25
PORTOLA MIDDLE SCHOOL PROJECT STATUS PRESENTATION M 31 2014 May 31, 2014 School Designer Design Awards Design Awards Bronze Award: Library/Media Center PORTOLA MIDDLE / FAIRMONT ELEMENTARY SCHOOLS WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT PROJECT STATUS UPDATE MAY 31, 2014 HIBSER YAMAUCHI ARCHITECTS, INC.
Transcript
Page 1: PORTOLA MIDDLE SCHOOL › 2014 › 06 › ... · May –Sept 2014 Permit ‐WCCUSD QA/QC Oct 2014 –Sept 2015 May 2016 –Sept 2016 Construction – Sept 2016 –Sept 2018 Renovate

PORTOLA MIDDLE SCHOOL PROJECT STATUS PRESENTATIONM 31 2014May 31, 2014

School DesignerDesign AwardsDesign Awards

Bronze Award: Library/Media Center

P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014

HIBSER YAMAUCHIARCHITECTS, INC.

Page 2: PORTOLA MIDDLE SCHOOL › 2014 › 06 › ... · May –Sept 2014 Permit ‐WCCUSD QA/QC Oct 2014 –Sept 2015 May 2016 –Sept 2016 Construction – Sept 2016 –Sept 2018 Renovate

BUILDING C BUILDING D

BUILDING ABUILDING B

P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014

HIBSER YAMAUCHIARCHITECTS, INC.

Page 3: PORTOLA MIDDLE SCHOOL › 2014 › 06 › ... · May –Sept 2014 Permit ‐WCCUSD QA/QC Oct 2014 –Sept 2015 May 2016 –Sept 2016 Construction – Sept 2016 –Sept 2018 Renovate

LOWER LEVEL –PHYSICAL ACTIVITY

BUILDING D

BUILDING C

BUILDING D

BUILDING ABUILDING B

P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014

HIBSER YAMAUCHIARCHITECTS, INC.

Page 4: PORTOLA MIDDLE SCHOOL › 2014 › 06 › ... · May –Sept 2014 Permit ‐WCCUSD QA/QC Oct 2014 –Sept 2015 May 2016 –Sept 2016 Construction – Sept 2016 –Sept 2018 Renovate

MID-LEVELENTRY AND ACADEMIC

BUILDING D

BUILDING C

BUILDING D

BUILDING ABUILDING B

P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014

HIBSER YAMAUCHIARCHITECTS, INC.

Page 5: PORTOLA MIDDLE SCHOOL › 2014 › 06 › ... · May –Sept 2014 Permit ‐WCCUSD QA/QC Oct 2014 –Sept 2015 May 2016 –Sept 2016 Construction – Sept 2016 –Sept 2018 Renovate

UPPER LEVELARTS / MULTI-USE

BUILDING D

BUILDING C

BUILDING D

BUILDING ABUILDING B

P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014

HIBSER YAMAUCHIARCHITECTS, INC.

Page 6: PORTOLA MIDDLE SCHOOL › 2014 › 06 › ... · May –Sept 2014 Permit ‐WCCUSD QA/QC Oct 2014 –Sept 2015 May 2016 –Sept 2016 Construction – Sept 2016 –Sept 2018 Renovate

BUILDING AORIGINAL CLASSROOM BUILDINGBUILDING

P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014

HIBSER YAMAUCHIARCHITECTS, INC.

Page 7: PORTOLA MIDDLE SCHOOL › 2014 › 06 › ... · May –Sept 2014 Permit ‐WCCUSD QA/QC Oct 2014 –Sept 2015 May 2016 –Sept 2016 Construction – Sept 2016 –Sept 2018 Renovate

BUILDING BNEW GYM / ADMIN / LIBRARYLIBRARY

P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014

HIBSER YAMAUCHIARCHITECTS, INC.

Page 8: PORTOLA MIDDLE SCHOOL › 2014 › 06 › ... · May –Sept 2014 Permit ‐WCCUSD QA/QC Oct 2014 –Sept 2015 May 2016 –Sept 2016 Construction – Sept 2016 –Sept 2018 Renovate

BUILDING CNEW CLASSROOM BUILDINGBUILDING

P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014

HIBSER YAMAUCHIARCHITECTS, INC.

Page 9: PORTOLA MIDDLE SCHOOL › 2014 › 06 › ... · May –Sept 2014 Permit ‐WCCUSD QA/QC Oct 2014 –Sept 2015 May 2016 –Sept 2016 Construction – Sept 2016 –Sept 2018 Renovate

BUILDING DNEW MULTI-PURPOSEBUILDINGBUILDING

P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014

HIBSER YAMAUCHIARCHITECTS, INC.

Page 10: PORTOLA MIDDLE SCHOOL › 2014 › 06 › ... · May –Sept 2014 Permit ‐WCCUSD QA/QC Oct 2014 –Sept 2015 May 2016 –Sept 2016 Construction – Sept 2016 –Sept 2018 Renovate

SCHEDULE

Complete Construction– Outfit FF&E

CURRENT CONTRACT

Today – Dec 2015

Renovate Temp Campus for Fairmont J 2016 A 2016

Move‐in –March/April 2016

Outfit FF&EJan 2016 – March 2016

June 2016 ‐ Aug 2016

POTENTIAL BEST CASE

Complete Construction–Today – Oct 2015

Move‐in –

Outfit FF&ENov 2015 – Dec 2015

POTENTIAL BEST CASE

Jan/Feb 2016Renovate Temp Campus for Fairmont March 2016 ‐May 2016

P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014

HIBSER YAMAUCHIARCHITECTS, INC.

Page 11: PORTOLA MIDDLE SCHOOL › 2014 › 06 › ... · May –Sept 2014 Permit ‐WCCUSD QA/QC Oct 2014 –Sept 2015 May 2016 –Sept 2016 Construction – Sept 2016 –Sept 2018 Renovate

FAIRMONT ELEMENTARY SCHOOL

Leroy F. Green Design Awards

Award of Merit

P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014

HIBSER YAMAUCHIARCHITECTS, INC.

Page 12: PORTOLA MIDDLE SCHOOL › 2014 › 06 › ... · May –Sept 2014 Permit ‐WCCUSD QA/QC Oct 2014 –Sept 2015 May 2016 –Sept 2016 Construction – Sept 2016 –Sept 2018 Renovate

CURRENT CAMPUS

• 55 year old campus 

• 2.95 acres

• 38,500 S.F. of Buildings

• 580 Pre‐K through 6th grade enrollment in 2013‐2014

• 24 classrooms

• Administration, Kindergarten classrooms and Library areclassrooms, and Library are undersized.

• Special Education classrooms are inadequate.

• Staff parking used by Public Library and Senior Center

P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014

HIBSER YAMAUCHIARCHITECTS, INC.

Page 13: PORTOLA MIDDLE SCHOOL › 2014 › 06 › ... · May –Sept 2014 Permit ‐WCCUSD QA/QC Oct 2014 –Sept 2015 May 2016 –Sept 2016 Construction – Sept 2016 –Sept 2018 Renovate

PROGRAM NEEDS

• Increase in Enrollment up to 611 students

• 10% Special Ed. – appropriate spaces needed

• Increase in classrooms required• Increase in classrooms required

• Flexible Multi‐Use spaces required

• Larger Multi‐Purpose & Administration

• More kindergarten classrooms• More kindergarten classrooms 

• Maintain existing play area

• Improve Sp. Ed Bus Pick‐Up / Drop‐off

• Improve control of campus entry pointsImprove control of campus entry points

P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014

HIBSER YAMAUCHIARCHITECTS, INC.

Page 14: PORTOLA MIDDLE SCHOOL › 2014 › 06 › ... · May –Sept 2014 Permit ‐WCCUSD QA/QC Oct 2014 –Sept 2015 May 2016 –Sept 2016 Construction – Sept 2016 –Sept 2018 Renovate

CHALLENGES

• Small site

• Site orientation – classroomSite orientation  classroom daylighting

• BART noise

• Pick‐up and drop‐ off congestion

• Separating Public library and Senior Center from campus

P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014

HIBSER YAMAUCHIARCHITECTS, INC.

Page 15: PORTOLA MIDDLE SCHOOL › 2014 › 06 › ... · May –Sept 2014 Permit ‐WCCUSD QA/QC Oct 2014 –Sept 2015 May 2016 –Sept 2016 Construction – Sept 2016 –Sept 2018 Renovate

BUILDING SECTION

P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014

HIBSER YAMAUCHIARCHITECTS, INC.

Page 16: PORTOLA MIDDLE SCHOOL › 2014 › 06 › ... · May –Sept 2014 Permit ‐WCCUSD QA/QC Oct 2014 –Sept 2015 May 2016 –Sept 2016 Construction – Sept 2016 –Sept 2018 Renovate

PROGRAM DRIVEN REPLACEMENT CAMPUSCAMPUS

• 3.23 acres

• 75,973 S.F.

• 611 Pre‐K through 6th grade enrollment

• 34 classrooms

• Administration controls campus points of entry

• Sp Ed classrooms size• Sp. Ed. classrooms ‐ size increased to 1,450 S.F. District Standard

• Two Multi‐Purpose rooms for instructional Flexibility.

• Outdoor learning spaces

P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014

HIBSER YAMAUCHIARCHITECTS, INC.

Page 17: PORTOLA MIDDLE SCHOOL › 2014 › 06 › ... · May –Sept 2014 Permit ‐WCCUSD QA/QC Oct 2014 –Sept 2015 May 2016 –Sept 2016 Construction – Sept 2016 –Sept 2018 Renovate

CLASSROOM WING

• 960 S.F. classrooms following District standards.

• 18 foot long teaching wall

• Ceiling mounted projector & pull down screen

• 4 computer stations

• Tall operable windows

• Classrooms meet CHPS criteria

STANDARD CLASSROOM

P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014

HIBSER YAMAUCHIARCHITECTS, INC.

Page 18: PORTOLA MIDDLE SCHOOL › 2014 › 06 › ... · May –Sept 2014 Permit ‐WCCUSD QA/QC Oct 2014 –Sept 2015 May 2016 –Sept 2016 Construction – Sept 2016 –Sept 2018 Renovate

SPECIAL ED. CLASSROOMS

• Three 1,450 S.F. classrooms with changing room, showers, laundry, restroom, and office/storage area.

• Pre-K, Primary and Secondary Severely Handicappedpp

• Learning Center• Speech• Full Inclusion / ICHAT• Occupational Therapy

STANDARD SPECIAL ED CLASSROOM

Occupational Therapy

P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014

HIBSER YAMAUCHIARCHITECTS, INC.

Page 19: PORTOLA MIDDLE SCHOOL › 2014 › 06 › ... · May –Sept 2014 Permit ‐WCCUSD QA/QC Oct 2014 –Sept 2015 May 2016 –Sept 2016 Construction – Sept 2016 –Sept 2018 Renovate

KINDERGARTEN WING

• 4 classrooms @ 1,450 S.F.; i l d h d k

SHARED WORKROOM

includes shared workspace, storage and student restrooms

• 18 foot long teaching wall

• High sloped ceilings forHigh sloped ceilings for daylighting and ventilation.

STANDARD KINDERGARTEN

P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014

HIBSER YAMAUCHIARCHITECTS, INC.

Page 20: PORTOLA MIDDLE SCHOOL › 2014 › 06 › ... · May –Sept 2014 Permit ‐WCCUSD QA/QC Oct 2014 –Sept 2015 May 2016 –Sept 2016 Construction – Sept 2016 –Sept 2018 Renovate

MULTI-PURPOSE BUILDING

• 8,513 S.F.

• Kitchen / Community kitchen

MULTI-PURPOSE ROOM STAGE

• Kitchen / Community kitchen

• Speedline

• Stage with access ramp

• Table / Chair Storage

KITCHEN

• Table / Chair Storage

• Lobby

• Outdoor Eating Area

LOBBY

P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014

HIBSER YAMAUCHIARCHITECTS, INC.

Page 21: PORTOLA MIDDLE SCHOOL › 2014 › 06 › ... · May –Sept 2014 Permit ‐WCCUSD QA/QC Oct 2014 –Sept 2015 May 2016 –Sept 2016 Construction – Sept 2016 –Sept 2018 Renovate

ADMINISTRATION WING

• Control of visitors enteringControl of visitors entering campus.

• Administration on ground floor.

• Community Clinic, Parents’ 

GROUND

Workroom, and Staff Lounge on second floor.

SECOND

P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014

HIBSER YAMAUCHIARCHITECTS, INC.

S CON

Page 22: PORTOLA MIDDLE SCHOOL › 2014 › 06 › ... · May –Sept 2014 Permit ‐WCCUSD QA/QC Oct 2014 –Sept 2015 May 2016 –Sept 2016 Construction – Sept 2016 –Sept 2018 Renovate

LIBRARY

• 2,800 S.F. state‐of‐the‐art Library / media center

• Story area with built in seating

C t il

MEDIACENTER

• Computer area easily supervised

• Ceiling mounted projection screen

WORK ROOM STOR

• Centrally located

• Flexibility

WORK ROOM STOR.

LIBRARY

P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014

HIBSER YAMAUCHIARCHITECTS, INC.

Page 23: PORTOLA MIDDLE SCHOOL › 2014 › 06 › ... · May –Sept 2014 Permit ‐WCCUSD QA/QC Oct 2014 –Sept 2015 May 2016 –Sept 2016 Construction – Sept 2016 –Sept 2018 Renovate

SITE FEATURES

• Fully accessible site

• Tactile learning panels at all classroom entries

• Making use of outdoor spaces l ias learning areas 

• Emphasis on local history & ecosystems

• Daylighting circulation – bothDaylighting circulation  both floors Classroom wing

• Community Garden

• Design meets CHPS requirements

P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014

HIBSER YAMAUCHIARCHITECTS, INC.

Page 24: PORTOLA MIDDLE SCHOOL › 2014 › 06 › ... · May –Sept 2014 Permit ‐WCCUSD QA/QC Oct 2014 –Sept 2015 May 2016 –Sept 2016 Construction – Sept 2016 –Sept 2018 Renovate

SCHEDULE

Complete Design –

Bidding –

May – Sept 2014

Permit ‐WCCUSD QA/QCOct 2014 – Sept 2015

Bidding May 2016 – Sept 2016

Construction  –Sept 2016 – Sept 2018

Renovate Temp Campus for Fairmont June 2016 – Aug 2016

P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014

HIBSER YAMAUCHIARCHITECTS, INC.

Page 25: PORTOLA MIDDLE SCHOOL › 2014 › 06 › ... · May –Sept 2014 Permit ‐WCCUSD QA/QC Oct 2014 –Sept 2015 May 2016 –Sept 2016 Construction – Sept 2016 –Sept 2018 Renovate

Thank you!

P O RTOLA M I D D L E / F A I RM O NT E L E M E N T A R Y S C H O O L SWEST CONTRA COSTA UNIFIED SCHOOL DISTRICTPROJECT STATUS UPDATEMAY 31, 2014