EXISTING DRAINAGE SYSTEM
AS SHOWN
2.1 0
Portion A
Portion B
Portion C
Portion D
Portion E
Portion F
Portion G
Remark: Adopted from Figure 5.1 of Drainage Study For Ngong Ping, Final Report.
Portion A - Watercourse near water storage tank at the North of Po Lin Monastery.
Portion B - Box culvert underneath Po Lin Monastery.
Portion C - The 2.85m(W) x 1.65m(H) box culvert located at the south of Po Lin Monastery.
Portion D - The 1650mm diameter twin-pipe.
Portion E - The natural stream between the 1650mm diameter twin-pipe and the gabion channel
next to Ngong Ping 360 Terminal.
Portion F - Gabion channel near Ngong Ping 360 Terminal.
Portion G - The natural stream at the downstream of gabion channel.