+ All Categories
Home > Documents > P.O. Box 7950 Stn Main Winnipeg Manitoba Canada R3C 0J1 · 2016-09-01 · P.O. Box 7950 Stn Main...

P.O. Box 7950 Stn Main Winnipeg Manitoba Canada R3C 0J1 · 2016-09-01 · P.O. Box 7950 Stn Main...

Date post: 27-Jun-2018
Category:
Upload: duongtuyen
View: 228 times
Download: 0 times
Share this document with a friend
4
P.O. Box 7950 Stn Main Winnipeg Manitoba Canada R3C 0J1 Telephone/ Nde téléphone: (204) 360-4394 Fax/ Nde télécopieur: (204) 360-3734 [email protected] October 4, 2013 Director Environmental Approvals Branch Manitoba Conservation Suite 160, 123 Main Street Winnipeg, MB R3C 1A5 Dear Ms. Braun: Re: Lake Winnipeg East System Improvement Project Adjustment to the Final Preferred Route (Client file 5624.00) Manitoba Hydro submitted an application (Client file 5624.00) for the Lake Winnipeg East System Improvement Project on January 2, 2013. We are requesting an amendment to our initial application to accommodate an adjustment to the Final Preferred Route of the proposed transmission line. Manitoba Infrastructure and Transportation (MIT) had concerns with the final route as it passed by two active quarries and requested that Manitoba Hydro avoid the active quarries. The attached maps illustrate the adjustments from the original Final Preferred Route, addressing the above concerns. MIT has reviewed the revised routing and have no further concerns. We have also attached an updated GIS file package of the revised Final Preferred Route. In closing, should you require more information or have any questions, please contact me at 360-4394. Yours truly, Shannon Johnson, Manager Licensing & Environmental Assessment Department, Transmission Planning & Design Transmission .
Transcript
Page 1: P.O. Box 7950 Stn Main Winnipeg Manitoba Canada R3C 0J1 · 2016-09-01 · P.O. Box 7950 Stn Main Winnipeg Manitoba Canada R3C 0J1 Telephone/ N de téléphone: (204) 360-4394 Fax

P.O. Box 7950 Stn Main ● Winnipeg Manitoba Canada ● R3C 0J1 Telephone/ N◦ de téléphone: (204) 360-4394 ● Fax/ N◦ de télécopieur: (204) 360-3734

[email protected]

October 4, 2013 Director Environmental Approvals Branch Manitoba Conservation Suite 160, 123 Main Street Winnipeg, MB R3C 1A5 Dear Ms. Braun: Re: Lake Winnipeg East System Improvement Project Adjustment to the Final Preferred Route (Client file 5624.00) Manitoba Hydro submitted an application (Client file 5624.00) for the Lake Winnipeg East System Improvement Project on January 2, 2013. We are requesting an amendment to our initial application to accommodate an adjustment to the Final Preferred Route of the proposed transmission line. Manitoba Infrastructure and Transportation (MIT) had concerns with the final route as it passed by two active quarries and requested that Manitoba Hydro avoid the active quarries. The attached maps illustrate the adjustments from the original Final Preferred Route, addressing the above concerns. MIT has reviewed the revised routing and have no further concerns. We have also attached an updated GIS file package of the revised Final Preferred Route. In closing, should you require more information or have any questions, please contact me at 360-4394. Yours truly, Shannon Johnson, Manager Licensing & Environmental Assessment Department, Transmission Planning & Design Transmission .

Page 2: P.O. Box 7950 Stn Main Winnipeg Manitoba Canada R3C 0J1 · 2016-09-01 · P.O. Box 7950 Stn Main Winnipeg Manitoba Canada R3C 0J1 Telephone/ N de téléphone: (204) 360-4394 Fax

¾À11

¾À59

¾À59

Hollow Water(WanipigowP.O.)

Manigotagan

FortAlexander

PineFalls

Hecla/GrindstoneProvincial Park

Elk IslandProvincial

Park

Manigotagan RiverProvincial Park

SagkeengFirst

Nation

Hollow WaterFirst Nation

Black RiverFirst Nation

SE-15-24-9-E

NW-36-21-9-E

Lake Winnipeg East System ImprovementTransmission Project

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMBDate Created: October 04, 2013

0 2 41 Miles

0 3 61.5 Kilometres ±1:180,000 Draft: For Discussion Purposes Only

Legend

LandbaseFirst NationProvincial Park Quarry (NW-36-21-9-E)

Quarry (SE-15-24-9-E)

Existing Infrastructure!( Community

! ! ! Transmission LineProvincial Trunk Highway

Provincial Road

Proposed InfrastructureFinal Preferred Route

UV304

LakeWinnipeg

ManigotaganCorner Station

Pine FallsStation

Page 3: P.O. Box 7950 Stn Main Winnipeg Manitoba Canada R3C 0J1 · 2016-09-01 · P.O. Box 7950 Stn Main Winnipeg Manitoba Canada R3C 0J1 Telephone/ N de téléphone: (204) 360-4394 Fax

NW-36-21-9-E

Lake Winnipeg East System ImprovementTransmission Project

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMBDate Created: October 04, 2013

0 1,250 2,500625 Feet

0 500 1,000250 Meters ±1:24,000 Draft: For Discussion Purposes Only

Legend

Proposed InfrastructureFinal Preferred Route Adjustment (60m ROW)

Final Preferred Route (60m ROW)

LandbaseQuarry NW-36-21-9-E

Page 4: P.O. Box 7950 Stn Main Winnipeg Manitoba Canada R3C 0J1 · 2016-09-01 · P.O. Box 7950 Stn Main Winnipeg Manitoba Canada R3C 0J1 Telephone/ N de téléphone: (204) 360-4394 Fax

ManigotaganRiver

Provincial Park

SE-15-24-9-E

Lake Winnipeg East System Improvement Transmission Project

Coordinate System: UTM Zone 14N NAD83Data Source: MB Hydro, ProvMBDate Created: October 04, 2013

0 1,500 3,000750 Feet

0 500 1,000250 Meters ±1:24,000 Draft: For Discussion Purposes Only

Legend

Proposed InfrastructureFinal Preferred Route Adjustment (60m ROW)

Final Preferred Route (60m ROW)

LandbaseQuarry SE-15-24-9-E


Recommended