Date post: | 10-Mar-2016 |
Category: |
Documents |
Upload: | joana-pedro |
View: | 233 times |
Download: | 0 times |
Joana PedroCurriculum Vitae|Portfolio 2005-11
Contents
Curriculum Vitae ....................................................... 4
ACADEMIC WORKS...................................................... 7
MULTI-FUNCTIONAL BUILDING Entre-Campos, Lisbon. | December 2010, FA-UTL
Arts School DormsAlacntara, Lisbon. | February 2007, FA-UTL
PROFESSIONAL WORKS.............................................. 39
Cantanhede MuseumARX Portgual Arquitectos|Project|2011
SERLACHIUS MuseumARX Portgual Arquitectos|Competition|2011
BUDDHIST TEMPLEFree Lance|Rehabilitation Project|2011
4Personal:
Name Joana Maria Jorge Simes Pedro
Date of Birth August 4, 1987
Adress Praceta do Sol, Lote 1, 1Direito, 2775-710 Carcavelos, Portugal
Mobile (00351) 918115710
e-mail [email protected]
Nacionality: Portuguese
Curriculum Vitae Professional Experience:
2011-12 Worked at ARX Portugal Arquitectos Collaborated in:
- Serlachius Museum - Gosta Extension [Competition] | Design Concept, Presentation Production, Virtual Images Photoshop.
- Grndola Library [Competition] | Presentation Production, Virtual Images Photoshop.
- Cantanhede Museum | Construction details drawings, communication with engineers and design groups.
2011-12 Free Lancer
Architecture Rehabilitation Project for a Buddhist Temple, Monsanto, Portugal
House Rehabilitation Project, Caxias, Portugal
Education:
2005-10 Master degree in Architecture at Faculdade de Arquitectura de Lisboa (FAUTL).
2008 Erasmus at Technische Universiteit Eindhoven, in the Netherlands.
2007 Architecture workshop held in Goa, India. Won through university Merit Competition: Panaji, Thriving City.
2005 High school diploma at Colgio Marista de Carcavelos.
Skills and Competences:
Computer Autodesk Autocad, Photoshop, InDesign, 3DMax, Cinema 4D | Microsoft Office , Exel, Powerpoint.
Languges Mother language: Portuguese.Fluent in English.
Personal Self disciplineGood managing deadlinesExperience in Team WorkCreative.
Spare Times
Travel, Dance, Painting
Other Interests:
Drawing From 1999 to 2002 had drawing lesson with the teacher Sandra Sequeira, as well as other drawing lesson in the high school and university.
Dance From 1996 to 1999, and from 2006 to 2012 had Ballet lessons at the dance school Ana Mangerico.
Music Had Piano lessons from 1999 to 2001
Summer Camps
From 2004 to 2010 worked during the Summer mouths entertaining and looking after children during their summer holidays.
ACADEMIC WORKS
9Multi-Functional Building
MULTI-FUNCTIONAL BUILDING Entre-Campos, Lisbon. | December 2010, FA-UTL
10
The Multifunctional Building
This project was developed in the in the context of the final Master project, it started with a cultural and historical research on the subject of Subtraction as a methodology of project approach, mated with some reference projects and a small discussion of the related concepts. Later, these concepts were applied to an experimental case-study on a Multi-Functional Building located in Entre-Campos, Lisbon.
The concept: The Meaning of the Empty in Architecture Subtraction as a concept to generate architectural space.
Subtraction is here understood as a driving concept of the project, a method or mean of generating inhabit space.
Therefore, this work pursuits the balance between a conceptualization of architecture and its constructive translation, by creating spaces that explore the sense of emptiness, negative shapes, materiality and density, using Subtraction as a tool to develop the project.
The main goal of the project was to understand the role of this methodology in the creation on inhabit space and in which way could it create a specific social and cultural life based on an urban densification context.
11Multi-Functional BuildingUrban Context
12
Total Area: 14.165m2
Area: 8047m2
Area: 1298m2
Area: 4819m2
13Multi-Functional BuildingA11Urban Plan
14
15Multi-Functional Building
Section
16
17Multi-Functional Building A10
Floor Plan
18
19Multi-Functional Building A06
Ground Floor Plan
20
A13
Section
Front Elevation
21Multi-Functional Building A04
Basement Floor Plan
22
23Multi-Functional Building
Stairs Detail
24
25Multi-Functional BuildingA16
Walls Detail
26
27Arts School Dorms
Arts School DormsAlacntara, Lisbon. | February 2007, FA-UTL
28
The Arts School DormsThe Arts School project located in Alcntara, Lisbon, arises from the design of two main squares, one in a upper public level and the other in a lower and more private level. This two squares are surrounded by a low height building that embodies the Arts school and aim to be a point of regeneration and attraction of this area.
After the design of the urban plan, it was develop in a more detail level the Dorms of the school
The Concept: The Box Inside the BoxFor the design of the School Dorms, the main idea was to combine a modular structure of small wooden boxes that would suit the sleeping spaces and would be covered by a concrete plan. In this sense, the inhabit space is created by the movement and interaction of this boxes and the structure.
29Arts School Dorms
R. Arco a Alcantara
Tv B
alua
rte
R. V
ieira
da
Silv
a
Av 24de Julho
34.24
20.0
0
Urban Plan
30
31Arts School Dorms
7.75
3.75
0.35
Front Elevation
32
3.00
3.00
7.25
1.00
0.25
0.50
3.80
7.75
A3
Section
33Arts School Dorms
piso 1
2.40
1.20
1.50
4.50
2.85
3.85
34.24
B'
B C D E F GA
4.87 4.75 4.75 4.75 4.75 9.87
1.95
2.52
4.90
1.70
1.80
4.85
2.85 1.35
1.95
1
2
3
4
5
6.85
2.65
6.85
1.78
1.50
20.0
0
B
D
A'A
C'C
E
D'
E'
1st Floor Plan
34
35Arts School Dorms
piso 01.
30
0.85
1.20
1.68
1.90
1.15
1.85
34.24
B C D E F GA
4.87 4.75 4.75 4.75 4.75 9.87
4.85
1.80
2.50
1.95
4.05
1.20 2.85
1.50 6.50 1.499.49
1.45
11.3
05.
002.
00
1
2
3
4
5
6.85
2.65
6.85
1.78
1.50
20.0
0
B
D
A'A
C'C
E
D' E'
Ground Floor Plan
36
0.70
0.85
0.55
3.95
7.30
Construction Detail
37Arts School Dorms
38
PROFESSIONAL WORKS
40
Cantanhede MuseumARX Portgual Arquitectos|Project|2011
Place: Cantanhede, Portugal
Area: 2.860m2
Client: Cmara Municipal de Cantanhede
Architects: ARX Portugal ArquitectosJos MateusNuno ateusProject coordinator: Sofia Raposo
Collaboration: Participation in the preliminary design of the museum; technical drawings and models; communication with engineers.
41Cantanhede Museum
4.70
0.83
4.70
0.83
4.70
1.08
4.00
22.8
4
0.53
0.25
0.53
0.53
0.92
0.85
0.25
0.26
1.82
0.25
3.25
2.00
A.3 - PT
3.24
3.75
65.50
0.400.700.80
2.75
0.49
0.51
Arquitecto OA n 2281
Arquitecto OA n 3047
TCNICO RESPONSVEL
Arquitectura
ESPECIALIDADE
DONO DE OBRA
PROJECTO
DESIGNAO
FASE
ESCALA
DATA
PROJ.
DES.
SUBSTITUDO
Nuno Mateus
Jos Mateus
FORMATO ORIGINAL
ARX PORTUGAL
ARQUITECTURA
F +351 21 3918119T +351 21 3918110
Portugal1200-808 LisboaLargo de Santos, n4 - 1
INSTALAES ESPECIAIS
Torre de MonsantoRua Afonso Praa, 30 - 131495-061 Algs
T +351 213928920F +351 [email protected]
FUNDAES E ESTRUTURAS
R. Prof. Simes Raposo, n20 A1600-662 LisboaPortugal
T +351 21 7110008F +351 21 [email protected]
ARQUITECTURA PAISAGISTA
R. Pina Manique C3 1 Esq2780-287 OeirasPortugal
T +351 21 1913738F +351 21 [email protected]
ESCALA GRFICA
5M10
CORTE LONGITUDINAL 2
ficheiro digital -
PROJECTO DE EXECUO
Cmara Municipal deCantanhede
Museu de Arte e doColeccionismo de Cantanhede
CORTE LONGITUDINAL 21
Cob2T3RT1RT2PE7PI1RP1C1
Cob4T3RT1RT2PE3PI1RP1C1
Cob4T4RT1RT2PI2RP1C1
Cob1T2RT1RT2PE3PI3PI1RP1C1
T2RT1RT2PI4RP1C1
T3RT2RT1PI4RP1C1
Cob1T3RT2RT1PI4RP1C1
Cob1PE1PE4PE5C2DIV1
Cob1T1RT1PE1PE2PI1RP1C1
Cob1T1RT1PE1PE2PI1RP1C1
Cob3T1RT1PI1RP1C1
7 AXONOMETRIA - REDE METLICACORTE - ESC: 1/20
ENCONTRO COM O PAVIMENTO
PINGADEIRA
PARAFUSO EM AOINOX, SEXTAVADO, M6
FELTRO GEOTXTIL
TELAS DEIMPERMEABILIZAO
LAJE DE BETO
ISOLAMENTO TRMICOEM POLIESTIRENOEXTRUDIDO
TUBO DE AO/CALO50 X20MM, PARAPINTAR
LMINA RESILIENTESDM E=45MM
ESTRUTURA DE BETO
BUCHAS METLICASTIPO OU EQUIVALENTE"HILTI" HSA M6
MONTANTE EM CHAPADE AO GALVANIZADO,E=10MM
LAJETAS DE BETOPR-MOLDADOAPARENTE E=80MM
ESTRUTURA DE BETO
PARAFUSO EM AOINOX, SEXTAVADO, M6
REMATE DECOBERTURA COMCHAPA DE AOGALVANIZADO, E=12MM,PARA PINTAR
LAJETAS DE BETOPR-MOLDADOAPARENTE E=80MM
MONTANTE EM CHAPADE AO GALVANIZADO,E=10MM
CHAPA DE AOGALVANIZADO E=2MM,PARA PINTAR
MONTANTE EM CHAPADE AO GALVANIZADO,E=10MM
MALHA DE ALUMNIOTERMOLACADODISTENDINDO TIPO OUEQUIVALENTE "FILS"MODELO IDEA, COR ADEFINIR
VIDRO DUPLO TIPO OUEQUIVALENTE " VIDROEXTERIOR SGGSECURIT EM COOL-LITESKN 154 II DE 10MM,VIDRO INTERIOR SGGSECURIT EM SERALIT AIMITAR FOSCAGEM ACIDO DE 12MM, COMCAIXA DE AR DE 16MM
CHAPA DE AOGALVANIZADO E=2MM,PARA PINTAR
MALHA DE ALUMNIOTERMOLACADODISTENDINDO TIPO OUEQUIVALENTE "FILS"MODELO IDEA, COR ADEFINIR
MALHA DE ALUMNIOTERMOLACADODISTENDINDO TIPO OUEQUIVALENTE "FILS"MODELO IDEA,COR ADEFINIR
VIDRO DUPLO TIPO OUEQUIVALENTE " VIDROEXTERIOR SGGSECURIT EM COOL-LITESKN 154 II DE 10MM,VIDRO INTERIOR SGGSECURIT EM SERALIT AIMITAR FOSCAGEM ACIDO DE 12MM, COMCAIXA DE AR DE 16MM
REVESTIMENTO TIPOOU EQUIVALENTE"DRYVIT", CONSTITUDOPOR PLACASDE ESFEROVITE, TELATECIDA DE VIDRO COM150G/M2, PRIMRIO EREVESTIMENTO FINAL,PRONTO PARA PINTAR
CHAPA DE AOGALVANIZADO E=2MM,PARA PINTAR
APOIO DE MONTANTEEM CHAPA DE AOGALVANIZADO, E=10MMSOLDADA EM "T"
TRANSIO ENTRE CHAPAS
REMATE - COBERTURA
APOIO DE MONTANTEEM CHAPA DE AOGALVANIZADO, E=10MMSOLDADA EM "T"
BETONILHA ARMADACOM REDE MALHASOL,AFAGADA EESQUARTELADA,INCLUNDOENDURECEDOR DESUPERFCIE TIPO OUEQUIVALENTE "MAPEI,SRIE ULTRATOP", NACOR CINZA CLARO
REVESTIMENTO TIPOOU EQUIVALENTE"DRYVIT", CONSTITUDOPOR PLACASDE ESFEROVITE, TELATECIDA DE VIDRO COM150G/M2, PRIMRIO EREVESTIMENTO FINAL,PRONTO PARA PINTAR
BETONILHA ARMADACOM REDE MALHASOL,AFAGADA EESQUARTELADA,INCLUNDOENDURECEDOR DESUPERFCIE TIPO OUEQUIVALENTE "MAPEI,SRIE ULTRATOP", NACOR CINZA CLARO
BUCHAS METLICASTIPO OU EQUIVALENTE"HILTI" HSA M12
0.071.170.07
1.24
0.78
0.13
0.78
0.31
0.09
0.44
0.13
1 FACHADA - REDE METLICAALADO PARCIAL - ESC: 1/10
MALHA DE ALUMNIOTERMOLACADO TIPOOU EQUIVALENTE "FILS"MODELO IDEA,COR ADEFINIR
MALHA DE ALUMNIOTERMOLACADO TIPOOU EQUIVALENTE "FILS"MODELO GATE, COR ADEFINIR
MALHA DE ALUMNIOTERMOLACADO TIPOOU EQUIVALENTE "FILS"MODELO IDEA, COR ADEFINIR
VIDRO DUPLO TIPO OUEQUIVALENTE " VIDROEXTERIOR SGGSECURIT EM COOL-LITESKN 154 II DE 10MM,VIDRO INTERIOR SGGSECURIT PLANILUX DE12MM, COM CAIXA DEAR DE 16MM
CHAPA DE AOGALVANIZADO PARAPINTARE=2MM
ARO EM CHAPA DE AOGALVANIZADO PARAPINTAR, E=12MM
REVESTIMENTO TIPOOU EQUIVALENTE"DRYVIT", CONSTITUDOPOR PLACASDE ESFEROVITE, TELATECIDA DE VIDRO COM150G/M2, PRIMRIO EREVESTIMENTO FINAL,PRONTO PARA PINTAR
BETO APARENTE
CHAPA DE AOGALVANIZADO, E=2MMPARA PINTAR
10
11
12
13
14
15
16
17
18
G J L
5.30
3.50
0.55
3.33
0.20
1.98
0.38
2.67
0.38
3.26
1.50
16.6
41.
500.
75
0.55
5.93
0.32
1.50
0.40
7.75
0.35
7.77
0.37
1.50
0.30
2.92
0.55
0.55
5.93
0.32
19.6
40.
303.
550.
55
0.34 0.30 10.38 0.30 1.40 0.35 6.67 0.30 2.73 0.35 3.50 0.66 5.40 0.55
0.30 10.38 1.40 0.35 1.25 0.20 2.75 0.30 5.31
0.35
3.50 0.40 5.65 0.55
0.16 5.73 0.25 2.95 0.35 10.15 0.35 0.66 5.39
0.35
0.30
4.32
0.34 4.32
58.45
58.45
58.45
0.60
1.75 0.38 6.85 3.23 0.35
1.20
0.20 5.18
2.65
0.30
2.98
0.32
10.38
0.300.251.347.701.34
0.250.30
0.45
0.45
0.63
0.35
7.000.70
26.83
0.600.352.5012.070.380.382.50
14.923.61 8.30
2.15
2.80
1.55
2.80
0.65
0.35
0.30
2.80
1.55
2.15
3.15
1
2
3
4
5
6
7
8
9
1.20
inc.= 1.3%
inc.=0.6%
inc.= 1.5%
inc.=0.6%
inc.= 0.6%
inc.=1.3%
inc.=0.6%
inc.=0.6%
inc.= 1,5%62.65
61.28
62.63
58.48
61.20
59.83
59.85
58.31 58.40
58.31 58.40
61.26
58.50 58.33
60.71
H2O61.11
60.71
58.40
58.40
58.40
0.50
0.50
Posio de projectores a confirmar em funoda colocao definitiva das rvores
Iluminao do espelho de gua conformeprojecto de especialidades, colocados sempre
a eixo das lajetas de beto
Tronco de rvore implantadoconforme projeto de especialidade
Iluminao exterior conforme projecto deespecialidades, colocados sempre a eixo dos
painis de beto
Todas as caixas de visita devero sercolocadas sempre a eixo dos painis debeto e completamente ocultas pordebaixo do canteiro de mulch
Guarda em vidro
0.690.10
0.10 0.10
0.10
0.50
0.50
0.50
0.50
0.50
0.50
2.80
1.95
2.38 1.15
Arquitecto OA n 2281
Arquitecto OA n 3047
TCNICO RESPONSVEL
Arquitectura
ESPECIALIDADE
DONO DE OBRA
PROJECTO
DESIGNAO
FASE
ESCALA
DATA
PROJ.
DES.
SUBSTITUDO
Nuno Mateus
Jos Mateus
FORMATO ORIGINAL
ARX PORTUGAL
ARQUITECTURA
F +351 21 3918119T +351 21 3918110
Portugal1200-808 LisboaLargo de Santos, n4 - 1
INSTALAES ESPECIAIS
Torre de MonsantoRua Afonso Praa, 30 - 131495-061 Algs
T +351 213928920F +351 [email protected]
FUNDAES E ESTRUTURAS
R. Prof. Simes Raposo, n20 A1600-662 LisboaPortugal
T +351 21 7110008F +351 21 [email protected]
ARQUITECTURA PAISAGISTA
R. Pina Manique C3 1 Esq2780-287 OeirasPortugal
T +351 21 1913738F +351 21 [email protected]
PLANTA PISO -11
Balco
0.13SalaTcnicade PisoA=11.50m2
Apoio a Exposies
0.08ArrecadaoA=34,05 m2
C1RP1PI1T1COB2
0.07Sala PolivalenteA=399,05 m2
C1RP1PI4T2RT1RT2
C1RP1PI1PI3PE3T2RT1RT2COB1
0.11AssociaoC.F.A=20,75 m2
C1RP1PI1PE3T3RT1RT2COB4
0.18 Arrumos A.T.A=3,70 m2
0.21CafetariaA=38,45 m2
C1RP1PI1T3RT1RT2COB4
0.15I.S.FemininasA=13,40 m2
C1RP1PI2T4RT1RT2COB4
0.16I.S.DeficientesA=5,80 m2 0.20Servios educativos
A=46,30 m2
0.19AdministraoA=46,30 m2
C1RP1PI1PE3T3RT1RT2COB4
0.23Reservas Visitveis / Sala de ExposiesA=111,15 m2
C1RP1PI1PE3T3RT1RT2COB2
A.4Ptio 3A=14,30 m2
A.3Ptio 2A=57,00 m2
0.17I.S.MasculinasA=13.40 m2
0.14ArrumosA=4,45 m2
0.09Apoios 1A=13,85 m2
C1RP1PI1T1COB4
0.10Apoios 2A=20,10 m2
C1RP1PI1T3RT1RT2COB4
0.12Apoio Reservas Visitveis/Sala de Exposies 1A=35,70 m2
C1RP1PI1PE3T3RT1RT2COB2
0.22Apoio Reservas Visitveis/ Sala de Exposies 2A=21,30 m2
C1RP1PI2T4RT1RT2COB4
C1RP1PI2T4RT1RT2COB4
C1RP1PI1T1COB4
C1RP1PI1T1
COB3
COB3
A.2Ptio 1A=22,75 m2
A.E.1Feira do ColeccionismoA=546,70 m2
ESCADA N 1
ESCADA N 2
ESCADA N 3
0.06rea TcnicaBombasA=18,05 m2
C1PI7T1
ESCALA GRFICA
5M10
C1RP1PI1PE3T3RT1RT2COB4
PLANTA PISO -2 _ PISO -1
ficheiro digital -
PROJECTO DE EXECUO
Cmara Municipal deCantanhede
Museu de Arte e doColeccionismo de Cantanhede
2A-203
1A-203
1A-202
1A-201
1A-204
1A-206
1A-207
1A-205
C1RP1PI1T3RT1RT2COB4
C1RP1PI1T3RT1RT2COB4
C1RP1PI1PE3T3RT1RT2COB2
A.E.2Entrada da Sala PolivalenteA=256,80 m2
Section
1st Floor PlanBasement Floor Plan
Wall Detail
0.50
1.40
22.9
01.
05
0.50 1.40 0.40 10.38 0.40 2.84
0.50
0.50
4.382.86
2.841.20
0.41
1.060.401.400.50
3.85
3.14
0.93
0.24 1
.53
2.75
1.30
2.75
1.30
2.25
1.85
1.45
3.15
1.60
1.40
8.15
0.50
1.60
8.19
0.28Exposies PermanentesA=360,45m2
C1Rp1PI4T3
76.15
Cob1
ESCADA N 1
ESCADA N 2
ESCALA GRFICA
5M10
2A-203
1A-203
1A-202
1A-201
1A-204
1A-206
1A-207
1A-205
C1RP1PI1PI6
T1RT1Cob1
PE1PE2PE3PE4
C1RP1PI1
T1RT1Cob1
PE1PE2PE3
C1RP1PI1PI6
T1RT1Cob1
PE1PE2PE4
4.70
0.83
4.70
0.83
4.70
1.08
4.00
22.8
4
0.53
0.25
0.53
0.53
0.92
0.85
0.25
0.26
1.82
0.25
3.25
2.00
A.3 - PT
3.24
3.75
65.50
0.400.700.80
2.75
0.49
0.51
Arquitecto OA n 2281
Arquitecto OA n 3047
TCNICO RESPONSVEL
Arquitectura
ESPECIALIDADE
DONO DE OBRA
PROJECTO
DESIGNAO
FASE
ESCALA
DATA
PROJ.
DES.
SUBSTITUDO
Nuno Mateus
Jos Mateus
FORMATO ORIGINAL
ARX PORTUGAL
ARQUITECTURA
F +351 21 3918119T +351 21 3918110
Portugal1200-808 LisboaLargo de Santos, n4 - 1
INSTALAES ESPECIAIS
Torre de MonsantoRua Afonso Praa, 30 - 131495-061 Algs
T +351 213928920F +351 [email protected]
FUNDAES E ESTRUTURAS
R. Prof. Simes Raposo, n20 A1600-662 LisboaPortugal
T +351 21 7110008F +351 21 [email protected]
ARQUITECTURA PAISAGISTA
R. Pina Manique C3 1 Esq2780-287 OeirasPortugal
T +351 21 1913738F +351 21 [email protected]
ESCALA GRFICA
5M10
CORTE LONGITUDINAL 2
ficheiro digital -
PROJECTO DE EXECUO
Cmara Municipal deCantanhede
Museu de Arte e doColeccionismo de Cantanhede
CORTE LONGITUDINAL 21
Cob2T3RT1RT2PE7PI1RP1C1
Cob4T3RT1RT2PE3PI1RP1C1
Cob4T4RT1RT2PI2RP1C1
Cob1T2RT1RT2PE3PI3PI1RP1C1
T2RT1RT2PI4RP1C1
T3RT2RT1PI4RP1C1
Cob1T3RT2RT1PI4RP1C1
Cob1PE1PE4PE5C2DIV1
Cob1T1RT1PE1PE2PI1RP1C1
Cob1T1RT1PE1PE2PI1RP1C1
Cob3T1RT1PI1RP1C1
42
SERLACHIUS MuseumARX Portgual Arquitectos|Competition|2011
Place: Joennniemi Manor, Finland
Area: 4.644m2
Client: Serlachius Museum
Architects: ARX Portugal ArquitectosJos MateusNuno ateusTeam Work: Sofia Raposo, Fabio Corts, Perseu Mandillo.
Collaboration: Participation in the development of the design concept; presentation production; virtual images - photoshop.
43Serlachius Museum
99.00
99.80
100.50
101.00
100.00
101.20105.15
101.40105.15
101.40105.15
101.40104.20
101.40105.15
101.40104.20
101.40104.20
101.40105.15
security clearanceexisting house + proposal - level -2
watersurface
EE EE
DD DD
CC CC
BB
BB
SOUTH SECTION
EAST
SEC
TION
50 m260 m2
lake
lake
lake
10 m2
N
scale 1/200
0 1 5 10
scale 1/200
99.80
102.00
102.50
103.00
103.50
104.00
104.5
105.50
106.00
106.50
107.18107.50
106.67
107.14
106.00
106.50
105.50
107.00
105.00
106.67
106.67
106.67
106.67
106.67
107.00
106.00
105.50
ET
ET
ET
ET
ET
ET
ET
ET
ET
ET
ET
ET
ET
ET
ET
ET
ET
ET
ET
ET
ET
ET
ET
museum entrance
exterior connection toserlachius museum
trash
sauna access
museum entrance
N
scale 1/200
scale 1/200
sherlachius museum gsta extension _gsta serlachius fine arts foundation _ 031 7 0 1 6 9 _
work process
circulation scheme
functional organization scheme
sauna design - scale 1/200
The new museum comes together as a landscape that reinterprets the concept of the existing garden and its accesses,as it simultaneously redesigns the current coastline, allowing the water to be part of the architecture composition.By reinforcing some of Paul Olsson's past intentions for this place, water comes out as sculptural element delineatinginner space. In its territorial expression, this water crosses and interacts with other natural elements - stone, wood andgreen structures - in a long wandering parterre between building and lake margin.
ET - Existing Trees NT - New Trees
0 1 5 10
Ground Floor Plan Basement Floor Plan Sections
Joana Pedro
contact: +351 918115710mail: [email protected]