Poseidon Med II George Polychroniou Poseidon Med II - Project Manager Executive Director Strategy, Business Development, Administration & IT DEPA Public Gas Corporation S.A. LNG: The meeting point for Marine Transport & Energy sectors in Cyprus Limassol Cyprus September 29, 2017
Transcript
Page 1: Poseidon Med II · Poseidon Med II George Polychroniou Poseidon Med II - Project Manager Executive Director Strategy, Business Development, Administration & IT DEPA –Public Gas

Poseidon Med IIGeorge Polychroniou

Poseidon Med II - Project Manager

Executive Director

Strategy, Business Development, Administration & IT

DEPA – Public Gas Corporation S.A.

LNG: The meeting point for Marine Transport & Energy sectors in CyprusLimassol Cyprus

September 29, 2017

Page 2: Poseidon Med II · Poseidon Med II George Polychroniou Poseidon Med II - Project Manager Executive Director Strategy, Business Development, Administration & IT DEPA –Public Gas

I. LNG as Marine Fuel

II. Poseidon Med II project

III.LNG in Cyprus

Content

Page 3: Poseidon Med II · Poseidon Med II George Polychroniou Poseidon Med II - Project Manager Executive Director Strategy, Business Development, Administration & IT DEPA –Public Gas

I. LNG as Marine Fuel

II. Poseidon Med II project

III.LNG in Cyprus

Page 4: Poseidon Med II · Poseidon Med II George Polychroniou Poseidon Med II - Project Manager Executive Director Strategy, Business Development, Administration & IT DEPA –Public Gas

4

International regulation on the emission control

…in ECA have use fuel oil with a sulphurcontent of no more than 0.10% since

1 January 2015.

…outside (ECA), the current limit for sulphur content of fuel oil is 3.50%,

falling to 0.50% m/m on after 1 January 2020

Ships trading…

Page 5: Poseidon Med II · Poseidon Med II George Polychroniou Poseidon Med II - Project Manager Executive Director Strategy, Business Development, Administration & IT DEPA –Public Gas

5

Alternatives based on MARPOL Annex VI

MARPOL - Annex VI

Page 6: Poseidon Med II · Poseidon Med II George Polychroniou Poseidon Med II - Project Manager Executive Director Strategy, Business Development, Administration & IT DEPA –Public Gas

• Recent decision of IMO/MEPC will speed up developments

• LNG competition with Low Sulphur Bunker Fuels and EGCS (scrubbers) but:

Competition depends on oil price level and LNG decoupling

LNG can offer compliance with potential future environmental regulation

(NOx, PM, COx)

Conversion Investments payback often < 5 years

LNG could be the most beneficial option for:

− Smaller vessels

− New builds

− Vessels operating on fixed routes (e.g. Container vessels, Ferries,

Cruise ships)

• Other issues also matter (safety, reliability)

6

LNG as marine fuel

Page 7: Poseidon Med II · Poseidon Med II George Polychroniou Poseidon Med II - Project Manager Executive Director Strategy, Business Development, Administration & IT DEPA –Public Gas

7

LNG fuelled Vessels

Excluding LNG carriers & inland waterway vessels

Source: DNV-GL, May 2017

There are currently 221 confirmed LNG ship fuel projects

1 1 3 3 3 4 8 9 15 21 25 35 4556

7597 106

34

73

98 108 110 113 113 115

10

50

100

150

200

250

Axi

s Ti

tle

Ships in operation Ships on order

106 LNG fuelled ships in operation worldwide today

115 confirmed LNG fuelled newbuilds in 2024

Page 8: Poseidon Med II · Poseidon Med II George Polychroniou Poseidon Med II - Project Manager Executive Director Strategy, Business Development, Administration & IT DEPA –Public Gas

8

LNG fuelled ships cover large area

The heat map is based on the LNG fuelled fleet’s AIS positions from 15.05.2017 – 25.05.2017

Page 9: Poseidon Med II · Poseidon Med II George Polychroniou Poseidon Med II - Project Manager Executive Director Strategy, Business Development, Administration & IT DEPA –Public Gas

9

LNG Demand for Bunkering

Different views often diverging.Drivers that could speed up the

demand:

New environmental regulations

Availability and cost of ownership for other bunker fuels

Optimization of the SSLNG supply chain

1

2

3

LNG Consumption as a bunker fuel

Source: Forecasting the future of Marine fuel, BCG, 2015

263 252 210155 116

23143

191 237

7

86

174

0

100

200

300

400

500

600

2014 2015 2020 2025 2030

Shipping Industry

Conventional HFO cleaned by scrubbers LNG

Tons (millions)

Page 10: Poseidon Med II · Poseidon Med II George Polychroniou Poseidon Med II - Project Manager Executive Director Strategy, Business Development, Administration & IT DEPA –Public Gas

I. LNG as Marine Fuel

II.Poseidon Med II project

III.LNG in Cyprus

Page 11: Poseidon Med II · Poseidon Med II George Polychroniou Poseidon Med II - Project Manager Executive Director Strategy, Business Development, Administration & IT DEPA –Public Gas

11

LNG at Ports

Piraeus

Patra

Heraklion

Igoumenitsa

Limassol

Venice

3 Countries

6 Ports

Greece

Italy

Cyprus

Duration: Jun.2015 – Dec.2020

Budget: ~€53M

Coordinator: DEPA

Technical Coordinator:

DESFA

Partenrs: 26

Co-financed: 50% by EU - CEFConnecting EuropeFacility

0

Page 12: Poseidon Med II · Poseidon Med II George Polychroniou Poseidon Med II - Project Manager Executive Director Strategy, Business Development, Administration & IT DEPA –Public Gas

12

Partners

Page 13: Poseidon Med II · Poseidon Med II George Polychroniou Poseidon Med II - Project Manager Executive Director Strategy, Business Development, Administration & IT DEPA –Public Gas

13

Activities

01Studies for Ports

02Designs of Vessels

03Regulation

04Financial

Synergies

Infrastructure at Revithoussa LNG terminal -

LNG infrastructure at 5 ports -

- Financial assessment

- Financial tools for investments Adaptation of regulatory framework -

Environmental impact assessment -

- LNG fuelled vessels (newbuilds & retrofit)

- LNG bunkering and feeder

Page 14: Poseidon Med II · Poseidon Med II George Polychroniou Poseidon Med II - Project Manager Executive Director Strategy, Business Development, Administration & IT DEPA –Public Gas

I. LNG as Marine Fuel

II. Poseidon Med II project

III.LNG in Cyprus

Page 15: Poseidon Med II · Poseidon Med II George Polychroniou Poseidon Med II - Project Manager Executive Director Strategy, Business Development, Administration & IT DEPA –Public Gas

15

Need for Synergies

LNG as marine fuel Road transport sector

Off grid areas individual/remote consumers,

potential distribution companies

Power Generation Plants Vasilikos power plant/ Greek Aegean islands

Page 16: Poseidon Med II · Poseidon Med II George Polychroniou Poseidon Med II - Project Manager Executive Director Strategy, Business Development, Administration & IT DEPA –Public Gas

LimassolVassilikos

16

LNG in Cyprus

LNG to be transferred from FSRU in Vassilikos…

Page 17: Poseidon Med II · Poseidon Med II George Polychroniou Poseidon Med II - Project Manager Executive Director Strategy, Business Development, Administration & IT DEPA –Public Gas