+ All Categories
Home > Documents > Portfolio

Portfolio

Date post: 26-Mar-2016
Category:
Upload: alejandrarojaswilckens
View: 214 times
Download: 2 times
Share this document with a friend
Description:
Alejandra Rojas Wilckens Architect and Permaculture portfolio
Popular Tags:
49
Alejandra Rojas Wilckens Architect and Permaculture Designer EMAIL [email protected] | CEL 09-7-5732301
Transcript
  • Alejandra Rojas WilckensArchitect and Permaculture Designer

    EMAIL [email protected] | CEL 09-7-5732301

  • INTRODUCTION

    IntroductionI am an Architect and Permaculture Designer, with a passion in the social Development of the World, particularly creating human settlements that benefit its people and environment. Focus in design thats in conjunction with nature, using Bioclimatic Design and Permaculture Design while respecting the natural resources that the planet gives us.

    Two years ago I went to Australia for studying Permaculture with the creator of this discipline, Bill Mollison, at the University of Melbourne, Australia. This was a dream that I could reach, and helped me to receive the knowledge about this system of design which points out to work with the Land and not against it. Coming back to Chile I want to share this, at the time of design our public spaces, applying sustainable and beauty concepts, design patterns respectful to the Earth. I would love to share this with the people that need it most. The need for living in green environments is not just because of its beauty, also it allows us to live in a more harmonious way in contact with the earth, and even more important, it allows us to grow our own food, in community; happy enjoying what nature has provided us.

    Chile, 2014

    EMAIL: [email protected] | CEL: 09-7-5732301

    2

    2014

  • TABLE OF CONTENTS

    Table of Contents 4 - 7 CONSULTING FOR SUSTAINABLE DESIGN LANDSCAPE 2013

    8 - 11 PERMACULTURE DESIGN, LANDSCAPE REGENERATION AND FOOD FOREST 2013

    12 - 13 PERMACULTURE DESIGN THE LIVING IN PEACE PROJECT, KARAMEA, NEW ZEALAND 2012

    14 - 17 DESIGN OF REPAIRS OF HERITAGE HOUSES IN HISTORIC CENTER OF RANCAGUA, CHILE 2012

    18 - 21 DESIGN OF RESTAURANT SANTA BRASA 2012

    22 - 24 STRUCTURAL REPAIR OF S.I.I. BUILDING, RECOLETA, SANTIAGO 2011

    25 - 27 DESIGN OF MONTESSORI SCHOOL IN VALPARAISO 2011

    28 - 32 DESIGN OF RUKA ECO-LODGE FOR INDIGENOUS ASOCIATION MAPULAHUAL 2009

    33 - 40 MUSEUM OF MYTHOLOGY OF CHILOE 2008-09

    41 - 44 RESTORATION OF SANTA LUCIA HILLS NORTH ENTRANCE 2007

    45 - 49 DESIGN OF CULTURAL CENTER,EX-PRISON IN VALPARAISO 2007

    3

    2014

  • CONSULTING FOR SUSTAINABLE DESIGN LANDSCAPE

    Consulting for Sustainable Design LandscapeConsulting and design of a green plate, part of the whole design of a Complex of Inclusive Collective Housing built of wood, for the city of Concepcin, Chile. Calling it a green plate is making reference to the Landscape Design of the project, which are green recreational areas on the first level and turn plate community work, on the second level, which consisted of vegetable beds and leisure areas, always trying to strike a balance between sustainability and in turn separation with private green areas of each department. We also sought to place the trees at strategic points depending on the desired shade.

    As part of a permaculture concept, we design a system for collecting rain water, carried in underground tanks to have supply during the dry season in Concepcin, for irrigation of beds and recreational areas, achieving self-sustainability of the landscape design project.

    4

    2013

  • CONSULTING FOR SUSTAINABLE DESIGN LANDSCAPE

    5

    2013

  • 2013 CONSULTING FOR SUSTAINABLE DESIGN LANDSCAPE

    6

  • VCIMVIVIENDA COLECTIVA INCLUSIVA DE MADERA

    ALUMNO:IGNACIO ROJAS W

    PROFESOR GUIA:ROBERTO BURDILES A

    LCONTENIDO:

    BOMBA ELEVADORA SOLAR

    ESTANQUE 5000 LTS

    FILTRO

    FILTRO

    ESTANQUE 5000 LTS

    BOMBA ELEVADORA SOLAR

    PANEL SOLAR

    PANEL SOLAR

    ESTANQUE 350 LTS

    ESTANQUE 350 LTS

    BAJADA AGUA PARA RIEGO

    BAJADA DE AGUA LLUVIA

    AGUA IMPULSADA PORBOMBA SOLAR

    RIEGO DE HUERTOS POR GOTEO

    RIEGO AREAS VERDESPUBLICAS POR GOTEO

    RIEGO AREAS VERDESPUBLICAS POR GOTEO

    RIEGO DE HUERTOSPOR GOTEO

    RIEGO DE AREAS VERDESESPACIO COMUNITARIOPOR GOTEO

    BAJADA AGUA PARA RIEGO

    BAJADA DE AGUA LLUVIA

    AGUA IMPULSADA PORBOMBA SOLAR

    TOTAL REAS VERDES: 303,16 m2CONSUMO: 1.5 lts/m2 - 454 lts/daPLUVIOSIDAD ANUAL CONCEPCION: 1200mm

    CAPACIDAD DE ALMACENAJE AGUA: 25000 lts55 DAS DE AUTONOMA

    SISTEMA DE RECOLECCIN DEAGUAS LLUVIAS Y REGADO 22

    2013CONSULTING FOR SUSTAINABLE DESIGN LANDSCAPE

    7

  • PERMACULTURE DESIGN, LANDSCAPE REGENERATION AND FOOD FOREST

    Permaculture Design, landscape regeneration and food forest, Wanaka, New ZealandAfter finishing the PDC (Permaculture Design Certificate Course), in the University of Melbourne, Australia, I had the opportunity to design a permaculture project for a family in New Zealand. It was a great chance, with the kiwilandscape being similar to the postglacial landscape in the south of Chile, where this type of geography is perfect to project the design of dams and swales. Basically the shape of the landscape allows to reach the basic first purpose in a permaculture design, to capture the water efficiently by moving it over the contour to add in generating soil, therefore the generation of fertility for the creation of a self-sustaining ecosystem.

    8

    2013

  • PERMACULTURE DESIGN, LANDSCAPE REGENERATION AND FOOD FOREST

    First it was necessary to recognize the propertys size, and profile shape, especially key contour lines for handling the waters movement over the ground and water retention in this. After thinking ways of soil restoration was critical with the eroded and heavily compacted from many years of grazing and monoculture agriculture explosion in the land.

    After this came the key and basic exercises for the future design. We designed a windbreaker that did not block the 180 degrees view from the inside of the house, which because of Wanaka council rules needed to be located in this place to not be seen from the road, leaving the house in the windiest place but with the best view of the property.

    DETAIL OF DESIGN FOR WIND PROTECTION

    RECODATIONS OF FIXING LAND COMPATIOON HIGH RUN

    OFF LANDSCAPE

    9

    2013

  • The next step of the design process was to draw the key contour lines; the idea is that these are contour lines where it is more efficient to move the water, along the property, hydrating the different areas of the land, creating soil fertility. At the same time a restoration treatment of the soil was necessary, which is demarcated by dashed lines in the plan. These channels also bind the different dams, moving through the contour line, with an overflow system, which allows the soil to be in constant hydration simply capturing the rainwater year falling during the year over the ground. This was the general scheme worked in the field.

    2013 PERMACULTURE DESIGN, LANDSCAPE REGENERATION AND FOOD FOREST

    10

  • After tracing the swales and dams, edible forests areas were traced, the windbreaker on the north side, which was a volume of soil and vegetation, and the west faces windbreaker. Then the vegetable species were chosen and how to combine them by scale, protection and leaf type, and clearly, as the needs of the clients. Also we taught them how to create their own compost so that they could have the basis of soil generation and grounds restoration for planting and growing their own vegetables in the future.

    COMPOST VEGETABLE PLANTING SYSTEM

    WORM COMPOST

    SPIRAL GARDEN

    2013PERMACULTURE DESIGN, LANDSCAPE REGENERATION AND FOOD FOREST

    11

  • PERMACULTURE DESIGN THE LIVING IN PEACE PROJECT, KARAMEA, NEW ZEALAND

    Permaculture Design THE LIVING IN PEACE PROJECT, Karamea, Nueva ZelandaNamed for its pursuit to achieve self-sustainability, specifically energy and food self-sustainable. Located in the southern island of the country, in a natural context, surrounded by national parks, on the west coast, I was greeted by the Permaculture Manager David Tailby, Certified Designer Permaculture by Bill Mollison also, assisting him to design different areas of the property such as orchards and edible forest, plus tasks such as creating compost and seedlings (the base of any planting), management of irrigation water based on rainwater harvesting and to choose the association of plant species. This last point allowed me to learn how to find the most beneficial place for each element, always designing for the creation of a natural ecosystem that achieves self-sustainability over time.

    12

    2012

  • PERMACULTURE DESIGN THE LIVING IN PEACE PROJECT, KARAMEA, NEW ZEALAND

    BEFORE

    COMPOST

    AFTER

    2012

    13

  • DESIGN OF REPAIRS OF HERITAGE HOUSES IN HISTORIC CENTER OF RANCAGUA, CHILE

    Design of Repairs of Heritage Houses in Historic Center of Rancagua, ChileAfter the huge Earthquake of 27th February 2010, the historic center of the city Rancagua was seriously damaged. All the buildings of this area are adobe-brick constructions, so some of the damages needed to be fixed with this old way of construction. This job was part of the governmental Program of Reconstruction and Repair of Heritage Buildings. We needed to visit the different houses, speak with the owners, measure them, register the damage in a diagnosis resume sheet, than design the repairs, and then go and visit with the Engineers in Construction for explain our Design Purpose, so they could built them according with our plans.

    3895.8

    1104

    .4

    Adosamiento

    Comedor

    EstarDormitorio 1Dormitorio 2Dormitorio 3Dormitorio 4Cocina

    Bao

    Dormitorio 5

    BodegaGarage

    Patio

    Dormitorio 6

    Bao

    58.3 472.7 15.0 269.5 15.0 438.0 18.0 293.0 20.0 1337.4 15.0 307.0 66.0 501.0 70.0

    48.0

    996.4

    60.0

    48.0

    255.9

    12.0

    88.0

    640.5

    60.0

    3708.5

    964.0

    187.4

    48.0

    128.0

    125.0

    169.0

    129.0

    143.0

    125.0

    145.0

    48.0

    349.0

    22.0

    135.0

    22.0

    515.4

    60.0

    187.4

    220.0 272.0 303.8 129.0 588.7 123.0 372.0 123.0 303.0 123.0 367.0 120.0 664.0

    58.3 472.7 35.0 398.820.0

    273.720.0

    600.020.0

    362.020.0

    393.420.0

    201.020.0

    388.021.8

    501.2 70.0

    265.0

    55.0

    155.0

    55.0

    2 2 2 2 2 2 2

    2

    2

    2

    2

    A'

    A

    Relleno grietas superficiales:Mezcla de barro/Cal hidralica/Yeso

    Primera capa de revoque 10mmMayor densidad de agregados gruesos

    Segunda capa de rovoque 5mmMezcla de barro/fibras/cal

    Pintura

    Albailera de AdobeGuardapolvo madera 0,5 x 6"

    Pintura

    3 a 4 capas de lechada de cal pura

    Revoque Exteriorrevoque de cal hidralica

    ZAARTU

    O' CARROL

    GAMERO

    ALM

    ARZA

    N

    264.9

    3197.4

    1004

    .7

    1073.1

    650.4

    Ado

    samiento

    ELEVACION PONIENTEESCALA 1:50

    22 2 2 2 2

    25

    2

    25 24 24 243 4

    11c 11c

    11c 11c 11c 11c

    11c

    ELEVACION SURESCALA 1:50

    Ado

    samiento

    25

    2

    2 2 2 2

    11c 11c

    11c

    CORTE A-A'ESCALA 1:50

    479.1

    288.0

    191.1

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0

    60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    264.9

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    UBICACION

    FIRMAS

    PROPIETARIO

    ARQUITECTO

    VB DOM

    N : FECHA :

    L A M I N A 01

    ESTUDIO 360

    EGIS Beatriz Valenzuela V.

    CONTENIDO

    SOLUCIONES TERRITORIALES

    PLANTA ARQUITECTURA

    S U B S I D I O Sde RECONSTRUCCIN y REPARACIN PATRIMONIAL

    ALZADOS CORTES

    NOMBRE

    e-mail

    : BEATRIZ VALENZUELA VAN TREEK

    : [email protected]

    : ALEJANDRA ROJAS WILCKENS: JAVIER GONZLEZ

    NOMBRE

    DOMICILIO

    R.U.T. ::

    :ROL :

    ROSA ELENA RUIZ MOSCOSO

    GAMERO N 185, RANCAGUA

    3.701.868-6

    S I M B O L O G I AProyecto de Reparacin Vivienda Patrimonial.

    2 - Estuco y pintura muro.3 - Machiembrado en aleros.

    EXTERIORES:

    24 - Bajada Aguas Lluvias.25 - Canaleta Aguas Lluvias.

    TECHUMBRE:

    PLANTA DE TECHUMBRE

    4 - Reemplazar Tapacn.11.d - Pintar puertas y ventanas con sus respectivos marcos.

    2012

    14

  • DESIGN OF REPAIRS OF HERITAGE HOUSES IN HISTORIC CENTER OF RANCAGUA, CHILE

    15

    2012

  • Estar-Comedor

    Cocina americana

    BaoDormitorio 1

    Dormitorio 2

    Bodega 1

    Bodega 2

    536.0120.0 376.010.0120.010.0 18.0 340.0 18.0

    15.0

    425.0

    15.0

    250.0

    15.0

    285.0

    464.0

    18.0

    388.0

    60.0

    1935

    .0

    10.0

    429.9

    10.0

    460.0

    10.0

    387.0

    (AMPLIACION)

    848.1

    15.0

    320.0 118.0 82.0 93.110.010.0 320.0 482.018.0 18.0

    130.0 95.0

    Ado

    samiento

    A A'

    B B'

    C

    C'1 1 1

    12 12a12 12a

    12

    12a

    12

    12a

    12

    12a

    12a

    12

    12 12a 12 12a

    1

    39

    39

    1

    11

    11

    17

    17

    17a17b

    30

    39

    12

    12

    12

    12

    12

    BALM

    ACEDA

    ACEVEDO

    TENIENTE

    CENTENARIO

    N

    Ado

    samiento

    Ado

    samiento

    ELEVACION PRINCIPALESCALA 1:50

    3 11b

    22 23

    24 25

    27 27a 27b

    Ado

    samiento

    Ado

    samiento

    ELEVACION POSTERIORESCALA 1:50

    27

    24 25

    2722 23

    27a 27b

    27a 27bVer detalle de cercha propuesta

    Ado

    samiento

    Ado

    samiento

    CORTE B-B'ESCALA 1:50

    16a

    27

    24 25

    2722 23

    27a

    39

    ELEVACION NORTEESCALA 1:50

    (AMPLIACION)

    32

    27 222327a27b28

    27 222327b28

    27a

    1

    1111 17 17

    17

    (AMPLIACION)

    Dormitorio 2 Dormitorio 1 Estar-comedor

    CORTE C-C'ESCALA 1:50

    27 2223

    27 2223

    27b

    27a

    30

    2827a

    27b28

    1985

    .0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 33.0518.0

    172.0

    506.0

    1985

    .014

    79.0

    506.0

    238.0

    233.0

    1307

    .018

    2.5

    233.0

    273.0

    57.5

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    40.0

    26.5

    10.0

    22

    22

    22

    28

    28

    28

    Estar-Comedor

    Ado

    samiento

    Ado

    samiento

    CORTE A-A'ESCALA 1:50

    Construir Doble tabique parareforzar muro de adobe

    Emplantillado pobre paraanclar tabique de seccin

    15x15cm

    esparrago anclaje 6'' o 8''

    Perno anclaje entra tabiques y muro

    Muro adobe con desprendimiento de material

    16a

    22 28

    30

    27 27a 27b

    UBICACION

    FIRMAS

    PROPIETARIO

    ARQUITECTO

    VB DOM

    N : FECHA :

    L A M I N A 01

    ESTUDIO 360

    EGIS Beatriz Valenzuela V.

    CONTENIDO

    SOLUCIONES TERRITORIALES

    PLANTA ARQUITECTURA

    S U B S I D I O Sde RECONSTRUCCIN y REPARACIN PATRIMONIAL

    ALZADOS CORTES

    NOMBRE

    e-mail

    : BEATRIZ VALENZUELA VAN TREEK

    : [email protected]

    : ALEJANDRA ROJAS WILCKENS: JAVIER GONZLEZ FUENTES

    NOMBRE

    DOMICILIO

    R.U.T. ::

    :ROL :

    MARA JOS MENDEZ SILVA

    CENTENARIO N 260, RANCAGUA

    13.944.502-3

    S I M B O L O G I AProyecto de Reparacin Vivienda Patrimonial.

    3 - Machiembrado en aleros.

    EXTERIORES:

    12 - Reforzar, estucar y pintar muro.12.a. - Filtracin humedad de muro (Revisar y reparar).

    INTERIORES:

    24 - Bajada Aguas Lluvias.23 - Sellos en Zicalum techumbre.

    25 - Canaleta Aguas Lluvias.

    22 - Reparacin de cerchas.

    28 - Reposicin de cerchas en mal estado.

    TECHUMBRE:

    27.a - Instalacin impermeabilizacin (fieltro).

    PLANTA DE TECHUMBRE

    1 - Reforzar, estucar y pintar muro.

    16 - Cambio de puerta.

    30 - Reposicin de volcanita en cielo.

    OTROS:

    32 - Reemplazar instalacin elctrica.

    11.b - Forrar alero.

    17 - Instalacin de puerta y marco.

    27 - Instalacin cobertura de techumbre (zincalum).

    27.b - Instalacin de aislante trmico (fisiterm, poliestirenoexpandido u otro).

    11 - Instalacin ventana.

    Muro Adobe35 x 70 x 15 cm.

    Listn de Madera de PinoImpregnada de 1" x 6 "

    Perno Roscalatae=10 mm. L= 76 cm.

    Tuerca HexagonalMetlica o = 10 mm.

    Golilla Metlicao = 10 mm.

    Bajo relievedel Adobe

    DETALLE 4

    Listn Madera de PinoImpregnada 2" x 6"

    Cielo Madera de PinoImpregnada 1" x 4"

    Tabla de Base PinoImpregnado 1" x 3"Montante Madera PinoImpregnada 2" x 3"Entablado de piso madera1" x 4"Arriostrado Maciso MaderaPino Impregnada 2" x 3"Fieltroe = 1 mm.

    Membrana Asflticae = 4 mm.Aislantee = 2,5 cm.

    Losa de Concretoe = 10 cm.Malla de Refuerzo6" x 6"Terreno NaturalCompactado

    Varillas Continuaso = 1 mm.

    20

    25

    Maderaimpregnada conrebaje de 1/2"para ensamblaje.

    Perforacin deltornillo pasante

    D e t a l l e 1

    20

    Detalle traslapo madera y fijacin con pletina.

    Detalle rebaje de madera.

    Pletina Metlica en "L" e = 3 mm.

    Bloque de Adobe Perforado 30 x 64 x 15 cm.

    Tornillo Roscalata Cabeza Plana 8 x 112"

    Perno Roscalatae=10 mm. L= 76 cm.

    Listn de Madera de Pino Impregnada de 1" x 6 "

    Tuerca HexagonalMetlica o = 10 mm.

    Golilla Metlica o = 10 mm.

    Pletina Metlica en "L" e = 3 mm.

    Relleno grietas superficiales:Mezcla de barro/Cal hidralica/Yeso

    Primera capa de revoque 10mmMayor densidad de agregados gruesos

    Segunda capa de rovoque 5mmMezcla de barro/fibras/cal

    Pintura

    Albailera de AdobeGuardapolvo madera 0,5 x 6"

    Pintura

    3 a 4 capas de lechada de cal pura

    Revoque Exteriorrevoque de cal hidralica

    Dintel en madera(existente).

    Refuerzo horizontal

    20

    h/2

    h/2

    50

    L1

    L2

    Refuerzo vertical

    Perforacin del tornillopasante

    Golilla Metlica o = 10 mm.

    Tuerca HexagonalMetlica o = 10 mm.

    Calado en Muro de Adobe3cm. Profundidad

    Perforacin o = 10 mm.de un lado al otro del muro.

    Perforacin o = 10 mm.de un lado al otro de la madera.

    Perforacin o = 10 mm.de un lado al otro de la madera.

    Listn de Madera de PinoImpregnada 1" x 6".

    Listn de Madera de PinoImpregnada 1" x 6".

    D e t a l l e 2B a j o r e l i e v e d e l a d o b e

    D e t a l l e 3E n s a m b l a j e m a d e r a s

    BALM

    ACEDA

    ACEVEDO

    TENIENTE

    CENTENARIO

    N

    Placa OSB Std.1220 x 2440 x 9,5 mm.

    Papel Fieltro Volcn15 lb. Liso 1 m. x 40 m.

    Listones de Madera de PinoImpregnada 1" x 1"

    Tirante Inferior Madera dePino Impregnada 2" x 6"

    Plancha de Zinc85 cm. x 200 cm.

    Perno Roscalatae = 10 mm. L = 7 cm.

    Canaleta Aguas LluviasZinc e = 2 mm.

    Tapacn Madera PinoImpregnada 1" x 7"

    Alero Machiembrado1" x 4" L = 3.20 m.

    Diagonal Madera PinoImpregnada 2" x 6"

    Tirante Superior MaderaPino Impregnada 2" x 6"Listn Madera Pino

    Impregnada 2" x 6"

    Listn Madera PinoImpregnada 2" x 6"

    Listones Madera de PinoImpregnado para Clavar 4" x 4"

    Plancha de Zinc85 cm. x 200 cm.

    Pie derecho pino aserrado 2x3''

    solera de montaje pino aserrado 2x3''

    Riostra pino aserrado 2x3''

    solera inferior pino aserrado 2x3''

    Sobresolera pino aserrado 2x3''

    Solera superior pino aserrado 2x3''

    Dintel pino aserrado 2x3''

    Alfeizar pino aserrado 2x3''

    Cadeneta pino aserrado 2x3''

    Dintel pino aserrado 2x3''

    20.640.040.040.040.052.552.5

    30.040.040.040.062.0 62.076.0

    40.0

    40.0

    40.0

    40.0

    28.0

    Emplantillado pobre 15x15cm para anclar tabique

    esparrago anclaje 6'' o 8''

    Ado

    samiento

    CORTE B-B'ESCALA 1:20

    Muro co

    rtafue

    go F-60

    Costanera 2"x2" @ 60 cmPlaca de OSB e=9.5 mm

    Fieltro 15 lbPlancha de Zincalum ondulad e= 0.35 cm

    Volcanita e= 8 mm

    Muro existente

    10.067.6

    10.067.6

    10.067.6

    10.067.6

    10.067.6

    10.0

    Cercha de madera 1"x4"

    230.0

    63.5

    20.0

    Solera y pie derechos de pino de 2"x4"Doble capa de planchas de permanit e= 6mmTabique cubierto con plancha de zincalum lisoLana Mineral

    Canal de agua lluvia de 125 x 125 mm e= 0.3 mmTapacn de 1"x8" en madera de pino aserrada

    398.0

    UBICACION

    FIRMAS

    PROPIETARIO

    ARQUITECTO

    VB DOM

    N : FECHA :

    L A M I N A 01

    ESTUDIO 360

    EGIS Beatriz Valenzuela V.

    CONTENIDO

    SOLUCIONES TERRITORIALES

    PLANTA ARQUITECTURA

    S U B S I D I O Sde RECONSTRUCCIN y REPARACIN PATRIMONIAL

    ALZADOS CORTES

    NOMBRE

    e-mail

    : BEATRIZ VALENZUELA VAN TREEK

    : [email protected]

    : ALEJANDRA ROJAS WILCKENS: JAVIER GONZLEZ FUENTES

    NOMBRE

    DOMICILIO

    R.U.T. ::

    :ROL :

    S I M B O L O G I AProyecto de Reparacin Vivienda Patrimonial.

    PLANTA DE TECHUMBRE

    MARA JOS MENDEZ SILVA

    CENTENARIO N 260, RANCAGUA

    13.944.502-3

    3 - Machiembrado en aleros.

    EXTERIORES:

    12 - Reforzar, estucar y pintar muro.12.a. - Filtracin humedad de muro (Revisar y reparar).

    INTERIORES:

    24 - Bajada Aguas Lluvias.23 - Sellos en Zicalum techumbre.

    25 - Canaleta Aguas Lluvias.

    22 - Reparacin de cerchas.

    28 - Reposicin de cerchas en mal estado.

    TECHUMBRE:

    27.a - Instalacin impermeabilizacin (fieltro).

    1 - Reforzar, estucar y pintar muro.

    16. - Cambio de puerta.

    30 - Reposicin de volcanita en cielo.

    OTROS:

    32 - Reemplazar instalacin elctrica.

    11.b - Forrar alero.

    17.a - Reemplazar marco de puerta o ventana. 17.b - Pintar marco de puerta o ventana.

    27 - Instalacin cobertura de techumbre (zincalum).

    DESIGN OF REPAIRS OF HERITAGE HOUSES IN HISTORIC CENTER OF RANCAGUA, CHILE2012

    16

  • 3895.8

    1104

    .4

    Adosamiento

    Comedor

    EstarDormitorio 1Dormitorio 2Dormitorio 3Dormitorio 4Cocina

    Bao

    Dormitorio 5

    BodegaGarage

    Patio

    Dormitorio 6

    Bao

    58.3 472.7 15.0 269.5 15.0 438.0 18.0 293.0 20.0 1337.4 15.0 307.0 66.0 501.0 70.0

    48.0

    996.4

    60.0

    48.0

    255.9

    12.0

    88.0

    640.5

    60.0

    3708.5

    964.0

    187.4

    48.0

    128.0

    125.0

    169.0

    129.0

    143.0

    125.0

    145.0

    48.0

    349.0

    22.0

    135.0

    22.0

    515.4

    60.0

    187.4

    220.0 272.0 303.8 129.0 588.7 123.0 372.0 123.0 303.0 123.0 367.0 120.0 664.0

    58.3 472.7 35.0 398.820.0

    273.720.0

    600.020.0

    362.020.0

    393.420.0

    201.020.0

    388.021.8

    501.2 70.0

    265.0

    55.0

    155.0

    55.0

    2 2 2 2 2 2 2

    2

    2

    2

    2

    A'

    A

    Relleno grietas superficiales:Mezcla de barro/Cal hidralica/Yeso

    Primera capa de revoque 10mmMayor densidad de agregados gruesos

    Segunda capa de rovoque 5mmMezcla de barro/fibras/cal

    Pintura

    Albailera de AdobeGuardapolvo madera 0,5 x 6"

    Pintura

    3 a 4 capas de lechada de cal pura

    Revoque Exteriorrevoque de cal hidralica

    ZAARTU

    O' CARROL

    GAMERO

    ALM

    ARZA

    N

    264.9

    3197.4

    1004

    .7

    1073.1

    650.4

    Ado

    samiento

    ELEVACION PONIENTEESCALA 1:50

    22 2 2 2 2

    25

    2

    25 24 24 243 4

    11c 11c

    11c 11c 11c 11c

    11c

    ELEVACION SURESCALA 1:50

    Ado

    samiento

    25

    2

    2 2 2 2

    11c 11c

    11c

    CORTE A-A'ESCALA 1:50

    479.1

    288.0

    191.1

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0

    60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0 60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    264.9

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    60.0

    UBICACION

    FIRMAS

    PROPIETARIO

    ARQUITECTO

    VB DOM

    N : FECHA :

    L A M I N A 01

    ESTUDIO 360

    EGIS Beatriz Valenzuela V.

    CONTENIDO

    SOLUCIONES TERRITORIALES

    PLANTA ARQUITECTURA

    S U B S I D I O Sde RECONSTRUCCIN y REPARACIN PATRIMONIAL

    ALZADOS CORTES

    NOMBRE

    e-mail

    : BEATRIZ VALENZUELA VAN TREEK

    : [email protected]

    : ALEJANDRA ROJAS WILCKENS: JAVIER GONZLEZ

    NOMBRE

    DOMICILIO

    R.U.T. ::

    :ROL :

    ROSA ELENA RUIZ MOSCOSO

    GAMERO N 185, RANCAGUA

    3.701.868-6

    S I M B O L O G I AProyecto de Reparacin Vivienda Patrimonial.

    2 - Estuco y pintura muro.3 - Machiembrado en aleros.

    EXTERIORES:

    24 - Bajada Aguas Lluvias.25 - Canaleta Aguas Lluvias.

    TECHUMBRE:

    PLANTA DE TECHUMBRE

    4 - Reemplazar Tapacn.11.d - Pintar puertas y ventanas con sus respectivos marcos.

    DESIGN OF REPAIRS OF HERITAGE HOUSES IN HISTORIC CENTER OF RANCAGUA, CHILE 2012

    17

  • DESIGN OF RESTAURANT SANTA BRASA

    Design of Restaurant Santa BrasaThis was an order of the owner of this company, that wanted to built this Retail project in the new shopping center of Santiago. It was an interior design of a restaurant, trying to give a scenic image, working with layers in the scenery background, different textures and depths, red acrylic and dry aged area behind a wood ribbon moving from the background to the front of the project. The main difficulty was to respond to all the requierements that the shopping centers asked for.

    18

    2012

  • DESIGN OF RESTAURANT SANTA BRASA

    19

    2012

  • DESIGN OF RESTAURANT SANTA BRASA2012

    20

  • DESIGN OF RESTAURANT SANTA BRASA 2012

    21

  • STRUCTURAL REPAIR OF S.I.I. BUILDING, RECOLETA, SANTIAGO

    Structural Repair of S.I.I. Building, Recoleta, SantiagoAfter the huge Earthquake of 27th February 2010, many Buildings were damaged from Santiago, capital of Chile, to Concepcion, Earthquakes epicenter. At this Engineer Consulting, AEES, they received many orders for Structural Calculations and Repairs Design for this damaged buildings. This was one of them, the building was having mainly damages in all the beams and columns, and the last level needed to be completely rebuilt, with collaborating slabs, therefore, join a new metallic structure with the old concrete one, strengthened this last one. My roll in this job was drafting and architecture design to support the engineers for the solution of structural problematics.

    PERFORACIN PLACA BASE=15/16"PERNO A 325 7/8" PARA TODAS LAS COLUMNAS

    5.00

    27.50

    30.00

    8.00

    2.50

    GROUT DE NIVELACIN SIKAGROUT

    2.00

    PERNO A 325 7/8"

    TUERCA DE NIVELACIN

    HORMIGN

    PL 30/27,5 e= 5mmACERO A 420-270 ES

    3 PARA TODAS LAS COLUMNAS

    6.35PLACA DE LOSA COLABORANTE

    DETALLE TIPO CN 2

    V.N IN 20 x 30,6

    PL 10/30 e= 10 mm (ALA DE IN 20x30.6)ACERO A 420-270 ES

    10.00

    3.00

    EJE D - PARALELO A EJE 5

    Tpico6

    ATIESADOR e= 5mm

    Tip.

    Tip.

    VISTA EN PLANTADETALLE CN 2

    5

    5

    D D

    5.00 3.00

    18.00

    4.00

    5.50

    V.N IN 20 x 30,6

    30.00

    30.00

    VISTA EN PLANTADETALLE CN 2- DEBAJO DE LOSA C.

    5

    5

    D D

    10.00

    ALMA DE V.N IN 20 x 30,6

    ATIESADOR e= 5mmATIESADOR e= 5mm

    PL 10/30 e= 10 mm (ALA DE IN 20x30.6)ACERO A 420-270 ES

    Tip.

    2.00

    16.00

    10.00

    ESC. 1:10ESC. 1:10

    ESC. 1:10

    GROUT DE NIVELACIN SIKAGROUT

    2.00

    PERNO A 325 7/8"

    HORMIGN

    PL 25/32,5 e= 5mmACERO A 420-270 ES

    PARA TODAS LAS COLUMNAS

    6.35PLACA DE LOSA COLABORANTE

    V.N IN 30 x 75,4

    DETALLE TIPO CN 1EJE C - PARALELO A EJE 5

    ATIESADORES e= 5mm

    Tpico6

    PL 25/32,5 e= 5mmACERO A 420-270 ES

    VN IN 20 X 19,8

    5

    VN IN 30x75.4VIGA H.A.

    10.50

    5

    17.50

    MURO H.A.

    CC

    5

    VISTA EN ELEVACINDETALLE CN 1

    GROUT DE NIVELACIN SIKAGROUT

    PERNO A 325PARA TODAS LAS COLUMNAS

    7/8"

    6.35PLACA DE LOSA COLABORANTE

    MURO H.A.

    3 3.5

    3.00

    18.00

    5.00

    TUERCA DE NIVELACIN

    25.00

    VN IN 30x75.4VIGA H.A.

    32.50

    5

    MURO H.A.

    C

    C

    5

    ALMA DE V.N IN 30x75.4

    ATIESADOR e= 5mm

    26.50

    5.00

    7.50

    3.00 7.50

    15.00

    3.00

    4.00

    GROUT DE NIVELACIN SIKAGROUT

    6

    VIGA H.A.

    CN 1

    10.00

    ATIESADOR e= 5mm

    Tip.

    ATIESADOR e= 5mm

    Tip.

    9.00

    32.50

    3.00

    3.00

    9.00 5.00

    10.00

    C

    14.00

    Tip. Tip.

    ESC. 1:10 ESC. 1:10

    V.N IN 30 x 75,4

    2.00

    TUERCA DE NIVELACIN

    HORMIGN

    PL 30/38 e= 5mmACERO A 420-270 ES

    6.35PLACA DE LOSA COLABORANTE

    DETALLE TIPO CN 4

    PL e= 8mm ALA DE IN 30x75.4ACERO A 420-270 ES

    PL 19/11.5 e= 16 mm ALA DE IN 30x75.4ACERO A 420-270 ES

    10.00

    VN IN 30x75.4

    43.00

    19.00

    8.00

    6.50

    11.50

    VN IN

    20 X 19

    ,8

    MURO H.A.

    11A

    11A

    C C

    EJE C - EJE 11A

    G

    VISTA EN PLANTADETALLE CN 4

    VN IN 30x75.4

    11.50

    6.50

    VN IN

    20 X 19

    ,8

    MURO H.A.

    11A

    11A

    C C

    VISTA EN PLANTADETALLE CN 4 - DEBAJO DE LOSA C.

    14.00

    32.00

    e= 8 mm (ALA DE IN 20x19.8)ACERO A 420-270 ES

    5.00 9.00 5.00

    6.50

    5.00

    3.50

    3.50

    19.00

    19.00

    5.00

    5.00

    6.50

    11.50

    PL 19/11,5 e= 5mmACERO A 420-270 ES

    3.00

    8.00

    GROUT DE NIVELACIN SIKAGROUT

    PERNO A 325PARA TODAS LAS COLUMNAS

    7/8"

    Tpico6

    Tip.

    VN IN 20 X 19,8

    LC 05 LC 01

    MURO H.A.

    ESC. 1:10 ESC. 1:10

    ESC. 1:10

    GROUT DE NIVELACIN SIKAGROUT

    2.00

    PERNO A 325

    TUERCA DE NIVELACIN

    HORMIGN

    PL 25/30 e= 5mmACERO A 420-270 ES

    PARA TODAS LAS COLUMNAS

    6.35PLACA DE LOSA COLABORANTE

    DETALLE TIPO CN 3

    10.00

    7/8"

    EJE C - EJE 8

    C

    NOTA= SE EXTIENDE 10 cms. LOSACOLABORANTE DESDE EJE C EN DIRECCIN AEJE D

    25.00

    44.00

    5.00

    VN IN 30x75.4VN IN 30x75.4

    VN IN 30x75.4

    8

    8

    CC

    VISTA EN PLANTADETALLE CN 3

    18.00

    5.0030.00

    5.00

    VN IN 30x75.4VN IN 30x75.4

    VN IN 30x75.4

    8

    8

    CC

    VISTA EN PLANTADETALLE CN 3 - DEBAJO DE LOSA C.

    PILAR H.A. 20/30

    ALMA DE V.N IN 30x75.4

    Tip.

    4.50 5.50

    ALMA DE V.N IN 30x75.4

    5.50

    ATIESADOR e= 5mm

    18.00

    30.00

    3.50

    3.50

    V.N IN 30 x 75,4

    ATIESADOR e= 5mmTip.

    ATIESADOR e= 5mmTip.

    Tpico6

    3.50

    2.00

    5.00

    3.50

    Tip. Tip.

    ESC. 1:10 ESC. 1:10

    ESC. 1:10

    3.0 3.5

    ATIESADORES e= 5mm

    Tpico6

    PL 30/28 e= 5mmACERO A 420-270 ES

    VN IN 20 X 19,8

    11A

    VISTA EN ELEVACINDETALLE CN 5

    GROUT DE NIVELACIN SIKAGROUT

    14.50 14.506.35PLACA DE LOSA COLABORANTE

    GROUT DE NIVELACIN SIKAGROUT

    2.00

    Tpico

    PERNO A 325

    TUERCA DE NIVELACIN

    HORMIGN

    PL 30/27,5 e= 5mmACERO A 420-270 ES

    3.06

    PARA TODAS LAS COLUMNAS

    DETALLE TIPO CN 5EJE G - EJE 11A

    10.00

    7/8"

    G

    ATIESADORES e= 5mm

    VN IN 20 X 19,8

    6.35PLACA DE LOSA COLABORANTE

    PERFORACIN PLACA BASE=15/16"PERNO A 325 7/8" PARA TODAS LAS COLUMNAS

    5.00

    27.50

    30.00

    8.00

    2.50

    3.00

    VISTA EN PLANTADETALLE CN 5

    11A

    11A

    G G

    5.00 3.00

    18.00

    4.00

    5.50

    VISTA EN PLANTADETALLE CN 5- DEBAJO DE LOSA C.

    VN IN

    20 X 19,8

    27.50

    30.00

    2.50

    10.50

    11A

    11A

    G G

    10.50

    VN IN

    20 X 19,8

    6.50

    PL 10,5/27,5 e= 5mmACERO A 420-270 ES

    ALM

    A DE V.N

    IN 30x75.4

    ATIESADOR e= 5mm

    13.00

    13.00

    13.00

    13.00

    Tip. Tip.Tip.

    Tip. Tip.

    2.00

    16.50

    7.50 7.50

    PL 10,5/27,5 e= 10 mm (ALA DE IN 20x19.8)ACERO A 420-270 ES

    ESC. 1:10 ESC. 1:10

    ESC. 1:10

    ESC. 1:10

    3.0 3.5

    ATIESADORES e= 5mm

    Tpico6

    PL 30/28 e= 5mmACERO A 420-270 ES

    VN IN 20 X 19,8

    13A

    VISTA EN ELEVACINDETALLE CN 5

    GROUT DE NIVELACIN SIKAGROUT

    14.50 14.506.35PLACA DE LOSA COLABORANTE

    GROUT DE NIVELACIN SIKAGROUT

    2.00

    Tpico

    PERNO A 325

    TUERCA DE NIVELACIN

    HORMIGN

    PL 30/27,5 e= 5mmACERO A 420-270 ES

    3.06

    PARA TODAS LAS COLUMNAS

    DETALLE TIPO CN 6EJE G - EJE 13A

    10.00

    7/8"

    G

    ATIESADORES e= 5mm

    VN IN 20 X 19,8

    6.35PLACA DE LOSA COLABORANTE

    PERFORACIN PLACA BASE=15/16"PERNO A 325 7/8" PARA TODAS LAS COLUMNAS

    5.00

    27.50

    30.00

    8.00

    2.50

    3.00

    VISTA EN PLANTADETALLE CN 6

    13A

    13A

    G G

    5.00 3.00

    18.00

    4.00

    5.50

    VISTA EN PLANTADETALLE CN 6- DEBAJO DE LOSA C.

    VN IN

    20 X 19,8

    27.50

    30.00

    2.50

    10.50

    13A

    13A

    G G

    10.50

    VN IN

    20 X 19,8

    6.50

    PL 10,5/27,5 e= 5mmACERO A 420-270 ES

    ALM

    A DE V.N

    IN 30x75.4

    ATIESADOR e= 5mm

    13.00

    13.00

    13.00

    13.00

    Tip. Tip.Tip.

    Tip. Tip.

    2.00

    16.50

    7.50 7.50

    ACERO A 420-270 ESPL 10,5/27,5 e= 8 mm (ALA DE IN 20x19.8)

    ESC. 1:10 ESC. 1:10

    ESC. 1:10

    ESC. 1:10

    CONSULTORIAEN INGENIERA

    NOTA: TODAS LAS MEDIDAS SE VERIFICARN EN OBRA

    22

    2011

  • STRUCTURAL REPAIR OF S.I.I. BUILDING, RECOLETA, SANTIAGO

    DET.6 ANCLAJE VIGA NUEVA HORMIGN ARMADOesc. 1:10

    VIGA NUEVA 20/50

    LOSA HA EXISTENTE16 CM

    30.00 30.00

    SUPERFICIEINTENCIONADAMENTE RUGOSA

    LOSA HA EXISTENTE16 CM

    (1+18)@30

    20.00

    50.00

    ELEVACIN EJE C

    LONGITUD DE ANCLAJEs/ TABLA DE EMPOTRAMIENTO EN LMINA 668-17

    h= 1/3 h viga

    VIGA NUEVA

    A 63/42H

    ICIEONADAMENTE RUGOSA

    h= 1/3 h viga

    LONGITUD DE ANCLAJEs/ TABLA DE EMPOTRAMIENTO EN LMINA 668-17

    DET.7 REFUERZOS VIGAS EJES 11A y 13Aesc. 1:10

    14.00 14.00CONECTOR 16 @ 20 cm.

    CONECTOR 16 @ 20 cm.anclado 14 cm con HILTI HIT RE 500

    PERFIL C 30 x 43,430.00

    VIGA EXISTENTE 20/59 VIGA EXISTENTE 20/59

    CONECTOR 16 @ 25 cm.anclado 15 cm con HILTI HIT RE 500

    CONECTOR 16 @ 25 cm.anclado 15 cm con HILTI HIT RE 500 N OTA = SE DEBER REALIZAR ENSAYO DE EXTRACCIN EN EL 10% DE LAS BARRAS

    LOS CONECTORES Y LAS VIGAS SERN EN ACERO ASTM A 36 * SUJECIN IGUAL AL IN 30x70.54, SLO QUE LA PLACA BASE TIENE 14 mm DE ESPESOR

    Tpico16

    Tpico 16 PERFIL C 30 x 43,4

    Tpico16

    Tpico 16

    DET. 8 UNIN PERFIL C 30 x 43.4 A VIGA H.A.esc. 1:10EJE 6- PISO 1

    30.00 8.00

    La

    2 PERNOS DE 1''VARILLA HAS, HILTI SIMILAR

    VN C 30x43.4

    VIGA H.A

    A A

    10.00

    2 PERNOS DE 1''VARILLA HAS, HILTI SIMILAR

    VISTA A-ALa= segn fabricante15.00

    MURO H.A

    20.00

    DET.9 UNIN VIGAS IN 20x75.4 Y VIGA 20x19.8esc. 1:10

    V.N IN 20 x 75,4

    VN IN 20x19.8

    V.N IN 20 x 75,4

    LOSA COLABORANTE

    s

    L S1

    S1

    S LL

    V.N IN 20 x 75,4

    V.N IN 20 x 75,4

    V.N IN 20 x 75,4

    V.N IN 20 x 75,4

    VN IN 20x19.8

    S1

    S1

    SLL

    ALAS RETIRADASALA RETIRADA

    S1 S1SLL

    S1

    S1

    SLL

    S1

    S1

    S LL

    V.N IN 20 x 75,4

    LOSA COLABORANTETpico

    6

    Tpico6

    Tpico6

    Tpico6

    Tpico6

    Tpico6

    3.00

    9.50

    3.00 15.00

    12.50

    CERCHACERCHA

    ATIESADORES e= 10 mm

    50.00

    31.00

    12.50 25.00 12.50

    CERCHA

    5.00 15.00 5.00

    12.50

    1.00

    0.501.00

    DET.10 MNSULA 1 PILAR /CERCHASesc. 1:10

    6.00 6.00

    5.00

    12.50 1.00 23.00 1.00 12.50

    25.00

    50.00

    ESPACIOCANALETA AGUA LLUVIA

    C.N

    C.N

    1.00

    6.00

    1.00

    6.00

    1.00

    5.00

    ACERO A 420/270 ESACERO A 420/270 ES

    Tpico6

    Tpico

    Tpico6

    Tpico6

    PL 15/11,5 e= 10mm

    Tpico

    Tpico

    IPE 180/91/8

    DET.11 MNSULA 2/ PILAR / CERCHA / VIGAesc. 1:10

    CERCHA

    IPE 180/91/8

    C.N C.N

    ESPACIOCANALETA AGUA LLUVIA

    3.00

    9.50

    3.00 15.00

    12.50

    ATIESADORES e= 10 mmPL 15/11,5 e= 10mm

    50.00

    31.00

    12.50 25.00 12.50

    1.00

    IPE 70/91/8

    12.50

    1.00

    0.50

    7.00 7.00

    IPE 70/91/8

    5.00

    25.00

    50.00

    1.00

    6.00

    1.00

    6.00

    1.00

    5.00

    CERCHA

    5.00 15.00 5.00

    12.50

    1.00

    0.50

    6.00 6.00

    C.N

    ACERO A 420/270 ESACERO A 420/270 ES

    12.50 1.00 23.00 1.00 12.50

    Tpico6

    Tpico6

    Tpico6

    Tpico6

    Tpico6

    Tpico6Tpico

    Tpico

    Tpico

    IPE 160

    IPE 200

    DET. 12 UNIN VIGA TECHUMREesc. 1:10ELEVACIN EJE 8

    IPE 160

    ACERO ASTM A368.00

    16.00

    7.4 mm

    5 mm

    7.4 mm

    10.00

    20.00

    5.6 mm

    8.5 mm

    8.5 mm

    IPE 200

    ACERO ASTM A36

    4.50

    S1

    S1

    S LL

    C.N

    CERCHA

    VIGA IN 20x19,8

    DET. 13 UNIN CERCHAS A VIGAS DE CIERRE O AMARRE TECHUMBREesc. 1:10ELEVACIN EJE G - PISO 3

    Tpico

    C.N

    CERCHA

    VIGA IN 20x19,8

    Tpico

    40/40/3

    PERFIL C 200/75/5

    ACERO A 420/270 ESPL 45/25 e= 10mm

    ACERO A 420/270 ESPERNO DE ACERO d= 1/2 ''mm

    PERFIL L 75/75/5

    Tpico

    Tpico

    D

    6

    6

    6

    6

    DET. 15 UNIN VIGA EN VOLADIZO IN 20x19,8 A PILAR H.A.esc. 1:10EJE 13 A ENTRE EJES F y G

    30.0038.00

    2 PERNOS A 325 5/8''

    2x2 VARILLA HAS 1'' SIMILAR

    10.00

    20.00

    L 100x100x6

    13.0020.00

    Tpico

    18.00ep= 12 mm

    Tpico

    B

    B

    VISTA B-B

    CONSULTORIAEN INGENIERA

    NOTA: TODAS LAS MEDIDAS SE VERIFICARN EN OBRA

    DETALLE CERCHA TIPOESC.1:25

    PERFIL C 200/75/5

    2 PERFILES L 40/40/3200/50/15/4 @ 50 cm (general)

    40/40/3

    200/75/5

    200/75/5

    NOTA= PARA CERCHAS 2,3 y 4VARA L PERO SON LOS MISMOS

    PERFILES

    PERFIL C 200/75/5

    PERFIL C 200/75/5

    @ 30 cm entre eje 5 y 8

    ACERO A 420/270 ES

    ACERO A 420/270 ES

    ACERO A 420/270 ES

    ACERO A 420/270 ESACERO A 420/270 ES

    ACERO A 420/270 ESACERO A 420/270 ES

    200.00

    25.00

    30.00

    NOTA= h hormign y enerradurasvaran segn losa, como se muestra entabla de losas colaborantes adjunta.

    lb

    DETALLE LOSA COLABORANTE TIPOESC.1:25

    221.50

    Ubicacin Denominacin ts (cm)

    Malla Armadura negativa por valle Conectores de corte por valle

    OBSERVACIONESsep (cm) N (mm) Lb (m) (mm) CantidadEjes 8, 8a,8b,13a,13b y 15 Subterrneo -5,6,8,8a,8b,13a,13b, y 15 2 Piso LC01 5 8 30 2 10 2.0 16 6

    Entre Ejes 3a y 5 1 piso LC02 6 8 30 - - - 12 4

    Entre ejes 5 y 6 1 Piso LC03 10 8 25 - - - 18 4

    Entre ejes C y D 1 y 2 piso LC04 12 8 20 - - - 15 4

    Ejes 10 y 11, 11 y 13 - 1 y 2 Piso LC05 8 8 30 2 10 2.8 18 4 1.80 M EN LOSA DE LUZ MENOR

    DETALLE AMARRE DE LOSA COLABORANTE A LATERALES DE HORMIGN

    ANCLAJE HSL M 10/20 HILTI

    esc. 1:10

    LOSA COLABORANTE16 cm PERFIL 60/60/5

    ATIESADOR @pl e= 5mm

    0.502,75

    2.756.00

    0.8

    0.8

    ESPECIFICACIONES SEGN FABRICANTE

    MALLA Fe 8 c/30 cm

    80.00

    LONGITUD DE ANCLAJEs/ TABLA DE EMPOTRAMIENTO EN LMINA 668-17

    La

    Fe 8 A 63/42H EN CADA VALLE

    310.00

    PERFIL C 150/50/5

    25.00

    0.50 14.00 0.50

    15.00

    VISTA EN PLANTA

    PERFIL C 150/50/5

    A

    A

    PL 30/3

    PERFIL C 150/50/5

    7.00

    55.00

    7.00

    55.00

    7.00

    55.00

    7.00

    55.00

    7.00

    24.00

    4.00

    51.00

    4.003.004.00

    51.00

    4.003.004.00

    51.00

    4.003.004.00

    51.00

    4.003.004.00

    51.00

    4.00

    PERFIL 30/4

    VISTA A-A

    DETALLE PILAR RETICULADO DE ACERO TIPOESC.1:10

    PL 5/15 e= 5mm

    Tpico

    Tpico

    Tpico

    3

    3

    C.N

    CERCHA

    VIGA IN 20x19,8

    Tpico

    ACERO A 420/270 ESPL 45/25 e= 10mm

    PERFIL L 75/75/5

    ACERO A 420/270 ESPERNO DE ACERO d= 1/2 ''mm

    PERFIL C 200/75/5 (CORDN INFERIOR CERCHA)

    40/40/3

    PERFIL C 200/75/5

    Tpico

    DETALLE UNIN CERCHA A PILARESC.1:10

    C.N

    0.50 7.00 0.50

    7.50

    1.00

    ACERO A 420/270 ESPL 45/25 e= 10mm

    ACERO A 420/270 ESPERNO DE ACERO d= 1/2 ''mm

    PERFIL L 75/75/5

    Tpico Tpico

    Tpico

    D

    PERFIL L 75/75/5

    4

    444

    2.00

    7.50

    EMPLANTILLADO DE HORMIGN H-5

    ZAPATA ACTUAL

    AMPLIACIN DE ZAPATA

    ARMADURA DE ANCLAJE TIPO CCONTINUA fe 16 @ 35 cm.

    ARMADURA DE DISTRIBUCINfe 12

    ARMADURA DE DISTRIBUCINfe 12 @ 25 cm.

    UNIN: PUENTE ADHERENTEADHESIVO SIKADUR 32

    DETALLE AMPLIACIN DE ZAPATA

    NOTA: ESTE ES UN DETALLE TIPO QUE SEACOMODAR SEGN SITUACIN EN TERRENO

    ESC. 1:20

    CONSULTORIAEN INGENIERA

    NOTA: TODAS LAS MEDIDAS SE VERIFICARN EN OBRA

    PERFORACIN PLACA BASE=15/16"PERNO A 325 7/8" PARA TODAS LAS COLUMNAS

    5.00

    27.50

    30.00

    8.00

    2.50

    GROUT DE NIVELACIN SIKAGROUT

    2.00

    PERNO A 325 7/8"

    TUERCA DE NIVELACIN

    HORMIGN

    PL 30/27,5 e= 5mmACERO A 420-270 ES

    3 PARA TODAS LAS COLUMNAS

    6.35PLACA DE LOSA COLABORANTE

    DETALLE TIPO CN 2

    V.N IN 20 x 30,6

    PL 10/30 e= 10 mm (ALA DE IN 20x30.6)ACERO A 420-270 ES

    10.00

    3.00

    EJE D - PARALELO A EJE 5

    Tpico6

    ATIESADOR e= 5mm

    Tip.

    Tip.

    VISTA EN PLANTADETALLE CN 2

    5

    5

    D D

    5.00 3.00

    18.00

    4.00

    5.50

    V.N IN 20 x 30,6

    30.00

    30.00

    VISTA EN PLANTADETALLE CN 2- DEBAJO DE LOSA C.

    5

    5

    D D

    10.00

    ALMA DE V.N IN 20 x 30,6

    ATIESADOR e= 5mmATIESADOR e= 5mm

    PL 10/30 e= 10 mm (ALA DE IN 20x30.6)ACERO A 420-270 ES

    Tip.

    2.00

    16.00

    10.00

    ESC. 1:10ESC. 1:10

    ESC. 1:10

    GROUT DE NIVELACIN SIKAGROUT

    2.00

    PERNO A 325 7/8"

    HORMIGN

    PL 25/32,5 e= 5mmACERO A 420-270 ES

    PARA TODAS LAS COLUMNAS

    6.35PLACA DE LOSA COLABORANTE

    V.N IN 30 x 75,4

    DETALLE TIPO CN 1EJE C - PARALELO A EJE 5

    ATIESADORES e= 5mm

    Tpico6

    PL 25/32,5 e= 5mmACERO A 420-270 ES

    VN IN 20 X 19,8

    5

    VN IN 30x75.4VIGA H.A.

    10.50

    5

    17.50

    MURO H.A.

    CC

    5

    VISTA EN ELEVACINDETALLE CN 1

    GROUT DE NIVELACIN SIKAGROUT

    PERNO A 325PARA TODAS LAS COLUMNAS

    7/8"

    6.35PLACA DE LOSA COLABORANTE

    MURO H.A.

    3 3.5

    3.00

    18.00

    5.00

    TUERCA DE NIVELACIN

    25.00

    VN IN 30x75.4VIGA H.A.

    32.50

    5

    MURO H.A.

    C

    C

    5

    ALMA DE V.N IN 30x75.4

    ATIESADOR e= 5mm

    26.50

    5.00

    7.50

    3.00 7.50

    15.00

    3.00

    4.00

    GROUT DE NIVELACIN SIKAGROUT

    6

    VIGA H.A.

    CN 1

    10.00

    ATIESADOR e= 5mm

    Tip.

    ATIESADOR e= 5mm

    Tip.

    9.00

    32.50

    3.00

    3.00

    9.00 5.00

    10.00

    C

    14.00

    Tip. Tip.

    ESC. 1:10 ESC. 1:10

    V.N IN 30 x 75,4

    2.00

    TUERCA DE NIVELACIN

    HORMIGN

    PL 30/38 e= 5mmACERO A 420-270 ES

    6.35PLACA DE LOSA COLABORANTE

    DETALLE TIPO CN 4

    PL e= 8mm ALA DE IN 30x75.4ACERO A 420-270 ES

    PL 19/11.5 e= 16 mm ALA DE IN 30x75.4ACERO A 420-270 ES

    10.00

    VN IN 30x75.4

    43.00

    19.00

    8.00

    6.50

    11.50

    VN IN

    20 X 19

    ,8

    MURO H.A.

    11A

    11A

    C C

    EJE C - EJE 11A

    G

    VISTA EN PLANTADETALLE CN 4

    VN IN 30x75.4

    11.50

    6.50

    VN IN

    20 X 19

    ,8

    MURO H.A.

    11A

    11A

    C C

    VISTA EN PLANTADETALLE CN 4 - DEBAJO DE LOSA C.

    14.00

    32.00

    e= 8 mm (ALA DE IN 20x19.8)ACERO A 420-270 ES

    5.00 9.00 5.00

    6.50

    5.00

    3.50

    3.50

    19.00

    19.00

    5.00

    5.00

    6.50

    11.50

    PL 19/11,5 e= 5mmACERO A 420-270 ES

    3.00

    8.00

    GROUT DE NIVELACIN SIKAGROUT

    PERNO A 325PARA TODAS LAS COLUMNAS

    7/8"

    Tpico6

    Tip.

    VN IN 20 X 19,8

    LC 05 LC 01

    MURO H.A.

    ESC. 1:10 ESC. 1:10

    ESC. 1:10

    GROUT DE NIVELACIN SIKAGROUT

    2.00

    PERNO A 325

    TUERCA DE NIVELACIN

    HORMIGN

    PL 25/30 e= 5mmACERO A 420-270 ES

    PARA TODAS LAS COLUMNAS

    6.35PLACA DE LOSA COLABORANTE

    DETALLE TIPO CN 3

    10.00

    7/8"

    EJE C - EJE 8

    C

    NOTA= SE EXTIENDE 10 cms. LOSACOLABORANTE DESDE EJE C EN DIRECCIN AEJE D

    25.00

    44.00

    5.00

    VN IN 30x75.4VN IN 30x75.4

    VN IN 30x75.4

    8

    8

    CC

    VISTA EN PLANTADETALLE CN 3

    18.00

    5.0030.00

    5.00

    VN IN 30x75.4VN IN 30x75.4

    VN IN 30x75.4

    8

    8

    CC

    VISTA EN PLANTADETALLE CN 3 - DEBAJO DE LOSA C.

    PILAR H.A. 20/30

    ALMA DE V.N IN 30x75.4

    Tip.

    4.50 5.50

    ALMA DE V.N IN 30x75.4

    5.50

    ATIESADOR e= 5mm

    18.00

    30.00

    3.50

    3.50

    V.N IN 30 x 75,4

    ATIESADOR e= 5mmTip.

    ATIESADOR e= 5mmTip.

    Tpico6

    3.50

    2.00

    5.00

    3.50

    Tip. Tip.

    ESC. 1:10 ESC. 1:10

    ESC. 1:10

    3.0 3.5

    ATIESADORES e= 5mm

    Tpico6

    PL 30/28 e= 5mmACERO A 420-270 ES

    VN IN 20 X 19,8

    11A

    VISTA EN ELEVACINDETALLE CN 5

    GROUT DE NIVELACIN SIKAGROUT

    14.50 14.506.35PLACA DE LOSA COLABORANTE

    GROUT DE NIVELACIN SIKAGROUT

    2.00

    Tpico

    PERNO A 325

    TUERCA DE NIVELACIN

    HORMIGN

    PL 30/27,5 e= 5mmACERO A 420-270 ES

    3.06

    PARA TODAS LAS COLUMNAS

    DETALLE TIPO CN 5EJE G - EJE 11A

    10.00

    7/8"

    G

    ATIESADORES e= 5mm

    VN IN 20 X 19,8

    6.35PLACA DE LOSA COLABORANTE

    PERFORACIN PLACA BASE=15/16"PERNO A 325 7/8" PARA TODAS LAS COLUMNAS

    5.00

    27.50

    30.00

    8.00

    2.50

    3.00

    VISTA EN PLANTADETALLE CN 5

    11A

    11A

    G G

    5.00 3.00

    18.00

    4.00

    5.50

    VISTA EN PLANTADETALLE CN 5- DEBAJO DE LOSA C.

    VN IN

    20 X 19,8

    27.50

    30.00

    2.50

    10.50

    11A

    11A

    G G

    10.50

    VN IN

    20 X 19,8

    6.50

    PL 10,5/27,5 e= 5mmACERO A 420-270 ES

    ALM

    A DE V.N

    IN 30x75.4

    ATIESADOR e= 5mm

    13.00

    13.00

    13.00

    13.00

    Tip. Tip.Tip.

    Tip. Tip.

    2.00

    16.50

    7.50 7.50

    PL 10,5/27,5 e= 10 mm (ALA DE IN 20x19.8)ACERO A 420-270 ES

    ESC. 1:10 ESC. 1:10

    ESC. 1:10

    ESC. 1:10

    3.0 3.5

    ATIESADORES e= 5mm

    Tpico6

    PL 30/28 e= 5mmACERO A 420-270 ES

    VN IN 20 X 19,8

    13A

    VISTA EN ELEVACINDETALLE CN 5

    GROUT DE NIVELACIN SIKAGROUT

    14.50 14.506.35PLACA DE LOSA COLABORANTE

    GROUT DE NIVELACIN SIKAGROUT

    2.00

    Tpico

    PERNO A 325

    TUERCA DE NIVELACIN

    HORMIGN

    PL 30/27,5 e= 5mmACERO A 420-270 ES

    3.06

    PARA TODAS LAS COLUMNAS

    DETALLE TIPO CN 6EJE G - EJE 13A

    10.00

    7/8"

    G

    ATIESADORES e= 5mm

    VN IN 20 X 19,8

    6.35PLACA DE LOSA COLABORANTE

    PERFORACIN PLACA BASE=15/16"PERNO A 325 7/8" PARA TODAS LAS COLUMNAS

    5.00

    27.50

    30.00

    8.00

    2.50

    3.00

    VISTA EN PLANTADETALLE CN 6

    13A

    13A

    G G

    5.00 3.00

    18.00

    4.00

    5.50

    VISTA EN PLANTADETALLE CN 6- DEBAJO DE LOSA C.

    VN IN

    20 X 19,8

    27.50

    30.00

    2.50

    10.50

    13A

    13A

    G G

    10.50

    VN IN

    20 X 19,8

    6.50

    PL 10,5/27,5 e= 5mmACERO A 420-270 ES

    ALM

    A DE V.N

    IN 30x75.4

    ATIESADOR e= 5mm

    13.00

    13.00

    13.00

    13.00

    Tip. Tip.Tip.

    Tip. Tip.

    2.00

    16.50

    7.50 7.50

    ACERO A 420-270 ESPL 10,5/27,5 e= 8 mm (ALA DE IN 20x19.8)

    ESC. 1:10 ESC. 1:10

    ESC. 1:10

    ESC. 1:10

    CONSULTORIAEN INGENIERA

    NOTA: TODAS LAS MEDIDAS SE VERIFICARN EN OBRA

    AC BD B

    MURO

    ALBAILERA ex.

    ELEVACIN EJE 6ESC. 1:50

    DM 8 @20esp=20

    VER ELEV

    ACIN ESTRU

    CTURA

    L EJE C

    LC 01

    2+216

    2+216

    2+216

    DET 5

    EST. 8@

    15

    2+216

    (30+311)

    Lat. 2+2 8EST. 8 @ 15

    212

    212

    2+212 L=341

    Lat. 2+2 8EST. 8 @ 15

    212

    212

    CADENA 20/50

    MURO

    H.A. PRO

    YECT

    ADO

    MURO

    ALBAILER

    A N

    UEV

    O

    N.P.T + O,O2

    N.P. + 3,13

    N.P. + 6,33

    DET.4y Nota 4

    CADENA VIGA ex. 15/70 2 12. Fe' 2 12

    M.H.A nuevo

    M.H.A nuevo

    V.N IN 30 x 75,4VN IN 20x30.6

    VN IN 20x30.6

    M.H.A nuevo

    VN IPE 200

    VER ELEV

    ACIN ESTRU

    CTURA

    L EJE C

    DET.4y Nota 4

    M.H.A nuevo

    2+212 existentes2+212 existentes

    2+216

    MURO CORTAFUEGO F-120

    AC BD B

    MURO

    ALB

    AILER

    A ex.

    ELEVACIN EJE 8ESC. 1:50

    DET 5 DET 5

    V.E 20/15

    DM 8 @20esp=20

    2+216

    2+216

    2+216 2+216

    2+216 L=539

    2+212 L=468(30+438)

    2+210(EXIST.) 40

    EST. 8@6

    Lat. 2+2 8EST. 8 @ 15

    212

    AC BD B

    2+212 L=468(30+438)

    CERCHA 1 (VER DETALLE TIPO) Lat. 2+2 8EST. 8 @ 15

    212

    212

    COLU

    MNA RETICU

    LADA DE A

    CERO (VER D

    ETALLE)

    CADENA 20/50

    DET.4y Nota 4

    N.P.T + O,O2

    N.P. + 3,13

    N.P. + 6,33

    061 EPI NVDET 11

    DET 12

    2 10. Fe' 2 10EST. 8 @5

    VE 20/70 2 12. Fe' 2 12 EST. 8 @25

    V.N IN 30 x 75,4

    2+216

    2+216 L=663

    (30+509)

    (30+633)

    VN IN 20x30.6

    VN IN 20x30.6

    LC 01

    VN IPE 200

    MURO CORTAFUEGO F-120

    AC BD B

    MURO

    ALB

    AILER

    A ex.

    ELEVACIN EJE 8 AESC. 1:50

    DET 5 DET 5

    V.E 20/70

    Lat. 2+2 8EST. 8 @ 15

    212

    AC BD B

    CERCHA 1 (VER DETALLE TIPO) Lat. 2+2 8EST. 8 @ 15

    212

    212

    CADENA 20/50

    N.P.T + O,O2

    N.P. + 3,13

    N.P. + 6,33

    L 115 L 114

    VE 20/54626

    MURO

    HORM

    IGN ARM

    ADO ex.

    MURO

    ALB

    AILER

    A NUEV

    O

    V.N IN 30 x 75,4LC 01

    VN IN 20x30.6

    VN IN 20x30.6

    VN IPE 200

    MURO CORTAFUEGO F-120

    CONSULTORIAEN INGENIERA

    Nota 1 : empalmes y traslapos verticalesy horizontales = 40

    Nota 2 : medidas en cm

    Nota 3: Reutilizar malla de Muro ademoler como connamiento dearmadura de viga y muro.

    Nota 4 : Los anclajes de armadura nuevaque se inserten en hormign armadoexistente, debern llevar aplicacin deadhesivo epxico HIT RE-500. Y laslongitudes de anclaje sern segncatlogo del proveedor.

    NOTAS

    NOTA: TODAS LAS MEDIDAS SE VERIFICARN EN OBRA

    23

    2011

  • EJE MEDIANEROA

    C

    B

    F

    I

    15

    A

    G

    1510

    D

    C

    N

    VE 20/12

    0 S.IN

    VERT

    IDA

    13 A 158531

    20/204 12

    20/204 12

    11A

    20/204 12

    6

    20/304 12

    25/254 16

    VIGA PARED EXISTENTE 15/316

    ( INVERTIDA )

    REFUERZO INFERIOR 4 25

    VE 20/12

    0 S.IN

    VERT

    IDA

    L 201

    L 202

    L 203

    25/254 16

    25/254 16

    VN 20/50 VN 20/50

    VE 20/60

    H.A. A

    DEM

    OLER

    H.A. A DEMOLER

    L 204

    LC 04

    LC 01

    CONTINUACION MURO FACHADA / ANTETECHO CONTINUACION MURO FACHADA / ANTETECHO

    VE 20/12

    0 S.IN

    VERT

    IDA

    3 22

    3 22

    2 10

    3 26

    7 26 4 12 2 122 12

    20/404 12

    2 12

    2 12

    2 12

    2 12

    25/254 16

    20/204 12

    12 @178 @20

    8 @12

    8 @12

    2 12

    CADEN

    A DINTE

    L 20

    /50

    2 12.

    Fe' 2 12

    20/204 12

    EST. 8 @15

    EST. 8 @15

    CADEN

    A DINTE

    L 20

    /50

    2 12.

    Fe' 2 12

    CADEN

    A DINTE

    L 20

    /50

    2 12.

    Fe' 2 12

    EST. 8 @15 EST. 8 @15

    EST. 8 @15

    EST. 8 @15

    VN 20/60

    2 16.

    Fe' 2 16

    20/204 12

    CADENA DINTEL 20/15 2 10. Fe' 2 10

    VER NOTA 3

    DET.1

    DET.5 DET.5 DET.2

    DET.5

    DET.3

    DET.5

    DET.4

    DET.5

    DET.5DET.2

    DET.16

    DET.5 DET.5DET.2

    DET.5

    DET.5

    DET.1

    DET.5 DET.5 DET.5 DET.5

    DET.2

    DET.1

    DET.6DET.6

    4 10

    B1B1A1 A1

    20/204 12

    DET.1

    DET.5

    DET.5

    DET.9

    13 B

    15 A

    8 A

    VN IN 20x30.6 VN IN 20x30.6 VN IN 20x30.6

    10A

    VN IN

    30x

    75.4

    VN IN

    30x

    75.4

    VN IN

    30x

    75.4

    VN IN

    30x

    75.4

    VN IN

    30x

    75.4

    VN IN

    30x

    75.4

    VN IN 30x75.4VN IN 30x75.4VN IN 30x75.4VN IN 30x75.4VN IN 30x75.4VN IN 30x75.4

    VN IN

    20 x 19

    ,8

    VN IN

    20 x 19

    ,8

    VN IN

    20 x 19

    ,8

    VN IN

    20 x 19

    ,8VN

    IN 20 x 19

    ,8VN

    IN 20 x 19

    ,8

    VN IN

    20 x 19

    ,8

    LC 01 LC 01 LC 01 LC 01 LC 01 LC 01

    8 @30 8 @30 8 @30 8 @30 8 @30 8 @30 8 @30

    VE

    LC 05

    8 @30

    LC 05

    8 @30

    8 @20

    2 10 l.b.= 2,00 m 2 10 l.b.= 2,00 m 2 10 l.b.= 2,00 m 2 10 l.b.= 2,00 m 2 10 l.b.= 2,00 m 2 10 l.b.= 2,00 m 2 10 l.b.= 2,00 m

    2 10 l.b.= 2,80 m

    2 10 l.b.= 2,80 m

    LC 01

    8 @30 2 10 l.b.= 2,00 m

    LC 01

    8 @30 2 10 l.b.= 2,00 m

    +VN IN 20 x 19

    ,8VN

    IN 20 x 19

    ,8VN

    IN 20 x 19

    ,8

    DETALLE ANCL

    AJE LOSA

    COLA

    BORA

    NTE

    DETALLE ANCL

    AJE LOSA

    COLA

    BORA

    NTE

    DETA

    LLE ANCLA

    JE LOSA

    COLA

    BORA

    NTE

    DETA

    LLE ANCLA

    JE LOSA

    COLA

    BORA

    NTE

    DET.5

    3A

    DET.5

    DET.5

    SIMBOLOGIA

    HORMIGN ARMADO EXISTENTE

    HORMIGN NUEVO - A CONSTRUIR

    NOTA:SE CONSIDERA DEMOLER O DESARMAR A TODOS LOSELEMENTOS EXISTENTES TALES COMO TABIQUES,REVESTIMIENTOS DE MUROS Y PISOS.

    HORMIGN A DEMOLER

    ALBAILERA EXISTENTE

    ESTRUCTURA METLICA

    VIGA EXISTENTEVE

    VIGA NUEVAVN

    LOSA A DEMOLER

    L.C LOSA COLABORANTE (NUEVA)

    CONSULTORIAEN INGENIERA

    NOTA: TODAS LAS MEDIDAS SE VERIFICARN EN OBRA

    SIMBOLOGIA

    HORMIGN ARMADO EXISTENTE

    HORMIGN NUEVO - A CONSTRUIR

    NOTA:SE CONSIDERA DEMOLER O DESARMAR A TODOS LOSELEMENTOS EXISTENTES TALES COMO TABIQUES,REVESTIMIENTOS DE MUROS Y PISOS.

    HORMIGN A DEMOLER

    ALBAILERA EXISTENTE

    ESTRUCTURA METLICA

    VIGA EXISTENTEVE

    VIGA NUEVAVN

    LOSA A DEMOLER

    L.C LOSA COLABORANTE (NUEVA)

    EJE MEDIANEROA

    C

    31 5 86

    B

    F

    I

    15

    A

    G

    15

    N

    10

    D

    CVN 20/50

    H.A. A DEMOLER

    VE 20/70

    VIGA PARED EXISTENTE 15/316

    ( INVERTIDA )

    VE 15/30

    H.A. A

    DEM

    OLER

    VIGA M

    ODIFICADA 20/30

    MN

    VE 20/70

    ESTR

    UCT

    URA

    METLICA

    A EJECU

    TAR

    H.A. A DEM

    OLER

    VE 20/59

    MN

    VE 20/40

    VE 20/54

    VE 20/59

    VE 20/70

    3A 10

    15/304 10

    V.N IPE 180/91/8

    20/204 10

    15/254 12 15/25

    4 12

    VE 15/70

    20/204 12

    2 12. Fe' 2 12 2 12. Fe' 2 12 VE 20/70 2 16. Fe' 2 16

    6 26

    20/304 12

    20/304 12

    6 22

    VE 20/59

    5 22

    20/204 1220/204 12

    20/204 12

    VE 20/70 2 16. Fe' 2 16VN 20/50

    REFUERZO INFERIOR 4 25

    L 110

    L 109

    L 106+

    L 101+

    L 102

    L 103 LC 04

    25/254 16

    L 114

    L 115

    +

    +L 117

    20/204 12

    20/204 12

    VE 20/15

    VN IN

    20 X 19

    ,8

    VE 20/70

    2 12.

    Fe' 2 12

    VE 20/70

    2 12.

    Fe' 2 12

    25/254 16

    2 12.

    Fe' 2 12

    2 12.

    Fe' 2 12

    3 12

    VE 15/70

    L 107

    LC 02

    LC 03

    VE 15/70 2 12. Fe' 2 12

    25/254 16

    L 113+

    L 116

    VN 20/40

    5 18

    20/404 12

    L 104

    L 120+

    L119

    20/204 12

    20/204 12

    20/404 12

    VE 20/59 2 12. Fe' 2 12

    20/204 12

    20/204 12

    20/204 12

    VE 20/12

    0 S.IN

    VERT

    IDA

    VE 20/12

    0 S.IN

    VERT

    IDA

    2 10

    3 26

    7 26

    8 26

    3 22

    3 22

    4 10

    4 12

    3 26

    3 26DEL PISO 2 EMPOTRADOEN EL MURO 1.00 m.

    6 @20

    6 @20

    10 @16

    6 @2012 @178 @20

    8 @12

    8 @12 8 @20

    2 12

    2 18

    VE 20/75

    4 18.

    F =4

    18

    4 1220/20

    2 12

    2 12

    4 1220/20

    2 12

    2 16.

    Fe' = 2 16

    20/204 12

    CADENA DINTEL 20/15 2 10. Fe' 2 10 2 122 12 CADENA DINTEL 20/15 2 10. Fe' 2 10

    CADEN

    A DINTEL 20/50

    2 12.

    Fe' 2 12

    CADEN

    A DINTEL 20/50

    2 12.

    Fe' 2 12

    CADEN

    A DINTEL 20/50

    2 12.

    Fe' 2 12

    CADEN

    A DINTEL 20/50

    2 12.

    Fe' 2 12

    20/404 12

    2 12

    2 12

    8 @14

    6 @20

    10 @168 @20

    10 @148 @20

    6 @206 @20

    6 @17

    6 @14

    25/254 16

    2 12

    2 12

    4 10

    2 12

    2 12

    EST. 8 @15 EST. 8 @15

    EST. 8 @15EST. 8 @15

    EST. 8 @15

    EST. 10 @20EST. 10 @20

    EST. 10 @20

    EST. 10 @20

    EST. 8 @15

    CADEN

    A DINTEL 20/15

    2 10.

    Fe' 2 10

    20/204 12

    EST. 8 @15

    D.M. 8 @20

    V.MODIF. 20/59

    5 22

    H.A. A DEM

    OLER

    H.A. A DEMOLER

    2 12. Fe' 2 12EST. 8 @19

    2 12. Fe' 2 12EST. 8 @14

    2 18. Fe' 2 12EST. 8 @24

    2 10.

    Fe' 2 10

    EST. 8 @5

    Fe 3 16.

    VN 20/30

    2 12.

    Fe' 2 12

    EST. 8 @14

    EST. 8 @25

    Fe' 2 12

    3 12

    EST. 8 @25

    Fe' 2 12

    EST. 8 @14

    EST. 8 @14

    EST. 8 @25

    Fe' 2 18

    EST. 8 @5

    EST. 8 @25

    EST. 8 @25

    CADENA DINTEL 20/15 2 10. Fe' 2 10

    DET.1

    VER NOTA 3 DET.5 DET.5 DET.2 DET.2 DET.2

    DET.2

    DET.1DET.16

    DET.1

    DET.5

    DET.1

    DET.4 DET.4

    DET.3 DET.4DET.5

    DET.5

    DET.8

    VER NOTA 3

    DET.5

    DET.6DET.6

    DET.7

    13A11A

    B1B1A1 A1

    13B

    15 A

    8 A 10A

    CADEN

    A VIGA 15/70

    2 12.

    Fe' 2 12

    VN IN 20x30.6 VN IN 20x30.6 VN IN 20x30.6

    C 30 x 36

    ,7 (V

    ER DET

    ALLE 8)

    VN IN

    20 X 19

    ,8

    VN IN

    20 X 19

    ,8

    VE 20/70 2 12. Fe' 2 12 VE 20/35 2 12. Fe' 2 12CAD.ex 20/152 10. Fe' 2 10

    LC 05

    8 @30

    LC 05

    8 @30 2 10 l.b.= 2,80 m

    2 10 l.b.= 2,80 m

    8 @30

    8 @25

    DET.8

    DET.8

    C 30x43

    .4

    C 30x43

    .4

    CONSULTORIAEN INGENIERA

    NOTA: TODAS LAS MEDIDAS SE VERIFICARN EN OBRA

    2011 STRUCTURAL REPAIR OF S.I.I. BUILDING, RECOLETA, SANTIAGO

    24

  • DESIGN OF MONTESSORI SCHOOL IN VALPARAISO

    Design of Montessori School in ValparaisoThis was an order from a young couple of Industrial Designers, that since they started to grow their own kids, they decided to create a Montessori School. At the beginning they transformed their own home, and in time it wasnt enough bigger for the new students that came every year. So they bought a property in Valparaiso, Chile, and decided to built a new School that needed to respond to the Montessori Education Requirements, and at the same time, a building that could be eco-efficient, as much as possible. The project was developed until preliminary draft status, for being presented in Valparaisos Council, for receiving the permit for Project Development.

    PROPIETARIO

    FECHA :

    PROYECTO :

    PROPIETARIO :

    1 DE 1ESCALA : LAMINA :

    CONTENIDO:

    UBICACION :

    DIBUJO :

    CALLE RICARDO H. DE FERRARI N 760

    xxxxRUT : 7.086.234-4

    ARQUITECTO

    DESTINO : EDUCACIONAL

    0.0 - +

    0.0 - +

    + - 0.0

    0.0 - ++ - 0.0

    0.0 - +

    + - 0.0

    + - 0.0

    + - 0.0

    + - 0.0

    Casa de Nios

    rodemoCCocina

    saiN oaBsoiN oaB

    seroseforP ed alaS

    nicartsinimdA

    1 oredanrevnI

    2 oredanrevnI

    agedoB ocincT lacoL

    sahcuD sahcuD

    1

    2

    3

    4

    5

    N

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    13

    14

    15

    EMPLAZAMIENTO ESC 1:250

    N

    PLANO DE UBICACIN ESC 1:2000

    PLANTA NIVEL 1 ESC 1:100

    PLANTA NIVEL 2 ESC 1:100

    ESQUEMA DE SUPERFICIES NIVEL 1 ESC. 1:100

    N

    11.71

    11.71

    0.81

    1.17

    6.45

    1.156.453.20

    8.44

    6.00

    8.44

    3.56

    1.50

    6.00

    6.20

    4.70

    4.709.92 m2

    10.68 m2

    0.86 m2

    0.86 m2

    1.15

    2.66 m2

    11.71

    11.71

    0.81

    1.17

    6.45

    1.156.453.20

    6.00

    3.56

    1.50

    6.00

    6.20

    4.70

    4.709.92 m2

    10.68 m2

    0.86 m2

    0.86 m2

    1.15

    2.66 m2

    6.26

    5.48

    1.56

    7.04

    5.02

    1.79

    6.49

    6.49

    6.26

    39.94 m210.68 m2

    4.71

    4.00

    1.58

    6.58 m2 3.14 m2

    4.35 m2

    2.27 m2

    4.71 4.49

    4.71

    1.40

    1.86

    5.56

    4.69

    4.00

    3.16 m2

    0.35

    0.81 m2

    ESQUEMA DE SUPERFICIES NIVEL 2 ESC. 1:100

    CUADRO DE SUPERFICIES

    6.000.20 0.81

    1.900.20

    1.90

    0.79 0.20

    1.16

    4.42

    0.20

    0.20

    2.90

    2.90

    13.07

    5.85

    2.00

    5.226.0

    0

    5.80

    0.20 1

    .20

    1.00

    3.60

    0.20

    10.50

    10.34

    20.00

    10.80 9.20

    2.98 0.20 1.31 1.70 0.20 2.70 1.40 0.20 5.68 1.20 2.31

    6.35 4.30 2.88 5.04

    0.20 9.06 0.22

    9.39

    0.80 1.00 2.40 0.70 4.63

    5.10 0.200.20 2.30 0.10 2.11

    sodilvsuniM rosnecsA

    sodilvsuniM rosnecsA

    7.42

    4.20

    0.20

    3.80

    0.20

    0.60

    1.70

    0.20

    1.50

    0.20

    1.29

    0.29

    0.50

    0.50

    0.50

    0.50

    0.50

    2.91

    6.90

    0.20

    1.00

    0.10

    1.80

    0.10

    0.80

    0.10

    1.20

    0.20

    1.20

    0.20

    5.10

    0.20

    1.20

    0.20

    5.80

    6.00

    ELEVACIN SUR ESC. 1:100

    Superficie Terreno: 1159.74 m2

    Superficie Construda:

    Superficie Nivel 1

    A 6.0 x 6.49 = 38.96 m2B (6.0 x 3.56)/2 = 10.68 m2C (3.2 x 6.2)/2 = 9.92 m2D 6.45 x 6.20 = 39.94 m2E (1.5 x 1.15)/2 = 0.86 m2F 1.5 x 4.70 = 5.41 m2G (1.17 x 1.49)/2 = 0.86 m2H (1.17 x 4.56)/2 = 2.66 m2I (0.81 x 6.00)/2 = 2.27 m2J (11.71 x 6.00)/2 = 70.24 m2K (1.79 x 5.48)/2 = 10.68 m2L 6.26 x 5.48 = 39.94 m2M (5.02 x 7.04)/2 = 17.67 m2N (1.56 x 6.26)/2 = 4.86 m2O 4.71 x 1.4 = 6.58 m2P (1.4 x 1.49)/2 = 3.14 m2Q (0.35 x 4.69)/2 = 0.81 m2R 4.69 x 5.56 = 26.09 m2S (1.86 x 4.69)/2 = 4.35 m2T (1.58 x 4.00)/2 = 3.16 m2U 4.71 x 4.00 = 18.82 m2

    10.80 4.71

    20.00

    6.005.80

    0.15 0.85

    4.00

    0.85 0.15

    13.07

    5.85

    2.00

    5.22

    67m2

    Bao de nios6.8 m2

    57.88 m2

    Taller 262 m2

    85.45 m2

    1 rellaT

    oaBDocentes

    + - 0.0

    3.42

    021-F ogeufatroC oruM % 74 otneimasohdA

    4.82

    4.30

    3.00

    6.30

    4.90

    0.70

    0.85

    EJE DE CAL

    ZADA FE

    RRAR

    I

    5.00

    C.I.P. N

    r. 934 de fecha 20.08.2010

    4.86 m2

    Superficie Nivel 2

    A 6.0 x 8.44 = 50.63 m2B (6.0 x 3.56)/2 = 10.68 m2C (3.2 x 6.2)/2 = 9.92 m2D 6.45 x 6.20 = 39.94 m2E (1.5 x 1.15)/2 = 0.86 m2F 1.5 x 4.70 = 5.41 m2G (1.17 x 1.49)/2 = 0.86 m2H (1.17 x 4.56)/2 = 2.66 m2I (0.81 x 6.00)/2 = 2.27 m2J (11.71 x 6.00)/2 = 70.24 m2

    Ocupacin Predial = 44,09 %Coeficiente de Constructibilidad = 0.27

    317.90 m2

    193.47 m2

    TOTAL SUPERFICIE CONSTRUIDA=

    Sup Nivel 1 + Sup. Nivel 2 =317.90 m2 + 193.47m2 = 511.37 m2

    MURO ADHOSA

    MIENTO

    F-120

    RASANTE DESDE M

    URO ADHOSAMINTO 45

    NIVEL TERRENO VECINO

    3.50

    RASANTE 70

    LNEA

    OFICIAL

    LNEA

    VERED

    A

    LNEA

    DE ED

    IFICACIN

    EJE DE CALZADA

    5.00 1.20 3.52

    4.71

    LNEA

    OFIC

    IAL

    LNEA

    VERED

    A

    LNEA

    DE ED

    IFICACIN

    EJE DE C

    ALZA

    DA

    5.001.203.52

    QUIEBR

    E DESLIN

    DE

    021-F OGEUFATROC OTNEIMASOHDA ORUM

    021-F OGEUFATROC OTNEIMASOHDA ORUM

    5.48

    0.00

    3.00

    2.30

    5.91

    5.63

    2.98

    0.73

    2.00

    0.20

    6.43

    5.93

    RASANTE 70

    RASANTE 70

    DESLINDE NORTE

    DESLINDE SUR

    6.66

    3.53

    2.90

    3.16

    2.90

    24.57

    19.24

    25.14

    B-B1 ETOL2M47.9511 PUS

    55.17

    N

    A

    B

    C

    D

    E

    4

    5

    6

    7

    8

    G'EF'B

    1

    2

    '1

    2'

    A

    B

    C

    D

    E

    4

    5

    6

    7

    8

    GE'FB'

    1

    2

    1'

    2'

    2011

    25

  • DESIGN OF MONTESSORI SCHOOL IN VALPARAISO

    26

    2011

  • PROPIETARIO

    FECHA :

    PROYECTO :

    PROPIETARIO :

    1 DE 1ESCALA : LAMINA :

    CONTENIDO:

    UBICACION :

    DIBUJO :

    CALLE RICARDO H. DE FERRARI N 760

    xxxxRUT : 7.086.234-4

    ARQUITECTO

    DESTINO : EDUCACIONAL

    0.0 - +

    0.0 - +

    + - 0.0

    0.0 - ++ - 0.0

    0.0 - +

    + - 0.0

    + - 0.0

    + - 0.0

    + - 0.0

    Casa de Nios

    rodemoCCocina

    saiN oaBsoiN oaB

    seroseforP ed alaS

    nicartsinimdA

    1 oredanrevnI

    2 oredanrevnI

    agedoB ocincT lacoL

    sahcuD sahcuD

    1

    2

    3

    4

    5

    N

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    13

    14

    15

    EMPLAZAMIENTO ESC 1:250

    N

    PLANO DE UBICACIN ESC 1:2000

    PLANTA NIVEL 1 ESC 1:100

    PLANTA NIVEL 2 ESC 1:100

    ESQUEMA DE SUPERFICIES NIVEL 1 ESC. 1:100

    N

    11.71

    11.71

    0.81

    1.17

    6.45

    1.156.453.20

    8.44

    6.00

    8.44

    3.56

    1.50

    6.00

    6.20

    4.70

    4.709.92 m2

    10.68 m2

    0.86 m2

    0.86 m2

    1.15

    2.66 m2

    11.71

    11.71

    0.81

    1.17

    6.45

    1.156.453.20

    6.00

    3.56

    1.50

    6.00

    6.20

    4.70

    4.709.92 m2

    10.68 m2

    0.86 m2

    0.86 m2

    1.15

    2.66 m2

    6.26

    5.48

    1.56

    7.04

    5.02

    1.79

    6.49

    6.49

    6.26

    39.94 m210.68 m2

    4.71

    4.00

    1.58

    6.58 m2 3.14 m2

    4.35 m2

    2.27 m2

    4.71 4.49

    4.71

    1.40

    1.86

    5.56

    4.69

    4.00

    3.16 m2

    0.35

    0.81 m2

    ESQUEMA DE SUPERFICIES NIVEL 2 ESC. 1:100

    CUADRO DE SUPERFICIES

    6.000.20 0.81

    1.900.20

    1.90

    0.79 0.20

    1.16

    4.42

    0.20

    0.20

    2.90

    2.90

    13.07

    5.85

    2.00

    5.226.0

    0

    5.80

    0.20 1

    .20

    1.00

    3.60

    0.20

    10.50

    10.34

    20.00

    10.80 9.20

    2.98 0.20 1.31 1.70 0.20 2.70 1.40 0.20 5.68 1.20 2.31

    6.35 4.30 2.88 5.04

    0.20 9.06 0.22

    9.39

    0.80 1.00 2.40 0.70 4.63

    5.10 0.200.20 2.30 0.10 2.11

    sodilvsuniM rosnecsA

    sodilvsuniM rosnecsA

    7.42

    4.20

    0.20

    3.80

    0.20

    0.60

    1.70

    0.20

    1.50

    0.20

    1.29

    0.29

    0.50

    0.50

    0.50

    0.50

    0.50

    2.91

    6.90

    0.20

    1.00

    0.10

    1.80

    0.10

    0.80

    0.10

    1.20

    0.20

    1.20

    0.20

    5.10

    0.20

    1.20

    0.20

    5.80

    6.00

    ELEVACIN SUR ESC. 1:100

    Superficie Terreno: 1159.74 m2

    Superficie Construda:

    Superficie Nivel 1

    A 6.0 x 6.49 = 38.96 m2B (6.0 x 3.56)/2 = 10.68 m2C (3.2 x 6.2)/2 = 9.92 m2D 6.45 x 6.20 = 39.94 m2E (1.5 x 1.15)/2 = 0.86 m2F 1.5 x 4.70 = 5.41 m2G (1.17 x 1.49)/2 = 0.86 m2H (1.17 x 4.56)/2 = 2.66 m2I (0.81 x 6.00)/2 = 2.27 m2J (11.71 x 6.00)/2 = 70.24 m2K (1.79 x 5.48)/2 = 10.68 m2L 6.26 x 5.48 = 39.94 m2M (5.02 x 7.04)/2 = 17.67 m2N (1.56 x 6.26)/2 = 4.86 m2O 4.71 x 1.4 = 6.58 m2P (1.4 x 1.49)/2 = 3.14 m2Q (0.35 x 4.69)/2 = 0.81 m2R 4.69 x 5.56 = 26.09 m2S (1.86 x 4.69)/2 = 4.35 m2T (1.58 x 4.00)/2 = 3.16 m2U 4.71 x 4.00 = 18.82 m2

    10.80 4.71

    20.00

    6.005.80

    0.15 0.85

    4.00

    0.85 0.15

    13.07

    5.85

    2.00

    5.22

    67m2

    Bao de nios6.8 m2

    57.88 m2

    Taller 262 m2

    85.45 m2

    1 rellaT

    oaBDocentes

    + - 0.0

    3.42

    021-F ogeufatroC oruM % 74 otneimasohdA

    4.82

    4.30

    3.00

    6.30

    4.90

    0.70

    0.85

    EJE DE CAL

    ZADA FE

    RRAR

    I

    5.00

    C.I.P. N

    r. 934 de fecha 20.08.2010

    4.86 m2

    Superficie Nivel 2

    A 6.0 x 8.44 = 50.63 m2B (6.0 x 3.56)/2 = 10.68 m2C (3.2 x 6.2)/2 = 9.92 m2D 6.45 x 6.20 = 39.94 m2E (1.5 x 1.15)/2 = 0.86 m2F 1.5 x 4.70 = 5.41 m2G (1.17 x 1.49)/2 = 0.86 m2H (1.17 x 4.56)/2 = 2.66 m2I (0.81 x 6.00)/2 = 2.27 m2J (11.71 x 6.00)/2 = 70.24 m2

    Ocupacin Predial = 44,09 %Coeficiente de Constructibilidad = 0.27

    317.90 m2

    193.47 m2

    TOTAL SUPERFICIE CONSTRUIDA=

    Sup Nivel 1 + Sup. Nivel 2 =317.90 m2 + 193.47m2 = 511.37 m2

    MURO ADHOSA

    MIENTO

    F-120

    RASANTE DESDE M

    URO ADHOSAMINTO 45

    NIVEL TERRENO VECINO

    3.50

    RASANTE 70

    LNEA

    OFICIAL

    LNEA

    VERED

    A

    LNEA

    DE ED

    IFICACIN

    EJE DE CALZADA

    5.00 1.20 3.52

    4.71

    LNEA

    OFIC

    IAL

    LNEA

    VERED

    A

    LNEA

    DE ED

    IFICACIN

    EJE DE C

    ALZA

    DA

    5.001.203.52

    QUIEBR

    E DESLIN

    DE

    021-F OGEUFATROC OTNEIMASOHDA ORUM

    021-F OGEUFATROC OTNEIMASOHDA ORUM

    5.48

    0.00

    3.00

    2.30

    5.91

    5.63

    2.98

    0.73

    2.00

    0.20

    6.43

    5.93

    RASANTE 70

    RASANTE 70

    DESLINDE NORTE

    DESLINDE SUR

    6.66

    3.53

    2.90

    3.16

    2.90

    24.57

    19.24

    25.14

    B-B1 ETOL2M47.9511 PUS

    55.17

    N

    A

    B

    C

    D

    E

    4

    5

    6

    7

    8

    G'EF'B

    1

    2

    '1

    2'

    A

    B

    C

    D

    E

    4

    5

    6

    7

    8

    GE'FB'

    1

    2

    1'

    2'

    2011DESIGN OF MONTESSORI SCHOOL IN VALPARAISO

    27

  • DESIGN OF RUKA ECO-LODGE FOR INDIGENOUS ASOCIATION MAPULAHUAL

    Design of Ruka Eco-Lodge for indigenous Asociation MapulahualThis was the Design for a Concourse, the problematic consisted in design a Lodge for the indigenous community Mapulahual , starting to develop an eco-tourism project, supported financially by the WWF (Worldwide Foundation). They needed to develop this spaces for work in their own economic activities, like weaving and preparation of jams and preserves, and at the same time a place for receiving guests. It was inspired in the Huilliches Indigenous Communities Lifestyle and Culture, living around the Fire place in the center. And the way to come into the project was proposing a series of tracks in the forest, respecting the landscape of the place. They did not have the enough finance to built it in one time. So was necessary to design it for two Building Stages.

    28

    2009

  • DESIGN OF RUKA ECO-LODGE FOR INDIGENOUS ASOCIATION MAPULAHUAL

    29

    2009

  • 30

    2009 DESIGN OF RUKA ECO-LODGE FOR INDIGENOUS ASOCIATION MAPULAHUAL

  • 31

    2009DESIGN OF RUKA ECO-LODGE FOR INDIGENOUS ASOCIATION MAPULAHUAL

  • 2009 DESIGN OF RUKA ECO-LODGE FOR INDIGENOUS ASOCIATION MAPULAHUAL

    32

  • MUSEUM OF MYTHOLOGY OF CHILOE

    Museum of Mythology of Chiloe This was the last Project in the University of Bio-Bio, created over a year for release and diploma. I love the island of Chiloe, thats why I chose this place of Chile for develop my last project in the career. The Mythology of Chiloe is something really particular of this island, attached to more then 30 legends and mythological beings. At the same time the way to develop the tourism is to spread this culture, and the best way was creating a space, for local artist, who are spinning, dyeing and knitting, wool. Is in the interaction with visitors and local artist, local people, that the Mythology could be transferred in an oral way, and is in the classic museum program how the mythology could be transferred in a tangible way, pictures, reading and visual tools. Therefore the Museum is a multi-programmatic building, anchored to an urban intervention, tracks along the ocean border and classic pile houses or palafitos on the bay of the city of Castro, having the project a dialogue through the illusion of the ghost boat Caleuche, local legend, with the urban environment.

    2008-09

    33

  • MUSEUM OF MYTHOLOGY OF CHILOE

    34

    2008-09

  • 13,0

    3,1

    3,0

    20,9

    3,0

    3,1

    3,0

    13,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,08,0

    6,9

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,7

    0,3

    2,7

    0,3

    2,8

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    0,4 2,8 0,3 2,9 0,3 2,9 0,4 3,7 4,0 0,3

    7,9 2,4 6,6 4,0

    2,4 2,5 4,0 4,0

    22,3

    22,7

    6,9

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,7

    0,3

    2,7

    0,3

    2,8

    4,6 0,6 3,0 0,4 5,6 0,4 3,6 0,4 3,7 0,3

    4,2 1,6 8,1 8,4

    72,3

    72,3

    24,2

    21,3

    26,9

    72,1

    3,0

    6,0

    3,0

    3,0

    3,0

    3,0

    3,0

    6,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    4,1

    6,0

    3,0

    3,0

    6,0

    15,0

    5,9

    5,9

    3,2

    8,0

    10,0

    2,0

    72,1

    26,7

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    20,9

    7,9 2,4 2,5 4,0 4,0

    8,0 5,7 4,2 4,2

    7,9 2,4 2,5 4,0 4,0

    0,2 1,10,2

    2,1 0,4 2,6 0,4 5,6 0,4 3,6 0,4 3,7 0,3

    0,5 2,4 3,0 0,2 2,1 0,4 2,6 0,4 4,7 0,4 3,6 0,4 3,6 0,4

    2,4 2,6 1,6 1,1 8,4 7,6

    2,2

    4,1

    3,0

    3,0

    3,0

    9,0

    15,0

    6,0

    5,8

    3,2

    8,0

    4,0

    8,0

    3,8

    0,4

    2,7

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,7

    0,3

    1,3

    0,3

    4,0

    0,3

    2,7

    0,3

    2,9

    2,0

    3,8

    0,4

    2,7

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,7

    0,3

    1,3

    0,3

    4,0

    0,3

    2,7

    0,3

    2,9

    2,0

    barrio gamboa - castro - chiloe

    Museo DE La Mitologia Chilota08.07.2009

    PROYECTO DE TITULO :

    Profesor gua: Jorge Harris

    Alumna: Alejandra rojas w.

    NIVEL -1NIVEL -2

    Plantas de Arquitectura

    1`` 52

    G

    F

    S

    W

    R

    I

    P

    Q

    V

    J

    U

    T

    G

    H

    O

    N

    K

    D

    M

    E

    L

    C

    A

    B

    F

    S

    W

    R

    I

    P

    Q

    V

    J

    U

    T

    H

    O

    N

    K

    D

    M

    E

    L

    C

    A

    B

    B

    I

    B

    D

    C

    F

    H

    C

    D

    F

    E

    LOCAL 1

    LOCAL 2

    LOCAL 3

    Bodegae

    Instalaciones

    Bao Hombres

    Bao Mujeres

    COCINERAS-3.25

    COCINERAS-3.25

    LLEGADA Y VENTAPRODUCTOS DEL MAR

    -3.65

    LLEGADA Y VENTAPRODUCTOS DEL MAR

    -3,65

    PLATAFORMA FLOTANTEdesde -4.1 a -5.85

    3 4

    IH

    41`` 532

    MONTACARGA

    E

    ACCESO MUSEODE LA MITOLOGA CHILOTA

    B

    I

    G

    F

    S

    W

    R

    I

    P

    Q

    V

    J

    U

    T

    B

    D

    C

    F

    H

    C

    D

    IH

    F

    E

    G

    H

    O

    N

    K

    D

    M

    E

    L

    C

    A

    B

    F

    S

    W

    R

    I

    P

    Q

    V

    J

    U

    T

    H

    O

    N

    K

    D

    M

    E

    L

    C

    A

    B

    Mundo del Mar

    MUNDO DE LA TIERRA

    EXPO

    SICIN M

    ITO DE ORIGN

    DE LA

    ISLA

    TEN-TEN

    Y COI-COI V

    IL

    41``1 532

    +- 0.0

    RECEPCIN CENTRO CULTURALDE LA MITOLOGA CHILOTA

    41``1 532

    - 1.65

    - 1.85

    -1.1

    - 1.45

    NORTE

    escala

    1:100

    3,8

    0,4

    2,7

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,3

    2,7

    0,3

    1,3

    0,3

    4,0

    0,3

    2,7

    0,3

    2,9

    2,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    7,9 2,4 2,5 4,0 4,0

    27,1

    2,3 6,7 9,5 4,2 4,0

    5,5 0,2 2,7 0,2 2,1 0,4 2,1 0,4 4,6 0,4 4,0 3,6 0,4

    27,1

    7,9 2,4 2,5 4,0 4,0

    5,9 3,9 6,2 4,2 4,4

    2,2 0,2 1,50,2

    0,9 3,7 0,2 6,1 0,3 3,7 0,3 3,7 0,3 0,5

    3,0

    3,0

    2,8

    18,1

    3,4

    2,6

    3,2

    3,0

    6,1

    3,9

    8,0

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,7

    0,3

    2,7

    0,3

    2,8

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,6

    0,4

    2,7

    0,3

    2,7

    0,3

    2,8

    4,8

    7,3

    4,8

    7,5

    3,0

    72,3

    2,9

    6,3

    9,0

    2,9

    3,1

    6,0

    6,0

    3,0

    3,1

    8,9

    8,1

    2,0

    2,0

    6,0

    2,0

    26,7

    7,9 2,4 2,5 4,0 4,0

    3,0

    6,0

    3,0

    3,0

    3,0

    3,0

    3,0

    6,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    2,7

    3,3

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    3,0

    7,9 2,4 2,5 4,0 4,0

    26,7

    2,5 0,3 3,7 0,2 2,1 0,4 2,0 0,4 4,7 0,4 3,6 0,4 3,6 0,4

    1,7 5,7 1,7 0,7 3,6 3,4 1,6 4,2 4,1

    12,0

    6,0

    3,0

    3,0

    26,8

    5,9

    3,2

    8,0

    3,0 0,2 1,10,2

    1,60,5

    0,4 2,6 0,4 5,6 0,4 3,6 0,4 3,7 0,3

    0,4

    2,6

    0,4

    2,6

    0,4

    11,7

    0,2

    2,8

    0,2

    2,8

    0,2

    2,8

    0,2

    2,8

    0,2

    2,8

    0,2

    2,8

    0,2

    2,8

    0,2

    2,8

    0,2

    2,8

    0,2

    2,7

    0,4

    2,6

    0,4

    2,7

    0,4

    1,30,4 1

    ,00,4

    2,7

    0,3

    2,7

    0,3

    2,8

    2,0

    1,4 1,5 7,8 3,6 4,4

    72,3

    3,0

    3,0

    2,8

    18,1

    3,4

    2,6

    3,2

    3,0

    6,1

    3,9

    8,0

    4,8

    7,5

    3,0

    4,8

    7,3

    NIVEL 1 NIVEL 2

    barrio gamboa - castro - chiloe

    Museo DE La Mitologia Chilota08.07.2009

    PROYECTO DE TITULO :

    logo

    Profesor gua: Jorge Harris

    Alumna: Alejandra rojas w.

    Plantas de Arquitectura

    3

    B

    I

    G

    F

    S

    W

    R

    4

    I

    P

    Q

    V

    J

    U

    T

    1``

    B

    D

    C

    F

    H

    C

    D

    IH

    F

    E

    G

    1

    H

    O

    N

    K

    D

    M

    E

    L

    C

    A

    B

    532

    F

    S

    W

    R

    I

    P

    Q

    V

    J

    U

    T

    H

    O

    N

    K

    D

    M

    E

    L

    C

    A

    B

    41``1 52

    E

    - 1.65

    - 1.85

    - 1.45

    MUNDO DE LA TIERRA

    B

    I

    G

    F

    S

    W

    R

    I

    P

    Q

    V

    J

    U

    T

    B

    D

    C

    + 1.9+ 1.9

    + 1.7

    + 2.40+ 2.40

    + 2.00

    F

    + 0.75+ 0.75

    + 1.20

    H

    E

    C

    D

    IH

    F

    E

    G

    H

    O

    N

    K

    D

    M

    E

    L

    C

    A

    B

    F

    S

    W

    R

    I

    P

    Q

    V

    J

    U

    T

    H

    O

    N

    K

    D

    M

    E

    L

    C

    A

    B

    41 5321''

    MUNDO DEL MAR+ 1.90

    + 1.20

    + 0.75

    + 1.20VENTA

    + 0.25

    + 1.20

    SECADO DE LANAS

    TELARES

    + 1.20

    + 0.75

    +- 0.0

    +- 0.0

    RECEPCIN CENTRO CULTURALDE LA MITOLOGA CHILOTA

    41``1 532

    - 1.65

    - 1.85

    -1.1

    - 1.45

    ACCESO MUSEODE LA MITOLOGA CHILOTA

    EXPO

    SICIN M

    ITO DE ORIGN

    DE LA

    ISLA

    TEN

    -TEN

    Y COI-COI V

    IL

    NORTE

    escala

    1:100

    2008-09MUSEUM OF MYTHOLOGY OF CHILOE

    35

  • barrio gamboa - castro - chiloe

    Museo DE La Mitologia Chilota


Recommended