+ All Categories
Home > Documents > PORTFOLIO (Manufacturing Engineering)

PORTFOLIO (Manufacturing Engineering)

Date post: 15-Apr-2017
Category:
Upload: david-diaz
View: 694 times
Download: 1 times
Share this document with a friend
22
DAVID DIAZ Mechanical Engineer PORTFOLIO Manufacturing Engineering Samples
Transcript
Page 1: PORTFOLIO (Manufacturing Engineering)

DAVID DIAZMechanical Engineer

PORTFOLIOManufacturing Engineering

Samples

Page 2: PORTFOLIO (Manufacturing Engineering)

DAVID DIAZMechanical Engineer

PORTFOLIOSome Samples

TRAVELERS AND PROCESS MAPPINGManufacturing Engineer

Options

Information to add(Options: Explain Op. or just Op. Name)

Qty Accepted and Rejected or just accepted or rejected

Approvals & InformationImportant info like what traveler

number to fallow if rework, info about scrap disposition, etc…

Page 3: PORTFOLIO (Manufacturing Engineering)

DAVID DIAZMechanical Engineer

PORTFOLIOSome Samples

TRAVELERS AND PROCESS MAPPINGManufacturing Engineer

Page 4: PORTFOLIO (Manufacturing Engineering)

DAVID DIAZMechanical Engineer

PORTFOLIOSome Samples

TRAVELERS AND PROCESS MAPPINGManufacturing Engineer

Job Traveler contains a all possible operations, when operation is not needed just mark N/A or a line and

sign up

Page 5: PORTFOLIO (Manufacturing Engineering)

DAVID DIAZMechanical Engineer

PORTFOLIOSome Samples

TRAVELERS AND PROCESS MAPPINGManufacturing EngineerMain Job Traveler

(Parent)

Sub Order Job Traveler(Child)

Page 6: PORTFOLIO (Manufacturing Engineering)

DAVID DIAZMechanical Engineer

PORTFOLIOSome Samples

TRAVELERS AND PROCESS MAPPINGManufacturing Engineer

Other Information to add

Page 7: PORTFOLIO (Manufacturing Engineering)

DAVID DIAZMechanical Engineer

PORTFOLIOSome Samples

TRAVELERS AND PROCESS MAPPINGManufacturing Engineer

Page 8: PORTFOLIO (Manufacturing Engineering)

DAVID DIAZMechanical Engineer

PORTFOLIOSome Samples

TRAVELERS AND PROCESS MAPPINGManufacturing Engineer

Ideas:

• Use plastic sheet protectors with different colors or print Job Traveler in different color papers (by Orders and Sub-Orders or by products).

• Create a SOP (Responsibilities, Job Traveler Process Procedure, etc…).

• Include Materials?

Page 9: PORTFOLIO (Manufacturing Engineering)

“PAPER BOXES REPLACEMENT”

KANBAN SYSTEM

DAVID DIAZMechanical Engineer

PORTFOLIOSome Samples

PROCESS IMPROVEMENT PROJETManufacturing Engineer

Page 10: PORTFOLIO (Manufacturing Engineering)

Paper Boxes Location on Main Copy Room8.5”X11” Paper11”X17” Paper

Page 11: PORTFOLIO (Manufacturing Engineering)

NEW PROCEDURE TO REPLACE PAPER BOXES

3 Boxes are Full

for 8.5”X11” Paper&2 Boxes Full for

11”X17” Paper

Page 12: PORTFOLIO (Manufacturing Engineering)

Box #2 is empty

NEW PROCEDURE TO REPLACE PAPER BOXES

Page 13: PORTFOLIO (Manufacturing Engineering)

NEW PROCEDURE TO REPLACE PAPER BOXES

Send Kanban Card to

Main Office Receptionist

Page 14: PORTFOLIO (Manufacturing Engineering)

NEW PROCEDURE TO REPLACE PAPER BOXES

Receptionist to order boxes

Page 15: PORTFOLIO (Manufacturing Engineering)

NEW PROCEDURE TO REPLACE PAPER BOXES

Receptionist to order boxes

All information needed to make order is already in the Kanban Card

Page 16: PORTFOLIO (Manufacturing Engineering)

NEW PROCEDURE TO REPLACE PAPER BOXES

Receptionist to send Kanban Card to Manager

Page 17: PORTFOLIO (Manufacturing Engineering)

NEW PROCEDURE TO REPLACE PAPER BOXES

Manager to approve Order

Page 18: PORTFOLIO (Manufacturing Engineering)

NEW PROCEDURE TO REPLACE PAPER BOXES

Manager to send Kanban Card to Shipping & Receiving

Page 19: PORTFOLIO (Manufacturing Engineering)

NEW PROCEDURE TO REPLACE PAPER BOXES

Shipping & Receiving to

receive Boxes

Page 20: PORTFOLIO (Manufacturing Engineering)

NEW PROCEDURE TO REPLACE PAPER BOXES

Shipping & Receiving to put Boxes in Item location

Shipping & receiving to

put Kanban Card back in

plastic envelope under box #2 &

Page 21: PORTFOLIO (Manufacturing Engineering)

You can always review the complete process on the back of the Kanban Card

Page 22: PORTFOLIO (Manufacturing Engineering)

IMPORTANT!Don’t forget to mark each completed step on the back of the

card or erase check marks once the process is complete!

Use markers located on Kanban Folders only:• Main Front Office• Manager Office and• Shipping & Receiving

Office


Recommended