EXISTING DRAINAGE SYSTEM AS SHOWN 2.1 0 Portion A Portion B Portion C Portion D Portion E Portion F Portion G Remark: Adopted from Figure 5.1 of Drainage Study For Ngong Ping, Final Report. Portion A - Watercourse near water storage tank at the North of Po Lin Monastery. Portion B - Box culvert underneath Po Lin Monastery. Portion C - The 2.85m(W) x 1.65m(H) box culvert located at the south of Po Lin Monastery. Portion D - The 1650mm diameter twin-pipe. Portion E - The natural stream between the 1650mm diameter twin-pipe and the gabion channel next to Ngong Ping 360 Terminal. Portion F - Gabion channel near Ngong Ping 360 Terminal. Portion G - The natural stream at the downstream of gabion channel.
Transcript
Page 1: Portion A - Watercourse near water storage tank at the ...

EXISTING DRAINAGE SYSTEM

AS SHOWN

2.1 0

Portion A

Portion B

Portion C

Portion D

Portion E

Portion F

Portion G

Remark: Adopted from Figure 5.1 of Drainage Study For Ngong Ping, Final Report.

Portion A - Watercourse near water storage tank at the North of Po Lin Monastery.

Portion B - Box culvert underneath Po Lin Monastery.

Portion C - The 2.85m(W) x 1.65m(H) box culvert located at the south of Po Lin Monastery.

Portion D - The 1650mm diameter twin-pipe.

Portion E - The natural stream between the 1650mm diameter twin-pipe and the gabion channel

next to Ngong Ping 360 Terminal.

Portion F - Gabion channel near Ngong Ping 360 Terminal.

Portion G - The natural stream at the downstream of gabion channel.