+ All Categories
Home > Documents > PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor...

PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor...

Date post: 09-Aug-2021
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
96
- 1 - PONTCHARTRAIN LEVEE DISTRICT EMERGENCY OPERATIONS PLAN 2010
Transcript
Page 1: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 1 -

PONTCHARTRAIN LEVEE

DISTRICT

EMERGENCY OPERATIONS

PLAN 2010

Page 2: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 2 -

EMERGENCY OPERATIONS PLAN AS PREPARED BY EXECUTIVE DIRECTOR

PONTCHARTRAIN LEVEE DISTRICT

Page 3: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 3 -

PLD JURISDICATIONAL MAP

Page 4: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 4 -

DESCRIPTION OF LEVEE DISTRICT AREA

The upstream limit on the Mississippi River for the Pontchartrain Levee District is

approximately three-tenths of a mile below (downstream) the Baton Rouge I-10 Bridge at levee

station 00+00 and extends down river to the St. Charles-Jefferson Parish line at levee station

5914+00 all on the east bank of the Mississippi River (115 miles of main line levee). The District is

comprised of six parishes - East Baton Rouge, Iberville, Ascension, St. James, St. John the Baptist

and St. Charles. Administration of levee district affairs is vested in the Board of Commissioners,

composed of nine (9) members.

Office Headquarters: Maintenance Shop:

2204 Albert Street 9620 Highway 44

Lutcher, LA Convent, LA

The Mississippi River relief system, the Bonnet Carre Spillway, is located within our District,

in Norco, Louisiana, although maintenance, upkeep and operation are the United States Army Corps

of Engineers. The decision to operate the Bonnet Carre Spillway is made when existing conditions,

combined with predicated stages and discharges, indicate that the mainline levees in New Orleans

and other downstream communities will be subjected to unacceptable stress from high water and

thus this system allows the Mississippi River flow to be diverted into Lake Pontchartrain and into the

Gulf of Mexico.

In addition to the Pontchartrain Levee District’s maintenance and administrative staff, there is

also a Pontchartrain Levee District Police Department that plays a vital role in the daily operations of

the District. Pontchartrain Levee District Police are very important, not only because they are

enforcing the laws of the State of Louisiana, but because these officers monitor the levee on a daily

basis. Because the levees are constantly being monitored, any change and/or hint of change is

reported to the U.S. Army Corps of Engineers immediately for further inspection.

Page 5: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 5 -

PLD MISSION

The overall mission of the Pontchartrain Levee District is: To maintain the existing levee

systems in a condition that will ensure integrity and capability to safely withstand the river stages and

hurricanes tidal surges anticipated by their design and condition; to improve by construction or

support the construction by others, of new or enhanced levels of protection as design parameters

change or higher levels of protection are authorized; and to anticipate weaknesses in the system

before and as they develop and actively respond with necessary emergency measures when the

levees are being subjected to river stages or hurricanes tidal surges that would cause flooding within

the jurisdiction of the Pontchartrain Levee District all with the regulations, approval and consent from

the Louisiana Department of Transportation and Development and the U.S. Army Corps Of

Engineers. The U.S. Army Corps of Engineers is particularly important in the consultation process

because as designers and constructors of these federal levee systems, the U.S. Army Corps of

Engineers has the ultimate authority over such a system that they created.

The Board of Commissioners believes this Emergency Operations Plan is essential in order

to achieve overall coordination and proper cooperation with other Agencies for efficient conduct of

activities during periods of emergency. It is our sincere desire to continue the process of improving

flood protection, maintenance and preservation of flood control works, and emergency operations.

The Board of Commissioners and all employees of the Levee District are dedicated to successful

accomplishment of these broad objectives.

Page 6: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 6 -

INDEX CONTENTS TAB 1 Board of Commissioners……………………………… ………. …………Page 9 TAB 2 Emergency Staff …………………………………………………………. Pages 11-12 TAB 3 Essential Stand-by Team…………………………………………………Page 14 TAB 3 PLD Equipment Utilized During Emergency……………………………Page 14 TAB 4 Purpose of Emergency Operations Plan…………...............................Page 16 TAB 5 Emergency Operations Planning………………………………………...Page 18 TAB 5 Assisting and Cooperating Agencies……………………………………Pages 18-19 TAB 6 Directors of Emergency Preparedness…………………………………Pages 21-22 TAB 7 Flood Fight of the Mississippi River Levee……………………………..Pages 24-25 TAB 8 Mississippi River High Water Operation………………………………..Pages 27-28 1) – Headquarters Office Staff – Executive Director 2) – Levee Maintenance Superintendent 3) – Equipment Maintenance Shop Superintendent 4) – Police Department – Captain of Police TAB 9 Storm/Hurricane Operations Overall ……..………………………….. Pages 30-31 TAB 10 Phase I ……………………………………………………………………Pages 33-34 1) – Headquarters 2) – Levee Maintenance Superintendent 3) – Equipment Maintenance Foremen 4) – Police Department – Captain of Police TAB 11 Phase II…………………………………………………………. Pages 36-37 1) – Headquarters 2) – Levee Maintenance Superintendent 3) – Equipment Maintenance Foremen 4) – Police Department – Captain of Police TAB 12 Phase III………..…………………………………………………Pages 39-40 1) – Headquarters 2) – Levee Maintenance Superintendent 3) – Equipment Maintenance Foremen 4) – Police Department – Captain of Police TAB 13 City Assisted Evacuation Plan ………………………………………….Pages 42-45 TAB 14 Canadian National Railroad Swing Gate…………..…………………. Pages 47-50 1) – Operation Information 2) – Procedures 3) – Emergency Contacts

TAB 15 Industry, Transportation and Other Emergency Operations………..Page 52 TAB 16 Appendix I …………………………………………….………………… Page 54 Policies TAB 17 Appendix II ……………………………………………………………… Pages 56-59 Major Industries

Page 7: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 7 -

INDEX CONTENTS Continued

TAB 18 Appendix III……………………………………………….…………….. Page 61 Mississippi River Bridges Mississippi River Ferry Services TAB 19 Appendix IV ……………………………………………….…………….. Page 63 Vendor List TAB 20 Appendix V..……………………………………………….………………Page 65 Facts about Sand Loads TAB 21 Appendix VI………………………………………………..................... Page 67 Procedures for Sand Bag Operations TAB 22 Appendix VII……………………………………………………………..Pages 69-96 Levee District Stations

Page 8: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 8 -

TAB 1

Page 9: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 9 -

BOARD OF COMMISSIONERS

President Steve Wilson, At Large 504/491-7966 Vice President Michael DeLaune, Canadian National/Illinois Central Railroad 225/571-8720 Commissioners Allen J. St. Pierre, St. John the Baptist Parish (C) 504/401-2306 Marty J. Poche, St. James Parish 225/869-9721 Jerry Savoy, Ascension Parish 225/715-6082 L.C., Irvin, Sr., Illinois Railroad Company (C) 225/715-9497 William Addison, East Baton Rouge Parish (C) 225/324-7064

(H) 225/275-5520 Executive Director Monica T. Salins (C) 504/559-6691 (H) 985/307-0598 Board Attorney Dwight D. Poirrier 225/621-3200 Executive Assistant to the Board Joseph Sevario 225/810-2381 Administrative Office Staff Jean Bush 225/647-8846 Kelly Poche (H) 225/869-8848

(C) 225/571-1715

Jerri Womack-Henderson 225/931-6527 Maintenance Consultant Jimmy Smith 225/647-4230 PLD Police Captain Lt. Sidney Scott (Detailed) (C) 225/206-0771 Emergency Coordinator Kenneth J. Steib, Sr. (C) 225/206-0639 (H) 225/644-6041

Page 10: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 10 -

TAB 2

Page 11: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 11 -

EMERGENCY STAFF

Levee Board Operations Superintendent/Emergency Coo rdinator

Kenneth Steib, Sr. (C) 225/206-0639 (H) 225/644-6041 Levee Maintenance Superintendent/Flood Fight

Norris Melancon (C) 225/206-0789 (H) 225/675-5560 Levee Foreman C

David Granier (C1) 225/206-1283 (H) 225/644-5852 (C2) 225/975-7515 Levee Foreman B

David Capone (H) 225/473-9836 (C) 225/276-3886

Chris Stropolo (CDL) (Detailed) 504/495-7134

Levee Foreman A

Darren Smylie 225/746-0498

Wayne Ursin (CDL) (C) 225/955-2138 (H) 225/647-7168 John Scott (Detailed) (H) 225/562-4434

(C) 225/975-1939

Jed LeBlanc (CDL) (Detailed) 225/675-8798

Mobile Equipment Operator 1/Heavy

Kenneth Steib, Jr. (C) 225/235-2907

Lawson Edwards (H) 225/644-1527 (C) 225/313-7655

Michael Shivers (Detailed) (H) 225/673-8823 (C) 225/241-6539

Rodney Gordon (Detailed) (H) 225/473-5721 (C) 225/348-2060

Joseph Cavalier (H) 225/644-7121

(C) 225/910-3935 Deidrick Green (CDL) (H) 225/562-3011

(C) 225/206-4886

Page 12: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 12 -

EMERGENCY STAFF CONTINUED

Alex Ferchaud (CDL) (H) 225/265-2524 (C) 225/303-4465

Mobile Equipment Shop Superintendent

Bart LeBlanc (Detailed) (CDL) (C1) 225/290-0904 (C2) 225/715-9057

(H) 225/675-8319 Mobile Equipment Shop Foreman

Jerome Picou (C) 225/206-3853 (H) 225/562-4859 Tool/Parts Room

Tracye Brown (H) 225/647-6944 (C) 225/603-8354 Police Captain

Sidney Scott, Jr. (Detailed) (C) 225/206-0771 (H) 225/622-5473 Police Officer 2

David Mautemps 225/764-0226

Terrell Morrison 225/933-1613

Joseph Lawler 985/785-0270

Cleophies Page 225/265-4995

Roscoe Brewer, Jr. 985/764-7002

Page 13: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 13 -

TAB 3

Page 14: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 14 -

EMERGENCY ESSENTIAL STAND-BY TEAM

Staff Support Personnel 1) Executive Director 2) Police Captain 3) Police Lieutenant 4) Levee Foreman C 5) Levee Foremen B 6) Emergency Coordinator/Levee Board Operations Superintendent 7) Levee Maintenance Superintendent 8) Mobile Equipment Shop Superintendent 9) Mobile Equipment Shop Foreman 10) Heavy Equipment Foreman Note: President of Board of Commissioners will be kept informed by Executive Director Employee first called (Stand-by Support) Heavy Equipment personnel will be called in, along with Heavy Equipment Foreman and Shop Foreman. Also any additional personnel will be called out as needed. In Hurricane Impact Condition, these essential personnel will be housed at Pontchartrain Levee District Headquarters up to and including Category 3 storm within 250 miles of Lutcher, LA. Called personnel will be determined at Phase II meeting and will be housed at an Ascension Parish hotel that will be arranged at the start of each hurricane season by the Executive Director.

PONTCHARTRAIN LEVEE DISTRICT (PLD) EQUIPMENT UTILIZED DURING EMERGENCY

Equipment owned and utilized by PLD during an emergency and daily operations.

Equipment is only operated by PLD employees.

1 – Hyundai 210 Excavator 1 – Motor Grader 1 – D6K Cat Dozer 1 – 650 Case Dozer 1 – Rubber Tire Backhoe 420 E Caterpillar 2 – Grader Box 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Push Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator 1 – 300 Series Bobcat 1 – 335 Bobcat Mini Excavator Equipment maintained by PLD Maintenance Department; kept in “ready mode” for daily operations and all PLD emergencies. *It is undetermined until an emergency event, if any of this equipment is available for utilization by another agency. (Note: PLD will not release any equipment, if available unless operated by PLD employees.

Page 15: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 15 -

TAB 4

Page 16: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 16 -

EMERGENCY OPERATIONS PLAN

PURPOSE

During each year all or substantial portions of the Pontchartrain Levee District are subject to

the potential disasters of major proportions which require planned emergency operations to protect

people and developments located within impact areas. In addition, this plan is vital for proper

maintenance, protection and preservation of the Mississippi River levees and flood protection

facilities.

These potential disasters result from Mississippi River, Lake Pontchartrain and Lake

Maurepas high water(s), hurricane(s) and large scale accidents of industry and transportation. Thus,

the Pontchartrain Levee District must be prepared to respond immediately to disaster occurrences

with appropriate emergency operations suitable to each instance.

The purpose of this report is to present a plan to guide those activities. However, it must be

recognized that emergency situations are not predictable, and due to circumstances of each (i.e.,

flood stages, degree of severity, hazardous impact, life threatening, etc.) plan elements will be

adapted to fit conditions.

Page 17: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 17 -

TAB 5

Page 18: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 18 -

EMERGENCY OPERATIONS PLANNING

Emergency operations planning for the Pontchartrain Levee District is directed to the

following conditions of readiness:

• Mississippi River High Water Operation

• Hurricane Operation

• Industry, transportation and other emergency operations

CONTACTS OF ASSISTING AND COOPERATING AGENCIES

Many agencies and organizations become involved in emergency operations.

They are: CORPS OF ENGINEERS, NEW ORLEANS DISTRICT

Emergency Operations Center Mike Stack, Jr., Chief of Emergency Mgmt. 504/862-1102 504/862-1159 504/865-7944 314/809/7036 [email protected] [email protected]

Jeffrey F. Carroll, Emergency Mgmt. James M. Thomas, Emergency Mgmt. 504/862-2383 504/862-2226 337/316-0109 504/388-6737 [email protected] [email protected]

Michael A. Krehely, Emergency Mgmt. Heath Jones, Emergency Mgmt. Flood Fight Hurricane 504/862-1338 504/862-2426 504/444-4187 [email protected] [email protected]

Jeff Falati, HPL Construction Project Manager 504/862-2980 [email protected]

NEW ORLEANS AREA

Stuart Waits, Area Engineer Chris Wagner, Assistant to Area Engineer 504/862-1452 504/862-1230 504/628-5056 504/628-5050 [email protected] [email protected]

OFFICE OF COASTAL PROTECTION AND RESTORATION

EMERGENCY CONTACT LIST

Jerome Zeringue, Steve Mathies Incident Commander/Emergency Director Incident Commander 225/342-3969 (O) 225/342-3969 (O) 985/709-1099 (C) 225/341-0701 (C) [email protected] [email protected]

Page 19: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 19 -

OCPR EMERGENCY CONTACT LIST CONTINUED John Monzon Chris Knotts Operations Coordinator Operations Coordinator 225/342-4501 (O) 225/342-6871 (O) 504/432-7741 (C) 225/328-8987 (C) [email protected] [email protected] Chris Williams Rick Raynie OCPR Staff OCPR Staff 225/342-7549 (O) 225/342-9436 (O) 225/603-8669 (C) 225/266-8232 (C) [email protected] [email protected] Kirk Rhinehart Luke LeBas OCPR Staff OCPR Staff 225/342-2179 (O) 225/342-4102 (O) 225/278-8436 (C) 225/966-8019 (C) [email protected] [email protected] Bill Feazel David Fruge OCPR Staff Corps Liaison 225/342-4641 (O) 225/342-7615 (O) 225/247-8089 (C) 225/393-1414 (C) [email protected] [email protected] Norwyn Johnson Corps Liaison 225/342-0924 (O) 225/276-6164 (C) [email protected]

Louisiana Department of Public Safety & Corrections

Elayn Hunt Correctional Center U. S. Coast Guard

Other Levee Districts

Those agencies, with which regular exchanges are made when assistance, information and/or cooperation are accomplished, include the following:

State Police

Sheriff - each of six parishes

Parish Police Jury or Council - six parishes

Cities and Towns throughout levee district

Louisiana Office of Emergency Preparedness

Louisiana Department of Natural Resources

Page 20: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 20 -

TAB 6

Page 21: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 21 -

DIRECTORS OF EMERGENCY PREPAREDNESS AND SAND BAG LOCATIONS

EAST BATON ROUGE PARISH

DIRECTOR JOANN MOREAU ASST. DIRECTOR – TUESDAY MILLS 3773 HARDING BLVD. P.O. BOX 1471 BATON ROUGE, LA 70821 225/389-2100 FAX 225/389-2114 EMAIL ADDRESS: [email protected]

SANDBAGS AT DISTRICT FIRE DEPARTMENT

IBERVILLE PARISH

DIRECTOR LAURIE DOIRON P.O. BOX 324 PLAQUEMINE, LA 70765 225/687-5140 FAX 225/687-5146 EMAIL ADDRESS: [email protected]

SANDBAGS AT PARISH BARN

ASCENSION PARISH

DIRECTOR RICHARD WEBRE 828 S. IRMA STREET BLDG 3 GONZALES, LA 70737 225/621-8360 FAX 225/621-8362 EMAIL ADDRESS: [email protected]

SANDBAGS AT: ASCENSION CIVIC CENTER – SORRENTO – US 61 FIRE DISTRICT TRAINING CENTER – GONZALES – US 61 PRAIRIEVILLE FIRE DEPARTMENT – LA 929 GALVEZ LAKE FIRE DEPARTMENT – JOE SEVARIO ROAD 7TH DISTRICT FIRE DEPARTMENT – HWY 44

ST. JAMES PARISH

DIRECTOR ERIC DEROCHE ASSISTANT DIRECTOR FRANCIS HYMEL P.O. BOX 106 CONVENT, LA 70723 225/562-2310 OR 225/562-2364 (24 HR. #) FAX 225/562-2269 EMAIL ADDRESS: [email protected] EMAIL ADDRESS: [email protected]

Page 22: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 22 -

DIRECTORS OF EMERGENCY PREPAREDNESS AND SAND BAG LOCATIONS

Continued SANDBAG LOCATION WILL BE ANNOUNCED ST. JOHN THE BAPTIST PARISH DIRECTOR PAUL ONCALE 1801 WEST AIRLINE HIGHWAY LAPLACE, LA 70068 985/652-2222 FAX 985/652-2183 OR 911 – IN ST. JOHN THE BAPTIST EMAIL ADDRESS [email protected] ST. CHARLES PARISH DIRECTOR SCOTT WHELCHEL P.O. BOX 302 HAHNVILLE, LA 70057 985/783-5050 FAX 985/783-6375 EMAIL ADDRESS [email protected] SANDBAGS AT: EAST BANK BRIDGE PARK RED CHURCH SUBDIVISION ORMOND FIRE HOUSE 4TH STREET BAR NONE SUBDIVISION CHARLES TOWN SUBDIVISION FAIRFIELD SUBDIVISION I-310 SERVICE ROAD OAKLAND SUBDIVISION PRESTON HOLLOW & RIVER ROAD RIVER VIEW DIANNE PLACE MONTZ RECREATION NEW SARPY RECREATION PARK NORCO ELEMENTARY SCHOOL & APPLE STREET NORCO FIRE STATION

Page 23: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 23 -

TAB 7

Page 24: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 24 -

FLOOD FIGHT OF THE MISSISSIPPI RIVER LEVEE

The National Weather Service and the U.S. Army Corps of Engineers monitor the river and can

predict the water heights against the Pontchartrain Levee District mainline Mississippi River levees

usually 10 days in advance. There predictions are utilized to determine the severity of the high water

event. The Pontchartrain Levee District monitors the river gages daily at www.rivergages.com for

the most updated gage information throughout the New Orleans District Basins. Generally, “Flood

Fight” on the Mississippi River can be assumed to start when the river gage at Carrollton reaches 11’

and rising. At this point, the river begins to overflow its natural banks and comes against the man-

made levees. Activity increases; diligent surveillance, inspections and high water reports begin. The

businesses along the batture are notified of the increased river stages and precautions are made for

the potential of the river to continue to rise. If there is a continued rise in the river stages, at 15’ on

the Carrollton gage, the Corps of Engineers will halt any and all work within 1500’ of the mainline

Mississippi River levees. An emergency operation activity includes Phase I and Phase II Flood Fight

activities as declared and carried out by the Corps of Engineers. Ordinarily the Corps of Engineers

enters Phase I prior to a river stage of 12 feet on the Carrollton Gage and Phase II at 15 feet.

1) River gage at 11 feet on the Carrollton Gage in New Orleans, the Emergency Coordinator will have a meeting with the following:

a) Executive Director f) Levee Foremen B b) Levee Maintenance Superintendent g) Heavy Equipment Foreman c) Mobile Equipment Shop Superintendent h) Police Captain d) Shop Foreman i) Police Lieutenant e) Levee Foreman C

2) Emergency Coordinator will track Mississippi River water gage readings Hurricane/High Water and make notification of Phase I to:

Corps of Engineers

Emergency Operations Center 504/862-1102 504/865-7944 Michael J. Stack, Chief of Emergency Management 504/862-1159 314/809-7039 Jeffrey F. Carroll, Emergency Management 504/862-2383 337/316-0109 James M. Thomas, Emergency Management 504/862-2226 504/388-6737 Michael Krehely, Emergency Management, Flood Fight 504/862-1338 504/444-4187 Heath Jones, Emergency Management, Hurricane 504/862-2426 Stuart Waits, Area Engineer 504/862-1452 504/628-5056 Chris Wagner, Assistant Area Engineer 504/862-1230 504-628-5050 Jeff Falati, HPL Construction Project Manager 504/862-2980

Page 25: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 25 -

Office of Coastal Protection and Restoration – Emer gency Contact

Jerome Zeringue, Incident Commander/Em. Director 225/342-3969 985/709-1099 Steve Mathies, Incident Commander 225/342-4683 225/341-0701 John Monzon, Operations Coordinator 225/342-4501 504/432-7741 Chris Knotts, Operations Coordinator 225/342-6871 225/328-8987 Chris Williams, OCPR Staff 225/342-7549 225/603-8669 Rick Raynie, OCPR Staff 225/342-9436 225/266-8232 Kirk Rhinehart, OCPR Staff 225/342-2179 225/278-8436 Luke LeBas, OCPR Staff 225/342-4102 225/966-8019 Bill Feazel, OCPR Staff 225/342-4641 225/247-8089 David Fruge, Corps Liaison 225/342-7615 225/393-1414 Norwyn Johnson, Corps Liaison 225/342-0924 225/276-6164

3) Emergency Coordinator will contact Hunt’s Correctional operation of Phase I (notification of possible sand bags)

a) Warden Howard Prince Secretary: Melissa Scioneaux 225/319-4505 b) Deputy Warden Tim Hooper 225/319-4504 c) Asst. Warden Colonel Jeff Tircuit Cell 225/439-8021 d) Hunt’s Control Center 225/642-3306

4) Emergency Coordinator will monitor high water condition and retrieve on daily basis information on levee condition. 5) Emergency Coordinator will inform Corps of Engineers of Phase I. 6) Emergency Coordinator will contact Hunt Correctional 7) Emergency Coordinator will contact Mobile Equipment Shop Superintendent and Shop Foreman to check on stand-by equipment needed during high water operation. 8) Emergency Coordinator will inform Police Captain and Police Lieutenant to call DOTD and any other parish or city government to alert them of Phase I High Water Operation. 9) Emergency Coordinator will inform Office Personnel to fax all contractors that are performing drilling, soil borings, seismic survey, pile driving. (NOTE: These operations are prohibited during high water operation.) 10) Emergency Coordinator will keep Executive Director and Operation Superintendent updated. 11) Emergency Coordinator will have a meeting with staff to go over all documents.

Page 26: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 26 -

TAB 8

Page 27: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 27 -

MISSISSIPPI RIVER HIGH WATER PROCEDURES 1. HEADQUARTERS OFFICE STAFF - EXECUTIVE DIRECTOR

a. After receiving notice from Corps of Engineers, President will direct, confer and coordinate with the Executive Director and/or Emergency Coordinator, and declare phases. Emergency Coordinator will then work in conjunction with the Corps of Engineers, Louisiana DOTD, GOHSEP and local EOCs on a daily basis, or as appropriate. A daily summary of activities will be presented to President as directed.

b. After consultation with the PLD President, orders will be delegated to the Levee Maintenance and Equipment Maintenance Units and Police Department into emergency operations for high water conditions.

c. Monitor river gages, particularly Baton Rouge and Carrollton (New Orleans). d. Establish a stand-by personnel team for working overtime as may be needed and as

directed. e. Advise President of the Board of Commissioners regarding revenue resources vs.

expenditures with projections, on a frequency as ordered by President. f. Direct Levee Maintenance to designate personnel and vehicles to assist Police

Department for levee inspections and communications. g. Provide assistance and cooperation to all Levee District units, Corps of Engineers,

Louisiana DOTD, GOHSEP, local EOCs and all other affected agencies. h. Coordinate, handle, and designate responses to inquiries from news media and

public.

2. LEVEE MAINTENANCE - LEVEE MAINTENANCE SUPERINTEN DENT

a. Provide continuing maintenance support as directed by Executive Director and/or Emergency Coordinator.

b. Confer daily with President and/or Emergency Coordinator and respond promptly to

requests for action. c. Submit a daily report to President, Executive Director and Emergency Coordinator of

major and special activities to include information input from Levee Foreman III, Mobile Equipment Shop Superintendent, Police Department and other sources, including notes on sandbags, rip-rap, shells, embankments, drainage efforts, etc.

d. Check stock of various materials, sandbags, supplies, parts, other items on a regular

basis and replace or expand as needed. e. Consult with Shop Foreman to verify all equipment, especially Heavy Equipment, is in

“ready condition” to provide assistance as may become necessary. f. Designate essential personnel to assist Police Department for levee inspections and

communications, as directed by President and/or Emergency Coordinator. 3. EQUIPMENT MAINTENANCE - MOBILE EQUIPMENT SHOP SUPE RINTENDENT

Page 28: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 28 -

a. Provide continuing support as required. b. Confer daily with the Emergency Coordinator and respond promptly to requests for

action. c. All power equipment, except tractor mowing units, will be constantly monitored with

respect to location, performance ability, fuel supply and schedule. d. Availability of power equipment will be according to priorities established by the

Emergency Coordinator and/or President. e. Timely transport of heavy equipment will be accomplished under direction of the

Mobile Equipment Shop Superintendent and Captain of the Police Department. f. Dispatch mechanics to provide field maintenance to equipment as required. g. Submit a brief, daily report to Emergency Coordinator and/or Executive Director of

major and special activities, making note of equipment not in working condition and mitigation plans.

4. POLICE DEPARTMENT - CAPTAIN, LEVEE DISTRICT POLI CE

a. Perform daily inspections of the entire levee system. b. Any violations and potential detrimental activities shall be promptly dealt with and

reported to Emergency Coordinator.

Page 29: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 29 -

TAB 9

Page 30: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 30 -

STORM/HURRICANE OPERATIONS OVERALL : From the time a storm (potential or actual

hurricane) is reported to possibly enter the Gulf of Mexico, the storm/hurricane path and forecasts

are carefully monitored. When a storm/hurricane moves into or is spawned in the Gulf of Mexico its

path is plotted from official reports and bulletins. Due to abilities of storms to change rapidly and

quickly become dangerous, the Pontchartrain Levee District must be prepared to respond promptly to

protect the levee system and minimize potential damages in the levee district area to the greatest

extent possible. Three different levels of Hurricane Emergency Operations have been established to

accommodate a phased increase in Levee Board activity. It is possible that a storm/hurricane could

form within any of the three phases described herein, and actions would be undertaken as described

under the applicable phase. Initiation of these activities will be determined by Executive Director after

consultation with the President and Emergency Coordinator. Those three phases are:

Phase I - Hurricane Threat—storm appears to be tracking as if it will enter the

Gulf of Mexico and potentially be a threat (H-72 hours out)*

Phase II - Hurricane Watch—storm poses a potential threat concerning the

safety and welfare of the citizens within the Pontchartrain Levee

District jurisdictions (H-48 to H-40 hours out)*

Phase III - Hurricane Warning- storm poses an actual threat and major impact

concerning the safety and welfare of the citizens within the

Pontchartrain Levee District jurisdictions (H-30 to H-24 hours out)*

*Depending on the actual circumstances of the storm, there may be more or less time

available; these phases were created based on history and reasonable justification.

Contact Personnel:

1) Emergency Coordinator will have meeting with storm committee members:

a) Executive Director f) Levee Foremen B b) Levee Maintenance Superintendent g) Heavy Equipment Foreman c) Mobile Equipment Shop Superintendent h) Police Captain d) Shop Foreman i) Police Lieutenant e) Levee Foreman C

2) Emergency Coordinator will track storm and make notification of Phase I to:

Corps of Engineers

Emergency Operations Center 504/862-1102 504/865-7944 Michael J. Stack, Chief of Emergency Management 504/862-1159 314/809-7039 Jeffrey F. Carroll, Emergency Management 504/862-2383 337/316-0109 James M. Thomas, Emergency Management 504/862-2226 504/388-6737 Michael Krehely, Emergency Management, Flood Fight 504/862/1338 504/444-4187 Heath Jones, Emergency Management, Hurricane 504/862-2426 Stuart Waits, Area Engineer 504/862-1452 504/628-5056 Chris Wagner, Assistant Area Engineer 504/862-1230 504-628-5050 Jeff Falati, HPL Construction Project Manager 504/862-2980

Page 31: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 31 -

Office of Coastal Protection and Restoration – Emer gency Contact Jerome Zeringue, Incident Commander/Em. Director 225/342-3969 985/709-1099 Steve Mathies, Incident Commander 225/342-4683 225/341-0701 John Monzon, Operations Coordinator 225/342-4501 504/432-7741 Chris Knotts, Operations Coordinator 225/342-6871 225/328-8987 Chris Williams, OCPR Staff 225/342-7549 225/603-8669 Rick Raynie, OCPR Staff 225/342-9436 225/266-8232 Kirk Rhinehart, OCPR Staff 225/342-2179 225/278-8436 Luke LeBas, OCPR Staff 225/342-4102 225/966-8019 Bill Feazel, OCPR Staff 225/342-4641 225/247-8089 David Fruge, Corps Liaison 225/342-7615 225/393-1414 Norwyn Johnson, Corps Liaison 225/342-0924 225/276-6164

3) Emergency Coordinator, with assistance from Levee Maintenance Superintendent and Mobile Equipment Shop Superintendent, will contact Hunt’s Correctional operation of Phase I (notification of possible sand bags)

a) Warden Howard Prince Secretary: Melissa Scioneaux 225/319-4505 b) Deputy Warden Tim Hooper 225/319-4504 c) Asst. Warden Colonel Jeff Tircuit Cell 225/439-8021 d) Hunt’s Control Center 225/642-3306

Storm/Hurricane Emergency Operations shall terminate at the time of dissipation of the

hurricane or its movement to more than 250 miles away from New Orleans, when reasonable

recovery is realized from flooding and/or wind damages, and normal operation can be resumed for

the levee system. Tasks to be performed under each of the three phases are presented in the

following:

Page 32: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 32 -

TAB 10

Page 33: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 33 -

STORM/HURRICANE OPERATION PROCEDURES PHASE I 1. HEADQUARTERS

a. After consultation with the President of the Board of Commissioners, the Executive Director will confer and coordinate with Emergency Coordinator. The Emergency Coordinator takes command and orders Levee Maintenance and Equipment Maintenance units and Police Department into Phase I, Hurricane Operation. The Emergency Coordinator delegates activities of all u nits and personnel until emergency declaration is terminated .

b. Emergency Coordinator will monitor and plot storm path, and will regularly advise

each unit of status. c. Make contact with and begin team coordination with Corps of Engineers, Louisiana

DOTD, and any parish or city governments, as appropriate. d. Maintain a daily log of major and special activities, with information input from Levee

Maintenance, Equipment Maintenance, Police Department and other sources. e. Provide President with a daily summary of activities or as directed by the President. f. Assign personnel to operate and monitor the base radio and handle communications

and pass along information to the Emergency Coordinator during office hours. g. Establish a stand-by personnel list for working overtime, as authorized and required,,

including office support and/or communications. h. Coordinate, handle, and/or designate responses to inquires from news media and

public. 2. LEVEE MAINTENANCE – SHOP SUPERINTENDENT

a. Assign personnel to operate and monitor the base radio and handle communications and pass along information to the Emergency Coordinator during office hours.

b. Provide continuing support as required, and carry out requirements of normal

operations to the maximum extent. c. Consult daily with Emergency Coordinator and/or President to determine action

requirements. d. Check stock of various materials, sandbags, supplies, parts, other items and replace

or expand as needed. e. Submit a brief, daily report to Emergency Coordinator of major and special activities.

Page 34: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 34 -

3. EQUIPMENT MAINTENANCE - SHOP FOREMAN AND HEAVY EQUI PMENT FOREMAN

a. Provide continuing support as required. b. Consult daily with Emergency Coordinator and/or Shop Superintendent and Executive

Director to determine action requirements. c. Check and service all power equipment, tractors, generators, pumps and all vehicles. d. Submit a brief daily report to Executive Director and/or Emergency Coordinator

special activities, noting equipment not in working condition. 4. POLICE DEPARTMENT - CAPTAIN, LEVEE DISTRICT POLI CE

a. Consult and coordinate with Headquarters Office Staff for adequate support of radio, telephone and message communications.

b. Consult with Emergency Coordinator and/or President to determine requirements,

needs and alternate plans. c. Check supplies and replenish if necessary. (portable lights, flares, caution lights,

barricades, first aid kits, portable radios, rain gear, etc.) d. Contact Sheriff Office and Police Jury/Parish Council office in each parish impacted

and acknowledge cooperation, set up procedure as needed. e. Complete A through D of sequence within 12 hours. f. Conduct security checks, inspections, and safety patrols as required. g. Submit a brief, daily report to Emergency Coordinator and President of major and

special activities requested and performed.

Page 35: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 35 -

TAB 11

Page 36: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 36 -

STORM/HURRICANE OPERATION PROCEDURES PHASE II 1. HEADQUARTERS

a. Emergency Coordinator will notify the Maintenance Department, Police Department and Headquarters that Phase II has been implemented.

b. All three departments are to establish overtime emergency duty rosters, notify

employees of schedules, and advise them to remain on "stand by" basis. c. Continue to monitor and plot storm/hurricane path and keep each department

advised of status. d. Assemble all employees, including Equipment Maintenance and Police Department

and conduct oral review of methods, potential tasks, tentative assignments, crew changes, overtime schedules, etc.

e. Re-contact Corps of Engineers and Louisiana DOTD to ascertain cooperation and

likely action alternatives. f. Maintain a daily log of major and special activities with information input from the

three Levee Board departments and other sources. g. Provide President with a daily summary of activities as directed. h. Initiate and continue overtime work as appropriate and required.

2. LEVEE MAINTENANCE / SHOP SUPERINTENDENT

a. Suspend normal maintenance, except items which must be continued for efficient operations.

b. Move all power equipment to a safe shelter and in strategic locations within the

District. c. Prepare to issue special tools. (rain gear, flashlights, rain boots, other equipment,

etc.) d. Finalize plan for overtime work schedules and develop rosters with crew

assignments, including all employees. Notify each employee to be on "stand by" basis.

e. Assign personnel, as required, to attend headquarters base radio, emergency

telephone and communications. f. Consult daily with Emergency Coordinator and/or President to determine action

requirements. g. Submit daily reports to Emergency Coordinator and/or President of major and special

activities.

Page 37: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 37 -

3. EQUIPMENT MAINTENANCE – SHOP FOREMAN AND HEAVY E QUIPMENT FOREMAN

a. Suspend normal maintenance activities except vital functions. b. Assemble with Levee Maintenance and Police Units to review collectively the tasks to

be performed, methods, potential activities, etc. c. Coordinate with Levee Maintenance Department to move all equipment to safe

shelter and strategic positioning locations. d. Assembly all portable generators and pumps along with welding equipment and air

compressors at planned locations. e. Finalize plans for overtime work schedules and develop rosters with crew

assignments, including all employees. . f. Consult daily with Emergency Coordinator and Executive Director and/or President to

determine action requirements. g. Submit daily report to Emergency Coordinator and President of major and special

activities.

4. POLICE DEPARTMENT - CAPTAIN, LEVEE DISTRICT POLI CE

a. Consult and coordinate with Headquarters Office Staff and Levee Maintenance for adequate support of radio, telephone and message communications; and direct E.O.C. activities.

b. Consult with Emergency Coordinator and/or President to determine requirements. c. Finalize plans for overtime work schedules and notify each person involved to be on

"stand by" basis. d. Keep in current contact with local EOCs, Sheriff and Police Jury/Parish Council

offices, each parish affected. e. Submit daily report to Emergency Coordinator and President of major and special

activities.

Page 38: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 38 -

TAB 12

Page 39: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 39 -

STORM/HURRICANE OPERATION PROCEDURES PHASE III 1. HEADQUARTERS

a. The Emergency Coordinator will immediately notify the Maintenance Department, Police Department and Headquarters that Phase III has been implemented.

b. Order all Maintenance and Police Department to confirm within 1 hour that overtime

rosters have been posted, employees notified, both personnel and equipment are on "Ready" status, and action can be promptly initiated.

c. Continue to monitor and plot hurricane positions and advise each working unit at

regular intervals. d. Perform and provide office support activities to all units of the Levee Board, as

authorized e. Continue overtime work as appropriate and required. f. Maintain a daily log of major and special activities with information input from Levee

Board Departments and other sources. g. Contact all board members to confirm contact numbers and availability.

2. LEVEE MAINTENANCE / SHOP SUPERINTENDENT

a. Consult with Emergency Coordinator and President to determine action requirements.

b. Coordinate activities with headquarters, Equipment Maintenance and Police

Department to assure best operations. c. All or parts of personnel are subject to being placed on overtime schedules. d. Dispatch work crews on as needed basis. e. Submit daily reports to Emergency Coordinator and President of major and special

activities.

3. EQUIPMENT MAINTENANCE - SHOP FOREMAN AND HEAVY E QUIPMENT FOREMAN

a. Consult with Executive Director, Emergency Coordinator, and/or President to determine action requirements.

b. Coordinate activities with Headquarters, Maintenance Department and Police

Department to assure best operations. c. All or parts of personnel are subject to being placed on overtime schedules, specific

assignments will be delegated. d. Dispatch work crews on as needed basis.

Page 40: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 40 -

e. Submit daily reports to Executive Director and Emergency Coordinator of major and special activities.

4. POLICE DEPARTMENT-CAPTAIN, LEVEE DISTRICT POLICE

a. Consult and coordinate with Headquarters Office Staff and Levee Maintenance for adequate support of radio, telephone and message communications, and direct E.O.C. activities.

b. Consult with Emergency Coordinator and Executive Director and/or President to

determine action requirements. c. Coordinate activities with Levee Maintenance and Equipment Maintenance to assure

best operations. d. All or parts of personnel assigned to Police duty are subject to being placed on

overtime schedules. Specific assignments will be delegated. e. Notify local EOCs, Sheriffs and Police Jury/Parish Council Offices in each parish of

actions being implemented. f. Submit daily reports to Emergency Coordinator and President of major and special

activities.

Page 41: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 41 -

TAB 13

Page 42: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 42 -

Page 43: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 43 -

Page 44: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 44 -

Page 45: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 45 -

Page 46: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 46 -

TAB 14

Page 47: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 47 -

CANADIAN NATIONAL RAILROAD SWING GATE OPERATION INFORMATION

Prior to closing the Canadian National Railway Swing Gate, the Canadian National Railway Chief Dispatcher should be notified to halt train traffic and notify them of a track obstruction. (Refer to the Canadian National Railway Floodgate contact information sheet) There are locks on the gate, and there is a railing that needs to be removed prior to closing the gate. The gate must be tethered at all times to prevent a free swing. The railroad swing gate could be especially difficult to close in windy conditions. The City of New Orleans has developed a plan to use the Canadian National Railway as an evacuation route. The City Assist Evacuation Plan goes into effect at “54 hours out,” which means 54 hours before tropical storm force winds of 39 mph reach coastal Louisiana. Between 54 hours and 30 hours out, the railroad would be used as a potential evacuation route. Evacuation by rail could continue until 12 hours out if needed. All railroad traffic should be west of the Canadian National Railway Swing Gate by 12 hours out. At this point, the Pontchartrain Levee District will have contacted all parties (refer to contact information at the front of this report) to notify them that the swing gate will be closed.

PONTCHARTRAIN LEVEE DISTRICT OPERATION PROCEDURES

FOR THE CANADIAN NATIONAL RAILROAD SWING GATE IN ST. CHARLES PARISH

The Canadian National Railroad Swing Gate, located at the eastern edge of the St. Charles Parish Hurricane Protection Levee at the St. Charles Parish/Jefferson Parish Line, is a 16 ton gate which closes the gap on the Hurricane Protection Levee in St. Charles Parish. The Pontchartrain Levee District (PLD) has trained personnel on staff to open and close the gate following the procedures described herein.

Since the operation of the gate will typically take place during extreme weather events, and since the gate is in place to contain floodwaters from entering the Parish from Lake Pontchartrain, main concerns include maintaining total control of the gate during the opening/closing procedures and achieving the proper seal adjustments once the gate is closed. Routine maintenance, lubrication, and visual inspections of the locking mechanisms, jacking screw, pivot points and hinges, seal, winches, cables and supports will be performed by the PLD on a quarterly basis. The CNR is responsible for maintaining their alarm and electro-lock. An annual inspection will be performed by representatives of the PLD, the CNR and the US Army Corps of Engineers. Listed below are the operation procedures for the swing gate:

1) If a storm, and/or rising waters from storm surge, poses a threat to St. Charles Parish within 24 hours, the Pontchartrain Levee District (PLD) will contact the ICCN Railroad to inform them of the need for the potential closing of the railroad swing gate by calling the Chief Dispatcher at 800 585 4967. Due to the City of New Orleans’ City Assisted Evacuation Plan (CAEP) which includes evacuation by rail, other emergency contacts are needed prior to the closing of the gate. These include, but are not limited to, the City of New Orleans, Department of Homeland Security, Amtrak, State of Louisiana, Department of Transportation and Development (LDOTD) and the Federal Railroad Administration. Please see the Emergency Contact List attached.

2) Just prior to the scheduled closing time, railroad personnel should arrive at the site to

disengage the alarm and electro-lock . If RR personnel are not on site at the scheduled time or if, for some reason, the PLD is directed to disengage the alarm and electro-lock, the

Page 48: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 48 -

procedure is as follows:

A. Remove the locks that open the control switch B. Lift handle in the direction shown C. After 15 seconds, you will hear a “sound” D. Move the handle all the way up

This will alert all train traffic to the impending closure of the gate, and disengage the RR device which informs the RR if the gate moves from its locked, open position. While this is being done, PLD personnel will be removing the handrails from the walkway. They are in the swing path of the gate and need to be removed before closing and opening the gate.

3) Once the RR systems are disengaged, lower the jacking screw, remove the lock and

disengage the locking mechanism attached to the gate. At this point, the cable on the winch located on top of the floodwall is preventing the gate from swinging freely. This cable is attached to the gate at all times.

4) Run the cable from the airport side winch through the tackle block located on the southwest

side of the tracks and attach it to the pull eye on the Swing Gate.

5) Release the braking system on the winch located on top of the floodwall and apply resistance. Begin closing the gate by turning the winch on the airport side of the tracks. Be sure to maintain tension on the winch that is mount ed on the floodwall as this will keep the gate from swinging freely.

6) Once the gate reaches 90° and is directly above the support to which the tackle blocks are

attached, place the cable connected to the winch on top of the floodwall through the tackle block and remove the cable connected to the winch on the airport side of the tracks from the tackle block. This will allow the gate to continue to be closed while maintaining tension on the opposite side.

7) Proceed with the gate closure.

8) After the gate is closed and mechanically secured, begin turning the handwheels on the top

of the gate to lower the seal. Be sure to have someone monitor the dropping of the seal to make sure it is being lowered evenly. If the sea l is lowered at differing rates, it may tear and / or not seal properly.

9) Place the plywood templates, as designed by the PLD Heavy Equipment Department, and

the sand bags in all four areas of the track opening. At this point, the Swing Gate is locked and sealed in its closed position. Before leaving the site, make sure that all winching system cables are properly rewound. Do not leave the cables across the tracks. It gives false signals. Also, replace the handrails to the walkway.

Once there is no longer a need for the Swing Gate to be closed, these procedures will be reversed to open the Swing Gate.

Page 49: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 49 -

EMERGENCY CONTACTS FOR CLOSING RR SWING GATE

CANADIAN NATIONAL RAILROAD FLOODGATE

CANADIAN NATIONAL RAILROAD AMTRAK CHIEF DISPATCHER Butch Williams Jim McDaniel 17641 S. Ashland Avenue 504-782-3365 (m) 504-528 -1621 (o) Homewood, IL 60430 504-410-2354 (o) Office 1-800-585-4967 [email protected]

CITY OF NEW ORLEANS, OFFICE OF HOMELAND SECURITY

Jerry Sneed - Director Matthew Kallmyer – Deputy Director 504-628-9035 (Work Cell) 504-799-5465 (Work Cell ) 504-717-7037 (Personal Cell) 504-782-5151 (Person al Cell) 504-658-8700 (O) 504-658-8700 (O) 504-658-8707 (O) 504-658-8703 (O) [email protected] [email protected] [email protected] [email protected]

Office of Coastal Protection and Restoration – Emer gency Contact

Jerome Zeringue, OCPR Incident Commander 225/342-3969 (O) 985/709-1099 (C)

FEDERAL RAILROAD ADMINISTRATION

Stephen Dupont 817-235-0849 (m) [email protected]

SAINT CHARLES PARISH

Sam Scholle Bob Dublan Steve Truitt 504-235-7180 (m) 504-559-0409 (m) 504-559-3652 (m) 985-783-5102 (o) 985-764-1553 (o)

EAST JEFFERSON LEVEE DISTRICT

Fran Campbell Danny Abadie Jonell Blowers 504-329-3688 (m) 504-915-1264 (m) 504-259-1184 (m) 504-733-0087 (o) 504-469-7522 (o)

PONTCHARTRAIN LEVEE DISTRICT

Kenneth Steib, Sr. Monica Salins Steve Wilson 225-206-0639 (m) 504-559-6691 (m) Board Presiden t 225-869-9721 (o) 225-869-9721 (o) 504-491-7966 (m ) 800-523-3148 (o) 985-307-0598 (h)

Page 50: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 50 -

AIRPORT

Emergency Non-Emergency 504-464-2700 504-464-2699

CONTACTS FOR ROUTINE MAINTENANCE – RR SWING GATE Signal or Track Maintenance Contracts Office 1-877-333-7989 Division Engineer 17641 S. Ashland Avenue Local Track Supervisor Homewood, IL 60430 504-734-6991 708-332-3500 Local Signal Supervisor 504-734-6990

Page 51: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 51 -

TAB 15

Page 52: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 52 -

INDUSTRY, TRANSPORTATION AND OTHER EMERGENCY OPERAT IONS: Major industrial

development, railroads, highways waterways and ship channels located throughout the Levee

District pose a continuous potential for extensive, serious emergencies to occur at any time, either in

the vicinity of the levee or in other areas of the District. Tornadoes and storm damages are

additional sources of emergency situations. Activities during these periods of emergency operations

will be determined at the time for each incident; and may include such basics as furnishing some

equipment and personnel, providing traffic control and security measures, and other appropriate

procedures.

HEADQUARTERS

a. At the time of being notified of an emergency situation, the President and resident Commissioner(s) shall be promptly advised for the purpose of seeking instructions and/or authorization to extend assistance.

b. Supervisory personnel and Police Department staff may be directed to make on site

assessments of various emergencies at any time. c. Direction and instructions will be given to each unit of the Levee Board organization

regarding the role of Levee Board personnel and extent of activity or assistance. d. Daily or more frequent reports as appropriate, will be made to the President and

resident Commissioner(s), or as otherwise directed. e. Each organizational unit will divert activities as may be required to support and carry

out the role or active areas of the Levee Board for the purpose of assisting governing authorities industries, businesses or other entities during emergency operations and recovery periods.

f. Each unit will submit a daily report to the President and/or Flood Fight Coordinator

regarding progress, overall status, additional needs, and other details.

Page 53: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 53 -

TAB 16

Page 54: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 54 -

APPENDIX I POLICIES FOR EMERGENCY OPERATIONS

1. A person from the Levee Board Staff shall be selected and appointed to serve as

"Emergency Coordinator" who will during Emergency Operations:

a. Assist President and act for him during periods of absence. b. Coordinate activities of the Levee Maintenance, Equipment Maintenance, and Police

Department, with direction from the President. c. Act as the primary contact representative to the Corps of Engineers Sector

Commanders during designated Phase I and Phase II periods and likewise to the Department of Transportation and Development.

d. Perform overall duties as instructed and authorized.

2. During periods of Emergency Operations, all request and plans for annual leave and other

types of leave shall be canceled or delayed until the emergency period has been concluded.

Exceptions may be granted by endorsement of the resident Commissioner(s) and President.

3. All employees are expected to respond to overtime schedules as may be assigned.

4. At the conclusion of each Emergency Operations, an expeditious and orderly transition will

be promptly executed to return staff activities to normal operations.

5. Commissioners will be provided with information regarding policies, rules, regulations, and

requirements of the Levee District, State and Federal for flood control, levees, and related

facilities/operations. All Levee District Personnel will be trained to be knowledgeable of this

type of information.

Page 55: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 55 -

TAB 17

Page 56: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 56 -

APPENDIX II MAJOR INDUSTRIES St. Charles Parish ADM Growmark/Destrehan Bunge North America P.O. Box 120 12442 River Road Ama, LA 70031 Destrehan, LA 70047-5302 Mr. Brent Boeckmann Mr. Mike Tate 985/764-7586 985/764-6516 Entergy GNOTS – Reserve, Inc. Little Gypsy Plant P.O. Box 1147 17420 River Road Destrehan, LA 70047 LaPlace, LA 70068 Mr. Dan Wise Mr. Gerard Fontenot 504/466-8700 985/653-3828 or 3827 International Matex Tank Terminals Mississippi River Ventures, LLC P.O. Box 159 P.O. Box 2515 St. Rose, LA 70087 Kenner, LA 70063 Mr. John Little Mr. Edward Renton, Jr. 504/468-3997 504/712-0080 Motiva Enterprises, LLC (Norco) Valero Energy Corporation P.O. Box 10 St. Charles Refinery Norco, LA 70079 P.O. Box 518 Mr. Hermie Bundick Norco, LA 70079 504/465-7222 Mr. Ralph Phillips 985/764-5868 fax 985/764-2359 St. John the Baptist Parish ADM/Growmark/Reserve Arcelor Mittal LaPlace P.O. Box 97 P.O. Box 5000 Ama, LA 70031 LaPlace, LA 70068 Mr. Warren Duffy Mr. Jerry Pitts 504/431-8245 985/652-4900 Cargill Grain Elevator Inc. E.I. Dupont de Nemours Company 2154 Highway 44 Pontchartrain Works Reserve, LA 70084 586 Highway 44 Mr. Pat Gathman LaPlace, LA 70068 985/536-1500 Mr. Walter Glenn [email protected] 985/536-5129 Fill Materials Inc. Marathon Ashland Petroleum, LLC 10567 Airline Drive P.O. Box AC St. Rose, LA 70087-3012 Garyville, LA 70051 Mr. Glen Smith Mr. Rich Bedell 504/737-1600 [email protected] 985/535-7110

Page 57: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

- 57 -

APPENDIX II MAJOR INDUSTRIES CONTINUED St. John the Baptist Parish Nalco Chemical Company Petroleum Fuel & Terminal Co. 3628 Highway 44 4084 Highway 44 Garyville, LA 70051 Garyville, LA 70051 Mr. Carl Pasquarelli Mr. Claud Phelps [email protected] 985/535-6256 985/535-4109 Port of South Louisiana Ingram Barge Company (Globalplex Facility) P.O. Drawer 533 P.O. Box 909 Reserve, LA 70084 LaPlace, LA 70069-0909 Mr. Arnie Rothstein Judge Joel Chaisson 985/536-4102 985/652-9278 St. James Parish CII Carbon, LLC Norranda Alumina LLC 1140 Jefferson Hwy 1111 Airline Hwy, Suite 3370 Gramercy, LA 70052 Gramercy, LA 70052 Mr. Jimmy Delaneville Mr. Ramon Gil 225/869-8010 225/869-2100 I/C Rail Marine Terminal Imperial Sugar, Co. 7790 LA Highway 44 P.O. Box 3360 Convent, LA 70723 Gramercy, LA 70052 Mr. Scott Louque Ms. Raylene Morris Carter 225/562-5200 or 225/562-5213 225/869-5521 Lafarge Corporation Mosaic Phosphates Company 10650 LA 44 7250 LA 44 Convent, LA 70723 Uncle Sam, LA 70792 Mr. Trey Scholar Mr. Brad Chance, Manager 225/562-7471 225/474-4063 Motiva Enterprises, LLC (Convent Refining) Occidental Chemical Corporation P.O. Box 37 7377 Highway 3214 Convent, LA 70723 Convent, LA 70723 Mr. David Brignac Mr. Dave Foreman 225/562-7681 225/562-9200 Zen-Noh Grain Elevator 8886 LA 44 Convent, LA 70723 Mr. Todd Canatella 225/562-3571

Page 58: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

58

APPENDIX II MAJOR INDUSTRIES CONTINUED

Ascension Parish BASF Corporation BuzziUnicem P.O. Box 457 P.O. Box 175 Geismar, LA 70737 Darrow, LA 70725 Mr. Tom Yura Mr. Jerry Price 225/339-7226 225/473-6775 or 225/473-6748 Lion Copolymer Crosstex Energy Services 36191 Hwy 30 P.O. Box 225 (Riverside Plant) Geismar, LA 70734 Geismar, LA 70734 Mr. Phillip Stillane Mr. Dean Carmouche 225/673-8871 225/673-6137 E.I. Dupont de Nemours Company Honeywell (Geismar) 3460 Highway 44 P.O. Box 226 Darrow, LA 70725 Geismar, LA 70734 Mr. Don Janezic Mr. Jim Hull 225/473-8618 225/642-8311 Kinder Morgan Bulk Terminals Rubicon Chemical Corporation All Locations P.O. Box 517 7116 Hwy 22 Geismar, LA 70734 Sorrento, LA 70778-0625 Mr. Mark Dearman 225/675-5387 225/673-6141 Shell Chemical Company Occidental Chemical (Geismar) P.O. Box 500 P.O. Box 227 Geismar, LA 70734 Geismar, LA 70734 Mr. Glenn Bucholtz Mr. Wade Alleman 225/473-4261 225/473-5000 West Lake Vinyls 36045 Hwy 30 Geismar, LA 70734 Mr. John Casey 225/673-6121 Iberville Parish Entergy LBC PetroUnited Terminals Inc Willow Glen Station 1725 Highway 75 2605 Highway 75 Sunshine, LA 70780 St. Gabriel, LA 70776 Mr. Kevin Chimento Mr. Brad Stotz 225/642-8335 .

Page 59: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

59

APPENDIX II MAJOR INDUSTRIES CONTINUED Iberville Parish Olin Chemical Company, Inc. Syngenta P. O. Box 23 P. O. Box 11 St. Gabriel, LA 70776 St. Gabriel, LA 70776 Mr. Steve Asbill Mr. Ralph Caddell 225/642-1800 225/642-1100 Total Petro Chemicals P. O. Box 98 Carville, LA 70721 Mr. Marcus Ledoux 225/642-5454

East Baton Rouge Parish Charles Higgins 10881 River Road Baton Rouge, LA 70820 225/766-2305 Ted Jones 4963 Houston Drive Baton Rouge, LA 70809 225/293-3822 Kirby Inland Marine, LP 7150 South River Road Baton Rouge, LA 70820 McKinney Towing P. O. Box 3869 Baton Rouge, LA 70821 Mr. Andy McKinney 225/387-0461 Richfield Riversilt P. O. Box 4209 Baton Rouge, LA 70821 Mr. Pete Hymel 225/766-6091 or cell 225/963-9107 Stone Oil Co. P. O. Box 2010 Gretna, LA 70053 504/366-3401

Page 60: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

60

TAB 18

Page 61: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

61

APPENDIX III

MISSISSIPPI RIVER BRIDGES

Highway Levee Parish Name Number Station East Baton Rouge New Mississippi I-10 1/3 mile upstream of River Bridge 0+00 Ascension Sunshine Bridge LA 70 3138 St. James Veterans Memorial LA 3213 4240 Bridge – “Vacherie”

St. Charles Hale Boggs Bridge I-310 5564 “Luling” MISSISSIPPI RIVER FERRY SERVICE Locations Levee Served Parish Station Plaquemine Iberville 1088 White Castle Iberville 1916 Reserve/Edgard St. John the Baptist 4681

Page 62: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

62

TAB 19

Page 63: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

63

APPENDIX IV VENDOR LIST

Ascension Equipment 225/647-5881 Belmont Lumber 225/869-5907 Blue’s Auto Part 225/644-8476

Broussard Paper Company 225/647-2737 Diez Napa Auto Parts 225/644-2141 Ernest Martine Trucking 225/473-8081 225/473-2711 225/335-7991 (Truck) 225/413-2475 (Bud) 225/445-6440 (Shawn) Gaubert Oil Company, Inc. 9225/473-8648 Gonzales Hardware 225/647-6565 Home Hardware Center 225/869-5701 Louisiana Machinery Reserve 985/536-1121 Prairieville 225/673-3480 Roland J. Robert Distributor

Gonzales 225/644-4886 Donaldsonville 225/473-7778

Ronnie Vallery Trucking 225/473-0731 225/473-7948 Siarc, Inc. 225/869-5596 St. Pierre Trucking 225/869-9880 cell 504/445-0912 Sorrento Lumber Company 225/675-5375 Sunshine Equipment 225/473-9861

Page 64: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

64

TAB 20

Page 65: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

65

APPENDIX V FACTS ABOUT SAND LOADS

1 – 30 yd trailer load = 900 sand bags 1 – 14 yd dump truck = 300 sand bags Sand bag operation Hunt’s Correctional Tim Hooper (Deputy Warden) 225/319-4504 Colonel Jeff Tircuit (Asst. Warden) Cell 225/439-8021 Howard Prince (Warden)

Secretary: Melissa Scioneaux 225/319-4505 Hunt’s Control Center 225/642-3306 Corps of Engineers Emergency Operations Center 504/862-1102 504/865-7944 Michael J. Stack, Chief of Emergency Management 504/862-1159 314/809-7039 Jeffrey F. Carroll, Emergency Management 504/862-2383 337/316-0109 James M. Thomas, Emergency Management 504/862-2226 504/388-6737 Michael Krehely, Emergency Management, Flood Fight 504/862-1338 504/444-4187 Heath Jones, Emergency Management, Hurricane 504/862-2426 Jeff Falati, HPL Construction Project Manager 504/862-2980 Corps of Engineers Construction Stuart Waits, Area Engineer 504/862-1452 504/628-5056 Chris Wagner, Assistant Area Engineer 504/862-1230 504-628-5050 Office of Coastal Protection and Restoration Jerome Zeringue, Incident Commander/Em. Director 225/342-3969 985/709-1099 Steve Mathies, Incident Commander 225/342-4683 225/341-0701 John Monzon, Operations Coordinator 225/342-4501 504/432-7741 Chris Knotts, Operations Coordinator 225/342-6871 225/328-8987 Chris Williams, OCPR Staff 225/342-7549 225/603-8669 Rick Raynie, OCPR Staff 225/342-9436 225/266-8232 Kirk Rhinehart, OCPR Staff 225/342-2179 225/278-8436 Luke LeBas, OCPR Staff 225/342-4102 225/966-8019 Bill Feazel, OCPR Staff 225/342-4641 225/247-8089 David Fruge, Corps Liaison 225/342-7615 225/393-1414 Norwyn Johnson, Corps Liaison 225/342-0924 225/276-6164

Department of Transportation and Development Jesse McClendon 985/375-0104 Misty Evans 985/375-0104

Page 66: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

66

TAB 21

Page 67: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

67

APPENDIX VI

PROCEDURES FOR EMERGENCY SAND BAG OPERATION

1) Emergency Coordinator will have a meeting with: a) Executive Director e) Levee Foremen B b) Shop Superintendent f) Heavy Equipment c) Shop Foreman g) Police Captain d) Levee Foreman C h) Police Lieutenant

2) Flood Fight Coordinator will contact Hunt Correctional Center to help with sand bag operations:

a) Warden Howard Prince Secretary: Melissa Scioneaux 225/319-4505 b) Deputy Warden Tim Hooper 225/319-4504 c) Asst. Warden Colonel Jeff Tircuit Cell 225/439-8021 d) Hunt’s Control Center 225/642-3306

3) A vendor will be notified to haul sand to Hunt Correctional site so that they could start

sand bag operations. 4) Heavy Equipment Foreman will keep account of amount of sand bags issued to state/ parish agencies.

5) The following estimate or retrieve from pass emergency operation.

a) 30 yd trailer load are able to fill 900 bags b) 14 yd dump truck are able to fill 300 bags

Page 68: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

68

TAB 22 APPENDIX VII

LEVEE DISTRICT STATIONS

Page 69: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

69

STATION OF REACH ITEM 0 Home Oil Co. 1 Slope paving begins 2 TO 53 Pipeline parallel to levee (Riverside) EXXON 11 Slope paving ends 13 Pipeline crossing 14 Pipeline crossing 16 Pipeline crossing, walkway to dock

(Economy Boat Store)

27 Sewer plant landside 35 Aerial wires 36 Asphalt Ramp (McKinney Towing) 52 Aerial wire 55 Pipeline crossing

72 Ramp

79 Cattle gap

76 Pipeline crossing (LSU)

77 Slope paving begins

111 Slope paving ends

145 Aerial wire and navigation light

146 Pipeline crossing (Exxon)

147 Cattle gap and fence

160 Slope paving begins

174 Pipeline crossing

180 Asphalt Ramp (Trinity Marine Service)

188 Aerial wire

Page 70: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

70

STATION OF REACH ITEM 242 Asphalt Ramp, aerial wire (Kirby Inland)

252 High Power line crossing, high tower on batture riverside 271 River gauge 295 Slope paving ends 310 Slope paving begins 332 Slope paving ends 355 Aerial wires 359 Asphalt ramp (Richfield River Silt Co) 360 to 370 Borrow pit 391 Agg. Ramp, 392 Cattle gap and fence 399 Ramp 414 Ramp 416 Cattle gap and fence 432 Slope paving begins 438 River gauge 443 Slope paving ends 450 to 480 Borrow pit 457 Cattle gap 480 Cattle gap and fence 491 to 560 Slope paving 514 Solar Power navigation light 560 Slope pavement ends 564 Aerial wire to navigation light 619+08 48" Water Line

Page 71: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

71

STATION OF REACH ITEM

620 Jct. La. 327 Spur 622 Slope paving begins 630 Ramp 630 to 639 Longwood Plantation 640 Ramp 642 Aerial wire and navigation light 658 Cattle gap 668 Cattle gap and fence 669 Aerial wire and navigation light 698 Cattle gap 727 Parish line: EAST BATON ROUGE, IBERVILLE 728 Aerial wire and navigation light 728 Cattle gap and fence 778 to 790 Borrow pit 794 River gauge, aerial wire, navigation light 807 Slope paving ends 808 Cattle gap and fence 817 Aerial wire and navigation light 833 to 850 Concrete bag slope paving 850 Slope paving begins 875 to 885 Borrow pit 888 Cattle gap and fence 900 to 930 Borrow pit 916 Cattle gap and fence 923 Ramp

Page 72: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

72

STATION OF REACH ITEM 935 to 951 Borrow pit 990 to 1013 Borrow pit 1010 Slope paving ends 1011 Pipeline crossing (Texaco Inc) 1013 Pipeline crossing 2 lines 10" & 12" gas lines (Air Products & Chemicals Inc) 1013 to 1024 Borrow pit 1024 Ramp 1035 Aerial wire 1039 Ramp (Plaquemine Point Shipyard) 1088 Aerial wire 1088 Plaquemines Ferry ramps, asphalt(landside) 1089 Slope paving begins 1099 Ramp (Banta Fleet Corp.) 1105 Aerial wires 1110 Cattle gap 1120 Slope pavement ends 1128 Cattle gap 1141 Cattle gap 1145 Cattle gap and fence 1149 Cattle gap and fence 1150 to 1185 Borrow Pit 1161 Cattle gap and fence 1169 Ramp 1172 Cattle gap and fence

Page 73: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

73

STATION OF REACH ITEM 1182 Cattle gap and fence 1187 Ramp 1188 Cattle gap 1220 Iberville Civil Defense Horn 1260 Ramp 1270 Jct. La. 327 and La. 75 1278 Pipeline crossing 15 lines (LBC of

Baton Rouge) 1279 Ramp 1280 Pipeline crossing 2 lines 1281 Pipeline crossing, 4 lines 3-8" & 1-6" 1302 Ramp 1310 Slope paving begins 1324 Navigational light 1349 Ramp 1350 River gauge 1352 Roberts Store 1365 Ramp 1398 Ramp (landside) 1398 to 1409 Pipeline crossings, numerous pipelines (20 or 30) (Willow Glenn Plant, Entergy) 1410 Ramp 1411 High power line crossing & Ramp 1413 Aerial wire 1440 LSU Agriculture experiment farm 1442 Ramp

Page 74: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

74

STATION OF REACH ITEM

1451 Pipeline crossing, 6-12" lines (Big 3 Industries Inc) 1454 Pipeline crossing, 1-24" line 1473 Ramp,(Aubrey's store),aerial wire

1474+50 Jct. La.74 1480 Pipeline crossing, 1-12" line (Scoylock Perimam) 1485 St. Gabriel Catholic Church 1490 Pipeline crossing, 1-12" line (CIBA) 1510 Syngenta Corporation 1519 Ramp 1522 Pipeline crossing, 1-10" & 1-20" line 1523 Ramp 1525 Pipeline crossing (Olin Chlor Aklia Co.) 1527 Ramp, Conveyor crossing 1530 Ramp 1554 Cattle gap and fence 1560 Cattle gap and fence 1571 Cattle gap and fence 1587 Navigational light 1595 Ramp (landside), Aerial wire 1603 Cattle gap and fence 1611 Cattle gap 1620 Ramp 1624 Pipeline crossing, elevated walkway to dock (Kinder Morgan) 1638 Cattle gap and fence

Page 75: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

75

STATION OF REACH ITEM

1670 Ramp 1708 Hunt Correctional Center begins, cattle gap and fence 1733 Slope paving ends 1760 Ramp 1798 Slope paving begins 1802 Ramp 1815 Slope paving ends 1820 Ramp, Cattle gap and fence 1876 Slope paving begins 1877 Cattle gap and fence (Hunt Correctional Center ends) 1891 Ramp (Gillis W. Long Center) 1899 Pipeline crossing 1908 Pipeline crossing, (Gillis W. Long Center) 1916 Asphalt ramp, (White Castle Ferry) aerial wire 1917 Cattle gap and fence 1925 Ramp, riverside 1963 Pipeline crossing 1969 Pipeline crossing 1976 Pipeline crossing, cattle gap and fence, end Hunt Correctional Center 2005 Navigational light 2010 Cattle gap and fence 2012 Ramp, aerial wire and navigational light Jct. La.75 2034 Asphalt ramp

Page 76: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

76

STATION OF REACH ITEM 2045 Slope Paving Ends 2074 Slope Paving Begins 2098 Asphalt Ramp (Cosmar Corp.) 2100 Pipeline crossing (15 pipes 1" to 18") elevated walkway to dock (Cosmar Corp) 2122 Pipeline crossing (18") 2123 Pipeline crossing (18") 2130 Parish line (IBERVILLE-ASCENSION), La.3115 2136 Slope Paving Ends 2138 Ramp (land/riverside) 2141 Pipeline crossing, overhead, 11 pipes 2" to 20", 12' clearance (PCS Nitrogen) 2142 Conc. Ramp 2150 Pipeline crossing (Inphous Chemical) 2157 Pipeline crossing (Inphous Chemical) 2169 Concrete ramp (overhead/riverside) 2170 Slope Paving Begins / Conc.dock 2175 Ramp (Voiks) 2204 Ramp, elevated walkway to dock 2208 Pipeline crossing, 3-6" lines (TRANSCANDA) 2240 Asph. ramp (Barber Brothers) 2243 Pipeline crossing (18") 2256 Jct. La.73 2263 Pipeline crossing, elevated walkway 7 lines 1/2" to 10" (Hexian Chemical) 2264 Ramp 2264 to 2265 6’ chain link fence

Page 77: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

77

STATION OF REACH ITEM 2271 Pipeline crossing, (6 lines 1" to 24") elevated walkway to dock (Borden Chemical) 2273 Aerial wire 2271 to 2280 Borrow pit 2281 Pipeline crossing, (2 lines 8" to 20") (Monochem) 2318 Asph. ramp (B.A.S.F.) 2322 Pipeline crossing (20 lines 1" to 10") elevated walkway to dock (BASF) 2323 Pipeline crossing (15 lines 1" to 24") elevated walkway to dock (BASF) 2333 Pipeline crossing (BASF) 2334 Pipeline crossing, 18" line covered river side elevated land side (Wyndott Chemical) 2340 Pipeline crossing (Sugar Bowl Gas Co) 2353 Pipeline crossing, 3 lines (United Gas Pipeline Co) 2360 to 2363+50 Chain link fence (riverside) 2361 Ramp (Shell Chemical Co) 2362 Pipeline crossing, elevated walkway to dock (Shell Chemical Co) 2363 Ramp, (Shell Chemical Co) 2371 Pipeline crossing (2 lines) (Shell Chemical Co) 2372 Pipeline crossing (2 lines) 2375 Pipeline crossing (2 lines 10" & 12") (Shell Chemical) 2379 Aerial wire (Hall-Buck Marine) 2380 Asph.ramp,(landside),agg.pit(Hall-Buck Marine) 2380 to 2394 Borrow pit (Hall-Buck)

Page 78: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

78

STATION OF REACH ITEM 2384 Walkway to Dock 2385 Pipeline crossing (Vulcan Materials) 2391 Pipeline crossing (2 lines) 2392 Ramp, aerial wire 2393 Ramp (Carline) 2393+50 Elev. walkway 2405 Pipeline crossing (3 lines) 2415 to 2426 Old Inger Oil Co site 2426 Pipeline crossing 3-6" lines 2427 Pipeline crossing 2440 Civil defense horn (Roadside) 2447 Slope Paving Ends 2460 Double ramp 2462 Pipeline crossing (265-2112) / Ramp 2463 Concrete Slope Paving Begins 2486 End concrete slope pavement, begin concrete bag slope paving (Marchand Levee Setback) 2539 Stop concrete bag slope paving(Marchand Levee Setback) 2550 Ramp/ Mt. Olive Baptist Church 2551 Aerial wire 2611 Ramp 2630 Slope paving begins 2711 Double ramp, asphalt (Darrow Fleet and Switching Co) 2714 Aerial wire 2714+50 Jct. La.22

Page 79: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

79

STATION OF REACH ITEM 2722 Pipeline crossing (1-8" line) 2729 Aerial wire 2730 Ramp (Webber Marine Services) 2775 Aerial wire and navigational light 2798 Hermitage Plantation 2803 Cattle gap and fence 2816 Slope paving ends 2820 Ramp (Sand Service Sales) 2820 to 2867 Borrow pit 2850 Cattle gap and fence 2855 Bocage Plantation 2866 Aerial wire 2866 Ramp (Gulf Transfer Co) 2879 Begin slope paving 2910 Aerial wire and navigational light 2934 Pipeline crossing (10 lines l" to 10") elevated walkway to dock (Buzzi Unicem. USA) 2936 Ramp (Bozzi Unicem.USA) 2952 Houmas House 2952 Aerial wire 2954 Aerial wire and navigation light 2984 Pipeline crossing 2986 Ramp (Burnside) 3000 Fence and Gate (Burnside) 3002 Conveyor crossing, 1-l0" pipeline crossing, elevated walkway to dock

Page 80: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

80

STATION OF REACH ITEM 3009 Ramp, riverside 3012 Conveyor crossing 3014 Ramp 3015 Fence and gate 3029 Aerial guy wire 3038 Pipeline crossing 3041 Pipeline crossing, (7 lines 5" to 22") over head, elevated walkway to dock (Dupont) 3050 Ramp 3079 Ramp, aerial wire 3079 Parish line: (ASCENSION-ST. JAMES) 3087 Pipeline crossing (11 lines 1" to 24") Ramp, landside (Motiva) 3097 Ramp (Motiva) 3103 Pipeline crossing (22 lines 1 1/2" to 24") Ramp, elevated walkway to dock (Motiva) 3111 Pipeline crossing (Motiva) 3118 Pipeline crossing (6 lines 2" to 12") (Lafarge Portland Cement Co) 3138 SUNSHINE BRIDGE 3139 Ramp 3141 Ramp 3160 Riprap toe protection begins 3174 Ramp (Weber Marine) 3177 Aerial wire 3178 2" Conduit 3195 Asphalt Ramp

Page 81: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

81

STATION OF REACH ITEM 3200 Walkway (Crescent Ship Service) 3209 Cable crossing 3224 Ramp, Belle Chase Marine 3229 Pipeline crossing and aerial wire 3230 Bisso Towboat Company, elev. walkway to river 3236 End riprap protection 3238 Ramp, End slope paving 3240 Ponchartain Levee Dist. Maint.shop 3246 Ramp (Quality Marine) 3246 Aerial wire 3255 Double ramp 3275 Ramp 3276 Aerial wire 3278 Pipeline crossing 3281 Ramp 3298 Begin slope paving 3313 Conveyor crossing 3314 Grain elevator (Zennoh -2GC) 3315 Concrete ramp, elevated driveway to dock 3323 Pipeline crossing 3325 Pipeline crossing 3327 End slope paving 3328 Pipeline crossing (water intake) 3348 Hymel's Rest. 3360 Begin slope paving

Page 82: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

82

STATION OF REACH ITEM 3372 Pipeline crossing (2 lines 10") 3372 to 3385 Riprap toe protection 3390 to 3408 Riprap toe protection 3399 Aerial wire and navigational light 3405 Aerial wire 3406 Ramp 3410 Aerial wire 3425 to 3428 Riprap toe protection 3425 to 3752 Borrow pit 3453 Asph.ramp, pipeline crossing (17 lines 3" to 10” elevated walk to dock (Occidental Chemical) 3456 Malarcher House 3457 Jct. La. 3214 3482 Asph.double ramp 3485 Ramp, Conveyor crossing 3495 Aerial wire 3509 Ramp (Mosaic Company Dock) 3509 Pipeline crossing and conveyor (13 lines 1" to 10") Ramp, asphalt 3510 Ramp 3520 Ramp 3560 Pipeline crossing 3561 Pipeline crossing 3572 Pipeline crossing (2 lines) 3597 Ramp (AEP River Operations)

Page 83: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

83

STATION OF REACH ITEM 3601 Power line to Watson Marine Service, pipeline crossing, Aerial wire & walkway 3626 Pipeline crossing (1 line (gas) 3665 New foreshore protection starts 3669 Water gauge 3675 Ramp, land side 3692 Slope paving ends 3703 Ramp 3720 to 3752 Borrow pit 3752 Ramp 3780 Slope paving Begins 3793 Aerial wire (St. James Water Plant) 3794 Ramp (St. James Water Plant) 3800 Riprap toe protection starts 3831 Ramp 3890 to 3920 Borrow pit 3906 Covered crossing (Pipe or Cable)? 3906 to 3912 Navigation range markers 3909 Aerial wire and navigational light 3921 Ramp 3935 Begin riprap protection 3939 Aerial wire, navigational light 3940 Aerial wire 3944 Ramp 3960 Slope paving Ends 3980 Slope paving Begins

Page 84: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

84

STATION OF REACH ITEM 3988 Jct. La.642 3989 Aerial wire 3991 Ramp 4005 2 ramps 4006 Land side ramp and conveyor crossing Paulina Grain Elevator, (Grand Point) 4030 Ramp-pipeline crossing, elev. ramp to river 4040 Slope paving Ends 4048 Slope paving Begins 4052 Ramp 4069 Cattle gap and fence 4075 Ramp 4078 Cattle gap and fence 4079 Ramp 4080 Slope paving Ends 4081 Cattle gap & fence 4105 Slope paving Begins 4109 Ramp (Weber Marine) 4119 Asphalt ramp (Crescent Ship Ser.) 4120 Aerial wire 4120 U.S. Post Office - Pauline (land side) 4121 Aerial wire 4156 Double asphalt ramp (Port Ship Service), aerial wire 4160 Aerial wire 4168 Pipeline crossing, (Lutcher water intake) Jct. La. 3193

Page 85: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

85

STATION OF REACH ITEM 4179 Ramp 4199 Ramp 4200 Pipeline crossing, elevated walkway to water intake 4202 Aerial wire 4224 Asph. ramp, land side 4225 Pipeline crossing (5 lines 1" to 10") Conveyor crossing 4227 Aerial wire 4231 Ramp, (Colonial Sugar Refinery) 4233 Conveyor crossing (Colonial Sugar Refinery) 4237 Aerial wire 4240 Ramp, Miss. River Bridge Jct. La. 3213 4241 Pipeline crossing (1 line) 4242 Ramp, river side 4260 Ramp, conveyor crossing 4264 Aerial wire 4268 Ramp, (Kaiser Chemical Co) 4272 Ramp, land side, conveyor crossing pipeline crossing (10 lines 2" to 48") 4279 Ramp, land side (Kaiser Chemical Co) 4280 Ramp, land side (Kaiser Chemical Co) 4281 Pipeline crossing (Kaiser Chemical Co) 4282 Pipeline crossing (Kaiser Chemical Co) 4285 Pipeline crossing (Montery Pipeline Co) 4285 Parish line: ST. JAMES-ST. JOHN

Page 86: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

86

STATION OF REACH ITEM 4291 Pipeline crossing (Kaiser Chemical Co), 4293 Ramp, pipeline crossing (3 lines 2" to 6") 4300 Ramp, (land and riverside) 4303 Overhead pipeline crossing 4318 Ramp (MT. Airy Refining Co) 4330 Pipeline crossing (17 lines 2" to 12") elevated walkway to dock (Petroleum Fuel and Terminal Co.) 4338 Ramp 4343 Riprap toe protection begins 4359 End riprap toe protection 4369 Pipeline crossing 4395 Ramp, land side (Nalco Chemical Co) 4396 Pipeline crossing, elevated walkway to dock (4 lines 1 1/2" to 8") (Nalco Chemical Co), 4408 Aerial wire 4410 Jct. La.54 4410 to 4445 Borrow pit

4437 Aerial wire

4445 to 4455 Road along riverside toe

4452 Water tower (Garyville)

4455 Asph. ramp, Aerial wire

4475 Double ramp, gate at land side toe (Fremin Smith) 4488 Aerial wire

4498 Pipeline crossing

4498 to 4554 6’ chain link fence

Page 87: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

87

STATION OF REACH ITEM 4502 Pipeline crossing

4505 Ramp, pipeline crossing, overhead walkway

4512 Slope paving Begins

4514 Pipeline crossing

4515 San Francisco House

4524 Pipeline crossing (12 lines 1" to 24") elevated walkway to dock No. 3 (Marathon Oil Co.)

4527 Ramp, (Marathon Oil Co)

4538 Ramp, landside pipeline crossing (17 lines 3" to 24") elevated walkway to dock No. 2 (Marathon Oil Co) 4547 Ramp, pipeline crossing (28 lines 1" to 24") driveway to dock No. 1 (Marathon Oil Co) 4556 Ramp (riverside) 4561 Elevated ramp to dock

4562 Pipeline crossing (6 lines 1" to 6") Ramp (Cargill Inc) 4575 Overhead conveyors (Cargill) 4578 Asphalt Ramp and driveway to dock 4588 Pipeline crossing, aerial wire (Lions Water Treatment Plant) 4596 Asphalt ramp, conveyor crossing (ADM Grain Elevator) 4597 Asphalt Ramp 4616 Ramp 4622 Asphalt ramp, conveyor crossing, elevated driveway to dock (Kinder Morgan) 4624 Pipeline crossing (1-14" line) 1 conveyor crossing at grade, 1 conveyor elevated

Page 88: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

88

STATION OF REACH ITEM 4629 Ramp 4630 End riprap toe protection 4633 Pipeline crossing 4640 Jct. La. 637 , aerial wire 4643 Ramp to dry dock, slope pavement begins 4660 to 4665 Rip rap for slope protection 4662 Aerial wire 4669 Agg. ramp, aerial wire, elev. walkway 4674 to 4677 Rip rap for slope protection 4681 Aerial wire, electric service (Reserve Ferry) 4682 Asphalt ramp 4689 Pipeline crossing 4690 Aerial wire 4691 Pipeline crossing (Reserve Water Works District No. 1) 4692 Aerial wire 4693 Asphalt Ramp (Weber Marine & South La. Port Comm. Fire Boat), pipeline crossing, aerial wire 4695 2" pipeline crossing 4696 Ramp 4710 Aerial wire and navigational light 4725 Pipeline crossing 4728 Asphalt Ramp, aerial wire, electric service (Triangle Fleet Co) Jct. La.3179 4735 Aerial wire 4755 Aerial wire

Page 89: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

89

STATION OF REACH ITEM 4756 Aerial wire, electric service 4774 Ramp, pipeline crossing, (2-30") conc. driveway 4775 Pipeline crossing (Dupont) 4781 Slope paving Ends 4786 Ramp, pipeline crossing (4 lines 2" to 30") at grade, elevated walkway to dock 4789 Aerial wire, electric service 4819 Ramp 4820 Jct. La. 636-3 4825 Ramp 4848 Ramp 4849 Pipeline crossing (24" sewer force main) St. Charles Parish 4870 Pipeline crossing (12" storm water line) 4891 Pipeline crossing 4933 Aerial wire 4936 Aerial wire 4942 Pipeline crossing 4947 Asph. ramp, pipeline crossing (water line) 4948 Aerial wire, electric service 4960 Slope paving begins 4962 Asphalt Ramp (Quality Marine Co), aerial wire 4965 Aerial wire 4966 Aerial wire 4967 Aerial wire 4968 Aerial wire

Page 90: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

90

STATION OF REACH ITEM 4971 Aerial wire 4973 Aerial wire 4990 Slope paving ends 5000 La. 3217, double ramps. pipeline crossing elevated ramp to dock (Bayou Steel Corp.) 5013 Aerial wire 5017 Aerial wire 5018 Aerial wire, slope paving begins 5019 Aerial wire 5021 Aerial wire 5028 Aerial wire 5032 Parish line: (ST. JOHN-ST. CHARLES) 5095 Slope paving ends 5110 Water tank, landside 5115 Pipeline crossing 5129 Aerial wire 5131 St. Charles Sewer crossing 5132 High power electric line crossing river 5139 Ramp, land side 5141 Pipeline crossing (Entergy) 5143 Pipeline crossing, pumping station 5146 Ramp, aerial wire 5147 Pipeline crossing 5150 Pipeline crossing 5151 Ramp 5153 Pipeline crossing

Page 91: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

91

STATION OF REACH ITEM 5154 Aerial wire, transmission line crossing river 5159 Water gauge, aerial wire 5161 Aerial wire 5172 Slope paving begins to spillway 5179 Ramp, land side 5181 Asphalt ramp, junction Upper Guide Levee, Bonnet Carre Spillway 5260 Junction Lower Guide Levee, Bonnet Carre Spillway 5269 Asphalt ramp 5270 Slope paving begins 5271 Pipeline crossing (3 lines) 5272 Pipeline crossing 5273 Pipeline crossing 5278 Pipeline crossing (42 lines 1" to 30") elevated walkway to dock (Shell Chemical Co) 5280 Asphalt ramp (Shell Chemical Co) 5288 Pipeline crossing (8 lines) (Shell Chemical Co) 5312 Pipeline crossing 5314 Aerial wire 5319 Aerial wire 5322 Pipeline crossing (16 lines 1" to 12") (Shell Oil Co) 5328 Asphalt ramp, elevated ramp to dock, gate #6, pipeline crossing (8 lines 2" to 12") 5330 Asphalt ramp, (Shell Oil Co) 5335 Pipeline crossing, elevated ramp to dock (1-9" line)

Page 92: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

92

STATION OF REACH ITEM 5338 Overhead pipeline crossing (11 lines, 2" to 12" Shell Oil Co.) 5340 Overhead pipeline crossing (11 lines 2" to 12") (Shell Oil Co) 5349 Ramp 5350 Pipeline crossing at grade (41 lines 1" to 12"), Asph.ramp (Shell Oil Co) 5352 Asph. ramp 5354 Asph. ramp 5355 Asph. ramp 5356 Pedestrian walkway riverside(Valero Dock #1) 5359 Overhead pipeline crossing 5365 Pedestrian walkway riverside(Valero Dock #2) aerial wire 5371 Ramp, pipeline crossing (26 lines 2" to 12") elevated walkway to dock, aerial wire, electric service (Valero Dock #3.) 5375 Ramp (Valero Ref.), aerial wire 5382 Pipeline crossing (9 lines 1" to 10"), elevated walkway to dock, (St. Charles Water Intake) 5383 Aerial wire 5390 Aerial wire, electric service (Valero) 5394 Asph. ramp 5397 Pipeline crossing, elevated walkway to dock (Valero Dock #4&5), aerial wire 5480 Aerial wire 5495 Ormond Plantation subdivision 5499 Beg. Asphalt levee surface.

Page 93: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

93

STATION OF REACH ITEM 5500 Asph. Bike Ramp 5512 Conc. Walkway (landside) 5515 Ormond Plantation Manor 5518 Riprap ends 5555 Aerial wire 5562 Aerial wire 5564 Ramp, Luling-Destrehan (I-310) Bridge 5565 Aerial wire 5568 Asph. Bike ramp 5569 Aerial wire 5578 Aerial wire 5586 Destrehan Plantation House 5588 Conc. Walkway (landside) 5609 Double asphalt ramp, aerial wire 5613 Asphalt ramp, elevated driveway to dock, (ADM Milling Co.) 5614 Elevated driveway to dock(ADM) 5617 Conveyor crossing,(ADM) 5618 Aerial wire 5619 Conveyor crossing (ADM Milling), slope paving begins 5621 Aerial wire 5637 Aerial wire 5641 Double concrete ramp, elevated driveway to dock, (Bunge Grain Co) 5643 Conveyor crossing, double, (Bunge Grain Co)

Page 94: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

94

STATION OF REACH ITEM 5644 Aerial wire (Bunge Grain Co) 5646 Ramp, riverside 5648 Pipeline crossing 5657 Pipeline crossing 5660 Pipeline crossing, (Shell pipeline Co) 5664 Pipeline crossing (2 lines) (Shell Pipeline Co) 5665 Pipeline crossing (2 lines), (United Gas Pipeline Corp) 5678 Pipeline crossing, aerial wire 5680 Pipeline crossing (1 line) (United Gas Pipeline Co) 5683 Asphalt ramp (Gnots), aerial wires 5684 Pipeline crossing 5685 Pipeline crossing (2 lines 30") 5689 Ramp, aerial wire 5708 Asph. Bike ramp 5710 Aerial wire 5711 Asph. ramp, Pipeline crossing (6 lines 5-8", 1-12") elevated walkway to dock (ITT) 5712 Pipeline crossing (28 lines 1 1/2" to 12") 5714 Aerial wire 5718 Asph. ramp(ITT) 5718 2 Pipeline crossing at grade (11 lines 6" to 14") (8 lines 6" to 10") 5720 Asph. ramp (IMTT) 5721 Aerial wire 5726 Asph. Bike ramp

Page 95: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

95

STATION OF REACH ITEM 5736 Aerial wire 5745 Aerial wire 5752 Asph. Bike ramp 5755 Ramp, aerial wire 5756 Aerial wire 5757 Aerial wire 5758 Aerial wire 5780 Pipeline crossing 5781 Aerial wire 5790 Aerial wire 5796 Aerial wire 5807 Bike path parking (landside), ramp 5810 Charlestown Apartments. 5813 Aerial wire 5814 Bike path parking (landside), ramp 5816 Aerial wire 5823 Aerial wire 5844 Aerial wire 5847 Aerial wire 5851 Aerial wire 5854 Asph. ramp (St. Rose Fleet Co) 5857 Aerial wire 5856 to 5870 Sand pit operation (T.L. James) 5865 Asphalt ramp, sand pit operation 5868 Pipeline crossing

Page 96: PONTCHARTRAIN LEVEE DISTRICT · 2014. 10. 28. · 2 – 14 yd. Dump Trucks 1 – John Deere Tractor Pu sh Blade 1 – 420DIT Cat Backhoe 1 – D5N Cat Dozer 1 – ECU 320 Cat Excavator

96

STATION OF REACH ITEM 5871 Aerial wire 5885 4” pipe crossing 5886 6” pipe crossing 5893 Pipeline crossing 5898 Asphalt ramp (Crescent Ship Service) 5900 Pipeline crossing (1 to 8" line) aerial wire 5900 Electric service, pedestrian walkway to dock 5906 Ramp (Port Ship Services Inc.) 5912 Navigation light landside crown, aerial wire 5912 END Pontchartrain Levee District