Presenter Name: Refugio M. Rochn
Contracting to : Pirooz Barar and Associates, Dawson Wells Consulting, and Benico Construction
Nature Acoustical
SOHA Engineers
Systems Engineering Limited
Company Names Presented in Portfolio:
Description
This Presentation Portfolio provides a retrospective view of work accomplished over the last 6 years + with a brief overview to 1994.
2009 - Present Resum and Example Software1.
2008 - 2009 Work With SOHA Engineers in San Francisco2.
2004 - 2008 Work With Systems Engineering Limited in the British Virgin Islands3.
Portfolio Contents
Strong Subject Fields: Plates & Shells (Dr. E. Luco), Structural Analysis (Dr. Frieder Seible), Mathematical Physics (Dr. NeNasser, Solid Mechanics (Dr. H. Murakami), Numerical Methods (Dr. R.J. Asaro), Steel Design (Dr. C-M Uang)
Bachelor's of Science, University of California, San Diego in La Jolla, Received June 14, 1996, GPA 3.14/4.00
Thesis: Shape Control of a Composite Mirror Substrate Utilizing Shape Memory Alloy
Dr. Arup K. Maji, Specialities in Smart & Adaptive Structures, Composite Materials & Nuclear Transport
Graduating Advisor
Dr. Walter Gerstle (Prof. Computational Mechanics) & Dr. Peter Wegner (Prof. Composite Materials)
Thesis Advisory Committee Members
Project Advisors at ATR Institute: Dr. Gordon McKeene & Lecturer Lary Lenke
Master's of Science, University of New Mexico in Albuquerque, Received December 16, 2000, GPA 3.66/4.00
Education
1997 http://www.postensoft.com/ O'Reilly and Associates and O'Neal and Associates both merged to build Posten.
1997 http://www.bay-ship.com/ Bay Ship & Yacht was probably not even a quarter the size of what it is now.
1998 - 2000 http://www.unm.edu/~civil/ & http://www.unm.edu/~atr/ & http://www.kirtland.af.mil/afrl_vs/
2000 - 2003 What was Boyle Engineering Corporation has merged with AECOM http://www.aecom.com/
2004 - 2008 http://www.systemscaribbean.com Systems Engineering in the news http://tiny.cc/srkth
2008 - 2009 http://www.soha.com/ Long-term established firm in San Francisco since 1965, original owner still going strong.
http://pbandainc.com Pirooz Barar individually established PB&A in 1983 after 16 years into career.
http://tiny.cc/azzt3 Links to contact information for Benny Shalom of Benico Construction, long-term individual career as engineer and
contractor
http://tiny.cc/qokwe Dawson Wells Consulting in current headline news BVI.
2009 - http://natureacoustical.pbworks.com Current website, conceptual framework, focus in engineering education
Company Websites Throughout Career since B.S. at UCSD
Structural Design Engineer with experience in the design, analysis, and detailing of office buildings, residences, retaining w alls, soil-
integrated walls (ie MSE and Soil Nailing), internal foundation improvement mix columns/piles, mat and strip foundations, underpi
(concrete and steel), permanent and temporary shoring, demolition, strut-and-tie design for deep beams and walls, lateral load sys
slab deck bridges, pre- and post- tensioned concrete bridge beams, seismic design of bridges, and buildings up to 8 stories. Experie
ship rehabilitation, DNC/CAD inter-linkages, and Hull design. Experience with adaptable optics research, space systems, and comp
materials design, manufacturing, and assembly. Experience with underwater acoustical systems, passive receiving dishes, and seal
underwater canisters. Experience with construction observation of concrete and masonry structures. Experience with Water -barri
designs.
Project Managing Engineer with experience leading design efforts in Resort Design, Technical projects with seismic and hurric ane lo
distribution, complex connection issues from non-matching materials, ie steel to masonry and concrete, and aluminum to protrude
reinforced rods into a fiber-composite base. Design-Build work with 5-Story Concrete Building with SMRF : Infilled Masonry Walls La
load system.
Project Coordination for BART Utilities and Drafting standards.
Project Quality Review for Glendale Seventh Day Adventist Hospital
Construction Administration for large scale hospital shoring projects, and two small scale drilled shaft pile walls.
Experience Summary
Refugio Rochin Projects since August 2004Monday, November 15, 2010
12:56 PM
NAXUTL Page 1
http://www.postensoft.com/http://www.postensoft.com/http://www.bay-ship.com/http://www.bay-ship.com/http://www.unm.edu/~civil/http://www.unm.edu/~civil/http://www.unm.edu/~atr/http://www.unm.edu/~atr/http://www.kirtland.af.mil/afrl_vs/http://www.aecom.com/http://tiny.cc/srkthhttp://pbandainc.com/http://pbandainc.com/http://tiny.cc/azzt3http://tiny.cc/azzt3http://tiny.cc/qokwehttp://tiny.cc/qokwehttp://natureacoustical.pbworks.com/http://natureacoustical.pbworks.com/http://natureacoustical.pbworks.com/http://tiny.cc/qokwehttp://tiny.cc/azzt3http://pbandainc.com/http://tiny.cc/srkthhttp://www.aecom.com/http://www.kirtland.af.mil/afrl_vs/http://www.unm.edu/~atr/http://www.unm.edu/~civil/http://www.bay-ship.com/http://www.postensoft.com/8/6/2019 portfolio-12-19-101219021247-phpapp01
2/44
8/6/2019 portfolio-12-19-101219021247-phpapp01
3/44
Wind Loading Main Profile Input-OutputMonday, November 15, 2010
7:15 AM
NAXUTL Page 3
8/6/2019 portfolio-12-19-101219021247-phpapp01
4/44
Topographic FactorsMonday, November 15, 2010
7:19 AM
NAXUTL Page 4
8/6/2019 portfolio-12-19-101219021247-phpapp01
5/44
This Program allows for the Calculations of Standing Towers, with Antennas, and fluxing modules.
CfStanding TowerMonday, November 15, 2010
7:22 AM
NAXUTL Page 5
8/6/2019 portfolio-12-19-101219021247-phpapp01
6/44
Design Response Spectra & Equivalent Lateral Force ProcedureMonday, November 22, 2010
8:44 PM
NAXUTL Page 6
8/6/2019 portfolio-12-19-101219021247-phpapp01
7/44
Gravity, Live and Seismic LoadsWednesday, November 17, 2010
12:42 AM
NAXUTL Page 7
8/6/2019 portfolio-12-19-101219021247-phpapp01
8/44
ISAACSON RESIDENCE - BENICO - FLAT SLAB WORKWednesday, December 08, 2010
12:41 PM
NAXUTL Page 8
8/6/2019 portfolio-12-19-101219021247-phpapp01
9/44
NAXUTL Page 9
8/6/2019 portfolio-12-19-101219021247-phpapp01
10/44
Project Client Cost Completion Services Provided Project Description
JOMA Barracks Building JOMA Properties $2M 6/2006 Structural design Four story office building on plied foundaRoad Town
Peebles Hospital B.V.I.
Construction starts 10/2005
BVI Government $45M 6/2007 Civil and structural design
Site supervision of civil andstructural works.
New 7 story hospital on very steep site. 1
ft. in steel.
Marias Office Building II Private Owner $5M 12/2006 Design Consulting New 5 story office building with piled fouin Road Town.
Veterans Housing Project St.Thomas USVI
USVI Government $19M 12/2006 Civil & structural design. New housing complex comprising 13 threbungalows and one 6 story building.
Virgin Gorda Yacht HarborBuildings I and II
R Penn & Associates $15M 10/2006 Structural Design and FieldServices
Two 3 Story office complexes in Virgin Gpiled foundations, Banco Popular regulatiBuilding
Systems Engineering Typical Project ProfilesMonday, November 15, 2010
6:10 AM
SYTMENG Page 10
8/6/2019 portfolio-12-19-101219021247-phpapp01
11/44
JOMA Properties : O'Neal Building
The O'Neal Building is still the most interesting building that I have
worked on in my career as a Civil-Structural Engineer for several reasons.
First of all, the building suffered from 5 structural irregularities
incorporating a weak story at the lower two floors, differential masses at
all of the floors greater than code differentials, different materials at each
floor, level, and vertical and horizontal load path irregularities. Thebuilding gets longer moving up towards the 4th floor, due to the setback
in the hill. And, the materials are very interesting, with an enormous
column approximately 4 feet in diameter. Thus I began to develop a
dynamic evaluation of the building to satisfy analysis requirements with
irregular buildings, which became rather cumbersome to minimize in
detail language. The experience was a terrific learning experience. I am
currently undergoing final analysis computations. The client postponed
these analyses, now I am conducting the work for educational purposes.
The JOMA Barracks was my first on island project, a
building was under construction when I arrived. Th
building piles had begun to be driven, and I worked
coordinating the construction work with the drawi
while renderin a few design details with sketch wo
JOMA Properties : Barracks Building
JOMA Properties : Commerce House
JOMA PropertiesMonday, November 15, 2010
5:56 AM
SYTMENG Page 11
http://www.jomaproperties.com/new_projects.php?properties_id=6http://www.jomaproperties.com/new_projects.php?properties_id=68/6/2019 portfolio-12-19-101219021247-phpapp01
12/44
Note: The model
and drawing is
actually mirrored
from the actual
configuration.
The jutting
portion on the
right is a separate
building attached
at a small bridgewith a flexible
connectivity.
The walls around the basement are mostly made of
placed rock with mortar in the joints, not a usual
masonry style although it appears to be masonry.
The Next floor is a similar material, yet it is very lightcontaining mainly timber framing, while the floor
above (3rd Floor) is a very heavy floor with many
internal wall cubicles, and a terrific number of
internal block walls. The top floor is closer in style to
the 3rd floor, except that the backside contains a
complete car parking lot. The main building connects
to a flexible building at the backend.
I believe it must be partially the great faith of the
Tortolian islanders that keeps the building standing,
because it is one of the oldest buildings in Road
Town, and there are frequent earthquakes of
magnitudes ranging from 3.5-4.5 on the Richter scale.The building appears to survive with a wit from the
chemist that designed and built it in 1967.
The JOMA Commerce House wa
last assignment before leaving t
island. I created a full scale mod
Visual Analysis and STAAD, and
created a first round of analyses
drawing renderings, however, s
the architects ideals were const
changing in highly pertinent sta
points for the structure. Theref
left the island with the mere moand a batch of computations loa
the gills. Upon my return to the
2 years later to work with Daws
Wells, the building was almost
complete in construction. The
contractor moved the architect
change the structures mode
completely, removing the flat sl
a basic steel pan composite dec
was pleased with the structure'
overall configuration, impressed
mode for the front pane installa
although dissatisfied with theprecautions of the crew.
SYTMENG Page 12
8/6/2019 portfolio-12-19-101219021247-phpapp01
13/44
SKN VIBES : St. Kitts and Nevis Online Periodical : January 2009
Pasted from
Peebles Hospital Design Phase 2006-200
After several years of negotiations with B
Officials, Peebles Hospital Design finally
progressed beyond a mere skeleton, and
our company was maneuvering the desig
of PEEBLES HOSPITAL coordinating with
SOUTHERLAND PAGE's architects, mecha
outfitters, and Hospital design experts. D
a hospital especially for the government
which is planning for the entire country a
other regions of the Caribbean, such as S
and Nevis, and perhaps Montserrat in em
events. The hospital is a 7-story steel mo
frame with concrete encasement for fire
corrosion protection, with lateral restrai
further composed of shear walls, bracing
cross-cabling.
My involvement was to complete the sei
system, complete for essential earthqua
standards, and to complete approximate
the details, including the core walls, and
foundation, and the dual-directional mo
frames including a number of the appurt
while keeping the CAD-Architectural cha
to date.
At the time of my departure from the BVfootings had been cast, while a large seg
a wall that was not tested by geotechnic
engineers due to the governments decis
came to crumble costing a tremendous s
the time..
Peebles Hospital - Community News of Construction ProgressMonday, November 15, 2010
12:44 PM
SYTMENG Page 13
http://www.sknvibes.com/News/NewsDetails.cfm/8320http://bvinews.com/bvi/progress-report-on-the-new-peebles-hospital-statement-by-deputy-premier-and-minister-of-health-hon-dancia-penn-obe-qc/http://bvinews.com/bvi/progress-report-on-the-new-peebles-hospital-statement-by-deputy-premier-and-minister-of-health-hon-dancia-penn-obe-qc/http://bvinews.com/bvi/progress-report-on-the-new-peebles-hospital-statement-by-deputy-premier-and-minister-of-health-hon-dancia-penn-obe-qc/http://bvinews.com/bvi/progress-report-on-the-new-peebles-hospital-statement-by-deputy-premier-and-minister-of-health-hon-dancia-penn-obe-qc/http://bvinews.com/bvi/progress-report-on-the-new-peebles-hospital-statement-by-deputy-premier-and-minister-of-health-hon-dancia-penn-obe-qc/http://www.sknvibes.com/News/NewsDetails.cfm/83208/6/2019 portfolio-12-19-101219021247-phpapp01
14/44
SKN VIBES : St. Kitts and Nevis Online Periodical : September 2008Screen clipping taken: 11/15/2010 12:46 PM
SYTMENG Page 14
http://www.sknvibes.com/Education/NewsDetails.cfm/6356http://www.sknvibes.com/Education/NewsDetails.cfm/63568/6/2019 portfolio-12-19-101219021247-phpapp01
15/44
Selected Details (2005 - 2006) Constructed in 2007
Virgin Gorda Yacht Harbor BuildingsThursday, November 25, 2010
5:42 PM
SYTMENG Page 15
8/6/2019 portfolio-12-19-101219021247-phpapp01
16/44
SYTMENG Page 16
8/6/2019 portfolio-12-19-101219021247-phpapp01
17/44
Screen clipping taken: 11/15/2010 12:25 PM
Screen clipping taken: 11/15/2010 12:26 PM
Scrub Island
Systems Engineering Limited has been working on high scale residentia
buildings in the Caribbean for the last 15-20 years, among all of the BV
including Cooper Island, and Guana Island, as well as Mustique one of Grenadines, Nevis, and Anguilla among othersand this project with OB
one of the biggest projects taken to date, completely branding Scrub Is
with the Resort Marina and an entire fleet of new homes. All the whil
Richard Branson was working on his neighboring island Mesquito.
For Scrub Island, our company divided the work, and I worked on the d
for approximately 10 of the residential buildings. Most of the work ou
drafter , Architect/Engineer Mitchell designed, however, my key role w
constantly keeping up a number of the facilities at the level of the acce
projet whilst the sea-bed found a harsh damage due to the interferenc
dusting of the grounds.
In the meantime I worked on a number of conciliatory efforts for much
previous financial damages wrought by hurricanes in ensuing regions.
Scrub Island ResortMonday, November 15, 2010
12:22 PM
SYTMENG Page 17
8/6/2019 portfolio-12-19-101219021247-phpapp01
18/44
My work at Tiwanee Resort involv
Design of Building D, and conductsome calculations for Building blo
and A. I built the scale Finite Elem
model of Building D (at left), and s
the shear walls in the building.
Tiwanee Resort in AnguillaThursday, November 25, 2010
12:28 AM
SYTMENG Page 18
8/6/2019 portfolio-12-19-101219021247-phpapp01
19/44
http://www.perfectplaces.com/vacation-
rentals/147350.htm
Sterling House , owner Donna Sterling
I worked with Donna on this project, it was one
most interesting projects I had for detail and de
We came into the project to modify the existingand to update the design to current Internation
standards. I built a full scale finite element mod
the residence, it was most interesting because D
constantly made changes, and enjoyed working
job with us and the contractors. Most of my dra
were hand drawn sketches, however, the mode
very intricate, utilizing STAAD for plate element
feedback,and Visual Analysis for columns design
Structural Features
Flat Slab Construction.Intricate pool layout over pool house building.
Tower with stair winding around.
Multi-level building with steps internal.
Retaining walls incorporate deadman into hill.
Seismic Design Features
Internal beams in flat slab for punching shear sp
Other Projects at Systems Engineering LimitedTuesday, November 16, 2010
4:09 PM
SYTMENG Page 19
http://www.perfectplaces.com/vacation-rentals/147350.htmhttp://www.perfectplaces.com/vacation-rentals/147350.htmhttp://www.perfectplaces.com/vacation-rentals/147350.htmhttp://www.perfectplaces.com/vacation-rentals/147350.htm8/6/2019 portfolio-12-19-101219021247-phpapp01
20/44
SOHA Typical Project ProfilesWednesday, December 01, 2010
5:01 PM
SOHA Pa e 20
8/6/2019 portfolio-12-19-101219021247-phpapp01
21/44
Screen clipping taken: 11/15/2010 1:11 PM
Current Construction Effort Web Cam : SFGH WEB CAM : Excavation Phase
Screen clipping taken: 11/15/2010 3:39 PM
3-D Perspective and Plan Vision
An interesting project, including our sh
portion as our President and Principals d
to invest in the company to train the en
engineering and CAD staff in BIM using R
This was our first project putting Revit to
test.
In the SFGH Moat Wall Project, I gained
preliminary comfort level in interacting w
the government partnerships for our op
meetings within the project scheduling a
coordination group. My first duties invo
identifying existing building information
provided through the internal network o
government documentation detailing al
prior, existing and new construction wit
vicinity. Subsequently we identified seisand gravity lateral earth pressures to be
applied to the proposed moat wall.
The Moat Wall provides a separated sho
wall, separate from the new hospital bu
which inevitably supports the load from
and surroundings, and isolates the build
from moisture and ground movement.
With a team of 4 engineers and three
draftsmen, we utilized the Revit class to
complete the entire Moat Wall and desiprocess within a span of less than 3 mon
from the initial team meeting.
My final contribution involved engineer
tunnel to enter into the existing hospita
building, and to provide shoring for such
tunnel. I utilized RISA for a multiple sho
configuration, and Strut-and-Tie design
demolition and entrance design into the
existing building. The demolition portio
a fair portion of calculations to support t
conservative older designed hospitalparticularly for seismic considerations w
excavation would be open.
SFGH Excavation and Moat Wall InstallationMonday, November 15, 2010
1:10 PM
SOHA Page 21
http://www.onsiteview.com/cams/view_remote.php?license=OSV-6ArUOwhttp://www.laroccadesign.com/pdf/health/SFGH.PDFhttp://www.laroccadesign.com/pdf/health/SFGH.PDFhttp://www.onsiteview.com/cams/view_remote.php?license=OSV-6ArUOw8/6/2019 portfolio-12-19-101219021247-phpapp01
22/44
Major Environmental Analysis - SFPUC Cases - CEQA Documents
The California Department of Water Resources, Division of Safety of Dams (DSOD), is responsible for regulating all da
in California. In 1983, the DSOD restricted the amount of water the SFPUC could store in Crystal Springs Reservoir bec
of concerns that the dam could be overtopped, and subsequently be damaged and/or even fail, during the Probable
Maximum Flood (PMF). The PMF is the theoretical flood event predicted to occur under the most severe and extreme
combination of meteorological and hydrological conditions in a particular drainage area, and the DSOD includes the P
as part of its design requirements to ensure the safety of the LCSD. Although the PMF has a very low probability of
occurrence, design for the PMF event is mandated by the DSOD as a fail safe design for lesser flood events.
The Lower Crystal Springs Dam Improvement Project is a project that SOHA acquired through the ongoing relationsh
with URS and SFPUC contract services, particulary for SOHA's strengths in Shoring and Trenching. We came into the L
Improvement Project to provide shoring for the new stilling basin designed by URS at the toe of the dam. The figures
below provide a brief visual of the relationship of the dam improvements to the Hetch Hetchy overall project base.
Our involvement concerned providing a temporary
shoring wall for the stability of the land slopes upon
demolition of the existing stilling basin, excavation, reconstruction of the new stilling basin. Assumptio
provided that the Dam itself requires no external su
during the construction. The Dam controllers may
limit the water levels in the reservoir.
With the dam on the active San Andreas Fault, I ex
the temporary shoring wall with a probable expecta
a 50-year seismic event which has been gestured to
anytime in the present based on experimental data
relating the occurrence of earthquakes in the past c
and for the pertinent susceptability of the region.
We utilized soil nail construction design to assist in
down construction and to minimize damage to the
landscaping. The soil nails will remain after the still
basin is cast. A portion of the design project is
demonstrated next in this tabular documentation.
A Temporary Soil Nail Wall to Support Rehabilitation Efforts
Lower Crystal Springs Dam Improvement ProgramMonday, November 15, 2010
3:54 PM
SOHA Page 22
http://www.sf-planning.org/index.aspx?page=1829http://www.sf-planning.org/index.aspx?page=18298/6/2019 portfolio-12-19-101219021247-phpapp01
23/44
Excerpts from the Draft Environmental Impact Report for the Lower Crystal Springs Dam Improvements Project
Hetch Hetchy Reservoir System
Existing Lower Crystal Springs Dam
Screen clipping taken: 11/15/2010 4:10 PM
SOHA Page 23
http://sf-planning.org/ftp/files/mea/2006.0536E_LCSDI_DEIR.pdfhttp://sf-planning.org/ftp/files/mea/2006.0536E_LCSDI_DEIR.pdf8/6/2019 portfolio-12-19-101219021247-phpapp01
24/44
LCSDIP : Soil Nail Wall Calculations with Preliminary DrawingsMonday, November 15, 2010
5:42 PM
SOHA Page 24
8/6/2019 portfolio-12-19-101219021247-phpapp01
25/44
SOHA Page 25
8/6/2019 portfolio-12-19-101219021247-phpapp01
26/44
SOHA Page 26
8/6/2019 portfolio-12-19-101219021247-phpapp01
27/44
SOHA Page 27
8/6/2019 portfolio-12-19-101219021247-phpapp01
28/44
SOHA Page 28
8/6/2019 portfolio-12-19-101219021247-phpapp01
29/44
8/6/2019 portfolio-12-19-101219021247-phpapp01
30/44
SOHA Page 30
8/6/2019 portfolio-12-19-101219021247-phpapp01
31/44
SOHA Page 31
8/6/2019 portfolio-12-19-101219021247-phpapp01
32/44
SOHA Page 32
8/6/2019 portfolio-12-19-101219021247-phpapp01
33/44
8/6/2019 portfolio-12-19-101219021247-phpapp01
34/44
SOHA Page 34
8/6/2019 portfolio-12-19-101219021247-phpapp01
35/44
SOHA Page 35
8/6/2019 portfolio-12-19-101219021247-phpapp01
36/44
SOHA Page 36
8/6/2019 portfolio-12-19-101219021247-phpapp01
37/44
SOHA Page 37
8/6/2019 portfolio-12-19-101219021247-phpapp01
38/44
I was brought into the Marian Medical Center Project towards the beginning of construction phase, with the
responsibility to evaluate the existing plans for the shoring of the hospital starting at the basement level. This
my first true Construction Administration project, where I was evaluating the work of another engineerat the
construction phase, particularly to coordinate the boundaries, to verify with all other disciplines involved, to
complete the drawings and to finalize the engineering and construction documents and hand them over to the
contractors.
The contract engineer worked on the preliminary drawings and calculations. I then served as a communicatio
medium working between the general contractor and sub-contractors and the clients, finalizing a hand-over ofdocumentation to the clients. My accomplishments comprised of gathering the information from all of the spe
disciplines, matching building set points, cleaning up the drawings to match standards, verifying the calculation
correctness and for additional loading, to issue revisions, to investigate any interferences of both construction
mobilization and structural issues, and most importantly to verify with geotechnical engineers certain data per
to soil conditioning and consolidation, particularly with regards to high impact pressure points due to prestres
anchoring above the base footings. Nearing a first round completion, we were struck with a new Appendix J
component to OSHPD standards which required a complete revision of the Geotechnical calculations sets.
I finalized providing a new set of calcs after revising for the high impact loads,and upon finding certain further
shoring necessities.
The discussions proceeded with the contractors and the clients, and we put forth the final requirements such
the contractors would take the assignments with the client's interests at a preconstruction meeting in Santa M
The OSHPD Engineer of Record finalized the approval of the contract documents.
Clients : Catholic Healthcare West
Managing Engineers : URS Corporation
Architect of Record : Moon Mayoras Architects, Incorporated, San Diego, CA
Structural Engineer of Record :
Geotechnical Engineer of Record : Rutherford & Chekene, San Francisco, CA
Shoring Engineer of Record : SOHA Engineers
General Contractor : Kitchell Corporation
Marian Medical Center Excavation and Shoring PortionMonday, November 15, 2010
5:18 PM
SOHA Page 38
8/6/2019 portfolio-12-19-101219021247-phpapp01
39/44
Screen clipping taken: 11/15/2010 5:18 PM
Marian Medical CenterSanta Maria, CaliforniaThis 195,000 square foot 4-story replacement facility will relocate services from an antiquated1964 patient tower into a new innovative patient-centered care environment. This facility isdesigned to be contextual with the surrounding Santa Maria mission-style architecture and is
organized around a two-story public lobby zone, which will house a Gift Shop, InformationResource Center and multiple Public and Outpatient Waiting Areas for the entire medicalcenter.
The facility will consist of 167 beds and will provide the following services:Critical Care UnitTelemetry UnitIntermediate Neonatal Nursery Unit
Medical/Surgical UnitLabor/Delivery/Recovery/Postpartum UnitPediatric Unit
In addition, this project will also include the complete replacement of the existing CentralEnergy Plant.
Square Footage: 358,000
Project Cost: $110 MCompletion Date: Dec 2012Location: Santa Maria, California
Pasted from
SOHA Page 39
http://www.moonmayoras.com/GeneralAcuteCareFacilities.html#marianhttp://www.moonmayoras.com/GeneralAcuteCareFacilities.html#marianhttp://www.moonmayoras.com/GeneralAcuteCareFacilities.html#marian8/6/2019 portfolio-12-19-101219021247-phpapp01
40/44
Projects
CCSF North Beach Campus Temporary Soil Nail Wall : See Description Below
SFPUC525 Golden Gate Avenue Building : Cladding, Diaphragm, and Internal Frame components including elevator well
See Description Below
Lake Merced Buttress wall : See Description Next Tab
St. Mary's Garage Underpinning and Pre-construction investigation of cracks. : See Description Below
Mercy Housing, Construction As-Built Documentation assembly. : Adjust drawings with all RFI information for final archi
166th Avenue at Hannah and Cull Canyon : Drilled Pier Retaining Walls for landslide decay.
Galileo High School Bleacher's Temporary Support for Rehabilitation work. : Site field decay identification, timber shori
Parkside Branch Library : Shear Wall and roof design calculations for extension to library.
Pt. Reyes Fireside barn : Wind Evaluations at Fireside barn for positionings on embankment.
Prada Showroom Renovation Shoring : Pipe Column Shoring for stabilizing showroom floor construction.
Other Projects at SOHA EngineersMonday, November 15, 2010
5:41 PM
SOHA Page 40
8/6/2019 portfolio-12-19-101219021247-phpapp01
41/44
http://forum.skyscraperpage.com/showthread.php?t=159669
I designed shoring using soil nails for a temporary excavation . The
excavation sequence next to a high-rise building was performed in two
steps. First a set of steel piles were drilled in next to the existing building,
while in the meantime, the excavation was established top-down to begin
a first phase excavation. Subsequently this first phase soil nail wall would
be completely removed to continue the excavation up to the drilled piles.
The below description describes Treadwell & Rollo's team of engineers
whom we worked with on the Shoring Project for the CCSF
Chinatown/North Beach Campus excavation.
CCSF North Beach Campus Temporary Soil Nail Wall DescriptionSFPUC 525 Golden Gate Avenue Building
Deemed the world's Greenest Building.
My tasks involved cladding design, intern
elevator framing, and photovoltaic pane
framing supports including seismic and
gravity analysis.
Further description
St. Mary's Garage Underpinning and
Preconstruction Investigation
A "new building" zon
requiring underpinnin
the existing buildings
demonstrated walls,
zone is within the
demarcation lines of
walls. The walls were
investigated for all ex
cracks prior to any wo
involvement as a part
pre-construction litig
prceedings.
SOHA Page 41
http://forum.skyscraperpage.com/showthread.php?t=159669http://forum.skyscraperpage.com/showthread.php?t=1596698/6/2019 portfolio-12-19-101219021247-phpapp01
42/44
Overlapping Secant Soil Cement Piles with Embedded Wide Flange Internal Soil Buttress Wall
For the Lake Merced Pump Station Redesign, a complete geotechnical soil improvement program w
implemented around the entire premise due to vast quantities of liquefiable soil. Prior to soil
improvements, the region is susceptible to liquefaction, and thus the entire support system of the mbuilding could heave into Lake Merced with a seismic event. This soil cement buttress wall provides
stability to the main portion of highly susceptible liquefiable soil in the region, and particularly focuse
the zone surrounding the Lake to Pump Station exchange piping system.
The secant piles are overlocking zones of soil-cement grout with embedded steel piles. The entire s
cement grout zone serves as a barrier to water and soil flow, thus partially preventing entrance hydr
flow of ground water into the region, as well as preventing soil movement. Further soil improvemen
conducted by the geotechnical modifications have provided for further densification. Pretensioned
Deadmen with high strength tensioning bars tying into a concrete cap beam are utilized to restrain th
foot depth of shoring soil lateral earth pressures considering the portion of soil at the lake banksubmerges.
My main tasks involved the engineering design for the buttress wall, on-site measurements, client
coordination meeting attendance and scheduling, and CAD drafting with CAD management.
Lake Merced Pump Station Installation of Secant PilesWednesday, November 17, 2010