Plumbing mlcp technical guidelines

Date post: 25-Mar-2016
Category:
Upload: uponor-international
View: 216 times
Download: 1 times
Share this document with a friend
Description:
http://www.uponor.com/~/media/countryspecific/international/download-centre/plumbing_mlcp/brochures/plumbing-mlcp-technical-guidelines.pdf?version=1
Popular Tags:
28
Uponor Tap Water and Radiator Connection MLCP System PLUMBING SOLUTIONS TECHNICAL GUIDELINES
Transcript
Page 1: Plumbing mlcp technical guidelines

Uponor Tap Water and Radiator Connection MLCP System

P LU M B I N G S O LU T I O N S

T E C H N I C A L G U I D E L I N E S

Page 2: Plumbing mlcp technical guidelines

Uponor - partnering with professionals

Uponor keeps its promises

People care more and more about the environment in which they live and work: whether it is commercial buildings, private residences or open and public spaces. Apart from that, standards and styles change and so do people’s expectations. In order to find the right systems and services to meet those demands, it becomes in-creasingly important to know where to go and whom to trust!

With Uponor, you partner with professionals who know how to satisfy your demands. Because we’ve always been working closely together with our partners and customers, we know about their needs. We want to give you more and we have to offer something special – everything to help you enjoy more success.In an increasingly complex world, we shall always be the smarter choice.

Competence and experience – the Uponor multi layer com posite pipe system (MLCP)

With an annual production of more than 100 million metres of pipes and many millions of metal and com-posite fittings, we market the comprehensive Uponor MLCP system in more than 60 countries worldwide – underlining our pioneering throughout the world today. The key to success is responding quickly and flexibly to market requirements as well as offering a spectrum of products that are unbeaten in terms of quality, safety, service and range. And all that is designed, developed and manufactured by one and the same reliable company.

Our partners and customers profit from convenient and reliable solutions for a wide range of installations. All Uponor products are available over the long-term. Quality, service and environmental friendliness are key objectives in the development pro cess. The system con-sists of in-house produced composite pipes and fittings that match perfectly. The system will be compli mented by the necessary accessories and a sophisticated tools program – everything out of one hand.

Page 3: Plumbing mlcp technical guidelines

Contents

Description of basic system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4

Technical data MLC pipe. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9

Thermal expansion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10

Distributing and risers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10

Determination of the bending leg length . . . . . . . . . . . . . . . . . . . . . . .11

MLC pipe pressure-loss graph . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12

Calculation basics – Radiator connection . . . . . . . . . . . . . . . . . . . . . . .13

Mounting instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .15

Pressure test with water for tap water pipes . . . . . . . . . . . . . . . . . . . . .23

Pressure test report for radiator connection . . . . . . . . . . . . . . . . . . . . .24

List of abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .25

How to contact us . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .25

Page 4: Plumbing mlcp technical guidelines

4

Description of basic system

The basic range of Uponor products includes all system components de-signed for different uses in a variety of applications, e.g. tapwater and radiator connection as well as radi-ant heating/cooling.

Description pipe

The Uponor multi-layer composite pipe (MLCP) is a pipe generation that unites the advantages of a plastic and metal pipe and therefore offers a high degree of flexibility and toughness, coupled with high pressure and temperature resistance.

The Uponor MLC pipe consists of a longitudinal safety welded alumini-um pipe, to which an inner and out-er layer of high temperature resist-ant polyethylene is applied (in accordance with DIN 16833). Owing to the specific form of the octene side chains in the molecular struc-ture of the material, a similar effect is achieved when polyethy lene is cross-linked.

All layers are permanently bounded together by means of an intermedi-ate adhesive layer. A special welding technique guarantees a maximum of safety. The thickness of the alumini-um selected for the Uponor MLC pipe is exactly adapted to the com-pressive strength requirements as well as the bending capability.

Smaller dimensions of MLC pipes are designed so that the aluminium layer neutralises the snap-back forces of the plastic material, enabling easier pipe installation with minimal effort.

Larger dimensions of MLC pipes and straight lengths of pipes have a greater aluminium layer thickness, making them stiffer and suitable for use as risers. The aluminium pipe is important for heat expansion. Ow-ing to the permanent bond between plastic and aluminium, thermal ex-pansion is determined by the expan-sion factor of the aluminium and roughly corresponds to that of a metal pipe, i.e. only 1/7th of the expansion of a pure plastic pipe. This offers advantages for pipe in-stallation, since the use of compen-sating points is largely unnecessary.

The smoothness of the inner plastic layer offers water no points of at-tack. Incrustration and corrosion are prevented in normal use. The trans-mission of flow noise or noise, e.g. emitted by circulating pumps, is re-duced to a minimum due to the spe-cific properties of the raw material.

The most important advantages of-fered by MLC pipes are:

Absolutely diffusion-tight, exceed the requirements of DIN 4726

Hygienicly harmless Minimal roughness k = 0.0004 mm

ensuring less pipe friction and lower pressure losses

Form stable, by compensation and reduction of snap-back forces

Highly flexible, making smaller dimensions (up to 32 x 3 mm) simple to bend by hand or with the corresponding tool

Heat expansion similar to that of metals, enabling larger pipe clip distances

Clean and easy to install, no welding, soldering, thread cut-ting or bonding

Corrosion-resistant, thanks to its inner and outer plastic layer

Excellent long-time rupture strength offers safety in daily use

Maximum temperature: 95 °C * Maximum continuous operating

pressure: 10 bar at 70 °C continu-ous operating temperature, with a tested longtime rupture strength of 50 years, safety factor 1.5 *

Low weight, easy handling Coils and straight lengths in

numerous sizes

The DGVW approval permits the use of Uponor MLC pipe for drinking water supply systems according to DIN 1988 TRWI. The approval in-cludes a positive assessment of the material according to the law gov-erning plastic articles for food use in drinking water supply, called KTW recommendation for short.

* In case of different parameters please con-sult Uponor.

50 m t 50 k

The Uponor multilayer composite pipe has a length expansion close to metal pipes because of its tight connec-tion between the polyethylene and the aluminium layer.

Longitudinally weldedaluminium

Adhesive PE-RTPE-RT Adhesive

Structure of MLC pipe with outer diameter of 14 - 110 mm

PP

PB

PVC

Uponor MLC pipe

Copper

Galvanized steel

Stainless steel

Page 5: Plumbing mlcp technical guidelines

5

Description of basic systemSystem advantages

The MLCP installation system offers the following advantages:

Certification: MLC pipe and connection

systems are approved in numer-ous countries throughout the world, e.g. Switzerland, Nether-lands, Italy, Norway, Poland, Russia, United Kingdom

DVGW certification of MLCP system, includes pipes, fittings and Uponor pressing tool

General test certificate of the supervising authority (ABP) for MLC pipe penetrations (bulk-heads) R 30 to R 90 with ROCK-WOOL Conlit shells 150 P/U for the outer diameters 14 to 110 mm.

Note:The approvals depend on the level of technology and advances in testing. Detailed information on the current approval status at the various institutes can be provided on request.

Material quality Uponor MLC Pipe: Excellent resistance to internal

pressure in long-time stress rupture test, i.e. exceptional long-time rupture strength

Maximum service life Quality test (SKZ) Complies with the law governing

plastic articles for food use in drinking water supply (KTW recommendation)

Low heat expansion Form stability thanks to com-

pensation of snap-back forces Highly flexible Low pipe roughness

Installation: Easy, quick and clean installation Only a few tools needed for all

applications Easy to use and time saving

installation Cold installation without hot

water filling, also with tight bending radius

Low labour costs The pipe straigthener can be

used to straighten offcut sec-tions of MLC pipe (supplied in coils or straight length) with an outer diameter of 14, 16, 18, 20 or 25 mm

Easy pressure testing with the pressure test plug

Service: Highly competent team at

company headquarter, with experienced professionals on hand to provide qualified customer service for all manner of applications

An own R&D-department with long experience in the complete manufacturing process, dedi-cated to the ongoing production of innovative developments for Uponor

Information that is kept con-stantly updated via our website, with a wide range of details of customer seminars and opportu-nities for further training in the use of our products

Factory visits, training courses held on our premises or onsite

Onsite advice and project consultation services for all products, along with professional planning software ranging from simple sets of data to full CAD applications, plus project plan-ning support for our service providers

Advice on the use of the calcula-tion and costing program, HSE

Exhaustive planning documenta-tion with ample real-case examples of applications

Assistance from the project planning stage to the final completion phase, project consultation services

Claims management The Uponor MLCP system (i.e.

pipes and connectors) carries a ten-year limited warranty

Page 6: Plumbing mlcp technical guidelines

6

Description of basic systemPress fittings

The patented MLCP pressing system enables connections to be estab-lished within a matter of seconds without welding or soldering. The externally fixed press sleeve, which is permanently connected to the fitting, offers protection against mechanical influences on the

o-rings. The press sleeve has inspection windows to check the insertion depth of the pipe in the fitting before pressing. The plastic stop ring on the shaped aluminium press sleeve simplifies the task of attaching the pressing jaws. The stop rings are colour coded to ensure an optical press marking. After the pressing procedure the

rings fall off. The pressing jaws and the stop rings of the same dimen-sion have been marked with the same colour code. After installation, the connection is capable of ab-sorbing bending forces, due to the form stable press sleeve, without any leakage occurring. After pressing the pipe can be readjusted.

Sectional drawing of 14 - 32 mm press

metal fitting with profile aluminium sleeve and plastic

stop ring

Sectional drawingof 40 - 50 mm metal

press fitting withstainless steel

pressure sleeve

Sectional drawing of 16 - 32 mm

composite press fitting

Sectional drawingof 63 - 110 mm

press fitting with stainless steel

pressure sleeve

optimiert1

optimiert2

Page 7: Plumbing mlcp technical guidelines

7

optimiert1

optimiert2

Compression fittings

The MLC range of compression fit-tings is designed to enable all con-ventional applications.

MLC compression fittings press the insert part (2) with fixed closed clamp ring (3) on to the MLC pipe by tightening the swivel nut (1). The compression fitting can be released again; whereas the insert part, made of PPSU, remains per-manently connected to the pipe. All ¾ inch compression adapters in-clude eurocone threaded parts.

Both press and compression fittings are permanently tight as confirmed by SKZ test reports and DVGW certificates.

Quality control

Constant quality controls before and during production:

Online inspections using special cameras, ball test, spiral test, measurement and tensile test.

In the works laboratory: Raw material testing, pipe tests using test piece (peeling test, thick-ness gauging), pressure and temperature tests and hot stor-age test.

Tests carried out by neutral Ger-man and international test insti-tutes.

According to the DVGW worksheet W 542, the minimum long-time rupture strength of multi-layer composite pipes in drinking water distribution systems must be veri-fied over a period of minimum 50 years. For this purpose, an inde-pendent test institute performs a number of tests and prepares the resulting internal pressure resistance diagrams.

These values are provided by the SKZ for Uponor MLCP. In addition to further tests, the values shown in the long-time internal pressure dia-grams form the basis for the issu-ance of the DVGW system test mark for MLCP with associated connec-tors. Together with the test institute and DVGW, Uponor is constantly working on pipe system tests in conformance with the associated worksheets of the DVGW.

The aim of these endeavours is to assure the quality of all currently approved MLCP products as well as extending the DVGW approval to new parts, fittings and pipe dimen-sions in the MLCP range of products.

Description of basic system

Sectional drawing of 14 – 25 mm compression fitting (1)

(2)

(3)

Page 8: Plumbing mlcp technical guidelines

8

Uponor multi-layer composite pipes have a life expectancy of minimum 50 years with correct use.

Description of basic system

The loading capacity of the connec-tions is tested in regular tensile tests. In addition to continuous pipe testing in the laboratory, every MLC pipe coil is tightness-tested under pressure.

1 , 0

1 0 , 0

1 0 0 , 0

1 1 0 1 0 0 1 0 0 0 1 0 0 0 0 1 0 0 0 0 0 1 0 0 0 0 0 0

t i m e i n [ h ]

2 0 ° C 6 0 ° C 7 0 ° C 9 5 ° C

1 5 1 0 2 5 5 0 y e a r s

Pres

sure

in [

bar]

Internal pressure rupture strength (Hydrostatic stress performance diagram)

Page 9: Plumbing mlcp technical guidelines

9

Technical data MLC pipeDimensions da × s (mm) 14 × 2 16 × 2 18 × 2 20 × 2.25 25 × 2.5 32 × 3 40 × 4 50 × 4.5 63 × 6 75 × 7.5 90 × 8.5 110 × 10

Inner diameter di (mm) 10 12 14 15.5 20 26 32 41 51 60 73 90

Coil length (m) 200 200/500 200 100/200 50/100 50 - - - - - -

Straight length (m) - 5 5 5 5 5 5 5 5 5 5 5

Outer diameter of coil (cm) 80 80 80 100 120 120 - - - - - -

Weight of coil/straight length (g/m)

91/- 105/118 125/135 148/160 211/240 323/323 -/508 -/745 -/1224 -/1788 -/2545 -/3597

Weight of coil/straight length with water 10 °C (g/m)

170/- 218/231 277/289 337/349 525/554 854/854 -/1310 -/2065 -/3267 -/4615 -/6730 -/9959

Weight per coil (kg) 18.2 21.0/52.5 24.6 14.8/29.6 10.6/21.1 16.2 - - - - - -

Weight per straight length (kg) - 0.59 0.68 0.80 1.20 1.62 2.54 3.73 6.12 8.94 12.73 17.99

Water volume (l/m) 0.079 0.113 0.154 0.189 0.314 0.531 0.800 1.320 2.040 2.827 4.185 6.362

Pipe roughness k (mm) 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004 0.0004

Thermal conductance λ (W/m × K)

0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40

Expansion coefficient α (m/m × K)

25 × 10-6 25 × 10-6 25 × 10-6 25 × 10-6 25 × 10-6 25 × 10-6 25 × 10-6 25 × 10-6 25 × 10-6 25 × 10-6 25 × 10-6 25 × 10-6

Minimum manual bending radius: 5 × da (mm)

70 80 90 100 125 160 - - - - - -

Minimum bending radius with inside bending spring 4 × da (mm)

56 64 72 80 100 128 - - - - - -

Minimum bending radius with outside bending spring 4 × da (mm)

56 64 72 80 100 - - - - - - -

Minimum bending radius with bending tool (mm)

43 49 49 78 80 128 - - - - - -

Maximum horizontal distance between fasteners (m)

1.20 1.20 1.20 1.30 1.50 1.60 2.00 2.00 2.20 2.40 2.40 2.40

Tap water: The maximum permanent operating temperature exists between 0°C and 70°C at a maximum permanent operating pressure of 10 bars*. The short-term malfunction temperature is 95°C of a maximum of 100 hours in the operating lifetime. Heating: The maximum permanent operating temperature is 80°C at a maximum permanent operating pressure of 10 bars*. The short-term malfunction temperature is 95°C of a maximum of 150 hours in the operating time per year.

* In some special products the permanent operating pressure is lower than 10 bars. Please have a look on the pipe marking.

In case of exceeding the maximum permanent operating temperatures e.g. in solar systems or district heating systems, the Uponor MLCP system can’t be connected directly to this kind of systems. It has to be ensured that in every situation the maximum limits of use of the Uponor MLCP system are not exceeded. In case of other use of the Uponor MLCP system Uponor has to be consulted.

Resistance of temperature:

Page 10: Plumbing mlcp technical guidelines

10

Thermal expansion

Distributing and risers

90

80

70

60

50

40

30

20

10

020 30 40 50

∆t = 10K

∆t = 20K

∆t = 30K

∆t = 40K

∆t = 50K

∆t = 60K

∆t = 70K

∆l =

The

rmal

exp

ansi

on m

m

90

100

L: Pipe length [m]

L

BS

Bending leg

Expansion legFixed point (FP)

Fixed point (FP)

Sliding clamp (GS)

∆l

The thermal expansion resulting from the mode of operation must be taken into account in the design of the pipe layout. The temperature difference Δt and pipe length L play a decisive role in thermal expansion.

For all installation variants, the ther-mal expansion of MLC pipes must be taken into account. For pipes in-tended for concealed installation or installation in screed, the thermal expansion is absorbed by insulation in the area of directional change.

The thermal expansion is calculated according to the following formula: Δl = α x L x Δt

Where the following are:Δl: Thermal expansion (mm)α: Thermal expansion coefficient

(0.025 mm/(m x K))L: Pipe length (m)Δt: Temperature difference (K)

For the planning and installation of distributing and rising mains with MLC pipes, in addition to the struc-tural requirements, also thermal ex-pansion aspects must be taken into account.

Rigid installation with MLC pipe is not possible. Thermal expansion of the pipes must always be absorbed or controlled.

Exposed MLC pipes fully exposed to thermal expansion, must be provid-ed with appropriate expansion com-pensation. For this purpose, a knowledge of the position of all fixed points is necessary. Compensa-tion always takes place between two fixed points (FP) and directional changes (bending leg BS).

Page 11: Plumbing mlcp technical guidelines

11

Determination of the bending leg lengthGraph of required bending leg length

80 70 60 50 40 30 20 10 500 1000 1500 2000 2500

∆t = Temperature difference [K]

L =

Ben

din

g s

ite

len

gth

[m

]

Example:

Installation temperature: 20 °C Operating temperature: 60 °C Temperature difference ∆T: 40 KExpansion leg length: 25 m

MLCP sizes da s: 32 3 mm

Required bending site length BS: about 850 mm

5

10

15

20

25

30

35

40

45

5014 16 18 20 25 32 40 50 63 75

90

110 mm

da =

BS = Bending site length [mm]

Calculation formula

da Outer diameter MLCP in mmL Pipe length in mBS Bending site length in mm

Thermal expansion coefficient (0.025 mm/(m x K))Temperature difference in K ∆t

BS = 30 da (∆t L)

0 0

80 70 60 50 40 30 20 10 500 1000 1500 2000 2500

∆t = Temperature difference [K]

L =

Ben

din

g s

ite

len

gth

[m

]

Example:

Installation temperature: 20 °C Operating temperature: 60 °C Temperature difference ∆T: 40 KExpansion leg length: 25 m

MLCP sizes da s: 32 3 mm

Required bending site length BS: about 850 mm

5

10

15

20

25

30

35

40

45

5014 16 18 20 25 32 40 50 63 75

90

110 mm

da =

BS = Bending site length [mm]

Calculation formula

da Outer diameter MLCP in mmL Pipe length in mBS Bending site length in mm

Thermal expansion coefficient (0.025 mm/(m x K))Temperature difference in K ∆t

BS = 30 da (∆t L)

0 080 70 60 50 40 30 20 10 500 1000 1500 2000 2500

∆t = Temperature difference [K]

L =

Ben

din

g s

ite

len

gth

[m

]

Example:

Installation temperature: 20 °C Operating temperature: 60 °C Temperature difference ∆T: 40 KExpansion leg length: 25 m

MLCP sizes da s: 32 3 mm

Required bending site length BS: about 850 mm

5

10

15

20

25

30

35

40

45

5014 16 18 20 25 32 40 50 63 75

90

110 mm

da =

BS = Bending site length [mm]

Calculation formula

da Outer diameter MLCP in mmL Pipe length in mBS Bending site length in mm

Thermal expansion coefficient (0.025 mm/(m x K))Temperature difference in K ∆t

BS = 30 da (∆t L)

0 0

Page 12: Plumbing mlcp technical guidelines

12

MLC pipe pressure-loss graphThe pressure-loss graph shows the pipe-conduit characteristics for MLC pipe, along with the various dimen-sions and flow-rate limits.

Using the graph, it is simple to as-certain the pipe-friction resistance per metre - for a given volume flow - relative to the dimensions of the pipe and the flow rate.

v = 0,1 m/s

Peak flow rate Vs [l/s]·

Pre

ssur

e-lo

ss d

ue t

o pi

pe f

rict

ion

R [

hPa/

m]

1.000,0

100,0

10,0

1,0

0,10,01 0,1 1,0 10,0 100,0

14

Page 13: Plumbing mlcp technical guidelines

13

Calculation basics – Radiator connectionMLC pipe pressure-loss graph

The pressure-loss graph shows the pipe-conduit characteristics for MLC pipe, along with the various dimen-sions and flow-rate limits.

Using the graph, it is simple to as-certain the pipe-friction resistance per metre - for a given volume or flow - relative to the dimensions of the pipe and the flow rate.

Out

put

Q in

kW

at

∆T =

5 K

T =

10

K

∆T =

15

K

∆T =

20

KFl

ow r

ate

m in

kg/

h

Pre

ssur

e-lo

ss d

ue t

o pi

pe f

rict

ion

R in

Pa/

m

v

Pressure loss due to pipe friction depending on flow rate at medium water tempera-ture of 60°C

Page 14: Plumbing mlcp technical guidelines

14

Pressure loss due to pipe friction depending on flow rate at medium water temperature of 60°C

Out

put

Q in

kW

at

∆T =

5 K

T =

10

K

∆T =

15

K

∆T =

20

Kfl

ow r

ate

m in

kg/

h

Pre

ssur

e-lo

ss d

ue t

o pi

pe f

rict

ion

R in

Pa/

m

v

Calculation basics – Radiator connection

Page 15: Plumbing mlcp technical guidelines

15

Uponor Unipipe MLC Pipe 14 – 110 mm

Mounting instructions

1 25 - 63 mm50 - 75 mm

14 - 20 mm

2

1

1

1

1 2 3

1

2

4

5

6

90 - 110 mm

3

14 - 20 mm

Page 16: Plumbing mlcp technical guidelines

16

Mounting instructions

Rmi n

da

∆q

∆l L

BS

da

Rmi nda

Rmi nda Rmi nda

14 - 25 mm16 - 32 mm

da Rmin[mm] [mm]14 7016 8018 9020 10025 12532 160

da Rmin[mm] [mm]14 5616 6418 7220 8025 10032 128

da Rmin[mm] [mm]14 5616 6418 7220 8025 100

da Rmin[mm] [mm]14 4016 4618 5220 8025 8332 111

14 - 25 mm

14 - 25 mm

∆l [mm] = ∆q [K] • 0,025 • L[m]

BS[mm] = 30 • da [mm] • (∆q [K] • 0,025 • L [mm])

Page 17: Plumbing mlcp technical guidelines

17

Mounting instructions

da 5

4

40 - 75 mm

max. 500 Umin -1

14 - 32 mm

90 - 110 mm

14 - 32 mm 16 - 32 mm 14 - 25 mm

PPSU

2

3

1

min.2 mm

min.4 mm

Page 18: Plumbing mlcp technical guidelines

18

Mounting instructions

14 – 20 16 – 32 – – 16 – 32 –

14 – 20 14 – 32 – – 14 – 32 –

– – 40 – 50 – – –

– – – 63 – 110 – –

– – – – – 14 – 25

KSP0

PPSU

PPSU

16 – 32 mm

Page 19: Plumbing mlcp technical guidelines

19

Mounting instructions

14 – 32 mm

40 – 50 mm

Page 20: Plumbing mlcp technical guidelines

20

63 – 110 mm

1 3

2

4

5 6

Mounting instructions

Page 21: Plumbing mlcp technical guidelines

21

14 – 25 mm

14 - 25 mm

1 3S1 S2 S3

14 x 1/2"

14 x 3/4"

16 x 1/2"

16 x 3/4"

18 x 1/2"

18 x 3/4"

20 x 1/2"

20 x 3/4"

25 x 3/4"

S2

S

S1S3

3 - 3,5 mm

2 4

A

Mounting instructions

Page 22: Plumbing mlcp technical guidelines

22

pH ≥ 12

Mounting instructions

Page 23: Plumbing mlcp technical guidelines

23

25T E C H N I C A L I N F O R M A T I O N M L C P S Y S T E M 0 8 / 2 0 0 7

MASTER

Pressure test with water for tap water pipes

Note: The chapter “Pressure test of tap water installations” in the actual technical manual “MLCP system for tap water installation and radiator connection” is to be followed.

Construction project:

Stage:

Person carrying out the test:

Test pressure = max. permissible operating pressure + 5 bar ≤ 15 bar(related to the lowest point of the system)

All tanks, equipment and fi ttings, e.g. safety valve and expansion tanks, which are not suitable for the pressure test, must be removed from the system during the test period. The system is fi lled with fi ltered water and completely vented. A visual inspection of the pipe joints must be made during the test. After the test pressure has been reached a suitable time must elapse to allow for temperature equalisation between the ambient temperature and the temperature of the fi ll water. If necessary, the test pressure must be re-established after the waiting period.

Preliminary test

Begin: Test pressure:o‘clock,Date Time

Re-establish the test pressure two times within 30 minutes at intervals of 10 minutes – then wait 30 minutes and read the test pressure (max. pressure loss 0.6 bar).

End: Test pressure:o‘clock,Date Time

bar

bar

(max. pressure loss 0.6 bar!)

Certifi cation

Test pressure:o‘clock,Date Time

bar

End: Test pressure:o‘clock,Date Time

bar

(max. pressure loss 0.2 bar!)

No leakage was found in the above specifi ed system during the preliminary or during the main test.

Locality, date Signature/contractor‘s stamp

Locality, date Signature/contractor‘s stamp

Main test

Begin:

Pressure test with water for tap water pipes

MASTER

Signature/owner

(max. pressure loss 0.6 bar!)

(max. pressure loss 0.2 bar!)

Page 24: Plumbing mlcp technical guidelines

24

42 T E C H N I C A L I N F O R M A T I O N M L C P S Y S T E M 0 8 / 2 0 0 7

MASTER

Pressure test report for the radiator installation

Note: The chapter “Pressure test of radiator installations” in the actual technical manual “MLCP system for tap water installation and radiator connection” is to be followed

Construction project:

Stage:

Person carrying out the test:

maximum permissible operating pressure (in relation to the lowest point of the system). bar

System altitude: m

Design parameter – Supply temperature: °C – Return temperature: °C

After the test pressure has been reached, a suitable time must elapse to allow for temperature equalisation between the ambient temperature and the temperature of the fi ll water. If necessary, the test pressure must be re-established after the waiting period.

All tanks, equipment and fi ttings, e.g. safety valve and expansion tanks, which are not suitable for the pressure test, must be removed from the system during the test period. The system is fi lled with fi ltered water and completely vented. During the test a visual inspection of the pipe connections must be made.

Begin: , o‘clock Test pressure: bar Date Time

End: , o‘clock Pressure loss: bar Date Time (max. 0,2 bar!)

The system specifi ed above was heated to the design temperatures on and no leakage was found There was also no leakage found after the cooling. With frost danger suitable measures are to be taken (e.g. use of antifreeze, heating of the building). If no freeze protection is required for the intended system use, the antifreeze is to be removed by emptying and fl ushing the system with at least 3 water changes.

Antifreeze was added to the water: Yes No

Drainage as stated above: Yes No

Certifi cation

Owner - date/signature Owner - date/signature

Plumber - date/signature

Pressure test report for radiator connection

MASTER

(max. pressure loss 0.2 bar!)

Page 25: Plumbing mlcp technical guidelines

25

Short cut German description English explanation

DIN Deutsches Institut für Normung German institute for standardisation

EnEV Energieeinsparverordnung German directive for energy saving

EN Europäische Norm European Standard

DVGW Deutscher Verein des Gas- und Wasserfaches German Technical and Scientific Association on Gas and Water

ABP Allgemeine bauaufsichtliche Prüfzeugnisse General test certificates of the supervising authority

PPSU Polyvenylsulfon Polyphenylsulfone

SKZ Süddeutsches Kunststoffzentrum South German Plastics Centre (Wuerzburg)

KTW Kunststofferzeugnisse in der Trinkwasser-installation

Plastic articles for food use in drinking water supply

ZSVHK Zentralverband Sanitär, Heizung und Klima Central association of plumbing, heating and climatisation

TRWI Technische Regeln Trinkwasser installation Directives for domestic drinking water sup-ply systems

List of abbreviations

How to contact us

Customer service center T +49 (0)9521-690-370

F +49 (0)9521-690-750

E [email protected]

Technical assistance T +49 (0)9521-690-739 or 834

F +49 (0)9521-690-750

E [email protected]

We reserve the right to make technical amendments and carry out updates.

Page 26: Plumbing mlcp technical guidelines

26

Notes

Page 27: Plumbing mlcp technical guidelines

Notes

Page 28: Plumbing mlcp technical guidelines

1042

727

– 06

/200

9 –

Subj

ect

to m

odifi

catio

ns

Uponor GmbHInternational SalesP.O. Box 164197433 HassfurtGermany

Uponor – partnering with professionals

Uponor is a leading supplier of plumbing and heating systems for the residential and commercial building markets across Europe and North America and a market leader in municipal infrastructure pipe systems in the Nordic countries. Uponor’s key applications include indoor climate and tap water systems.

Uponor International Sales takes care of all business activities in the Balkans, Western, Central and East Asia, Africa and Latin America.

Uponor. Simply more.

T +49-(0)9521 690 0F +49-(0)9521 690 750E [email protected] www.uponor.com/international


Recommended