August, 2014 Polish Road Projects Financing 1
Transcript
Page 1: Polish Road Projects Financing - UNECE · Concessionaire: Autostrada Wielkopolska S.A. End of concession: III 2037 Construction period: 2001 – 2004 Total Cost: 875 million euro

August, 2014

Polish Road Projects Financing

1

Page 2: Polish Road Projects Financing - UNECE · Concessionaire: Autostrada Wielkopolska S.A. End of concession: III 2037 Construction period: 2001 – 2004 Total Cost: 875 million euro

National Transport Policy for 2006 – 2025, approved by the Council of Ministers in June 2005

Programme for National Roads Construction in 2011 – 2015, approved by the Council of Ministers January 2011

Attachment No. 5 to the Programme for National Roads Construction in 2011-

2015 (as amended) approved by the Council of Ministers 4 June 2013.

Attachment No. 6 to the Programme for National Roads Construction in 2011-2015 (as amended) approved by the Council of Ministers 1 October 2013.

The framework for roads projects

2

Page 3: Polish Road Projects Financing - UNECE · Concessionaire: Autostrada Wielkopolska S.A. End of concession: III 2037 Construction period: 2001 – 2004 Total Cost: 875 million euro

Main goals:

• To integrate Polish road system with European

• To improve Polish economic and social competitiveness

Budget – 20,7 bilion EURO (82,8 bilion zl)

Source of Financing – National Road Fund

Budget in the new financial perpective 2014-2020 – ca 72,27 bilion zl

Source of Financing – National Road Fund

Programme for National Roads Construction

3

Page 4: Polish Road Projects Financing - UNECE · Concessionaire: Autostrada Wielkopolska S.A. End of concession: III 2037 Construction period: 2001 – 2004 Total Cost: 875 million euro

National Roads Fund financially supports the Programme for National Roads Construction

Covers expenditures for preparing, construction, reconstruction and renovating national roads

The Fund uses the financial resources according to the yearly plan

The incomes of NRF are:

• Fuel fee

• European Union funds

• European Investment Bank loans

• Bonds

• Revenues from Electronic Toll Collection

National Road Fund

4

Page 5: Polish Road Projects Financing - UNECE · Concessionaire: Autostrada Wielkopolska S.A. End of concession: III 2037 Construction period: 2001 – 2004 Total Cost: 875 million euro

1. PPP projects (public-private partnerships) – the main assumption for the construction of motorways in ppp is to classify the project outside the scope of government spending. Eurostat’s approach to classification of the assets involved in ppp is published in Manual on Government Deficit and Debt: - The PPP assets are classified in the private partner's balance sheet if both of the following conditions are met: the private partner bears the construction risks and at least one of either availability or demand risk. - One of ppp model – availability payment – the new Eurostat approach would lead to a recognition of the project on the public sector balance sheet, as income from user tolls exceed the share of 50 % in costs (income of private partner). 2. SPV (Special Purpose Vehicles) – the implementation of the construction of motorway sections can be done by a special purpose vehicles. The solution is under consideration and requires some changes in legislation. The project accomplished by spv can be classified according to classification and criteria provided in Manual. 3. Traditional system of financing road construction (the National Road Fund, EIB, EU funds).

Financing methods

5

Page 6: Polish Road Projects Financing - UNECE · Concessionaire: Autostrada Wielkopolska S.A. End of concession: III 2037 Construction period: 2001 – 2004 Total Cost: 875 million euro

Programme for National Roads Construction

0.0

5,000.0

10,000.0

15,000.0

20,000.0

25,000.0

2006 2007 2008 2009 2010 2011 2012 2013 2014 forecast

848.8 1,248.0 1,064.5

585.0 740.7 562.5 297.7 538.9 381.3

4,232.1

5,847.3

9,163.8

14,248.8

16,851.6

23,283.6

18,169.5

9,916.0

8,349.2

Construction

Projects Preparation

2006-2014 GDDKiA expenditures mln. zł

6

Page 7: Polish Road Projects Financing - UNECE · Concessionaire: Autostrada Wielkopolska S.A. End of concession: III 2037 Construction period: 2001 – 2004 Total Cost: 875 million euro

National Road Fund

14%

13%

30%

33%

7%

3%

fuel fee

EU funds

EIB loans

Bonds

ETC

others sources

National Road Fund incomes in 2014

7

Page 8: Polish Road Projects Financing - UNECE · Concessionaire: Autostrada Wielkopolska S.A. End of concession: III 2037 Construction period: 2001 – 2004 Total Cost: 875 million euro

GDDKiA is the biggest individual beneficiary of European Funds

2000-2006

Cohesion Fund – 1,652 bilion euro EU contribution

Sectoral Operational Programme Transport – 0,34 bilion euro EU contribution

2007-2013

Operational Programme Infrastructure and Environment – 10,0 bilion euro EU contribution

Operational Programme for Eastern Poland Development – 0,21 bilion euro EU contribution

2014-2020

Operational Programme Infrastructure and Environment –10,0 bilion euro EU contribution (estimated / still under negotiation)

European Union Funds

8

Page 9: Polish Road Projects Financing - UNECE · Concessionaire: Autostrada Wielkopolska S.A. End of concession: III 2037 Construction period: 2001 – 2004 Total Cost: 875 million euro

European Union Funds

0.00

2,000,000,000.00

4,000,000,000.00

6,000,000,000.00

8,000,000,000.00

10,000,000,000.00

12,000,000,000.00

14,000,000,000.00

16,000,000,000.00

2009 2010 2011 2012 2013 2014 2015 2016

3,2 mld

4,9 mld

10,3 mld

14,2 mld

5,3 mld

4,8 mld

0,7 mld 0,05 mld

EU fundsas statebudgetincome

Plan

Incometo NRF

European Union funds as income for National Roads Fund [PLN]

9

Page 10: Polish Road Projects Financing - UNECE · Concessionaire: Autostrada Wielkopolska S.A. End of concession: III 2037 Construction period: 2001 – 2004 Total Cost: 875 million euro

With EU contribution from 2002 to 2013

GDDKiA delivered

• 680 km of motorways

• 835 km of expressways

• 674 km of city ring roads and other roads upgrades

With new EU funds for 2014 – 2020

GDDKiA plans to deliver

• 57 km of motorways

• 1350 km of expressways

• 123 km of city ring roads

European Union Funds

10

Page 11: Polish Road Projects Financing - UNECE · Concessionaire: Autostrada Wielkopolska S.A. End of concession: III 2037 Construction period: 2001 – 2004 Total Cost: 875 million euro

Bank Gospodarstwa Krajowego handles the underwriting of government guaranteed National Road Fund (NRF) bonds. The Capital obtained by issuing bonds is used to fund KFD operations. These bonds may have various maturities - 5, 10 years or more. The volume and schedule of issuance in different years are based on cash flow needs of NRF, and analysis of market conditions, supply and demand for government securities in a given time period. In 2012 PLN 3.7 million worth of 10 year bonds were sold in auctions conducted in June. In 2012 cash inflows from sale of obligations amount to 16% of the NRF budget.

Bonds

11

Page 12: Polish Road Projects Financing - UNECE · Concessionaire: Autostrada Wielkopolska S.A. End of concession: III 2037 Construction period: 2001 – 2004 Total Cost: 875 million euro

26 EIB finance contracts signed between 2001 and 2014

Total value – approx. 8,7 bilion euro

Including: Finance contracts running: 17 Finance contracts completed: 9 Contracts to be signed soon: 2 Under appraisal till the end of 2014: 2

European Investment Bank

12

Page 13: Polish Road Projects Financing - UNECE · Concessionaire: Autostrada Wielkopolska S.A. End of concession: III 2037 Construction period: 2001 – 2004 Total Cost: 875 million euro

A1 Motorway, section Gdańsk – Toruń

Concessionaire: Gdańsk Transport Company S.A.

End of concession: VIII 2039

Stage I Gdańsk – Grudziądz

Lenght: 89 km

Construction period: XI 2005 – X 2008

Total Cost: 0,66 billion euro (cost of construction 0,5 billion euro)

Stage II Grudziądz – Toruń

Lenght: 62 km

Construction period: VIII 2008 – X 2011

Total Cost: 1,1 bilion euro (cost of construction 0,7 billion euro)

Toll revenues (National Road Fund): 236,5 million zl (2010 – VI 2014)

Public Private Partnership

13

Page 14: Polish Road Projects Financing - UNECE · Concessionaire: Autostrada Wielkopolska S.A. End of concession: III 2037 Construction period: 2001 – 2004 Total Cost: 875 million euro

A2 Motorway

• Section I Nowy Tomyśl – Konin (149 km)

Concessionaire: Autostrada Wielkopolska S.A.

End of concession: III 2037

Construction period: 2001 – 2004

Total Cost: 875 million euro (cost of construction: 622 million euro)

• section II Świecko - Nowy Tomyśl (106 km)

Concessionaire: Autostrada Wielkopolska II S.A.

End of concession: III 2037

Construction period: 2009 – 2012

Total Cost: 1,6 billion euro (cost of construction: 1,3 billion euro)

Toll revenues (National Roads Fund): 7,3 million zl (V 2012 – VIII 2014)

A4 Motorway

• section Katowice – Kraków (61 km)

End of concession: III 2027

Concessionaire is obligated to adapt and maintenance existing motorway

Public Private Partnership

14

Page 15: Polish Road Projects Financing - UNECE · Concessionaire: Autostrada Wielkopolska S.A. End of concession: III 2037 Construction period: 2001 – 2004 Total Cost: 875 million euro

The viaTOLL system is obligatory for all motor vehicles and combination of vehicles with a maximum permissible weight of over 3.5 tonnes and for buses regardless of their maximum permissible weight. According to the Act of 21 March 1985 on public roads, electronic toll collection applies in Poland on toll motorways, expressways and selected national roads. All viaTOLL system incomes will be forwarded to the National Road Fund. They will be spent on further investments in the development of the road network in Poland and the modernization of the existing road infrastructure.

Electronic Toll Collection

15

Page 16: Polish Road Projects Financing - UNECE · Concessionaire: Autostrada Wielkopolska S.A. End of concession: III 2037 Construction period: 2001 – 2004 Total Cost: 875 million euro

Electronic Toll Collection

Incomes from Toll Collection

2011 2012 2013 2014* 2015* 2016* 2017* 2018* Ʃ

Income from ETC [000 PLN]

343 642 813 742 1 007 737 1 406 603 1 503 700 1 628 342 1 720 078 1 577 473 10 001 317

Income from MTC [000 PLN]

33 758 131 567 184 534 165 106 169 716 176 029 376 350 338 652 1 575 712

SUMA 377 400 945 309 1 192 271 1 571 709 1 673 416 1 804 371 2 096 428 1 916 125 11 577 029

*Forecast

16

Page 17: Polish Road Projects Financing - UNECE · Concessionaire: Autostrada Wielkopolska S.A. End of concession: III 2037 Construction period: 2001 – 2004 Total Cost: 875 million euro

The viaTOLL system is based on a short-range, wireless communication technology. This system consists of several basic elements and its operation can be best summarized as follows: Toll gantries fitted with antennas are located above the toll roads. The antennas enable communication between the transceivers and the viaBOX device mounted in the vehicle. Each time the vehicle equipped with viaBOX device passes beneath the gantry the driver is charged for travelling on a particular section of toll road. The driver is also notified about it by a single beep of the viaBOX device. The toll collection is entirely automatic, and there is no need to slow down or stop. The viaTOLL system operates on state toll motorways and vehicles equipped with the viaBOX device are able to use the designated electronic toll collection lanes. When such a vehicle approaches the barrier at the toll booth, the barrier will open automatically.

Electronic Toll Collection

17

Page 18: Polish Road Projects Financing - UNECE · Concessionaire: Autostrada Wielkopolska S.A. End of concession: III 2037 Construction period: 2001 – 2004 Total Cost: 875 million euro

Thank you for your attention

www.gddkia.gov.pl