Are These Projects?
1. Put a man on the Moon andreturn him safely to Earth by the
end of this decade.
2. Decide which of six criticalassignments is most important.
3. Get the monthly reports done on
time.
4. Build a new office building.
8/8/2019 PM INTRO(JUNIORS)
10/16
8/8/2019 PM INTRO(JUNIORS)
11/16
Project Management Life Cycle
8/8/2019 PM INTRO(JUNIORS)
12/16
ProjectPhases
1. Define
-Vision & Scope
- Objective
2. Plan WBS
Costestimates
3. Schedule and Control Timeconstraints foreachtask
Sequencing oftasks
4. Closure
8/8/2019 PM INTRO(JUNIORS)
13/16
"Tasks" are activities whichmustbe
completedto acheiveproject goal. Breaktheproject intotasks and subtasks. Taskshave start andendpoints, are shortrelativetotheproject and are significant (not "going
tolibrary", butrather, "searchliterature")0LOHVWRQHVDUHLPSRUWDQWFKHFNSRLQWVRULQWHULPJRDOVIRUDSURMHFW&DQEHXVHGWRFDWFK
VFKHGXOLQJSUREOHPVHDUO\1DPHE\QRXQYHUEIRUPHJUHSRUWGXHSDUWVRUGHUHGSURWRW\SHFRPSOHWH
8/8/2019 PM INTRO(JUNIORS)
14/16
:RUN%UHDNGRZQ6WDWHPHQW
$ZRUNEUHDNGRZQVWDWHPHQW:%6LVDFDWHJRUL]HGOLVWRIWDVNVZLWKDQHVWLPDWHRIUHVRXUFHVUHTXLUHGWRFRPSOHWHWKHWDVN$QH[DPSOH:%6DSSHDUVEHORZ
What makes up my entire project (Scope)? What is the agreed upon work scope and what is
additional work?
What are my start and completion dates
(Schedule)? How much is the project going to cost (Cost)?
8/8/2019 PM INTRO(JUNIORS)
15/16
Work Breakdown Structure
(WBS) Tree
The graphical structure of the WBSis an easy way to identify theproject components andrelationships of those
components; however, the WBScan be displayed in anotherformat as well: the Tree format.Both formats are acceptable. Thegraphical format is at times easier
to understand, but can take upconsiderable space in a report.The tree is not as easy tounderstand but is more easilyincorporated into a report format.
Note the WBS codes and thestructure of the Levels in the Treeformat mirror the graphical format.The content has not changed;only the way the content is
presented has changed.
1 ACME Housing Corporation
1.1 New Home Construction
1.1.1 Concrete
1.1.1.1 Pour Foundation
1.1.1.2 Install Patio
1.1.1.3 Pour Stairway
1.1.2 Framing
1.1.2.1 Frame Exterior Walls
1.1.2.2 Frame Interior Walls
1.1.2.3 Install Roofing Trusses1.1.3 Plumbing
1.1.3.1 Install Water Lines
1.1.3.2 Install Gas Lines
1.1.3.3 Install B/K Fixtures
1.1.4 Electrical
1.1.4.1 Install Wiring
1.1.4.2 Install Outlets/Switches
1.1.4.3 Install Fixtures
1.1.5 Interior
1.1.5.1 Install Drywall
1.1.5.2 Install Carpets
1.1.5.3 Install Painting
1.1.6 Roofing
1.1.6.1 Install Felt
1.1.6.2 Install Shingles
1.1.6.3 Install Vents
8/8/2019 PM INTRO(JUNIORS)
16/16
an ar as cs Ganttcharts are a projectplanning toolthatcanbe
usedtorepresentthetiming oftasks requiredto
complete a project. Because Ganttcharts aresimpletounderstand andeasy toconstruct, theyareusedby mostprojectmanagers forallbutthemostcomplexprojects.
In a Ganttchart, eachtasktakes uponerow. Datesrun along thetop in increments ofdays, weeks ormonths, depending on thetotallengthofthe
project. Theexpectedtime foreachtask is
representedby a horizontalbarwhoseleftendmarks theexpectedbeginning ofthetask andwhoserightendmarks theexpectedcompletiondate. Tasks may run sequentially, in paralleloroverlapping.