 OPERASI
2 CUMMINS KTA 38-65 33148031 800 640 OPERASI
3 CUMMINS KTA 50-G2 33119834 800 640 OPERASI
4 CUMMINS KTA 50-G1 32688937 800 640 OPERASI
5 CUMMINS KTA 50-G2 331051830 800 640 OPERASI
6 CUMMINS KTA 50-G2 33128154 1260 1008 OPERASI
JUMLAH 5260 4208
KONDISI UNIT SEWA 3MW - 5MWPLTD GUNUNGSITOLI DAN PLTD TELUK DALAM
KONDISI ANGIN NIASKONDISI ANGIN NIAS