2. PUBLIC LIBRARY - CARACAS 2007 / UCV-FAU /Area: 936
m2/Program:reading - audiovisual rooms, cafe, shop, stands and
administration URBAN LEISURE CENTRE - CARACAS 2008 / UCV-FAU /
Area: 1.990 m2 / Program: Climbing wall, auditoriums, galleries,
gym and restaurant HOTEL - MARGARITA ISLAND 2009 / UCV-FAU/Area:
490 m 2/Program:16 rooms,restaurant,administration and a platform
on the water URBAN SCENE - CARACAS- FAVELA LA LUCHA 2009 / UCV-FAU
/ Area 7.600 m2 / Program: Workshops, music school, square and
auditoriums URBAN PORT CITY SEA-CONNECTION - PTO CABELLO 2010 /
UCV-FAU / Area: 50.000 m2 / Program: Passenger terminal and square.
APARTMENT ISLA CIES - CARACAS 2011 / CGA / Area: 116 m2 / Program :
Living room, dining room, kitchen, three bedrooms and two baths
PRIVATE HOUSE - CARACAS 2011 / CGA /Area: 350 m2/Program :Living
room, dining room, kitchen, five rooms, terrace and poll APARTMENT
SOLAR VALLE ALTO - CARACAS 2011 / CGA / Area: 185 m2 / Program :
Living room, dining room, kitchen, three bedrooms and five
bathsARCHITECT Alexander Nino / School of Architecture, Faculty of
Architecture and Urbanism.Central University of Venezuela U.C.V /
2010Address: 97, Rue de Meaux. 75019 PARIS / Email:
[email protected] / Mobile: +33 0649374091
PHOTOGRAPHY
3. 2007 / UCV-FAU / Area: 936 m2/Program: reading -audiovisual
rooms, cafe, shop, stands and administration Plan of the ground
floor Location map / Chacao Plan of basement Second floor plan
Third floor plan First floor plan Offices Hall Reading room Reading
room Reading room Deposit Coffee Bathrooms Audiovisual room
Bathrooms Store AuditoriumPUBLIC LIBRARY - CARACAS Bolvar Square
The project is located in a commercial and residential zone in
Cara- cas, capital city of Venezuela, the challenge was resolved
within a few meters of a worthy program for community library in
Chacao, on a plot in medians where light and ventilation were
decisive to get a PUBLIC BUILDING quality space. Section A-A
4. 2008 / UCV-FAU / Area: 1.990 m2 / Program:Climbing
wall,auditoriums,galleries,gym, cinema and restaurant The project
on the building FEDE Vargas abandoned in Caracas since 1987 search
Chacao to provide activities for the local life of Sucre Libertador
the neighborhood but also for the city in Baruta El Hatillo
general. It has a mixed program that allows you to browse the site
through different Gran Caracas Level Restaurant spaces experiences.
(A swimming pool, auditoriums, galleries, sports facilities, a
restaurant, a cinema and of course the climbing wall, the central
axis of the project.) The goal is to offer the public a variety of
spaces recreation out of the Chacao municipality routine and
develop personal activities.URBAN LEISURE CENTRE - CARACAS Level
Square The climbing wall is designed as a large folding embraces
and penetrates the building, generating spaces and different
conditions on each floor. The externalization of activities that
occur within a theme that is developed through a semi-permeable
Level Auditoriums facade that reflects the dynamic nature of the
project. PUBLIC BUILDING EDIFICE PUBLIC Level gym and climbing wall
access Section A-A Faade Plan of basement swimming pool Section
B-B
5. HOTEL - MARGARITA ISLAND2009/UCV-FAU/Area: 490 m 2 /
Program: 16 rooms, restaurant, administration and a platform on the
water Terrace Platform Restaurant Platform on the waterPlan a room
Floor structure Structure Faade Section A-A TOURIST
ACCOMMODATION
6. Music 2009 / UCV-FAU / Area: 7.600 m2 / Program: Workshops,
music school, square and auditoriumsSCENE URBAINE - CARACAS- FAVELA
LA LUCHA Vegetation Center of production, consumption and cultural
exchanges First floor plan Meeting Spontaneity in which people live
in the favela is producing a space open to multiple transformations
and visions but lacks opportunities. The project tries to emulate
this lifestyle where the street is the space where the events
occur. This is to create a public space linking the city and the
favela, and a Volume meeting place of articulation of dissonant
worlds, that of the formal city and the city spontaneously. The
space is defined by a building that houses various commercial and
cultural programs for the community of the district of La Lucha.
Instead creates and is partly covered by a platform that provides
access to two auditoriums. Commercial activities are at ground
level, while the upper levels are Square used for manufacture
workshops instruments and music rooms. Section A-A URBAN PROJECT
The urban cluster Plan of the ground floor LA MSICA Y EL BARRIO
SON, A NUESTRO ENTENDER, VALORES QUE NOS PERSEGUIRN PARA SIEMPRE,
ENVOLVINDONOS CON ESE MANTO DE OLORES Y SABORES QUE DA LA CALLE.
Rubn Blades. Section B-B
7. URBAN PORT CITY SEA-CONNECTION - PTO CABELLO The main
objective is to create a new The intermediate space: urban
mediations for a connection between the centrality to generate a
polycentric city, city and the port. which reactivates different
places of Puerto Cabello. This linear park is a response to The
purpose of the study is the gap between the city and the port that
extends the need to find a meeting point between 2010 / UCV-FAU-
THESIS / Area: 50.000 m2 / Program: Passenger terminal and square.
from north to south. The proposal seeks the connection and
relationship the frame of the city and the port area. It is a kind
of centrality linear articulates between the two parties, from
public space as a generator meeting. Faced with a series of public
spaces interacting the closed and controlled atmosphere that
characterizes the place, the principle Limite hacia el puerto.
Calle Puerto Cabello (Norte) with joint programs to create a
complex of the project is a great cover that allows the fluidity
and connection space. urban space beyond the monofunctional. The
variety of uses is vital to enable the The passenger terminal and
public square function as an interface between location and
articulate with the port and the city and the sea which offers new
breathing spaces in the city. By nature the city. Residences with
shops, cultural spaces, education or leisure generate a dynamic
business that hosts, space tourist information or events that are
masses alternating with built vacuum. integrated through a system
of universal design patios in the space where Simple buildings are
not sufficient to mark the transition of urban space to space
architectural casi imperceptible. Limite hacia el puerto. Calle
Puerto Cabello (Sur) a boundary may be necessary with the port.
This is why the slopes are located The city-sea discovery by the
user in different ways according to its path. along the harbor, the
topography to Thus, for the visitor who arrives in the city, the
building unfolds to become create a transition from public to
private. The main axis along the harbor is amplified to a place on
the sea, with a view of the bay. Conversely, passengers arriving in
draw a tree-lined avenue which hosts a bike town from the ocean are
faced with a cover that serves as an antechamber path, and space
for contemplation in a game URBAN PROJECT and accompanies their
emergence until they reach a leading place in the city. Limite
hacia el Mar. (Caso puntual) of lights and shadows. The public
space is the basic element for working meeting of the frame Master
plan
8. URBAN PORT CITY SEA-CONNECTION - PTO CABELLO Section A-A
Section B-B Plan of the ground floor URBAN PROJECT The limit is the
finis terrae, end and beginning of something unknown. It is an
archaic notion of the limit, an idea that is clearly not worked in
the Section C-C contemporary space. Indeed, contemporary space
includes a threshold limit as a pivot point and not an end. Josep
Llus Mateo Faade
9. 2011 / CGA / Area: 160 m2 / Program: Living room, dining
room, kitchen, three bedroom and two bath Section 1-1APARTMENT ISLA
CIES - CARACAS Demolition plan Section 5-5 INTERIOR DESIGN Plan
Located in a high-end residential zone in Caracas, capital city of
Venezuela, this 160 sqm apartment was custom designed to satisfy
the clients needs and desires. They wanted a space more open and
bright all in a fluid space. Section 6-6 I was responsible for
designing the apartment, construction documents also the materials
and furnitures.
10. Demolition plan 2011 / CGA / Area: 350 m2 / Program :
Living room, dining room, kitchen, four bedrooms and five
bathsPRIVATE HOUSE - CARACAS First floor Second floor Located in a
high-end residential zone in Caracas, capital city of Ve- nezuela,
this 350 sqm house was completely transformed, we propose a
renovation project over an existing house. They wanted a space
INTERIOR DESIGN completely different and specially more open to the
garden . I was Section B-B responsible for designing the house,
construction documents also the materials and furnitures. First
floor Second floor Section A-A
11. 2011 / CGA / Area: 185 M2 / Program : Living room, dining
room, kitchen, three bedroom and five bathsAPARTMENT SOLAR VALLE
ALTO - CARACAS Section 2-2 Section 1-1 INTERIOR DESIGN Section 4-4
Plan Located in a high-end residential zone in Caracas, capital
city of Venezuela, this 185 sqm apartment was custom designed to
satisfy the clients needs and desires. They wanted a space more
open but with some privacy when so required by the client. I was
responsible for designing the apartment, construction documents
also the materials Section 5-5 and furnitures.