+ All Categories
Home > Documents > portfolio-12-19-101219021247-phpapp01

portfolio-12-19-101219021247-phpapp01

Date post: 08-Apr-2018
Category:
Upload: shivammishra
View: 218 times
Download: 0 times
Share this document with a friend

of 44

Transcript
  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    1/44

    Presenter Name: Refugio M. Rochn

    Contracting to : Pirooz Barar and Associates, Dawson Wells Consulting, and Benico Construction

    Nature Acoustical

    SOHA Engineers

    Systems Engineering Limited

    Company Names Presented in Portfolio:

    Description

    This Presentation Portfolio provides a retrospective view of work accomplished over the last 6 years + with a brief overview to 1994.

    2009 - Present Resum and Example Software1.

    2008 - 2009 Work With SOHA Engineers in San Francisco2.

    2004 - 2008 Work With Systems Engineering Limited in the British Virgin Islands3.

    Portfolio Contents

    Strong Subject Fields: Plates & Shells (Dr. E. Luco), Structural Analysis (Dr. Frieder Seible), Mathematical Physics (Dr. NeNasser, Solid Mechanics (Dr. H. Murakami), Numerical Methods (Dr. R.J. Asaro), Steel Design (Dr. C-M Uang)

    Bachelor's of Science, University of California, San Diego in La Jolla, Received June 14, 1996, GPA 3.14/4.00

    Thesis: Shape Control of a Composite Mirror Substrate Utilizing Shape Memory Alloy

    Dr. Arup K. Maji, Specialities in Smart & Adaptive Structures, Composite Materials & Nuclear Transport

    Graduating Advisor

    Dr. Walter Gerstle (Prof. Computational Mechanics) & Dr. Peter Wegner (Prof. Composite Materials)

    Thesis Advisory Committee Members

    Project Advisors at ATR Institute: Dr. Gordon McKeene & Lecturer Lary Lenke

    Master's of Science, University of New Mexico in Albuquerque, Received December 16, 2000, GPA 3.66/4.00

    Education

    1997 http://www.postensoft.com/ O'Reilly and Associates and O'Neal and Associates both merged to build Posten.

    1997 http://www.bay-ship.com/ Bay Ship & Yacht was probably not even a quarter the size of what it is now.

    1998 - 2000 http://www.unm.edu/~civil/ & http://www.unm.edu/~atr/ & http://www.kirtland.af.mil/afrl_vs/

    2000 - 2003 What was Boyle Engineering Corporation has merged with AECOM http://www.aecom.com/

    2004 - 2008 http://www.systemscaribbean.com Systems Engineering in the news http://tiny.cc/srkth

    2008 - 2009 http://www.soha.com/ Long-term established firm in San Francisco since 1965, original owner still going strong.

    http://pbandainc.com Pirooz Barar individually established PB&A in 1983 after 16 years into career.

    http://tiny.cc/azzt3 Links to contact information for Benny Shalom of Benico Construction, long-term individual career as engineer and

    contractor

    http://tiny.cc/qokwe Dawson Wells Consulting in current headline news BVI.

    2009 - http://natureacoustical.pbworks.com Current website, conceptual framework, focus in engineering education

    Company Websites Throughout Career since B.S. at UCSD

    Structural Design Engineer with experience in the design, analysis, and detailing of office buildings, residences, retaining w alls, soil-

    integrated walls (ie MSE and Soil Nailing), internal foundation improvement mix columns/piles, mat and strip foundations, underpi

    (concrete and steel), permanent and temporary shoring, demolition, strut-and-tie design for deep beams and walls, lateral load sys

    slab deck bridges, pre- and post- tensioned concrete bridge beams, seismic design of bridges, and buildings up to 8 stories. Experie

    ship rehabilitation, DNC/CAD inter-linkages, and Hull design. Experience with adaptable optics research, space systems, and comp

    materials design, manufacturing, and assembly. Experience with underwater acoustical systems, passive receiving dishes, and seal

    underwater canisters. Experience with construction observation of concrete and masonry structures. Experience with Water -barri

    designs.

    Project Managing Engineer with experience leading design efforts in Resort Design, Technical projects with seismic and hurric ane lo

    distribution, complex connection issues from non-matching materials, ie steel to masonry and concrete, and aluminum to protrude

    reinforced rods into a fiber-composite base. Design-Build work with 5-Story Concrete Building with SMRF : Infilled Masonry Walls La

    load system.

    Project Coordination for BART Utilities and Drafting standards.

    Project Quality Review for Glendale Seventh Day Adventist Hospital

    Construction Administration for large scale hospital shoring projects, and two small scale drilled shaft pile walls.

    Experience Summary

    Refugio Rochin Projects since August 2004Monday, November 15, 2010

    12:56 PM

    NAXUTL Page 1

    http://www.postensoft.com/http://www.postensoft.com/http://www.bay-ship.com/http://www.bay-ship.com/http://www.unm.edu/~civil/http://www.unm.edu/~civil/http://www.unm.edu/~atr/http://www.unm.edu/~atr/http://www.kirtland.af.mil/afrl_vs/http://www.aecom.com/http://tiny.cc/srkthhttp://pbandainc.com/http://pbandainc.com/http://tiny.cc/azzt3http://tiny.cc/azzt3http://tiny.cc/qokwehttp://tiny.cc/qokwehttp://natureacoustical.pbworks.com/http://natureacoustical.pbworks.com/http://natureacoustical.pbworks.com/http://tiny.cc/qokwehttp://tiny.cc/azzt3http://pbandainc.com/http://tiny.cc/srkthhttp://www.aecom.com/http://www.kirtland.af.mil/afrl_vs/http://www.unm.edu/~atr/http://www.unm.edu/~civil/http://www.bay-ship.com/http://www.postensoft.com/
  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    2/44

  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    3/44

    Wind Loading Main Profile Input-OutputMonday, November 15, 2010

    7:15 AM

    NAXUTL Page 3

  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    4/44

    Topographic FactorsMonday, November 15, 2010

    7:19 AM

    NAXUTL Page 4

  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    5/44

    This Program allows for the Calculations of Standing Towers, with Antennas, and fluxing modules.

    CfStanding TowerMonday, November 15, 2010

    7:22 AM

    NAXUTL Page 5

  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    6/44

    Design Response Spectra & Equivalent Lateral Force ProcedureMonday, November 22, 2010

    8:44 PM

    NAXUTL Page 6

  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    7/44

    Gravity, Live and Seismic LoadsWednesday, November 17, 2010

    12:42 AM

    NAXUTL Page 7

  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    8/44

    ISAACSON RESIDENCE - BENICO - FLAT SLAB WORKWednesday, December 08, 2010

    12:41 PM

    NAXUTL Page 8

  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    9/44

    NAXUTL Page 9

  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    10/44

    Project Client Cost Completion Services Provided Project Description

    JOMA Barracks Building JOMA Properties $2M 6/2006 Structural design Four story office building on plied foundaRoad Town

    Peebles Hospital B.V.I.

    Construction starts 10/2005

    BVI Government $45M 6/2007 Civil and structural design

    Site supervision of civil andstructural works.

    New 7 story hospital on very steep site. 1

    ft. in steel.

    Marias Office Building II Private Owner $5M 12/2006 Design Consulting New 5 story office building with piled fouin Road Town.

    Veterans Housing Project St.Thomas USVI

    USVI Government $19M 12/2006 Civil & structural design. New housing complex comprising 13 threbungalows and one 6 story building.

    Virgin Gorda Yacht HarborBuildings I and II

    R Penn & Associates $15M 10/2006 Structural Design and FieldServices

    Two 3 Story office complexes in Virgin Gpiled foundations, Banco Popular regulatiBuilding

    Systems Engineering Typical Project ProfilesMonday, November 15, 2010

    6:10 AM

    SYTMENG Page 10

  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    11/44

    JOMA Properties : O'Neal Building

    The O'Neal Building is still the most interesting building that I have

    worked on in my career as a Civil-Structural Engineer for several reasons.

    First of all, the building suffered from 5 structural irregularities

    incorporating a weak story at the lower two floors, differential masses at

    all of the floors greater than code differentials, different materials at each

    floor, level, and vertical and horizontal load path irregularities. Thebuilding gets longer moving up towards the 4th floor, due to the setback

    in the hill. And, the materials are very interesting, with an enormous

    column approximately 4 feet in diameter. Thus I began to develop a

    dynamic evaluation of the building to satisfy analysis requirements with

    irregular buildings, which became rather cumbersome to minimize in

    detail language. The experience was a terrific learning experience. I am

    currently undergoing final analysis computations. The client postponed

    these analyses, now I am conducting the work for educational purposes.

    The JOMA Barracks was my first on island project, a

    building was under construction when I arrived. Th

    building piles had begun to be driven, and I worked

    coordinating the construction work with the drawi

    while renderin a few design details with sketch wo

    JOMA Properties : Barracks Building

    JOMA Properties : Commerce House

    JOMA PropertiesMonday, November 15, 2010

    5:56 AM

    SYTMENG Page 11

    http://www.jomaproperties.com/new_projects.php?properties_id=6http://www.jomaproperties.com/new_projects.php?properties_id=6
  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    12/44

    Note: The model

    and drawing is

    actually mirrored

    from the actual

    configuration.

    The jutting

    portion on the

    right is a separate

    building attached

    at a small bridgewith a flexible

    connectivity.

    The walls around the basement are mostly made of

    placed rock with mortar in the joints, not a usual

    masonry style although it appears to be masonry.

    The Next floor is a similar material, yet it is very lightcontaining mainly timber framing, while the floor

    above (3rd Floor) is a very heavy floor with many

    internal wall cubicles, and a terrific number of

    internal block walls. The top floor is closer in style to

    the 3rd floor, except that the backside contains a

    complete car parking lot. The main building connects

    to a flexible building at the backend.

    I believe it must be partially the great faith of the

    Tortolian islanders that keeps the building standing,

    because it is one of the oldest buildings in Road

    Town, and there are frequent earthquakes of

    magnitudes ranging from 3.5-4.5 on the Richter scale.The building appears to survive with a wit from the

    chemist that designed and built it in 1967.

    The JOMA Commerce House wa

    last assignment before leaving t

    island. I created a full scale mod

    Visual Analysis and STAAD, and

    created a first round of analyses

    drawing renderings, however, s

    the architects ideals were const

    changing in highly pertinent sta

    points for the structure. Theref

    left the island with the mere moand a batch of computations loa

    the gills. Upon my return to the

    2 years later to work with Daws

    Wells, the building was almost

    complete in construction. The

    contractor moved the architect

    change the structures mode

    completely, removing the flat sl

    a basic steel pan composite dec

    was pleased with the structure'

    overall configuration, impressed

    mode for the front pane installa

    although dissatisfied with theprecautions of the crew.

    SYTMENG Page 12

  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    13/44

    SKN VIBES : St. Kitts and Nevis Online Periodical : January 2009

    Pasted from

    Peebles Hospital Design Phase 2006-200

    After several years of negotiations with B

    Officials, Peebles Hospital Design finally

    progressed beyond a mere skeleton, and

    our company was maneuvering the desig

    of PEEBLES HOSPITAL coordinating with

    SOUTHERLAND PAGE's architects, mecha

    outfitters, and Hospital design experts. D

    a hospital especially for the government

    which is planning for the entire country a

    other regions of the Caribbean, such as S

    and Nevis, and perhaps Montserrat in em

    events. The hospital is a 7-story steel mo

    frame with concrete encasement for fire

    corrosion protection, with lateral restrai

    further composed of shear walls, bracing

    cross-cabling.

    My involvement was to complete the sei

    system, complete for essential earthqua

    standards, and to complete approximate

    the details, including the core walls, and

    foundation, and the dual-directional mo

    frames including a number of the appurt

    while keeping the CAD-Architectural cha

    to date.

    At the time of my departure from the BVfootings had been cast, while a large seg

    a wall that was not tested by geotechnic

    engineers due to the governments decis

    came to crumble costing a tremendous s

    the time..

    Peebles Hospital - Community News of Construction ProgressMonday, November 15, 2010

    12:44 PM

    SYTMENG Page 13

    http://www.sknvibes.com/News/NewsDetails.cfm/8320http://bvinews.com/bvi/progress-report-on-the-new-peebles-hospital-statement-by-deputy-premier-and-minister-of-health-hon-dancia-penn-obe-qc/http://bvinews.com/bvi/progress-report-on-the-new-peebles-hospital-statement-by-deputy-premier-and-minister-of-health-hon-dancia-penn-obe-qc/http://bvinews.com/bvi/progress-report-on-the-new-peebles-hospital-statement-by-deputy-premier-and-minister-of-health-hon-dancia-penn-obe-qc/http://bvinews.com/bvi/progress-report-on-the-new-peebles-hospital-statement-by-deputy-premier-and-minister-of-health-hon-dancia-penn-obe-qc/http://bvinews.com/bvi/progress-report-on-the-new-peebles-hospital-statement-by-deputy-premier-and-minister-of-health-hon-dancia-penn-obe-qc/http://www.sknvibes.com/News/NewsDetails.cfm/8320
  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    14/44

    SKN VIBES : St. Kitts and Nevis Online Periodical : September 2008Screen clipping taken: 11/15/2010 12:46 PM

    SYTMENG Page 14

    http://www.sknvibes.com/Education/NewsDetails.cfm/6356http://www.sknvibes.com/Education/NewsDetails.cfm/6356
  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    15/44

    Selected Details (2005 - 2006) Constructed in 2007

    Virgin Gorda Yacht Harbor BuildingsThursday, November 25, 2010

    5:42 PM

    SYTMENG Page 15

  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    16/44

    SYTMENG Page 16

  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    17/44

    Screen clipping taken: 11/15/2010 12:25 PM

    Screen clipping taken: 11/15/2010 12:26 PM

    Scrub Island

    Systems Engineering Limited has been working on high scale residentia

    buildings in the Caribbean for the last 15-20 years, among all of the BV

    including Cooper Island, and Guana Island, as well as Mustique one of Grenadines, Nevis, and Anguilla among othersand this project with OB

    one of the biggest projects taken to date, completely branding Scrub Is

    with the Resort Marina and an entire fleet of new homes. All the whil

    Richard Branson was working on his neighboring island Mesquito.

    For Scrub Island, our company divided the work, and I worked on the d

    for approximately 10 of the residential buildings. Most of the work ou

    drafter , Architect/Engineer Mitchell designed, however, my key role w

    constantly keeping up a number of the facilities at the level of the acce

    projet whilst the sea-bed found a harsh damage due to the interferenc

    dusting of the grounds.

    In the meantime I worked on a number of conciliatory efforts for much

    previous financial damages wrought by hurricanes in ensuing regions.

    Scrub Island ResortMonday, November 15, 2010

    12:22 PM

    SYTMENG Page 17

  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    18/44

    My work at Tiwanee Resort involv

    Design of Building D, and conductsome calculations for Building blo

    and A. I built the scale Finite Elem

    model of Building D (at left), and s

    the shear walls in the building.

    Tiwanee Resort in AnguillaThursday, November 25, 2010

    12:28 AM

    SYTMENG Page 18

  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    19/44

    http://www.perfectplaces.com/vacation-

    rentals/147350.htm

    Sterling House , owner Donna Sterling

    I worked with Donna on this project, it was one

    most interesting projects I had for detail and de

    We came into the project to modify the existingand to update the design to current Internation

    standards. I built a full scale finite element mod

    the residence, it was most interesting because D

    constantly made changes, and enjoyed working

    job with us and the contractors. Most of my dra

    were hand drawn sketches, however, the mode

    very intricate, utilizing STAAD for plate element

    feedback,and Visual Analysis for columns design

    Structural Features

    Flat Slab Construction.Intricate pool layout over pool house building.

    Tower with stair winding around.

    Multi-level building with steps internal.

    Retaining walls incorporate deadman into hill.

    Seismic Design Features

    Internal beams in flat slab for punching shear sp

    Other Projects at Systems Engineering LimitedTuesday, November 16, 2010

    4:09 PM

    SYTMENG Page 19

    http://www.perfectplaces.com/vacation-rentals/147350.htmhttp://www.perfectplaces.com/vacation-rentals/147350.htmhttp://www.perfectplaces.com/vacation-rentals/147350.htmhttp://www.perfectplaces.com/vacation-rentals/147350.htm
  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    20/44

    SOHA Typical Project ProfilesWednesday, December 01, 2010

    5:01 PM

    SOHA Pa e 20

  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    21/44

    Screen clipping taken: 11/15/2010 1:11 PM

    Current Construction Effort Web Cam : SFGH WEB CAM : Excavation Phase

    Screen clipping taken: 11/15/2010 3:39 PM

    3-D Perspective and Plan Vision

    An interesting project, including our sh

    portion as our President and Principals d

    to invest in the company to train the en

    engineering and CAD staff in BIM using R

    This was our first project putting Revit to

    test.

    In the SFGH Moat Wall Project, I gained

    preliminary comfort level in interacting w

    the government partnerships for our op

    meetings within the project scheduling a

    coordination group. My first duties invo

    identifying existing building information

    provided through the internal network o

    government documentation detailing al

    prior, existing and new construction wit

    vicinity. Subsequently we identified seisand gravity lateral earth pressures to be

    applied to the proposed moat wall.

    The Moat Wall provides a separated sho

    wall, separate from the new hospital bu

    which inevitably supports the load from

    and surroundings, and isolates the build

    from moisture and ground movement.

    With a team of 4 engineers and three

    draftsmen, we utilized the Revit class to

    complete the entire Moat Wall and desiprocess within a span of less than 3 mon

    from the initial team meeting.

    My final contribution involved engineer

    tunnel to enter into the existing hospita

    building, and to provide shoring for such

    tunnel. I utilized RISA for a multiple sho

    configuration, and Strut-and-Tie design

    demolition and entrance design into the

    existing building. The demolition portio

    a fair portion of calculations to support t

    conservative older designed hospitalparticularly for seismic considerations w

    excavation would be open.

    SFGH Excavation and Moat Wall InstallationMonday, November 15, 2010

    1:10 PM

    SOHA Page 21

    http://www.onsiteview.com/cams/view_remote.php?license=OSV-6ArUOwhttp://www.laroccadesign.com/pdf/health/SFGH.PDFhttp://www.laroccadesign.com/pdf/health/SFGH.PDFhttp://www.onsiteview.com/cams/view_remote.php?license=OSV-6ArUOw
  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    22/44

    Major Environmental Analysis - SFPUC Cases - CEQA Documents

    The California Department of Water Resources, Division of Safety of Dams (DSOD), is responsible for regulating all da

    in California. In 1983, the DSOD restricted the amount of water the SFPUC could store in Crystal Springs Reservoir bec

    of concerns that the dam could be overtopped, and subsequently be damaged and/or even fail, during the Probable

    Maximum Flood (PMF). The PMF is the theoretical flood event predicted to occur under the most severe and extreme

    combination of meteorological and hydrological conditions in a particular drainage area, and the DSOD includes the P

    as part of its design requirements to ensure the safety of the LCSD. Although the PMF has a very low probability of

    occurrence, design for the PMF event is mandated by the DSOD as a fail safe design for lesser flood events.

    The Lower Crystal Springs Dam Improvement Project is a project that SOHA acquired through the ongoing relationsh

    with URS and SFPUC contract services, particulary for SOHA's strengths in Shoring and Trenching. We came into the L

    Improvement Project to provide shoring for the new stilling basin designed by URS at the toe of the dam. The figures

    below provide a brief visual of the relationship of the dam improvements to the Hetch Hetchy overall project base.

    Our involvement concerned providing a temporary

    shoring wall for the stability of the land slopes upon

    demolition of the existing stilling basin, excavation, reconstruction of the new stilling basin. Assumptio

    provided that the Dam itself requires no external su

    during the construction. The Dam controllers may

    limit the water levels in the reservoir.

    With the dam on the active San Andreas Fault, I ex

    the temporary shoring wall with a probable expecta

    a 50-year seismic event which has been gestured to

    anytime in the present based on experimental data

    relating the occurrence of earthquakes in the past c

    and for the pertinent susceptability of the region.

    We utilized soil nail construction design to assist in

    down construction and to minimize damage to the

    landscaping. The soil nails will remain after the still

    basin is cast. A portion of the design project is

    demonstrated next in this tabular documentation.

    A Temporary Soil Nail Wall to Support Rehabilitation Efforts

    Lower Crystal Springs Dam Improvement ProgramMonday, November 15, 2010

    3:54 PM

    SOHA Page 22

    http://www.sf-planning.org/index.aspx?page=1829http://www.sf-planning.org/index.aspx?page=1829
  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    23/44

    Excerpts from the Draft Environmental Impact Report for the Lower Crystal Springs Dam Improvements Project

    Hetch Hetchy Reservoir System

    Existing Lower Crystal Springs Dam

    Screen clipping taken: 11/15/2010 4:10 PM

    SOHA Page 23

    http://sf-planning.org/ftp/files/mea/2006.0536E_LCSDI_DEIR.pdfhttp://sf-planning.org/ftp/files/mea/2006.0536E_LCSDI_DEIR.pdf
  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    24/44

    LCSDIP : Soil Nail Wall Calculations with Preliminary DrawingsMonday, November 15, 2010

    5:42 PM

    SOHA Page 24

  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    25/44

    SOHA Page 25

  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    26/44

    SOHA Page 26

  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    27/44

    SOHA Page 27

  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    28/44

    SOHA Page 28

  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    29/44

  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    30/44

    SOHA Page 30

  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    31/44

    SOHA Page 31

  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    32/44

    SOHA Page 32

  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    33/44

  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    34/44

    SOHA Page 34

  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    35/44

    SOHA Page 35

  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    36/44

    SOHA Page 36

  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    37/44

    SOHA Page 37

  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    38/44

    I was brought into the Marian Medical Center Project towards the beginning of construction phase, with the

    responsibility to evaluate the existing plans for the shoring of the hospital starting at the basement level. This

    my first true Construction Administration project, where I was evaluating the work of another engineerat the

    construction phase, particularly to coordinate the boundaries, to verify with all other disciplines involved, to

    complete the drawings and to finalize the engineering and construction documents and hand them over to the

    contractors.

    The contract engineer worked on the preliminary drawings and calculations. I then served as a communicatio

    medium working between the general contractor and sub-contractors and the clients, finalizing a hand-over ofdocumentation to the clients. My accomplishments comprised of gathering the information from all of the spe

    disciplines, matching building set points, cleaning up the drawings to match standards, verifying the calculation

    correctness and for additional loading, to issue revisions, to investigate any interferences of both construction

    mobilization and structural issues, and most importantly to verify with geotechnical engineers certain data per

    to soil conditioning and consolidation, particularly with regards to high impact pressure points due to prestres

    anchoring above the base footings. Nearing a first round completion, we were struck with a new Appendix J

    component to OSHPD standards which required a complete revision of the Geotechnical calculations sets.

    I finalized providing a new set of calcs after revising for the high impact loads,and upon finding certain further

    shoring necessities.

    The discussions proceeded with the contractors and the clients, and we put forth the final requirements such

    the contractors would take the assignments with the client's interests at a preconstruction meeting in Santa M

    The OSHPD Engineer of Record finalized the approval of the contract documents.

    Clients : Catholic Healthcare West

    Managing Engineers : URS Corporation

    Architect of Record : Moon Mayoras Architects, Incorporated, San Diego, CA

    Structural Engineer of Record :

    Geotechnical Engineer of Record : Rutherford & Chekene, San Francisco, CA

    Shoring Engineer of Record : SOHA Engineers

    General Contractor : Kitchell Corporation

    Marian Medical Center Excavation and Shoring PortionMonday, November 15, 2010

    5:18 PM

    SOHA Page 38

  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    39/44

    Screen clipping taken: 11/15/2010 5:18 PM

    Marian Medical CenterSanta Maria, CaliforniaThis 195,000 square foot 4-story replacement facility will relocate services from an antiquated1964 patient tower into a new innovative patient-centered care environment. This facility isdesigned to be contextual with the surrounding Santa Maria mission-style architecture and is

    organized around a two-story public lobby zone, which will house a Gift Shop, InformationResource Center and multiple Public and Outpatient Waiting Areas for the entire medicalcenter.

    The facility will consist of 167 beds and will provide the following services:Critical Care UnitTelemetry UnitIntermediate Neonatal Nursery Unit

    Medical/Surgical UnitLabor/Delivery/Recovery/Postpartum UnitPediatric Unit

    In addition, this project will also include the complete replacement of the existing CentralEnergy Plant.

    Square Footage: 358,000

    Project Cost: $110 MCompletion Date: Dec 2012Location: Santa Maria, California

    Pasted from

    SOHA Page 39

    http://www.moonmayoras.com/GeneralAcuteCareFacilities.html#marianhttp://www.moonmayoras.com/GeneralAcuteCareFacilities.html#marianhttp://www.moonmayoras.com/GeneralAcuteCareFacilities.html#marian
  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    40/44

    Projects

    CCSF North Beach Campus Temporary Soil Nail Wall : See Description Below

    SFPUC525 Golden Gate Avenue Building : Cladding, Diaphragm, and Internal Frame components including elevator well

    See Description Below

    Lake Merced Buttress wall : See Description Next Tab

    St. Mary's Garage Underpinning and Pre-construction investigation of cracks. : See Description Below

    Mercy Housing, Construction As-Built Documentation assembly. : Adjust drawings with all RFI information for final archi

    166th Avenue at Hannah and Cull Canyon : Drilled Pier Retaining Walls for landslide decay.

    Galileo High School Bleacher's Temporary Support for Rehabilitation work. : Site field decay identification, timber shori

    Parkside Branch Library : Shear Wall and roof design calculations for extension to library.

    Pt. Reyes Fireside barn : Wind Evaluations at Fireside barn for positionings on embankment.

    Prada Showroom Renovation Shoring : Pipe Column Shoring for stabilizing showroom floor construction.

    Other Projects at SOHA EngineersMonday, November 15, 2010

    5:41 PM

    SOHA Page 40

  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    41/44

    http://forum.skyscraperpage.com/showthread.php?t=159669

    I designed shoring using soil nails for a temporary excavation . The

    excavation sequence next to a high-rise building was performed in two

    steps. First a set of steel piles were drilled in next to the existing building,

    while in the meantime, the excavation was established top-down to begin

    a first phase excavation. Subsequently this first phase soil nail wall would

    be completely removed to continue the excavation up to the drilled piles.

    The below description describes Treadwell & Rollo's team of engineers

    whom we worked with on the Shoring Project for the CCSF

    Chinatown/North Beach Campus excavation.

    CCSF North Beach Campus Temporary Soil Nail Wall DescriptionSFPUC 525 Golden Gate Avenue Building

    Deemed the world's Greenest Building.

    My tasks involved cladding design, intern

    elevator framing, and photovoltaic pane

    framing supports including seismic and

    gravity analysis.

    Further description

    St. Mary's Garage Underpinning and

    Preconstruction Investigation

    A "new building" zon

    requiring underpinnin

    the existing buildings

    demonstrated walls,

    zone is within the

    demarcation lines of

    walls. The walls were

    investigated for all ex

    cracks prior to any wo

    involvement as a part

    pre-construction litig

    prceedings.

    SOHA Page 41

    http://forum.skyscraperpage.com/showthread.php?t=159669http://forum.skyscraperpage.com/showthread.php?t=159669
  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    42/44

    Overlapping Secant Soil Cement Piles with Embedded Wide Flange Internal Soil Buttress Wall

    For the Lake Merced Pump Station Redesign, a complete geotechnical soil improvement program w

    implemented around the entire premise due to vast quantities of liquefiable soil. Prior to soil

    improvements, the region is susceptible to liquefaction, and thus the entire support system of the mbuilding could heave into Lake Merced with a seismic event. This soil cement buttress wall provides

    stability to the main portion of highly susceptible liquefiable soil in the region, and particularly focuse

    the zone surrounding the Lake to Pump Station exchange piping system.

    The secant piles are overlocking zones of soil-cement grout with embedded steel piles. The entire s

    cement grout zone serves as a barrier to water and soil flow, thus partially preventing entrance hydr

    flow of ground water into the region, as well as preventing soil movement. Further soil improvemen

    conducted by the geotechnical modifications have provided for further densification. Pretensioned

    Deadmen with high strength tensioning bars tying into a concrete cap beam are utilized to restrain th

    foot depth of shoring soil lateral earth pressures considering the portion of soil at the lake banksubmerges.

    My main tasks involved the engineering design for the buttress wall, on-site measurements, client

    coordination meeting attendance and scheduling, and CAD drafting with CAD management.

    Lake Merced Pump Station Installation of Secant PilesWednesday, November 17, 2010

    2:35 AM

    SOHA Page 42

  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    43/44

    SOHA Page 43

  • 8/6/2019 portfolio-12-19-101219021247-phpapp01

    44/44


Recommended