+ All Categories
Home > Documents >  · Poissions ratio (p) is The maximum permissible shear stress for M25 concrete as per IS 456:...

 · Poissions ratio (p) is The maximum permissible shear stress for M25 concrete as per IS 456:...

Date post: 15-Mar-2020
Category:
Upload: others
View: 30 times
Download: 1 times
Share this document with a friend
5
https://www.freshersnow.com/
Transcript
Page 1:  · Poissions ratio (p) is The maximum permissible shear stress for M25 concrete as per IS 456: 2000 in Limit State Method of design is 1.25 N/mm2 1.5 N/mm2 1.75 N/mm2 ... CBR value

https://www.freshersnow.com/

Page 2:  · Poissions ratio (p) is The maximum permissible shear stress for M25 concrete as per IS 456: 2000 in Limit State Method of design is 1.25 N/mm2 1.5 N/mm2 1.75 N/mm2 ... CBR value

https://www.freshersnow.com/

Page 3:  · Poissions ratio (p) is The maximum permissible shear stress for M25 concrete as per IS 456: 2000 in Limit State Method of design is 1.25 N/mm2 1.5 N/mm2 1.75 N/mm2 ... CBR value

https://www.freshersnow.com/

Page 4:  · Poissions ratio (p) is The maximum permissible shear stress for M25 concrete as per IS 456: 2000 in Limit State Method of design is 1.25 N/mm2 1.5 N/mm2 1.75 N/mm2 ... CBR value

https://www.freshersnow.com/

Page 5:  · Poissions ratio (p) is The maximum permissible shear stress for M25 concrete as per IS 456: 2000 in Limit State Method of design is 1.25 N/mm2 1.5 N/mm2 1.75 N/mm2 ... CBR value

https://www.freshersnow.com/


Recommended