Policy and regulations governing BESS for grid support applications USAID Battery Energy Storage System (BESS) Training Program November 28 th , 2018
Transcript
Page 1: Policy and regulations governing BESS for grid …...Policy and regulations governing BESS for grid support applications USAID Battery Energy Storage System (BESS) Training Program

Policy and regulations governing BESS for grid supportapplications

USAID Battery Energy Storage System (BESS) Training ProgramNovember 28th, 2018

Page 2: Policy and regulations governing BESS for grid …...Policy and regulations governing BESS for grid support applications USAID Battery Energy Storage System (BESS) Training Program

Fluence is the global leader in energy storage

16 Countries

600 MW

10+ Years

68 Projects

Created and backed by two industry powerhouses

© Fluence Energy LLC. All Rights Reserved.2

Page 3: Policy and regulations governing BESS for grid …...Policy and regulations governing BESS for grid support applications USAID Battery Energy Storage System (BESS) Training Program

Transform the way we power our world to create a more sustainable future

Our Mission

© Fluence Energy LLC. All Rights Reserved. 3

Page 4: Policy and regulations governing BESS for grid …...Policy and regulations governing BESS for grid support applications USAID Battery Energy Storage System (BESS) Training Program

2017

805.6TOTAL MW

Storage adoption is accelerating across the US

Source: GTM ResearchFront of meter battery or flywheel energy storage installations, cumulative

2008 2013

TOTAL MW TOTAL MW

224.038.7

2018 YTD

• CA: 567.5 MW procured by PG&E

• Nevada: 100 MW procured (solar + storage) by NV Energy

• Arizona: 50 MW (solar + storage) procured by APS; 25 MW by SRP

• Hawaii: 14 MW (solar + storage) procured by KIUC

• … and several other projects that were announced

Page 5: Policy and regulations governing BESS for grid …...Policy and regulations governing BESS for grid support applications USAID Battery Energy Storage System (BESS) Training Program

Storage growth is expected to continue

© Fluence Energy LLC. All Rights Reserved. Highly Confidential and Proprietary5

Source: DOE database

2014: 80 projects;108 MW Commissioned

2011: 38 projects;66 MW Commissioned

2015: 77 projects; 350 MW Commissioned • Broad market acceptance

• Winners are consolidating market• Growth of new applications• > 5 GW/year installations*

FLUENCE VIEW: Growth will be higher than average expectation; more upside opportunity than downside potential

Market expectation:CAGR of 10-30%

Introduction Strong Growth Growth

2007 20232018* Not including residential

Page 6: Policy and regulations governing BESS for grid …...Policy and regulations governing BESS for grid support applications USAID Battery Energy Storage System (BESS) Training Program

Storage applications continue to expand

Page 7: Policy and regulations governing BESS for grid …...Policy and regulations governing BESS for grid support applications USAID Battery Energy Storage System (BESS) Training Program

0

100

200

300

400

500

600

700

800

900

1000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

$/kW

hSteep battery price decline enables more applications in more markets to be deployed economically

© Fluence Energy LLC. All Rights Reserved.7

Frequency regulation Microgrid & Islands

Critical Power Energy Cost Control

Generation Enhancement

Capacity Peak Power

Renewable Integration T&D Enhancement

0.5 – 1h Up to 4h

Up to 1h Up to 4h

Up to 1h Up to 6h

Up to 4h Up to 4h

8

6

4

21

3

5

7

Cost development: Energy Storage Energy storage market applications

Battery Cell Price, 2010-2025 ($/kWh)Average market view

Page 8: Policy and regulations governing BESS for grid …...Policy and regulations governing BESS for grid support applications USAID Battery Energy Storage System (BESS) Training Program

30 MW of energy storage for San Diego Gas & Electric, California, United States

Largest energy storage project in North America• 30 MW / 120 MWh• Contract to online in 6 months • Sited on 1 acre, where a power plant could not be permitted

Page 9: Policy and regulations governing BESS for grid …...Policy and regulations governing BESS for grid support applications USAID Battery Energy Storage System (BESS) Training Program

BATTERY CABINET

BATTERY MODULES

What is energy storage? Large-scale batteries for industrial applications.Modular, scalable arrays of proven technologies integrated at utility and industrial scale.

BATTERY PACKS

BATTERY CELLS

Power Control Electronics Low voltage and medium voltage components

HVAC

Fire detection and extinguishing system

Battery cabinets and battery management system

Intelligence: Array Controls & Application Software

Connection:Electrical & Other Balance of Plant

Page 10: Policy and regulations governing BESS for grid …...Policy and regulations governing BESS for grid support applications USAID Battery Energy Storage System (BESS) Training Program

Energy storage allows grid operators to serve grid peaks with renewable energy

© Fluence Energy LLC. All Rights Reserved.10

Page 11: Policy and regulations governing BESS for grid …...Policy and regulations governing BESS for grid support applications USAID Battery Energy Storage System (BESS) Training Program

CEA – 2018 National Electricity Plan Highlights the Ramping ConcernIn addition to ancillary services, storage provides the best form of flexible peaking capacity that the Indian Market needs.

© Fluence Energy LLC. All Rights Reserved.11

57 GW ramp in 6 hours

http://www.cea.nic.in/reports/committee/nep/nep_jan_2018.pdf

Page 12: Policy and regulations governing BESS for grid …...Policy and regulations governing BESS for grid support applications USAID Battery Energy Storage System (BESS) Training Program

Storage is “always on” to provide multiple servicesNet charging profile:

Services profile:

Charging Discharging Charging Discharging Charging

Regulation Ramp support / on-peak energy

RegulationRegulation / on-peak energy

Regulation

COMPOSITE DISPATCH PROFILE:

100 MW storage array for load following / ramping

100 MW frequency regulation except HE18-20

Page 13: Policy and regulations governing BESS for grid …...Policy and regulations governing BESS for grid support applications USAID Battery Energy Storage System (BESS) Training Program

Key Results from CEA Analysis Indicate Extent of Flexible Capacity NeedStorage as a flexible capacity resource can replace pumped hydro which takes several years to develop

© Fluence Energy LLC. All Rights Reserved.13

http://www.cea.nic.in/reports/committee/nep/nep_jan_2018.pdf

46 GW of peaking capacity required by

2027

Page 14: Policy and regulations governing BESS for grid …...Policy and regulations governing BESS for grid support applications USAID Battery Energy Storage System (BESS) Training Program

Utilities are expanding to new applications and scaling up projects

© Fluence. All Rights Reserved.14

RENEWABLE INTEGRATIONSOLAR + STORAGE PEAKING CAPACITY

Announced a65 MW solar + 50 MW storage 15 year PPA

BEGIN SERVICE IN 2021

DISTRIBUTION SYSTEM RELIABILITYMcMicken2 MW / 2 MWh

2017 2018

DISTRIBUTION SYSTEM RELIABILITYFestival Ranch 2 MW / 2 MWh

T&D DEFERRALPunkin Center2 MW / 8 MWh

Page 15: Policy and regulations governing BESS for grid …...Policy and regulations governing BESS for grid support applications USAID Battery Energy Storage System (BESS) Training Program

15 © Fluence Energy LLC. All Rights Reserved. Highly Confidential and Proprietary

Transmission Enhancement / Trading

AusNet / Energy Australia Ballarat, VIC, Australia , 30 MW / 30 MWh(Under Construction)SERVICES• Local Capacity• Peak/Off-peak Management• FCAS/ Ancillary Services

IMPACT• Competitive selection • Maximizes transmission• Strengthens Network

Page 16: Policy and regulations governing BESS for grid …...Policy and regulations governing BESS for grid support applications USAID Battery Energy Storage System (BESS) Training Program

World’s largest contracted energy storage project

Peaking capacity

Southern California EdisonLong Beach, California, United States100 MW / 400 MWh

SERVICES• Local capacity• Peak/Off-peak management• Ramping/ Ancillary Services

IMPACT• Competitive selection over thermal gas

peaker• Maximizes transmission• Meets emission targets

Page 17: Policy and regulations governing BESS for grid …...Policy and regulations governing BESS for grid support applications USAID Battery Energy Storage System (BESS) Training Program

Paving the way forward

Page 18: Policy and regulations governing BESS for grid …...Policy and regulations governing BESS for grid support applications USAID Battery Energy Storage System (BESS) Training Program

Include all benefits of storage in

modeling and evaluation

Planning and Procurement are Two Key Pillars

Page 19: Policy and regulations governing BESS for grid …...Policy and regulations governing BESS for grid support applications USAID Battery Energy Storage System (BESS) Training Program

Energy storage key takeaways

A. Cost effective– Energy storage is already more economic than

traditional assets in different applications

B. Bankable– Technology is proven– Large energy storage projects have already

been financed under 20-year PPAs

C. Systems operate autonomously– Built with standard electrical equipment found at

most power plants– Typical power plant O&M job scope

D. Regulatory environment is evolving across the globe– Growing number of markets are including energy

storage in grid planning

© Fluence Energy LLC. All Rights Reserved.19

Page 20: Policy and regulations governing BESS for grid …...Policy and regulations governing BESS for grid support applications USAID Battery Energy Storage System (BESS) Training Program

Way forward in new markets

© Fluence Energy LLC. All Rights Reserved.20

1. Stop and check before building:– Pumped Hydro or Peaking Gas: Is

storage or RE + Storage cheaper?

2. To fit energy storage into existing planning (resource planning, T&D)

3. High-level targets drive economic adoption (NESM)

Page 21: Policy and regulations governing BESS for grid …...Policy and regulations governing BESS for grid support applications USAID Battery Energy Storage System (BESS) Training Program

Thank You.

Kiran KumaraswamyMarket Applications [email protected]