Works Area U: Hoi Ting Road Works Area
130Powered Mechanical
EquipmentTM Ref./
BS/No. ofItems SWL/Item On-time Noise Mitigation Noise
Barrier Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A)
Breaker, mini-robot mounted BS C2/10 1 110 75% 109Mobile Crane BS
C7/114 1 101 30% 96Trucks BS C9/39 2 103 30% 101Concrete lorry mixer BS C6/23 1 100 30% 95Vibratory poker OCNP
024 2 94 30% 92Air compressor, air flow >30mm3/minCNP 003 2 104 50% Enclosure/Shed* 15 89Handheld breaker CNP 024 2 108 50% 108Generator, silenced CNP 102 1 100 75% 99
Total 109 110Max 110
131Powered Mechanical
EquipmentTM Ref./
BS/No. ofItems SWL/Item On-time Noise Mitigation Noise
Barrier Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A)Fork lift truck BS C7, 93 1 104 30% 99Road Trucks BS C9/39 1 103 30% 98
Total 101Remark:
Possession of site
Powered Mechanical Equipment Adopted in EIA of Express Rail Link (Mitigated Scenario)
Appendix 3.18 Construction Noise Impact of Express Rail Link on Identified Noise Sensitive Receivers
Site storage
# With reference to MTRC Contract C4420 Tsim Sha Tsui Modification Noise Assessment Report for Variation of Environmental Permit, July 2003, noise reduction of 10dB(A) would beachieved with the use of noise insulating fabric.^ According to Table B.1 of BS 5228: Part 1: 1997, rock drill in portable or fixed acoustic enclosure with suitable ventilation could achieve a noise reduction of 20dB(A).
(1) EIA Ref. 1 - SWL of Welding Plant refer to the approved EIA Report of Sheung Shui to Lok Ma Chau Spur Line (AEIAR-052/2002). EIA Ref. 2 - SWL of narrow gauge trains refer to approved EIA Report of Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel (AEIAR-099/2006) EIA Ref. 3 - The SWL of rock crusher refer to approved EIA Report of Planning and Engineering Feasibility Study for Development at Anderson Road (AEIAR-007/1999) BS - British Standard BS5228:1997, Part 1 Noise and Vibration Control on Construction and Open Sites OCNP - SWL refer to the other PME documented by the Noise Control Authority (http://www.epd.gov.hk/epd/english/application_for_licences/guidance/files/OtherSWLe.pdf)* With reference to paragraph 4.5 of EIAO Guidance Note No. 9/2004, movable noise barrier would achieve a noise reduction of 5dB(A) and 10 dB(A) for movable plant and stationaryplant respectively, while the use of enclosure/shed would achieve 15 dB(A) noise reduction.
Works Area V: Hoi Ting Road Works Area
132
Powered Mechanical Equipment TM Ref./ BS/ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A) dB(A)
Excavator BS C3/97 1 105 75% 104
Breaker, mini-robot mounted BS C2/10 1 110 30% 105
Mobile Crane BS C7/114 1 101 30% 96
Trucks BS C9/39 4 103 30% 104
Concrete lorry mixer BS C6/23 2 100 30% 98
Vibratory poker OCNP 024 2 94 50% 94
Air compressor, air flow >30mm3/min CNP 003 2 104 50% Enclosure/Shed* 15 89
Handheld breaker CNP 024 2 108 30% 106
Generator, s ilenced CNP 102 1 100 75% 99
Total 107 104 107
Max 107
133
Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A) dB(A) dB(A)
Tracked crane with grab BS C7, 105 4 108 60% 112
Air compressor, air flow >30mm3/min CNP 0032
104 60% Enclosure/Shed* 15 90
Hydraulic Extractor CNP 163 1 90 60% 88
Excavator BS C3/97 2 105 60% 106
Grout mixer OCNP 016 1 90 60% 86
Pump, submersible CNP 283 1 85 60% 81
Dump Truck BS C9/39 4 103 30% 104
Concrete Lorry Mixer BS C6/23 4 100 60% 104
Total 106 112 104 104
Max 112
134
Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A) dB(A)
Tracked crane BS C7, 105 2 108 25% 105
Air compressor, air flow >30mm3/min CNP 003 1 104 60% Enclosure/Shed* 15 87
Excavator BS C3/97 3 105 60% Underground Plant 5 103
Generator CNP 102 1 100 60% 98
Dump Truck BS C9/39 6 103 30% 106
Mobile Crane BS C7/114 2 101 30% 99
Total 107 101 106
Max 107
135
Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A) dB(A)
Tower Crane CNP 049 1 95 60% 93
Mobile Crane BS C7/114 1 101 60% 99
Crane Lorry OCNP 022 1 105 60% 103
Concrete Pump OCNP 007 1 109 60% Enclosure/Shed* 15 92
High Pressure Water Jet OCNP 035 1 94 60% 92
Concrete Poker OCNP 024 2 94 60% 95
Rebar Bending Machine CNP 021 2 90 60% 91
Generator CNP 102 2 100 60% 101
Air compressor, air flow >30mm3/min CNP 003 1 104 60% Enclosure/Shed* 15 86
Concrete Lorry Mixer BS C6/23 2 100 60% 101
Total 105 103 101
Max 105
136
Powered Mechanical Equipment TM Ref./ BS/ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A)
Mobile Crane BS C7/114 2 101 50% 101
Air compressor, air flow >30mm3/min CNP 003 1 104 50% Enclosure/Shed* 15 86
Low loader vehic le OCNP 010 1 105 30% 100
Total 104
137
Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A) dB(A)
Tower Crane CNP 049 1 95 60% 93
Mobile Crane BS C7/114 1 101 60% 99
Crane Lorry OCNP 022 1 105 60% 103
Concrete Pump OCNP 007 1 109 60% Enclosure/Shed* 15 92
High Pressure Water Jet OCNP 035 1 94 60% 92
Concrete Poker OCNP 024 2 94 60% 95
Rebar Bending Machine CNP 021 2 90 60% 91
Generator CNP 102 2 100 60% 101
Air compressor, air flow >30mm3/min CNP 003 1 104 60% Enclosure/Shed* 15 86
Concrete Lorry Mixer BS C6/23 2 100 60% 101
Total 105 103 101
Max 105
Appendix 3.18 Construction Noise Impact of Express Rail Link on Identified Noise Sensitiv e Receiv ers
Powered Mechanical Equipment Adopted in EIA of Express Rail Link (Mitigated Scenario)
Possession of site
Diaphragm Wall
TBM Removal
Bulk Excavation/Fill - Soft
Ventilation building construction
Concrete Works
138 Backfilling
Powered Mechanical Equipment TM Ref./ BS/ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A)
Backhoe BS C3/97 1 105 30% 100
Dump Truck BS C9/39 1 103 30% 98
Compaction Roller CNP 185 1 108 60% 106
Generator CNP 102 1 100 60% 98
Compaction Plate BS C8/30 2 101 60% 102
Power Rammer CNP 169 1 108 60% Fabric # 10 96
Total 109
Remark:
(1) EIA Ref. 1 - The SWL of Welding Set refer to the approved EIA Report of Sheung Shui to Lok Ma Chau Spur Line (AEIAR-052/2002).
BS - British Standard BS5228:1997, Part 1 Noise and Vibration Control on Construction and Open Sites
OCNP - SWL refer to the other PME documented by the Noise Control Authority (http://www.epd.gov.hk/epd/english/application_for_licences/guidance/files/OtherSWLe.pdf)
# With reference to MTRC Contract C4420 Tsim Sha Tsui Modification Noise Assessment Report for Variation of Environmental Permit, July 2003, noise reduction of 10dB(A)
would be achieved with the use of noise insulating fabric.
^ According to Table B.1 of BS 5228: Part 1: 1997, rock drill in portable or fixed acoustic enclosure with suitable ventilation could achieve a noise reduction of 20dB(A).
* With reference to paragraph 4.5 of EIAO Guidance Note No. 9/2004, movable noise barrier would achieve a noise reduction of 5dB(A) and 10 dB(A) for movable plant and
stationary plant respectively, while the use of enclosure/shed would achieve 15 dB(A) noise reduction.
Works Area V: WKT- Zone 1
139 Possession of sitePowered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A) dB(A)Excavator BS C3/97 1 105 60% 103Breaker, mini-robot mounted BS C2/10 1 110 60% 108Mobile Crane BS C7/114 1 101 60% 99Dump Truck BS C9/39 2 103 30% 101Concrete Lorry Mixer BS C6/23 1 100 60% 98Poker, vibratory, hand-held (electric) OCNP 024 1 94 60% 92Air compressor, air flow >30mm3/min CNP 003 2 104 60% Enclosure/Shed* 15 90Handheld Breaker CNP 024 2 108 60% 109Generator CNP 102 1 100 60% 98
Total 109 103 110Max 110
140 Diaphargm WallPowered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A)
Tracked crane with grab BS C7, 105 2 108 60% 109Air compressor, air flow >30mm3/min CNP 003 2 104 60% Enclosure/Shed* 15 90
Hydraulic Extractor CNP 163 1 90 60% 88
Excavator BS C3/97 2 105 60% 106Grout mixer OCNP 016 1 90 60% 86Pump, submersible CNP 283 1 85 60% 81
Dump Truck BS C9/39 1 103 30% 98
Concrete Lorry Mixer BS C6/23 1 100 60% 98Total 107 109Max 109
141 Foundation Works (H-pile, B-pile)Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A) dB(A) dB(A)
Tracked crane BS C7, 105 2 108 25% 105 105
Backhoe BS C3/97 2 105 25% 102 102
Piling Rig BS C11, 2 2 112 60% Fabric# 10 103 103
Drill Rig OCNP 014 2 110 60% Fabric# 10 101 101
Excavator BS C3/97 2 105 60% 106 106
Grab and Chisel CNP 164 2 115 60% Fabric# 10 106 106Piling, large diameter bored, reversecirculation drill CNP 166 2 100 60% Fabric# 10 91 91
Oscillator CNP 165 2 115 60% Fabric# 10 106 106Air compressor, air flow >30mm3/min CNP 003 2 104 60% Enclosure/Shed* 15 90 90
Grout Mixer OCNP 016 2 90 60% 91
Grout Pump OCNP 017 2 105 60% Enclosure/Shed* 15 91
Generator CNP 102 2 100 60% 101
Dump Truck BS C9/39 1 103 30% 98
Concrete Truck BS C6/23 1 100 60% 98
Rebar Bending Machine CNP 021 1 90 60% 89
Welding Set EIA ref. 1 2 78 60% 78Generator CNP 102 1 100 60% 98
Total 113 113 104 98Max 113
142 Bulk Excavation- SoftPowered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A) dB(A)
Tracked crane BS C7, 105 2 108 25% 105
Air compressor, air flow >30mm3/min CNP 003 2 104 60% Enclosure/Shed* 15 90
Excavator BS C3/97 4 105 60% 109
Generator CNP 102 4 100 60% 104
Dump Truck BS C9/39 6 103 30% 106Conveyor system CNP 041 1 90 60% 88
Total 108 109 106Max 109
143 Bulk Excavation- HardPowered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A)
Tracked crane BS C7, 105 1 108 25% 102
Drill Rig OCNP 014 3 110 25% Fabric# 10 99
Hydraulic Breaker BS C8/13 3 110 25% 109
Excavator BS C3/97 5 105 60% 110
Generator CNP 102 3 100 60% 103Air compressor, air flow >30mm3/min CNP 003 3 104 60% Enclosure/Shed* 15 92
Dump Truck BS C9/39 5 103 30% 105Total 113 105Max 113
144 Concrete WorksPowered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A) dB(A)
Tower Crane CNP 049 2 95 60% 96
Mobile Crane BS C7/114 2 101 60% 102
Crane Lorry OCNP 022 3 105 60% 108
Concrete Pump OCNP 007 4 109 60% Enclosure/Shed* 15 98
Poker, vibratory, hand-held (electric) OCNP 024 15 94 60% 104
Rebar Bending Machine CNP 021 2 90 60% 91
Generator CNP 102 4 100 60% 104 104Air compressor, air flow >30mm3/min CNP 003 1 104 60% Enclosure/Shed* 15 86
Concrete Lorry Mixer BS C6/23 4 100 60% 104Total 109 109 104Max 109
145 Top Down Excavation (Soft)Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A) dB(A)
Tracked crane BS C7, 105 5 108 25% 109Air compressor, air flow >30mm3/min CNP 003 6 104 60% Enclosure/Shed* 15 95
Excavator BS C3/97 12 105 60% Underground Plant 10 104
Generator CNP 102 6 100 60% Underground Plant 10 96
Dump Truck BS C9/39 1 103 30% 98Conveyor system CNP 041 1 90 60% 88
Total 109 98 105Max 109
146 Top Down Concrete WorksPowered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A)
Tower Crane CNP 049 2 95 60% Underground Plant 10 86
Mobile Crane BS C7/114 2 101 60% Underground Plant 10 92
Crane Lorry OCNP 022 3 105 60% Underground Plant 10 98
Concrete Pump OCNP 007 3 109 60% Enclosure/Shed* 15 97
Poker, vibratory, hand-held (electric) OCNP 024 15 94 60% Underground Plant 10 94
Rebar Bending Machine CNP 021 2 90 60% Underground Plant 10 81
Generator CNP 102 4 100 60% Underground Plant 10 94Air compressor, air flow >30mm3/min CNP 003 1 104 60% Enclosure/Shed* 15 86
Concrete Lorry Mixer BS C6/23 2 100 60% 101Total 102 101Max 102
Appendix 3.18 Construction Noise Impact of Express Rail Link on Identified Noise Sensitive Receivers
Powered Mechanical Equipment Adopted in EIA of Express Rail Link (Mitigated Scenario)
Works Area V: WKT- Zone 1
Appendix 3.18 Construction Noise Impact of Express Rail Link on Identified Noise Sensitive Receivers
Powered Mechanical Equipment Adopted in EIA of Express Rail Link (Mitigated Scenario)
147 Top Down Excavation (Hard)Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A)
Tracked crane BS C7, 105 8 108 25% Underground Plant 10 101
Drill Rig OCNP 014 21 110 60% Fabric# 10 111
Hydraulic Breaker BS C8/13 21 110 60% Underground Plant 10 111
Excavator w/ breaker BS C8/13 41 110 60% Underground Plant 10 114
Generator CNP 102 21 100 60% Underground Plant 10 101Air compressor, air flow >30mm3/min CNP 003 21 104 60% Underground Plant 10 105
Dump Truck BS C9/39 3 103 30% 103Total 117 103Max 117
148 BackfillingPowered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A)Backhoe BS C3/97 1 105 30% 100Dump Truck BS C9/39 1 103 30% 98Compaction Roller CNP 185 1 108 60% 106Generator CNP 102 1 100 60% 98Compaction Plate BS C8/30 2 101 60% 102Power Rammer CNP 169 1 108 60% Fabric# 10 96
Total 109149
Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL Total SWL(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A) dB(A)
Generator CNP 102 2 100 60% 101 101Excavator BS C3/97 1 105 60% 103Mobile Crane BS C7/114 2 101 60% 102Dump Truck BS C9/39 2 103 30% 101Poker, vibratory, hand-held (electric) OCNP 024 2 94 60% 95Breaker, excavator mounted (pneumatic) BS C8/13 1 110 60% 108Air compressor, air flow>10m3/min and<=30m3/min
CNP 002 1102 60% Enclosure/Shed* 15 85
Concrete Lorry Mixer BS C6/23 2 100 60% 101Total 110 104 104Max 110
150Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A) dB(A) dB(A)Wheel Loader BS C3/97 1 105 60% 103Concrete mixer (electric) CNP 045 1 96 60% 94Generator CNP 102 2 100 60% 101Concrete mixer (petrol) CNP 046 3 96 60% 99Tipper Truck BS C3/112 1 113 30% 108
Concrete Lorry Mixer BS C6/23 3 100 60% 103Batching Plant CNP 022 1 108 60% 106Air compressor, air flow>10m3/min and<=30m3/min
CNP 002 2 102 60% Enclosure/Shed* 15 88
Total 106 106 108 103Max 108
151Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A)Tracked crane BS C7, 105 1 108 60% 106Generator CNP 102 1 100 60% 98Welding set EIA ref. 1 1 78 60% 76
Total 106
Max 106Remark:(1) EIA Ref. 1 - The SWL of Welding Set refer to the approved EIA Report of Sheung Shui to Lok Ma Chau Spur Line (AEIAR-052/2002). BS - British Standard BS5228:1997, Part 1 Noise and Vibration Control on Construction and Open Sites OCNP - SWL refer to the other PME documented by the Noise Control Authority (http://www.epd.gov.hk/epd/english/application_for_licences/guidance/files/OtherSWLe.pdf)* With reference to paragraph 4.5 of EIAO Guidance Note No. 9/2004, movable noise barrier would achieve a noise reduction of 5dB(A) and 10 dB(A) for movable plant and stationaryplant respectively, while the use of enclosure/shed would achieve 15 dB(A) noise reduction.# With reference to MTRC Contract C4420 Tsim Sha Tsui Modification Noise Assessment Report for Variation of Environmental Permit, July 2003, noise reduction of 10dB(A) would beachieved with the use of noise insulating fabric.^ According to Table B.1 of BS 5228: Part 1: 1997, rock drill in portable or fixed acoustic enclosure with suitable ventilation could achieve a noise reduction of 20dB(A).
Concrete Batching Plant - Construction Stage
Concrete Batching Plant - Operation Stage
Concrete Batching Plant - Demolition
Works Area V: WKT- Zone 2
152 Possession of site
Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A) dB(A)Excavator BS C3/97 1 105 60% 103Breaker, mini-robot mounted BS C2/10 1 110 60% 108Mobile Crane BS C7/114 1 101 60% 99Dump Truck BS C9/39 2 103 30% 101Concrete Lorry Mixer BS C6/23 1 100 60% 98Poker, vibratory, hand-held (electric) OCNP 024 1 94 60% 92
Air compressor, air flow >30mm3/min CNP 003 2 104 60% Enclosure/Shed* 15 90Handheld Breaker CNP 024 2 108 60% 109Generator CNP 102 1 100 60% 98
Total 109 103 110Max 110
153 Diaphargm Wall
Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A)
Tracked crane with grabBS C7,
105 2 108 60% 109
Air compressor, air flow >30mm3/min CNP 003 2 104 60% Enclosure/Shed* 15 90
Hydraulic Extractor CNP 163 1 90 60% 88
Excavator BS C3/97 2 105 60% 106Grout mixer OCNP 016 1 90 60% 86Pump, submersible CNP 283 1 85 60% 81
Dump Truck BS C9/39 1 103 30% 98
Concrete Lorry Mixer BS C6/23 1 100 60% 98Total 107 109Max 109
154 Foundation Works (H-pile, B-pile)
Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A) dB(A) dB(A)
Tracked craneBS C7,
105 4 108 25% 108 108
Backhoe BS C3/97 4 105 25% 105 105
Piling Rig BS C11, 2 4 112 60% Fabric# 10 106 106
Drill Rig OCNP 014 4 110 60% Fabric# 10 104 104
Excavator BS C3/97 4 105 60% 109 109
Grab and Chisel CNP 164 3 115 60% Fabric# 10 108 108Piling, large diameter bored, reversecirculation drill CNP 166 3 100 60% Fabric# 10 93 93
Oscillator CNP 165 3 115 60% Fabric# 10 108 108
Air compressor, air flow >30mm3/min CNP 003 3 104 60% Enclosure/Shed* 15 92 92
Grout Mixer OCNP 016 3 90 60% 93
Grout Pump OCNP 017 3 105 60% Enclosure/Shed* 15 93
Rebar Bending Machine CNP 021 2 90 60% 91
Generator CNP 102 1 100 60% 98
Dump Truck BS C9/39 1 103 30% 98
Concrete Lorry Mixer BS C6/23 1 100 60% 98
Welding Set EIA ref. 1 2 78 60% 79Generator CNP 102 2 100 60% 101
Total 115 115 104 101Max 115
155 Bulk Excavation- Soft
Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A) dB(A)
Tracked crane BS C7, 105 2 108 25% 105
Air compressor, air flow >30mm3/min CNP 003 2 104 60% Enclosure/Shed* 15 89
Excavator BS C3/97 4 105 60% 109
Generator CNP 102 4 100 60% 104
Dump Truck BS C9/39 5 103 30% 105Total 108 109 105Max 109
156 Concrete Works
Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A) dB(A)
Tower Crane CNP 049 2 95 60% 96
Mobile Crane BS C7/114 3 101 60% 104
Crane Lorry OCNP 022 4 105 60% 109
Concrete Pump OCNP 007 5 109 60% Enclosure/Shed* 15 99
Poker, vibratory, hand-held (electric) OCNP 024 21 94 60% 105
Rebar Bending Machine CNP 021 3 90 60% 93
Generator CNP 102 5 100 60% 105 105
Air compressor, air flow >30mm3/min CNP 003 1 104 60% Enclosure/Shed* 15 87
Concrete Lorry Mixer BS C6/23 4 100 60% 104Total 110 110 105Max 110
157 Top Down Excavation (Soft)
Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A) dB(A)
Tracked craneBS C7,
105 6 108 25% 110
Air compressor, air flow >30mm3/min CNP 003 8 104 60% Enclosure/Shed* 10 101
Excavator BS C3/97 16 105 60% Underground Plant 10 105
Generator CNP 102 8 100 60% Underground Plant 10 97
Dump Truck BS C9/39 6 103 30% 106Total 110 106 107Max 110
Appendix 3.18 Construction Noise Impact of Express Rail Link on Identified Noise Sensitive Receivers
Powered Mechanical Equipment Adopted in EIA of Express Rail Link (Mitigated Scenario)
Works Area V: WKT- Zone 2
Appendix 3.18 Construction Noise Impact of Express Rail Link on Identified Noise Sensitive Receivers
Powered Mechanical Equipment Adopted in EIA of Express Rail Link (Mitigated Scenario)
158 Top Down Concrete Works
Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A)
Tower Crane CNP 049 3 95 60% Underground Plant 10 88
Mobile Crane BS C7/114 3 101 60% Underground Plant 10 94
Crane Lorry OCNP 022 4 105 60% Underground Plant 10 99
Concrete Pump OCNP 007 5 109 60% Enclosure/Shed* 15 99
Rebar Bending Machine CNP 021 3 90 60% Underground Plant 10 83
Generator CNP 102 3 100 60% Underground Plant 10 93
Air compressor, air flow >30mm3/min CNP 003 1 104 60% Enclosure/Shed* 15 87
Concrete Lorry Mixer BS C6/23 2 100 60% 101Total 103 101Max 103
159 Top Down Excavation (Hard)
Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A)
Tracked craneBS C7,
105 3 108 25% Underground Plant 10 97
Drill Rig OCNP 014 8 110 60% Fabric# 10 107
Hydraulic Breaker BS C8/13 8 110 60% Underground Plant 10 107
Excavator w/ breaker BS C8/13 15 110 60% Underground Plant 10 110
Generator CNP 102 8 100 60% Underground Plant 10 97
Air compressor, air flow >30mm3/min CNP 003 8 104 60% Enclosure/Shed* 15 96
Dump Truck BS C9/39 3 103 30% 103Total 113 103Max 113
160 Backfilling
Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A)Backhoe BS C3/97 1 105 30% 100Dump Truck BS C9/39 1 103 30% 98Compaction Roller CNP 185 1 108 60% 106Generator CNP 102 1 100 60% 98Compaction Plate BS C8/30 2 101 60% 102Power Rammer CNP 169 1 108 60% Fabric# 10 96
Total 109161 ABWF Works
Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A)
Grinding Machine CNP 065 10 98 60% Underground Plant 10 96
Screed Mixer & Pump CNP 281 7 88 60% Underground Plant 10 84
Backhoe BS C3/97 7 105 60% Underground Plant 10 101
Fork Lift BS C7, 93 7 104 60% Underground Plant 10 100
Material Hoist CNP 123 7 104 60% Underground Plant 10 100Total 106
Remark:(1) EIA Ref. 1 - The SWL of Welding Set refer to the approved EIA Report of Sheung Shui to Lok Ma Chau Spur Line (AEIAR-052/2002). BS - British Standard BS5228:1997, Part 1 Noise and Vibration Control on Construction and Open Sites OCNP - SWL refer to the other PME documented by the Noise Control Authority (http://www.epd.gov.hk/epd/english/application_for_licences/guidance/files/OtherSWLe.pdf)Remark:(1) EIA Ref. 1 - The SWL of Welding Set refer to the approved EIA Report of Sheung Shui to Lok Ma Chau Spur Line (AEIAR-052/2002). BS - British Standard BS5228:1997, Part 1 Noise and Vibration Control on Construction and Open Sites OCNP - SWL refer to the other PME documented by the Noise Control Authority (http://www.epd.gov.hk/epd/english/application_for_licences/guidance/files/OtherSWLe.pdf)* With reference to paragraph 4.5 of EIAO Guidance Note No. 9/2004, movable noise barrier would achieve a noise reduction of 5dB(A) and 10 dB(A) for movable plant andstationary plant respectively, while the use of enclosure/shed would achieve 15 dB(A) noise reduction.# With reference to MTRC Contract C4420 Tsim Sha Tsui Modification Noise Assessment Report for Variation of Environmental Permit, July 2003, noise reduction of 10dB(A)would be achieved with the use of noise insulating fabric.
^ According to Table B.1 of BS 5228: Part 1: 1997, rock drill in portable or fixed acoustic enclosure with suitable ventilation could achieve a noise reduction of 20dB(A).
Works Area V: WKT-Zone 3
162 Possession of site
Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A) dB(A)Excavator BS C3/97 1 105 60% 103Breaker, mini-robot mounted BS C2/10 1 110 60% 108Mobile Crane BS C7/114 1 101 60% 99Dump Truck BS C9/39 2 103 30% 101Concrete Lorry Mixer BS C6/23 1 100 60% 98Poker, vibratory, hand-held (electric) OCNP 024 1 94 60% 92Air compressor, air flow >30mm3/min CNP 003 2 104 60% Enclosure/Shed* 15 90Handheld Breaker CNP 024 2 108 60% 109Generator CNP 102 1 100 60% 98
Total 109 103 110Max 110
163 Diaphargm Wall
Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A)
Tracked crane with grab BS C7, 105 1 108 60% 106Air compressor, air flow >30mm3/min CNP 003 2 104 60% Enclosure/Shed* 15 90
Hydraulic Extractor CNP 163 1 90 60% 88
Excavator BS C3/97 2 105 60% 106Grout mixer OCNP 016 1 90 60% 86Pump, submersible CNP 283 1 85 60% 81
Dump Truck BS C9/39 1 103 30% 98
Concrete Lorry Mixer BS C6/23 1 100 60% 98Total 107 106Max 107
164 Foundation Works (H-pile, B-pile)
Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A) dB(A) dB(A)
Tracked crane BS C7, 105 2 108 25% 105 105
Backhoe BS C3/97 2 105 20% 101 101
Piling Rig BS C11, 2 2 112 60% Fabric# 10 103 103
Drill Rig OCNP 014 2 110 60% Fabric# 10 101 101
Excavator BS C3/97 2 105 60% 106 106
Grab and Chisel CNP 164 3 115 60% Fabric# 10 108 108Piling, large diameter bored, reversecirculation drill
CNP 1663
100 60% Fabric# 10 93 93
Oscillator CNP 165 3 115 60% Fabric# 10 108 108Air compressor, air flow >30mm3/min CNP 003 2 104 60% Enclosure/Shed* 15 90 90
Rebar Bending Machine CNP 021 2 90 60% 91
Grout Mixer OCNP 016 1 90 60% 88
Grout Pump OCNP 017 1 105 60% Enclosure/Shed* 15 88
Generator CNP 102 1 100 60% 98
Dump Truck BS C9/39 1 103 30% 98
Concrete Lorry Mixer BS C6/23 1 100 60% 99
Welding Set EIA ref. 1 2 78 60% 79Generator CNP 102 2 100 60% 101
Total 20 114 104 101Max 114
165 Bulk Excavation- Soft
Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A) dB(A)
Tracked crane BS C7, 105 2 108 25% 105Air compressor, air flow >30mm3/min CNP 003 2 104 60% Enclosure/Shed* 15 89
Excavator BS C3/97 3 105 60% 108
Generator CNP 102 4 100 60% 104
Dump Truck BS C9/39 5 103 30% 105Total 108 108 105Max 108
166 Bulk Excavation- Hard
Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A) dB(A)
Tracked crane BS C7, 105 2 108 25% 105
Drill Rig OCNP 014 4 110 25% Fabric# 10 100
Hydraulic Breaker BS C8/13 4 110 25% 110
Excavator BS C3/97 9 105 60% 112
Generator CNP 102 4 100 60% 104Air compressor, air flow >30mm3/min CNP 003 4 104 60% Enclosure/Shed* 15 93
Dump Truck BS C9/39 5 103 30% 105 105Total 114 111 105Max 114
167 Concrete Works
Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A) dB(A)
Tower Crane CNP 049 3 95 60% 98
Mobile Crane BS C7/114 2 101 60% 102
Crane Lorry OCNP 022 3 105 60% 108
Concrete Pump OCNP 007 4 109 60% Enclosure/Shed* 15 98
Concrete Poker OCNP 024 15 94 60% 104
Rebar Bending Machine CNP 021 2 90 60% 91
Generator CNP 102 4 100 60% 104Air compressor, air flow >30mm3/min CNP 003 1 104 60% Enclosure/Shed* 15 86
Concrete Lorry Mixer BS C6/23 3 100 60% 103Total 109 107 104Max 109
168 Top Down Excavation (Soft)
Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A) dB(A)
Tracked crane BS C7, 105 12 108 25% 113Air compressor, air flow >30mm3/min CNP 003 15 104 60% Enclosure/Shed* 15 99
Excavator BS C3/97 30 105 60% Underground Plant 10 108
Generator CNP 102 15 100 60% Underground Plant 10 100
Dump Truck BS C9/39 8 103 30% 107Total 113 107 109Max 113
169 Top Down Concrete Works
Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A)
Tower Crane CNP 049 3 95 60% Underground Plant 10 88
Mobile Crane BS C7/114 2 101 60% Underground Plant 10 92
Crane Lorry OCNP 022 3 105 60% Underground Plant 10 98
Concrete Pump OCNP 007 4 109 60% Enclosure/Shed* 15 98
Poker, vibratory, hand-held (electric) OCNP 024 14 94 60% Underground Plant 10 93
Rebar Bending Machine CNP 021 2 90 60% Underground Plant 10 81
Generator CNP 102 4 100 60% Underground Plant 10 94Air compressor, air flow >30mm3/min CNP 003 1 104 60% Enclosure/Shed* 15 86
Concrete Lorry Mixer BS C6/23 2 100 60% 101Total 103 101Max 103
Appendix 3.18 Construction Noise Impact of Express Rail Link on Identified Noise Sensitive Receivers
Powered Mechanical Equipment Adopted in EIA of Express Rail Link (Mitigated Scenario)
Works Area V: WKT-Zone 3
Appendix 3.18 Construction Noise Impact of Express Rail Link on Identified Noise Sensitive Receivers
Powered Mechanical Equipment Adopted in EIA of Express Rail Link (Mitigated Scenario)
170 Top Down Excavation (Hard)
Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A)
Tracked crane BS C7/105 5 108 25% Underground Plant 10 99
Drill Rig OCNP 014 13 110 60% Fabric# 15 104
Hydraulic Breaker BS C8/13 13 110 60% Underground Plant 10 109
Excavator w/ breaker BS C8/13 26 110 60% Underground Plant 10 112
Generator CNP 102 13 100 60% Underground Plant 10 99Air compressor, air flow >30mm3/min CNP 003 13 104 60% Enclosure/Shed* 15 98
Dump Truck BS C9/39 6 103 30% 106Total 114 106Max 114
171 Backfilling
Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A)Backhoe BS C3/97 1 105 30% 100Dump Truck BS C9/39 1 103 30% 98Compaction Roller CNP 185 1 108 60% 106Generator CNP 102 1 100 60% 98Compaction Plate BS C8/30 2 101 60% 102Power Rammer CNP 169 1 108 60% Fabric# 10 96
Total 109172 ABWF Works
Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A)
Grinding Machine CNP 065 10 98 60% Underground Plant 10 96
Screed Mixer & Pump CNP 281 7 88 60% Underground Plant 10 84
Backhoe BS C3/97 7 105 60% Underground Plant 10 101
Fork Lift BS C7, 93 7 104 60% Underground Plant 10 100
Material Hoist CNP 123 7 104 60% Underground Plant 10 100Total 106
Remark:(1) EIA Ref. 1 - The SWL of Welding Set refer to the approved EIA Report of Sheung Shui to Lok Ma Chau Spur Line (AEIAR-052/2002). BS - British Standard BS5228:1997, Part 1 Noise and Vibration Control on Construction and Open Sites OCNP - SWL refer to the other PME documented by the Noise Control Authority (http://www.epd.gov.hk/epd/english/application_for_licences/guidance/files/OtherSWLe.pdf)
^ According to Table B.1 of BS 5228: Part 1: 1997, rock drill in portable or fixed acoustic enclosure with suitable ventilation could achieve a noise reduction of 20dB(A).
* With reference to paragraph 4.5 of EIAO Guidance Note No. 9/2004, movable noise barrier would achieve a noise reduction of 5dB(A) and 10 dB(A) for movable plant and stationaryplant respectively, while the use of enclosure/shed would achieve 15 dB(A) noise reduction.# With reference to MTRC Contract C4420 Tsim Sha Tsui Modification Noise Assessment Report for Variation of Environmental Permit, July 2003, noise reduction of 10dB(A) wouldbe achieved with the use of noise insulating fabric.
Works Area V: C&C Tunnel Zone 4
173 Diaphargm Wall
Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A) dB(A)
Tracked crane with grabBS C7,
105 2 108 60% 109 109Air compressor, air flow >30mm3/min CNP 003 2 104 60% Enclosure/Shed* 15 90
Hydraulic Extractor CNP 163 1 90 60% 88
Excavator BS C3/97 2 105 60% 106Grout mixer OCNP 016 1 90 60% 86Pump, submersible CNP 283 1 85 60% 81
Dump Truck BS C9/39 1 103 30% 98 98
Concrete Lorry Mixer BS C6/23 1 100 60% 98Total 107 109 109Max 109
174 Foundation Works (H-pile, B-pile)
Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A) dB(A) dB(A)
Tracked craneBS C7,
105 2 108 60% 109
Backhoe BS C3/97 2 105 60% 106
Piling Rig BS C11, 2 2 112 60% Fabric# 10 103
Drill RigOCNP
014 2 110 60% Fabric# 10 101
Excavator BS C3/97 2 105 60% 106
Grab and Chisel CNP 164 1 115 60% Fabric# 10 103Piling, large diameter bored, reversecirculation drill CNP 166 1 100 60% Fabric# 10 88
Oscillator CNP 165 1 115 60% Fabric# 10 103
Air compressor, air flow >30mm3/min CNP 003 2 104 60% Enclosure/Shed* 15 90
Grout MixerOCNP
016 1 90 60% 88
Grout PumpOCNP
017 1 105 60% Enclosure/Shed* 15 88
Generator CNP 102 1 100 60% 98
Dump Truck BS C9/39 1 103 30% 98
Concrete Lorry Mixer BS C6/23 1 100 60% 99
Welding Set EIA ref. 1 1 78 60% 76
Generator CNP 102 1 100 60% 98Total 112 109 103 98Max 112
175 Bulk Excavation- Soft
Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A)
Tracked crane BS C7, 105 4 108 25% 108Air compressor, air flow >30mm3/min CNP 003 3 104 60% Enclosure/Shed* 15 92
Excavator BS C3/97 4 105 60% 109
Generator CNP 102 4 100 60% 104Total 109 109Max 109
176 Bulk Excavation- Hard
Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A)
Tracked craneBS C7,
105 2 108 25% 105
Drill RigOCNP
014 3 110 25% Fabric# 10 99
Hydraulic Breaker BS C8/13 3 110 25% 109
Excavator BS C3/97 6 105 60% 111
Generator CNP 102 3 100 60% 103Air compressor, air flow >30mm3/min CNP 003 3 104 60% Enclosure/Shed* 15 92
Dump Truck BS C9/39 5 103 30% 105Total 114 105Max 114
177 Concrete Works
Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A) dB(A)
Tower Crane CNP 049 2 95 60% 96
Mobile Crane BS C7/114 1 101 60% 99
Crane LorryOCNP
022 1 105 60% 103
Concrete PumpOCNP
007 1 109 60% Enclosure/Shed* 15 92
High Pressure Water JetOCNP
035 1 94 60% 92
Poker, vibratory, hand-held (electric)OCNP
024 2 94 60% 95
Rebar Bending Machine CNP 021 2 90 60% 91
Generator CNP 102 2 100 60% 101 101
Air compressor, air flow >30mm3/min CNP 003 1 104 60% Enclosure/Shed* 15 86
Concrete Lorry Mixer BS C6/23 2 100 60% 101Total 105 105 101Max 105
178 ABWF Works
Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A)
Grinding Machine CNP 065 10 98 60% Underground Plant 10 96
Screed Mixer & Pump CNP 281 7 88 60% Underground Plant 10 84
Backhoe BS C3/97 7 105 60% Underground Plant 10 101
Fork Lift BS C7, 93 7 104 60% Underground Plant 10 100
Material Hoist CNP 123 7 104 60% Underground Plant 10 100Total 106
179 Backfilling
Powered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A)Backhoe BS C3/97 1 105 30% 100Dump Truck BS C9/39 1 103 30% 98Compaction Roller CNP 185 1 108 60% 106Generator CNP 102 1 100 60% 98Compaction Plate BS C8/30 2 101 60% 102Power Rammer CNP 169 1 108 60% Fabric# 10 96
Total 109
Remark:(1) EIA Ref. 1 - The SWL of Welding Set refer to the approved EIA Report of Sheung Shui to Lok Ma Chau Spur Line (AEIAR-052/2002). BS - British Standard BS5228:1997, Part 1 Noise and Vibration Control on Construction and Open Sites OCNP - SWL refer to the other PME documented by the Noise Control Authority (http://www.epd.gov.hk/epd/english/application_for_licences/guidance/files/OtherSWLe.pdf)
Appendix 3.18 Construction Noise Impact of Express Rail Link on Identified Noise Sensitive Receivers
Powered Mechanical Equipment Adopted in EIA of Express Rail Link (Mitigated Scenario)
* With reference to paragraph 4.5 of EIAO Guidance Note No. 9/2004, movable noise barrier would achieve a noise reduction of 5dB(A) and 10 dB(A) for movable plant andstationary plant respectively, while the use of enclosure/shed would achieve 15 dB(A) noise reduction.# With reference to MTRC Contract C4420 Tsim Sha Tsui Modification Noise Assessment Report for Variation of Environmental Permit, July 2003, noise reduction of10dB(A) would be achieved with the use of noise insulating fabric.^ According to Table B.1 of BS 5228: Part 1: 1997, rock drill in portable or fixed acoustic enclosure with suitable ventilation could achieve a noise reduction of 20dB(A).
Works Area V: C&C Tunnel Zone 5
180 Diaphargm WallPowered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A) dB(A)
Tracked crane with grab BS C7, 105 2 108 60% 109 109
Air compressor, air flow >30mm3/min CNP 003 2 104 60% Enclosure/Shed* 15 90
Hydraulic Extractor CNP 163 1 90 60% 88
Excavator BS C3/97 2 105 60% 106Grout mixer OCNP 016 1 90 60% 86Pump, submersible CNP 283 1 85 60% 81
Dump Truck BS C9/39 1 103 30% 98 98
Concrete Lorry Mixer BS C6/23 1 100 60% 98Total 107 109 109Max 109
181 Bulk Excavation- SoftPowered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A) dB(A)
Tracked crane BS C7, 105 1 108 25% 102 102
Air compressor, air flow >30mm3/min CNP 003 1 104 60% Enclosure/Shed* 15 87 87
Excavator BS C3/97 1 105 60% 103
Generator CNP 102 1 100 60% 98 98Total 103 103 103Max 103
182 Concrete WorksPowered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A) dB(A)
Tower Crane CNP 049 1 95 60% 93
Mobile Crane BS C7/114 1 101 60% 99
Crane Lorry OCNP 022 1 105 60% 103
Concrete Pump OCNP 007 1 109 60% Enclosure/Shed* 15 92
High Pressure Water Jet OCNP 035 1 94 60% 92
Poker, vibratory, hand-held (electric) OCNP 024 2 94 60% 95
Rebar Bending Machine CNP 021 2 90 60% 91
Generator CNP 102 2 100 60% 101 101
Air compressor, air flow >30mm3/min CNP 003 1 104 60% Enclosure/Shed* 15 86
Concrete Lorry Mixer BS C6/23 2 100 60% 101
Total 105 105 101Max 105
183 BackfillingPowered Mechanical Equipment TM Ref./ No. of Items SWL/Item On-time Noise Mitigation Noise Barrier Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A)Backhoe BS C3/97 1 105 30% 100Dump Truck BS C9/39 1 103 30% 98Compaction Roller CNP 185 1 108 60% 106Generator CNP 102 1 100 60% 98Compaction Plate BS C8/30 2 101 60% 102Power Rammer CNP 169 1 108 60% Fabric# 10 96
Total 109
Remark:(1) EIA Ref. 1 - The SWL of Welding Set refer to the approved EIA Report of Sheung Shui to Lok Ma Chau Spur Line (AEIAR-052/2002). BS - British Standard BS5228:1997, Part 1 Noise and Vibration Control on Construction and Open Sites OCNP - SWL refer to the other PME documented by the Noise Control Authority (http://www.epd.gov.hk/epd/english/application_for_licences/guidance/files/OtherSWLe.pdf)(1) EIA Ref. 1 - The SWL of Welding Set refer to the approved EIA Report of Sheung Shui to Lok Ma Chau Spur Line (AEIAR-052/2002). BS - British Standard BS5228:1997, Part 1 Noise and Vibration Control on Construction and Open Sites OCNP - SWL refer to the other PME documented by the Noise Control Authority (http://www.epd.gov.hk/epd/english/application_for_licences/guidance/files/OtherSWLe.pdf)* With reference to paragraph 4.5 of EIAO Guidance Note No. 9/2004, movable noise barrier would achieve a noise reduction of 5dB(A) and 10 dB(A) for movable plant andstationary plant respectively, while the use of enclosure/shed would achieve 15 dB(A) noise reduction.# With reference to MTRC Contract C4420 Tsim Sha Tsui Modification Noise Assessment Report for Variation of Environmental Permit, July 2003, noise reduction of 10dB(A) wouldbe achieved with the use of noise insulating fabric.^ According to Table B.1 of BS 5228: Part 1: 1997, rock drill in portable or fixed acoustic enclosure with suitable ventilation could achieve a noise reduction of 20dB(A).
Appendix 3.18 Construction Noise Impact of Express Rail Link on Identified Noise Sensitive Receivers
Powered Mechanical Equipment Adopted in EIA of Express Rail Link (Mitigated Scenario)
Works Area W: Barging and Stockpiling184 Barging
Powered Mechanical Equipment TM Ref./ No. ofItems SWL/Item On-time Noise Mitigation Noise Barrier Total SWL Total SWL
(PME) other Ref. dB(A) % Measure Reduction dB(A) dB(A)Barge CNP 061 5 104 60% 109Tug Boat CNP 221 5 110 60% 115Dump truck BS C9/39 30 103 30% 113Excavator BS C3/97 2 105 60% 106Conveyor CNP 041 2 90 60% 91
Total 116 113Max 116
Remark:(1) EIA Ref. 1 - The SWL of Welding Set refer to the approved EIA Report of Sheung Shui to Lok Ma Chau Spur Line (AEIAR-052/2002). BS - British Standard BS5228:1997, Part 1 Noise and Vibration Control on Construction and Open Sites OCNP - SWL refer to the other PME documented by the Noise Control Authority (http://www.epd.gov.hk/epd/english/application_for_licences/guidance/files/OtherSWLe.pdf)
^ According to Table B.1 of BS 5228: Part 1: 1997, rock drill in portable or fixed acoustic enclosure with suitable ventilation could achieve a noise reduction of 20dB(A).
Appendix 3.18 Construction Noise Impact of Express Rail Link on Identified Noise Sensitive Receivers
Powered Mechanical Equipment Adopted in EIA of Express Rail Link (Mitigated Scenario)
* With reference to paragraph 4.5 of EIAO Guidance Note No. 9/2004, movable noise barrier would achieve a noise reduction of 5dB(A) and 10 dB(A) for movable plantand stationary plant respectively, while the use of enclosure/shed would achieve 15 dB(A) noise reduction.# With reference to MTRC Contract C4420 Tsim Sha Tsui Modification Noise Assessment Report for Variation of Environmental Permit, July 2003, noise reduction of10dB(A) would be achieved with the use of noise insulating fabric.
2009Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr Ma
y Jun Jul Aug Sep Oct Nov Dec1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61
130 Possession of site 102 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0131 Site storage 91 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
132 Possession of site 98 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0133 Diaphragm Wall 102 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0134 Bulk Excavation/Fill - Soft 94 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0135 Concrete Works 95 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
136 TBM Removal 94 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
137 Ventilation building construction 95 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0138 Backfilling Works 106 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
139 Possession of site 110 108 64 64 64 64 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0140 Diaphragm Wall 109 229 57 0 0 0 57 57 57 57 57 57 57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0141 Foundation Works 113 251 60 0 0 0 60 60 60 60 60 60 60 60 60 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0142 Bulk Excavation - soft 109 251 56 0 0 0 0 0 0 0 0 0 0 0 0 56 56 56 56 56 56 56 56 56 56 56 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0143 Bulk Excavation - hard 113 251 60 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 60 60 60 60 60 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0144 Concrete Works 109 251 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 56 56 56 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
145 Top Down Excavation - Soft 109 251 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 56 56 56 56 0 56 0 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
146 Top Down Concrete Works 102 251 49 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 49 0 49 0 49 0 49 0 0 49 49 0 49 49 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0147 Top Down Excavation - Hard 117 251 64 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 64 0 64 64 0 0 64 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
148 Backfilling Works 109 251 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 56 56 56 56 56 0 0 0 0 0 0 0 0 0 0
149 Concrete Batching Plant - ConstructionStage 110 157 61 61 61 61 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
150 Concrete Batching Plant - Operation Stage 108 157 59 0 0 0 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 0 0 0 0 0 0 0 0 0 0 0
151 Concrete Batching Plant - Demolition 106 157 58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 58 58 58 0 0 0 0 0 0 0 0
152 Possession of site 110 229 57 57 57 57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0153 Diaphragm Wall 109 232 57 0 0 0 57 57 57 57 57 57 57 57 57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0154 Foundation Works 115 263 62 0 0 0 62 62 62 62 62 62 62 62 62 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0155 Bulk Excavation - soft 109 263 55 0 0 0 0 0 0 0 0 0 0 0 0 55 55 55 55 55 55 55 55 55 55 55 55 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0156 Concrete Works 110 263 57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 57 57 57 57 57 57 57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0157 Top Down Excavation - Soft 110 263 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 56 56 0 56 0 56 0 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0158 Top Down Concrete Works 103 263 50 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 50 0 50 0 50 0 50 0 0 50 0 50 50 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0159 Top Down Excavation - Hard 113 263 60 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 60 60 0 60 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0160 Backfilling Works 109 263 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 56 56 56 56 56 56 56 56
161 ABWF Works for WKT building 106 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
162 Possession of site 100 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0163 Diaphragm Wall 97 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0164 Foundation Works 112 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
165 Bulk Excavation - soft 98 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
166 Bulk Excavation - rock 105 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0167 Concrete Works 100 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0168 Top Down Excavation - Soft 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
169 Top Down Concrete Works 103 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
170 Top Down Excavation - Hard 114 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0171 Backfilling Works 101 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0172 ABWF Works for WKT building 106 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
173 Diaphragm Wall 99 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0174 Foundation Works 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0175 Bulk Excavation - soft 100 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0176 Bulk Excavation - hard 105 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0177 Concrete Works 95 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0178 ABWF Works for PTI and CLP substation 106 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0179 Backfilling Works 101 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
180 Diaphragm Wall 99 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0181 Bulk Excavation - soft 94 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0182 Concrete Works 95 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0183 Backfilling Works 101 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
184 Barging and Stockpiling 116 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Total SPL, dB(A) 66 66 66 66 66 66 66 66 66 66 66 66 62 62 62 62 62 62 62 62 62 62 62 64 64 64 64 64 62 62 62 62 61 61 61 61 61 65 61 65 66 63 60 66 60 60 61 61 61 61 60 58 58 56 56 56 56 56 56 56 56
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Remarks:1. Noise sources at more than 300m from the sensitive receiver are not considered in cumulative noise assessment due to large distance attenuation effect.2. For the calculation of sound pressure levels (SPL), the PMEs are assumed to be placed at the notional source position according to the "Technical Memorandum on Noise from Construction Work other than Percussive Piling" by EPD.
The use of PME would not be visible whenviewed from the assessment facade of NSR.The NSR is considered to be totallyscreened. According to GW-TM, a noisereduction of 10 dB(A) would be achieved.
Works Area V: C&C Tunnel Zone 5
Works Area W: Barging and Stockpiling
Exceedance
Works Area U: Hoi Ting Road Works Area
Works Area V: Hoi Ting Road Works Area
Works Area V: WKT- Zone 1
Works Area V: WKT- Zone 2
Works Area V: WKT-Zone 3
Works Area V: C&C Tunnel Zone 4
2012 2013 2014
Act No. Construction Element SWL Dist1 SPL2
Appendix 3.18 Construction Noise Impact of Express Rail Link on Identified Noise Sensitive Receivers
VT2 - Tower 2, Victoria Towers2010 2011
2009Dec Jan Feb Mar Apr Ma
y Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr Ma
y Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr Ma
y Jun Jul Aug Sep Oct Nov Dec1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61
130 Possession of site 102 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0131 Site storage 91 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
132 Possession of site 98 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0133 Diaphragm Wall 102 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0134 Bulk Excavation/Fill - Soft 94 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0135 Concrete Works 95 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
136 TBM Removal 94 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
137 Ventilation building construction 95 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0138 Backfilling Works 0 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
139 Possession of site 110 123 63 63 63 63 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0140 Diaphragm Wall 109 166 60 0 0 0 60 60 60 60 60 60 60 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0141 Foundation Works 113 260 60 0 0 0 60 60 60 60 60 60 60 60 60 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0142 Bulk Excavation - soft 109 260 56 0 0 0 0 0 0 0 0 0 0 0 0 56 56 56 56 56 56 56 56 56 56 56 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0143 Bulk Excavation - hard 113 260 60 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 60 60 60 60 60 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0144 Concrete Works 109 260 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 56 56 56 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
145 Top Down Excavation - Soft 109 260 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 56 56 56 56 0 56 0 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
146 Top Down Concrete Works 102 260 49 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 49 0 49 0 49 0 49 0 0 49 49 0 49 49 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0147 Top Down Excavation - Hard 117 260 64 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 64 0 64 64 0 0 64 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
148 Backfilling Works 109 260 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 56 56 56 56 56 0 0 0 0 0 0 0 0 0 0
149 Concrete Batching Plant - ConstructionStage 110 166 60 60 60 60 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
150 Concrete Batching Plant - Operation Stage 108 166 58 0 0 0 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 0 0 0 0 0 0 0 0 0 0 0
151 Concrete Batching Plant - Demolition 106 166 57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 57 57 57 0 0 0 0 0 0 0 0
152 Possession of site 100 213 48 48 48 48 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0153 Diaphragm Wall 99 170 50 0 0 0 50 50 50 50 50 50 50 50 50 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0154 Foundation Works 113 226 61 0 0 0 61 61 61 61 61 61 61 61 61 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0155 Bulk Excavation - soft 99 226 47 0 0 0 0 0 0 0 0 0 0 0 0 47 47 47 47 47 47 47 47 47 47 47 47 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0156 Concrete Works 101 226 49 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 49 49 49 49 49 49 49 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0157 Top Down Excavation - Soft 107 226 55 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 55 55 0 55 0 55 0 55 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0158 Top Down Concrete Works 103 226 51 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 51 0 51 0 51 0 51 0 0 51 0 51 51 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0159 Top Down Excavation - Hard 113 226 61 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 61 61 0 61 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0160 Backfilling Works 101 226 48 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 48 48 48 48 48 48 48 48
161 ABWF Works for WKT building 106 243 53 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 0
162 Possession of site 100 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0163 Diaphragm Wall 97 266 44 0 0 0 44 44 44 44 44 44 44 44 44 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0164 Foundation Works 112 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
165 Bulk Excavation - soft 98 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
166 Bulk Excavation - rock 105 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0167 Concrete Works 100 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0168 Top Down Excavation - Soft 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
169 Top Down Concrete Works 103 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
170 Top Down Excavation - Hard 114 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0171 Backfilling Works 101 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0172 ABWF Works for WKT building 106 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
173 Diaphragm Wall 99 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0174 Foundation Works 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0175 Bulk Excavation - soft 100 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0176 Bulk Excavation - hard 105 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0177 Concrete Works 95 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0178 ABWF Works for PTI and CLP substation 106 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0179 Backfilling Works 101 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
180 Diaphragm Wall 99 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0181 Bulk Excavation - soft 94 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0182 Concrete Works 95 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0183 Backfilling Works 101 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
184 Barging and Stockpiling 116 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Total SPL, dB(A) 65 65 65 66 66 66 66 66 66 66 65 65 60 60 60 60 60 60 60 60 60 60 60 63 63 63 63 63 60 60 60 61 60 61 60 61 60 65 60 65 66 63 59 67 60 60 61 61 61 61 60 58 58 54 54 54 54 54 54 54 48
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Remarks:1. Noise sources at more than 300m from the sensitive receiver are not considered in cumulative noise assessment due to large distance attenuation effect.2. For the calculation of sound pressure levels (SPL), the PMEs are assumed to be placed at the notional source position according to the "Technical Memorandum on Noise from Construction Work other than Percussive Piling" by EPD.
The use of PME would not be visible whenviewed from the assessment facade of NSR.The NSR is considered to be totallyscreened. According to GW-TM, a noisereduction of 10 dB(A) would be achieved.
Works Area V: C&C Tunnel Zone 5
Works Area W: Barging and Stockpiling
Exceedance
Works Area U: Hoi Ting Road Works Area
Works Area V: Hoi Ting Road Works Area
Works Area V: WKT- Zone 1
Works Area V: WKT- Zone 2
Works Area V: WKT-Zone 3
Works Area V: C&C Tunnel Zone 4
2012 2013 2014
Act No. Construction Element SWL Dist1 SPL2
Appendix 3.18 Construction Noise Impact of Express Rail Link on Identified Noise Sensitive Receivers
WN - Wai On Building2010 2011
P8 - Planned Residential Development at Site D of Austin Station
2009Dec Jan Feb Mar Apr Ma
y Jun Jul Aug Sep Oct Nov De
c Jan Feb Mar Apr May Jun Jul Aug Se
p Oct Nov Dec Jan Feb Mar Apr Ma
y Jun Jul Aug Sep Oct Nov De
c Jan Feb Mar Apr May Jun Jul Aug Se
p Oct Nov Dec Jan Feb Mar Apr Ma
y Jun Jul Aug Sep Oct Nov De
c1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61
130 Possession of site 110 - 0 0 0 0 0 0 -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0131 Site storage 101 - 0 0 0 0 0 0 0 -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
132 Possession of site 107 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0133 Diaphragm Wall 112 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0134 Bulk Excavation/Fill - Soft 107 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0135 Concrete Works 105 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0136 TBM Removal 104 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0137 Ventilation building construction 105 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0138 Backfilling Works 106 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
139 Possession of site 110 127 63 -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0140 Diaphragm Wall 109 126 62 0 0 0 -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0141 Foundation Works 113 210 61 0 0 0 -* -* -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0142 Bulk Excavation - soft 109 210 57 0 0 0 0 0 0 0 0 0 0 0 0 -* -* -* -* -* -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0143 Bulk Excavation - hard 113 210 62 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0144 Concrete Works 109 210 57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
145 Top Down Excavation - Soft 109 210 58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* -* -* -* 0 -* 0 -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
146 Top Down Concrete Works 102 210 51 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* 0 -* 0 -* 0 51 0 0 51 51 0 51 51 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0147 Top Down Excavation - Hard 117 210 66 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 66 0 66 66 0 0 66 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0148 Backfilling Works 109 210 57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 57 57 57 57 57 0 0 0 0 0 0 0 0 0 0149 Concrete Batching Plant - Construction
Stage 110 170 60 -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0150 Concrete Batching Plant - Operation Stage 108 170 58 0 0 0 -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* 58 58 58 58 58 58 58 58 58 58 58 58 58 0 0 0 0 0 0 0 0 0 0 0151 Concrete Batching Plant - Demolition 106 170 57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 57 57 57 0 0 0 0 0 0 0 0
152 Possession of site 110 68 68 -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0153 Diaphragm Wall 109 77 66 0 0 0 -* -* -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0154 Foundation Works 115 102 70 0 0 0 -* -* -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0155 Bulk Excavation - soft 109 102 64 0 0 0 0 0 0 0 0 0 0 0 0 -* -* -* -* -* -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0156 Concrete Works 110 102 65 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0157 Top Down Excavation - Soft 110 102 65 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* -* 0 -* 0 -* 0 65 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0158 Top Down Concrete Works 103 102 58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* 0 -* 0 58 0 58 0 0 58 0 58 58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0159 Top Down Excavation - Hard 113 102 68 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 68 68 0 68 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0160 Backfilling Works 109 102 64 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 64 64 64 64 64 64 64 64161 ABWF Works for WKT building 106 83 62 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 0
162 Possession of site 110 204 58 -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0163 Diaphragm Wall 107 151 58 0 0 0 -* -* -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0164 Foundation Works 114 145 65 0 0 0 -* -* -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0165 Bulk Excavation - soft 108 145 59 0 0 0 0 0 0 0 0 0 0 0 0 -* -* -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0166 Bulk Excavation - rock 114 145 66 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0167 Concrete Works 109 145 61 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0168 Top Down Excavation - Soft 113 145 65 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* 0 -* 0 -* 0 65 0 65 65 0 65 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0169 Top Down Concrete Works 103 145 55 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* 0 -* 0 -* 0 55 0 0 55 0 55 0 55 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0170 Top Down Excavation - Hard 114 145 66 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 66 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0171 Backfilling Works 109 145 61 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 61 61 61 61 61 61 61 61172 ABWF Works for WKT building 106 244 53 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 0
173 Diaphragm Wall 109 - 0 0 0 0 0 0 0 0 0 * * * * * -* -* -* 0 0 -* -* -* -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0174 Foundation Works 112 - 0 0 0 0 0 0 0 * * * * * * * -* -* -* -* -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0175 Bulk Excavation - soft 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0176 Bulk Excavation - hard 114 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0177 Concrete Works 105 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* -* -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0178 ABWF Works for PTI and CLP substation 106 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0179 Backfilling Works 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
180 Diaphragm Wall 109 - 0 0 0 0 0 0 0 0 0 -* -* -* -* -* -* -* -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0181 Bulk Excavation - soft 103 - 0 0 0 0 0 0 0 -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0182 Concrete Works 105 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* -* -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0183 Backfilling Works 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
184 Barging and Stockpiling 116 - 0 0 0 0 0 0 0 0 0 0 0 -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Total SPL, dB(A) - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 69 66 69 71 69 67 71 69 65 65 65 65 65 64 64 64 67 67 67 67 67 67 67 66
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Remarks:1. Noise sources at more than 300m from the sensitive receiver are not considered in cumulative noise assessment due to large distance attenuation effect.2. For the calculation of sound pressure levels (SPL), the PMEs are assumed to be placed at the notional source position according to the "Technical Memorandum on Noise from Construction Work other than Percussive Piling" by EPD.*. There is no noise sensitive use in month 1 -37.
Works Area V: WKT- Zone 2
Works Area V: WKT-Zone 3
Act No. Construction Element
2014
Works Area U: Hoi Ting Road Works Area
Works Area V: Hoi Ting Road Works Area
Works Area V: WKT- Zone 1
2012 20132010
Exceedance
Appendix 3.18 Construction Noise Impact of Express Rail Link on Identified Noise Sensitive Receivers
SWL Dist1 SPL2
2011
Works Area W: Barging and Stockpiling
Works Area V: C&C Tunnel Zone 4
Works Area V: C&C Tunnel Zone 5
2009Dec Jan Feb Mar Apr May Jun Jul Aug Se
p Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Se
p Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Se
p Oct Nov Dec1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61
130 Possession of site 110 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0131 Site storage 101 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
132 Possession of site 107 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0133 Diaphragm Wall 112 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0134 Bulk Excavation/Fill - Soft 107 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0135 Concrete Works 105 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0136 TBM Removal 104 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0137 Ventilation building construction 105 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0138 Backfilling Works 106 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
139 Possession of site 110 317 55 55 55 55 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0140 Diaphragm Wall 109 242 56 0 0 0 56 56 56 56 56 56 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0141 Foundation Works 113 283 59 0 0 0 59 59 59 59 59 59 59 59 59 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0142 Bulk Excavation - soft 109 283 55 0 0 0 0 0 0 0 0 0 0 0 0 55 55 55 55 55 55 55 55 55 55 55 55 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0143 Bulk Excavation - hard 113 283 59 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 59 59 59 59 59 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0144 Concrete Works 109 283 55 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 55 55 55 55 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
145 Top Down Excavation - Soft 109 283 55 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 55 55 55 55 0 55 0 55 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
146 Top Down Concrete Works 102 283 48 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 48 0 48 0 48 0 48 0 0 48 48 0 48 48 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0147 Top Down Excavation - Hard 117 283 63 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 63 0 63 63 0 0 63 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0148 Backfilling Works 109 283 55 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 55 55 55 55 55 0 0 0 0 0 0 0 0 0 0149 Concrete Batching Plant - Construction
Stage 110 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
150 Concrete Batching Plant - Operation Stage 108 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
151 Concrete Batching Plant - Demolition 106 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
152 Possession of site 110 126 63 63 63 63 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0153 Diaphragm Wall 109 62 68 0 0 0 68 68 68 68 68 68 68 68 68 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0154 Foundation Works 115 102 70 0 0 0 70 70 70 70 70 70 70 70 70 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0155 Bulk Excavation - soft 109 102 64 0 0 0 0 0 0 0 0 0 0 0 0 64 64 64 64 64 64 64 64 64 64 64 64 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0156 Concrete Works 110 102 65 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 65 65 65 65 65 65 65 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0157 Top Down Excavation - Soft 110 102 65 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 65 65 0 65 0 65 0 65 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0158 Top Down Concrete Works 103 102 58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 58 0 58 0 58 0 58 0 0 58 0 58 58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0159 Top Down Excavation - Hard 113 102 68 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 68 68 0 68 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0160 Backfilling Works 109 102 64 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 64 64 64 64 64 64 64 64
161 ABWF Works for WKT building 106 104 60 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 0
162 Possession of site 110 58 69 69 69 69 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0163 Diaphragm Wall* 107 55 67 0 0 0 67 67 67 67 67 0 0 67 67 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
107 33 72 0 0 0 0 0 0 0 0 72 72 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0164 Foundation Works 114 90 70 0 0 0 70 70 70 70 70 70 70 70 70 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
165 Bulk Excavation - soft 108 90 63 0 0 0 0 0 0 0 0 0 0 0 0 63 63 63 63 63 63 63 63 63 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
166 Bulk Excavation - rock 114 90 70 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 70 70 70 70 70 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0167 Concrete Works 109 90 65 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 65 65 65 65 65 65 65 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0168 Top Down Excavation - Soft 113 90 69 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 69 0 69 0 69 0 69 0 69 69 0 69 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
169 Top Down Concrete Works 103 90 59 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 59 0 59 0 59 0 59 0 0 59 0 59 0 59 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
170 Top Down Excavation - Hard 114 90 70 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 70 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0171 Backfilling Works 109 90 65 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 65 65 65 65 65 65 65 65172 ABWF Works for WKT building 106 102 61 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 0
173 Diaphragm Wall 109 193 58 0 0 0 0 0 0 0 0 58 58 58 58 58 58 58 58 0 0 58 58 58 58 58 58 58 58 58 58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0174 Foundation Works 112 233 59 0 0 0 0 0 0 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0175 Bulk Excavation - soft 109 233 57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0176 Bulk Excavation - hard 114 233 62 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 62 62 62 62 62 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0177 Concrete Works 105 233 52 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 52 52 52 52 52 52 52 52 52 52 52 52 52 52 52 52 52 52 52 52 52 52 52 52 52 52 52 52 52 52 0 0 0178 ABWF Works for PTI and CLP substation 106 315 51 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 0 0 0179 Backfilling Works 109 233 57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 57 57 57 57 57 57 57 57 57 57 57 57 57 0 0 0
180 Diaphragm Wall 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0181 Bulk Excavation - soft 103 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0182 Concrete Works 105 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0183 Backfilling Works 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
184 Barging and Stockpiling 116 256 63 0 0 0 0 0 0 0 0 0 0 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 0 0 0 0 0 0 0 0 0 0 0 0Total SPL, dB(A) 70 70 70 75 75 75 75 75 77 77 76 76 69 69 69 69 69 69 69 73 73 72 72 72 70 70 70 70 70 70 70 71 68 71 68 71 68 72 69 72 73 70 70 71 72 68 67 67 67 65 65 65 65 69 69 69 69 69 69 69 68
- - - - - - - - 2 2 1 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Remarks:1. Noise sources at more than 300m from the sensitive receiver are not considered in cumulative noise assessment due to large distance attenuation effect.2. For the calculation of sound pressure levels (SPL), the PMEs are assumed to be placed at the notional source position according to the "Technical Memorandum on Noise from Construction Work other than Percussive Piling" by EPD.* The construction activity would be conducted at two different locations which would not be constructed simultaneously. Therefore, two different notional sources are considered in the month 4 - 8, 11-12 and 9 - 10.
Works Area V: C&C Tunnel Zone 5
2010
Works Area V: WKT- Zone 2
Works Area V: WKT-Zone 3
Act No. Construction Element
2014
Works Area U: Hoi Ting Road Works Area
Works Area V: Hoi Ting Road Works Area
Works Area V: WKT- Zone 1
2012 2013
Exceedance
Appendix 3.18 Construction Noise Impact of Express Rail Link on Identified Noise Sensitive Receivers
TW3a - Tower III, The Waterfront
SWL Dist1 SPL2
2011
Works Area W: Barging and Stockpiling
Works Area V: C&C Tunnel Zone 4
2009Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61
130 Possession of site 102 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0131 Site storage 91 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
132 Possession of site 98 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0133 Diaphragm Wall 102 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0134 Bulk Excavation/Fill - Soft 94 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0135 Concrete Works 95 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0136 TBM Removal 94 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0137 Ventilation building construction 95 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0138 Backfilling Works 0 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
139 Possession of site 110 225 58 58 58 58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0140 Diaphragm Wall 109 138 61 0 0 0 61 61 61 61 61 61 61 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0141 Foundation Works 113 200 62 0 0 0 62 62 62 62 62 62 62 62 62 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0142 Bulk Excavation - soft 109 200 58 0 0 0 0 0 0 0 0 0 0 0 0 58 58 58 58 58 58 58 58 58 58 58 58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0143 Bulk Excavation - hard 113 200 62 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 62 62 62 62 62 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0144 Concrete Works 109 200 58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 58 58 58 58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
145 Top Down Excavation - Soft 109 200 58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 58 58 58 58 0 58 0 58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0146 Top Down Concrete Works 102 200 51 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 51 0 51 0 51 0 51 0 0 51 51 0 51 51 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0147 Top Down Excavation - Hard 117 200 66 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 66 0 66 66 0 0 66 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0148 Backfilling Works 109 200 58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 58 58 58 58 58 0 0 0 0 0 0 0 0 0 0
149 Concrete Batching Plant - ConstructionStage 110 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
150 Concrete Batching Plant - Operation Stage 108 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
151 Concrete Batching Plant - Demolition 106 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
152 Possession of site 110 64 68 68 68 68 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0153 Diaphragm Wall* 109 62 68 0 0 0 68 68 68 68 68 68 68 68 68 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
109 67 68 0 0 0 68 68 68 68 68 68 68 68 68 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0154 Foundation Works 115 67 74 0 0 0 0 0 0 0 0 0 0 0 0 74 74 74 74 74 74 74 74 74 74 74 74 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0155 Bulk Excavation - soft 109 67 67 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 67 67 67 67 67 67 67 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0156 Concrete Works 110 67 69 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 69 69 0 69 0 69 0 69 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0157 Top Down Excavation - Soft 110 67 68 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 68 0 68 0 68 0 68 0 0 68 0 68 68 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0158 Top Down Concrete Works 103 67 62 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 62 62 0 62 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0159 Top Down Excavation - Hard 113 67 72 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 72 72 72 72 72 72 72 72160 Backfilling Works 109 251 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 0161 ABWF Works for WKT building 106 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
162 Possession of site 100 84 57 0 0 0 57 57 57 57 57 57 57 57 57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0163 Diaphragm Wall 97 134 49 0 0 0 49 49 49 49 49 49 49 49 49 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0164 Foundation Works 112 134 64 0 0 0 0 0 0 0 0 0 0 0 0 64 64 64 64 64 64 64 64 64 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0165 Bulk Excavation - soft 98 134 50 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 50 50 50 50 50 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0166 Bulk Excavation - rock 105 134 58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 58 58 58 58 58 58 58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0167 Concrete Works 100 134 53 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 53 0 53 0 53 0 53 0 53 53 0 53 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0168 Top Down Excavation - Soft 109 134 61 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 61 0 61 0 61 0 61 0 0 61 0 61 0 61 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0169 Top Down Concrete Works 103 134 55 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 55 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0170 Top Down Excavation - Hard 114 134 67 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 67 67 67 67 67 67 67 67171 Backfilling Works 101 104 55 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 0172 ABWF Works for WKT building 106 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
173 Diaphragm Wall 99 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0174 Foundation Works 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0175 Bulk Excavation - soft 100 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0176 Bulk Excavation - hard 105 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0177 Concrete Works 95 134 48 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 48 0 0 0178 ABWF Works for PTI and CLP substation 106 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0179 Backfilling Works 101 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
180 Diaphragm Wall 99 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0181 Bulk Excavation - soft 94 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0182 Concrete Works 95 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0183 Backfilling Works 101 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
184 Barging and Stockpiling 116 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Total SPL, dB(A) 68 68 68 72 72 72 72 72 72 72 72 72 75 75 75 75 75 75 75 75 75 74 74 74 69 69 69 69 68 68 68 69 70 69 70 69 70 70 70 70 68 65 68 69 69 69 61 61 61 61 61 59 59 73 73 73 73 73 73 73 73
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Remarks:1. Noise sources at more than 300m from the sensitive receiver are not considered in cumulative noise assessment due to large distance attenuation effect.2. For the calculation of sound pressure levels (SPL), the PMEs are assumed to be placed at the notional source position according to the "Technical Memorandum on Noise from Construction Work other than Percussive Piling" by EPD.* The construction activity would be conducted at two different locations which would not be constructed simultaneously. Therefore, two different notional sources are considered in the month 4 - 8 and 9 - 12.
The use of PME would not be visible whenviewed from the assessment facade ofNSR. The NSR is considered to be totallyscreened. According to GW-TM, a noisereduction of 10 dB(A) would be achieved.
Works Area V: C&C Tunnel Zone 5
Works Area W: Barging and Stockpiling
Exceedance
Works Area U: Hoi Ting Road Works
Works Area V: Hoi Ting Road Works
Works Area V: WKT- Zone 1
Works Area V: WKT- Zone 2
Works Area V: WKT-Zone 3
Works Area V: C&C Tunnel Zone 4
2012 2013 2014
Act No. Construction Element SWL Dist1 SPL2
Arch2b - Moon Tower, The Arch2010 2011
Appendix 3.18 Construction Noise Impact of Express Rail Link on Identified Noise Sensitive Receivers
2009Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov De
c Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61
130 Possession of site 102 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0131 Site storage 91 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
132 Possession of site 98 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0133 Diaphragm Wall 102 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0134 Bulk Excavation/Fill - Soft 94 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0135 Concrete Works 95 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
136 TBM Removal 94 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0137 Ventilation building construction 95 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0138 Backfilling Works 106 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
139 Possession of site 110 249 57 57 57 57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0140 Diaphragm Wall 109 176 59 0 0 0 59 59 59 59 59 59 59 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0141 Foundation Works 113 243 60 0 0 0 60 60 60 60 60 60 60 60 60 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0142 Bulk Excavation - soft 109 243 56 0 0 0 0 0 0 0 0 0 0 0 0 56 56 56 56 56 56 56 56 56 56 56 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0143 Bulk Excavation - hard 113 243 61 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 61 61 61 61 61 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0144 Concrete Works 109 243 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 56 56 56 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
145 Top Down Excavation - Soft 109 243 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 56 56 56 56 0 56 0 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0146 Top Down Concrete Works 102 243 50 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 50 0 50 0 50 0 50 0 0 50 50 0 50 50 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0147 Top Down Excavation - Hard 117 243 65 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 65 0 65 65 0 0 65 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
148 Backfilling Works 109 243 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 56 56 56 56 56 0 0 0 0 0 0 0 0 0 0
149 Concrete Batching Plant - Construction Stage 110 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
150 Concrete Batching Plant - Operation Stage 108 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
151 Concrete Batching Plant - Demolition 106 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
152 Possession of site 110 152 61 61 61 61 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0153 Diaphragm Wall 109 139 61 0 0 0 61 61 61 61 61 61 61 61 61 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0154 Foundation Works 115 155 67 0 0 0 67 67 67 67 67 67 67 67 67 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0155 Bulk Excavation - soft 109 155 60 0 0 0 0 0 0 0 0 0 0 0 0 60 60 60 60 60 60 60 60 60 60 60 60 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0156 Concrete Works 110 155 61 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 61 61 61 61 61 61 61 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0157 Top Down Excavation - Soft 110 155 61 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 61 61 0 61 0 61 0 61 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0158 Top Down Concrete Works 103 155 54 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 54 0 54 0 54 0 54 0 0 54 0 54 54 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0159 Top Down Excavation - Hard 113 155 64 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 64 64 0 64 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0160 Backfilling Works 109 155 60 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 60 60 60 60 60 60 60 60
161 ABWF Works for WKT building 106 192 55 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 0
162 Possession of site 100 207 49 49 49 49 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0163 Diaphragm Wall 97 162 48 0 0 0 48 48 48 48 48 48 48 48 48 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0164 Foundation Works 112 244 59 0 0 0 59 59 59 59 59 59 59 59 59 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
165 Bulk Excavation - soft 98 244 45 0 0 0 0 0 0 0 0 0 0 0 0 45 45 45 45 45 45 45 45 45 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0166 Bulk Excavation - rock 105 244 53 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 53 53 53 53 53 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0167 Concrete Works 100 244 47 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 47 47 47 47 47 47 47 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0168 Top Down Excavation - Soft 109 244 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 56 0 56 0 56 0 56 0 56 56 0 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
169 Top Down Concrete Works 103 244 50 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 50 0 50 0 50 0 50 0 0 50 0 50 0 50 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
170 Top Down Excavation - Hard 114 244 62 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 62 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0171 Backfilling Works 101 244 48 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 48 48 48 48 48 48 48 48172 ABWF Works for WKT building 106 260 52 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 52 52 52 52 52 52 52 52 52 52 52 52 52 52 52 52 52 0
173 Diaphragm Wall 99 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0174 Foundation Works 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0175 Bulk Excavation - soft 100 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0176 Bulk Excavation - hard 105 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0177 Concrete Works 95 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0178 ABWF Works for PTI and CLP substation 106 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0179 Backfilling Works 101 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
180 Diaphragm Wall 99 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0181 Bulk Excavation - soft 94 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0182 Concrete Works 95 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0183 Backfilling Works 101 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
184 Barging and Stockpiling 106 176 56 0 0 0 0 0 0 0 0 0 0 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 0 0 0 0 0 0 0 0 0 0 0 0Total SPL, dB(A) 63 63 63 70 70 70 70 70 70 70 69 69 63 63 63 63 63 63 63 63 63 63 63 65 65 65 65 65 63 63 63 64 63 62 63 62 63 66 63 66 68 65 61 68 64 61 61 61 61 59 59 57 57 62 62 62 62 62 62 62 60
Exceedance - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Remarks:1. Noise sources at more than 300m from the sensitive receiver are not considered in cumulative noise assessment due to large distance attenuation effect.2. For the calculation of sound pressure levels (SPL), the PMEs are assumed to be placed at the notional source position according to the "Technical Memorandum on Noise from Construction Work other than Percussive Piling" by EPD.
The use of PME would not be visible whenviewed from the assessment facade of NSR.The NSR is considered to be totally screened.According to GW-TM, a noise reduction of 10dB(A) would be achieved.
2013
SWL Dist1
2014
SPL2
2012ARCH4 - Sky Tower, The Arch
20112010
Appendix 3.18 Construction Noise Impact of Express Rail Link on Identified Noise Sensitive Receivers
Works Area U: Hoi Ting Road Works Area
Works Area V: C&C Tunnel Zone 4
Act No. Construction Element
Works Area W: Barging and Stockpiling
Works Area V: Hoi Ting Road Works Area
Works Area V: WKT- Zone 1
Works Area V: WKT- Zone 2
Works Area V: WKT-Zone 3
Works Area V: C&C Tunnel Zone 5
2009Dec Jan Feb Mar Apr Ma
y Jun Jul Aug
Sep Oct Nov De
c Jan Feb Mar Apr May Jun Jul Au
gSep Oct Nov De
c Jan Feb Mar Apr May Jun Jul Au
gSep Oct Nov De
c Jan Feb Mar Apr May Jun Jul Au
gSep Oct Nov De
c Jan Feb Mar Apr May Jun Jul Au
gSep Oct Nov De
c1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61
130 Possession of site 102 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0131 Site storage 91 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
132 Possession of site 98 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0133 Diaphragm Wall 102 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0134 Bulk Excavation/Fill - Soft 94 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0135 Concrete Works 95 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
136 TBM Removal 94 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0137 Ventilation building construction 95 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0138 Backfilling Works 0 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
139 Possession of site 110 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0140 Diaphragm Wall 109 267 56 0 0 0 56 56 56 56 56 56 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0141 Foundation Works 113 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0142 Bulk Excavation - soft 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0143 Bulk Excavation - hard 113 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0144 Concrete Works 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
145 Top Down Excavation - Soft 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0146 Top Down Concrete Works 102 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0147 Top Down Excavation - Hard 117 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
148 Backfilling Works 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
149 Concrete Batching Plant - Construction Stage 110 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
150 Concrete Batching Plant - Operation Stage 108 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
151 Concrete Batching Plant - Demolition 106 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
152 Possession of site 100 240 47 47 47 47 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0153 Diaphragm Wall 99 239 47 0 0 0 47 47 47 47 47 47 47 47 47 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0154 Foundation Works 113 256 60 0 0 0 60 60 60 60 60 60 60 60 60 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0155 Bulk Excavation - soft 99 256 46 0 0 0 0 0 0 0 0 0 0 0 0 46 46 46 46 46 46 46 46 46 46 46 46 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0156 Concrete Works 101 256 48 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 48 48 48 48 48 48 48 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0157 Top Down Excavation - Soft 107 256 54 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 54 54 0 54 0 54 0 54 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0158 Top Down Concrete Works 103 256 50 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 50 0 50 0 50 0 50 0 0 50 0 50 50 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0159 Top Down Excavation - Hard 113 256 60 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 60 60 0 60 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0160 Backfilling Works 101 256 47 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 47 47 47 47 47 47 47 47
161 ABWF Works for WKT building 106 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
162 Possession of site 100 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0163 Diaphragm Wall 97 248 44 0 0 0 44 44 44 44 44 44 44 44 44 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0164 Foundation Works 112 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
165 Bulk Excavation - soft 98 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0166 Bulk Excavation - rock 105 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0167 Concrete Works 100 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0168 Top Down Excavation - Soft 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
169 Top Down Concrete Works 103 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
170 Top Down Excavation - Hard 114 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0171 Backfilling Works 101 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0172 ABWF Works for WKT building 106 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
173 Diaphragm Wall 99 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0174 Foundation Works 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0175 Bulk Excavation - soft 100 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0176 Bulk Excavation - hard 105 - 75 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 75 75 75 75 75 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0177 Concrete Works 95 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0178 ABWF Works for PTI and CLP substation 106 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0179 Backfilling Works 101 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
180 Diaphragm Wall 99 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0181 Bulk Excavation - soft 94 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0182 Concrete Works 95 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0183 Backfilling Works 101 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
184 Barging and Stockpiling 116 250 63 0 0 0 0 0 0 0 0 0 0 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 0 0 0 0 0 0 0 0 0 0 0 0Total SPL, dB(A) 47 47 47 62 62 62 62 62 62 62 65 65 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 64 64 63 64 63 64 75 75 75 75 75 63 65 63 63 63 63 63 - - - - 47 47 47 47 47 47 47 47
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Remarks:1. Noise sources at more than 300m from the sensitive receiver are not considered in cumulative noise assessment due to large distance attenuation effect.2. For the calculation of sound pressure levels (SPL), the PMEs are assumed to be placed at the notional source position according to the "Technical Memorandum on Noise from Construction Work other than Percussive Piling" by EPD.
The use of PME would not be visible whenviewed from the assessment facade of NSR.The NSR is considered to be totally screened.According to GW-TM, a noise reduction of 10dB(A) would be achieved.
Works Area V: C&C Tunnel Zone 5
Works Area W: Barging and Stockpiling
Exceedance
Works Area U: Hoi Ting Road Works Area
Works Area V: Hoi Ting Road Works Area
Works Area V: WKT- Zone 1
Works Area V: WKT- Zone 2
Works Area V: WKT-Zone 3
Works Area V: C&C Tunnel Zone 4
2012 2013 2014
Act No. Construction Element SWL Dist1 SPL2
HARB2 - Tower 2, The Harbourside2010 2011
Appendix 3.18 Construction Noise Impact of Express Rail Link on Identified Noise Sensitive Receivers
2009Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov De
c Jan Feb Mar Apr May Jun Jul Au
gSep Oct Nov De
c Jan Feb Mar Apr May Jun Jul Au
gSep Oct Nov De
c Jan Feb Mar Apr May Jun Jul Au
gSep Oct Nov De
c Jan Feb Mar Apr May Jun Jul Au
gSep Oct Nov De
c1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61
130 Possession of site 110 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0131 Site storage 101 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
132 Possession of site 107 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0133 Diaphragm Wall 112 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0134 Bulk Excavation/Fill - Soft 107 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0135 Concrete Works 105 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
136 TBM Removal 104 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0137 Ventilation building construction 105 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0138 Backfilling Works 106 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
139 Possession of site 110 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0140 Diaphragm Wall 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0141 Foundation Works 113 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0142 Bulk Excavation - soft 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0143 Bulk Excavation - hard 113 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0144 Concrete Works 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
145 Top Down Excavation - Soft 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0146 Top Down Concrete Works 102 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0147 Top Down Excavation - Hard 117 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
148 Backfilling Works 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
149 Concrete Batching Plant - Construction Stage 110 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
150 Concrete Batching Plant - Operation Stage 108 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
151 Concrete Batching Plant - Demolition 106 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
152 Possession of site 110 280 56 56 56 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0153 Diaphragm Wall 109 224 57 0 0 0 57 57 57 57 57 57 57 57 57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0154 Foundation Works 115 267 62 0 0 0 62 62 62 62 62 62 62 62 62 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0155 Bulk Excavation - soft 109 267 55 0 0 0 0 0 0 0 0 0 0 0 0 55 55 55 55 55 55 55 55 55 55 55 55 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0156 Concrete Works 110 267 57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 57 57 57 57 57 57 57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0157 Top Down Excavation - Soft 110 267 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 56 56 0 56 0 56 0 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0158 Top Down Concrete Works 103 267 50 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 50 0 50 0 50 0 50 0 0 50 0 50 50 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0159 Top Down Excavation - Hard 113 267 59 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 59 59 0 59 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0160 Backfilling Works 109 267 55 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 55 55 55 55 55 55 55 55
161 ABWF Works for WKT building 106 228 54 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 0
162 Possession of site 110 72 67 67 67 67 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0163 Diaphragm Wall 107 49 68 0 0 0 68 68 68 68 68 68 68 68 68 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0164 Foundation Works 114 99 69 0 0 0 69 69 69 69 69 69 69 69 69 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
165 Bulk Excavation - soft 108 100 63 0 0 0 0 0 0 0 0 0 0 0 0 63 63 63 63 63 63 63 63 63 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0166 Bulk Excavation - rock 114 102 69 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 69 69 69 69 69 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0167 Concrete Works 109 99 64 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 64 64 64 64 64 64 64 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0168 Top Down Excavation - Soft 113 99 68 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 68 0 68 0 68 0 68 0 68 68 0 68 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
169 Top Down Concrete Works 103 99 58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 58 0 58 0 58 0 58 0 0 58 0 58 0 58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
170 Top Down Excavation - Hard 114 99 70 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 70 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0171 Backfilling Works 109 99 64 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 64 64 64 64 64 64 64 64172 ABWF Works for WKT building 106 105 60 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 0
173 Diaphragm Wall 109 51 70 0 0 0 0 0 0 0 0 70 70 70 70 70 70 70 70 0 0 70 70 70 70 70 70 70 70 70 70 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0174 Foundation Works 112 110 66 0 0 0 0 0 0 66 66 66 66 66 66 66 66 66 66 66 66 66 66 66 66 66 66 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0175 Bulk Excavation - soft 109 110 64 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0176 Bulk Excavation - hard 114 110 68 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 68 68 68 68 68 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0177 Concrete Works 105 110 59 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 0 0 0178 ABWF Works for PTI and CLP substation 106 151 57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 0 0 0179 Backfilling Works 109 110 63 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 63 63 63 63 63 63 63 63 63 63 63 63 63 0 0 0
180 Diaphragm Wall 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0181 Bulk Excavation - soft 103 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0182 Concrete Works 105 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0183 Backfilling Works 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
184 Barging and Stockpiling 116 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Total SPL, dB(A) 67 67 67 72 72 72 73 73 75 75 75 75 72 72 72 72 68 68 72 74 74 73 74 74 72 72 72 72 68 68 68 70 66 70 66 70 66 71 69 71 72 69 69 66 71 67 67 67 67 67 67 67 67 69 69 69 69 69 66 66 65
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Remarks:1. Noise sources at more than 300m from the sensitive receiver are not considered in cumulative noise assessment due to large distance attenuation effect.2. For the calculation of sound pressure levels (SPL), the PMEs are assumed to be placed at the notional source position according to the "Technical Memorandum on Noise from Construction Work other than Percussive Piling" by EPD.:̂ Construction activities would not be constructed simultaneously, therefore the max SPL among these activities would be used for the calculation of construction noise of that particular motnh. These activities include: activity no. 165 and 173 in month 21 to 24.
Appendix 3.18 Construction Noise Impact of Express Rail Link on Identified Noise Sensitive Receivers
Works Area V: C&C Tunnel Zone 5
2010
Works Area V: WKT- Zone 2
Works Area V: WKT-Zone 3
Act No. Construction Element
2014
Works Area U: Hoi Ting Road Works Area
Works Area V: Hoi Ting Road Works Area
Works Area V: WKT- Zone 1
2012 2013
Exceedance
SOR3 -Tower 6, Sorrento
SWL Dist1 SPL2
2011
Works Area W: Barging and Stockpiling
Works Area V: C&C Tunnel Zone 4
P3 - Planned Residential Development at Site C of Austin Station2009Dec Jan Feb Mar Apr Ma
y Jun Jul Aug
Sep Oct Nov De
c Jan Feb Mar Apr May Jun Jul Au
gSep Oct Nov De
c Jan Feb Mar Apr May Jun Jul Au
gSep Oct Nov De
c Jan Feb Mar Apr May Jun Jul Au
gSep Oct Nov De
c Jan Feb Mar Apr May Jun Jul Au
gSep Oct Nov De
c1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61
130 Possession of site 110 - 0 0 0 0 0 0 -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0131 Site storage 101 - 0 0 0 0 0 0 0 -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
132 Possession of site 107 - 0 0 0 0 0 -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0133 Diaphragm Wall 112 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0134 Bulk Excavation/Fill - Soft 107 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0135 Concrete Works 105 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0136 TBM Removal 104 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0137 Ventilation building construction 105 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0138 Backfilling Works 106 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
139 Possession of site 110 - 0 -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0140 Diaphragm Wall 109 278 55 0 0 0 -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0141 Foundation Works 113 - 0 0 0 0 -* -* -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0142 Bulk Excavation - soft 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 -* -* -* -* -* -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0143 Bulk Excavation - hard 113 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0144 Concrete Works 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0145 Top Down Excavation - Soft 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* -* -* -* 0 -* 0 -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0146 Top Down Concrete Works 102 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* 0 -* 0 -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0147 Top Down Excavation - Hard 117 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0148 Backfilling Works 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0149 Concrete Batching Plant - Construction Stage 110 - 0 -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0150 Concrete Batching Plant - Operation Stage 108 - 0 0 0 0 -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0151 Concrete Batching Plant - Demolition 106 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
152 Possession of site 110 204 58 -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0153 Diaphragm Wall 109 104 64 0 0 0 -* -* -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0154 Foundation Works 115 210 64 0 0 0 -* -* -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0155 Bulk Excavation - soft 109 210 57 0 0 0 0 0 0 0 0 0 0 0 0 -* -* -* -* -* -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0156 Concrete Works 110 210 59 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0157 Top Down Excavation - Soft 110 210 58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* -* 0 -* 0 -* 0 58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0158 Top Down Concrete Works 103 210 52 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* 0 -* 0 52 0 52 0 0 52 0 52 52 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0159 Top Down Excavation - Hard 113 210 62 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 62 62 0 62 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0160 Backfilling Works 109 210 57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 57 57 57 57 57 57 57 57161 ABWF Works for WKT building 106 152 57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 0
162 Possession of site 110 65 68 -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0163 Diaphragm Wall 107 27 73 0 0 0 -* -* -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0164 Foundation Works 114 80 71 0 0 0 -* -* -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0165 Bulk Excavation - soft 108 80 64 0 0 0 0 0 0 0 0 0 0 0 0 -* -* -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0166 Bulk Excavation - rock 114 80 71 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0167 Concrete Works 109 80 66 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0168 Top Down Excavation - Soft 113 80 70 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* 0 -* 0 -* 0 70 0 70 70 0 70 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0169 Top Down Concrete Works 103 80 60 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* 0 -* 0 -* 0 60 0 0 60 0 60 0 60 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0170 Top Down Excavation - Hard 114 80 71 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 71 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0171 Backfilling Works 109 80 66 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 66 66 66 66 66 66 66 66172 ABWF Works for WKT building 106 155 57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 0
173 Diaphragm Wall 109 123 62 0 0 0 0 0 0 0 0 -* -* -* -* -* -* -* -* 0 0 -* -* -* -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0174 Foundation Works 112 167 62 0 0 0 0 0 0 -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0175 Bulk Excavation - soft 109 167 60 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0176 Bulk Excavation - hard 114 167 64 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 64 64 64 64 64 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0177 Concrete Works 105 167 55 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* -* -* -* -* -* -* -* -* 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 0 0 0178 ABWF Works for PTI and CLP substation 106 189 55 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 55 0 0 0179 Backfilling Works 109 167 59 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 59 59 59 59 59 59 59 59 59 59 59 59 59 0 0 0
180 Diaphragm Wall 109 - 0 0 0 0 0 0 0 0 0 -* -* -* -* -* -* -* -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0181 Bulk Excavation - soft 103 - 0 0 0 0 0 0 0 -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0182 Concrete Works 105 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -* -* -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0183 Backfilling Works 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
184 Barging and Stockpiling 116 - 0 0 0 0 0 0 0 0 0 0 0 -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* -* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Total SPL, dB(A) - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 71 66 71 72 67 70 66 72 66 64 64 64 64 64 64 64 68 68 68 68 68 67 67 67
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Remarks:1. Noise sources at more than 300m from the sensitive receiver are not considered in cumulative noise assessment due to large distance attenuation effect.2. For the calculation of sound pressure levels (SPL), the PMEs are assumed to be placed at the notional source position according to the "Technical Memorandum on Noise from Construction Work other than Percussive Piling" by EPD.*. There is no noise sensitive use in month 1 -37.
Works Area V: C&C Tunnel Zone 5
Works Area W: Barging and Stockpiling
Exceedance
Works Area U: Hoi Ting Road Works Area
Works Area V: Hoi Ting Road Works Area
Works Area V: WKT- Zone 1
Works Area V: WKT- Zone 2
Works Area V: WKT-Zone 3
Works Area V: C&C Tunnel Zone 4
2012 2013 2014
Act No. Construction Element SWL Dist1 SPL2
2010 2011
Appendix 3.18 Construction Noise Impact of Express Rail Link on Identified Noise Sensitive Receivers
P1 - Planned Residential Development at the Junction of Hoi Wang Road and Yan Cheung Road2009Dec Jan Feb Mar Apr Ma
y Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr Ma
y Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr Ma
y Jun Jul Aug Sep Oct Nov Dec1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61
130 Possession of site 110 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0131 Site storage 101 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
132 Possession of site 107 263 54 0 0 0 0 54 54 54 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0133 Diaphragm Wall 112 238 59 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 59 59 59 59 59 59 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0134 Bulk Excavation/Fill - Soft 107 316 52 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 52 52 52 52 52 52 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0135 Concrete Works 105 316 50 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 50 50 50 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0136 TBM Removal 104 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0137 Ventilation building construction 105 266 51 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 51 51 51 51 51 51 51 51 51 51 0 0 0 0 0 0 0 0 0 0 0 0 0138 Backfilling Works 106 325 51 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 51 51 0 0 0 0 0 0 0 0 0 0 0
139 Possession of site 110 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0140 Diaphragm Wall 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0141 Foundation Works 113 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0142 Bulk Excavation - soft 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0143 Bulk Excavation - hard 113 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0144 Concrete Works 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
145 Top Down Excavation - Soft 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0146 Top Down Concrete Works 102 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0147 Top Down Excavation - Hard 117 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0148 Backfilling Works 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
149 Concrete Batching Plant - Construction Stage 110 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
150 Concrete Batching Plant - Operation Stage 108 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
151 Concrete Batching Plant - Demolition 106 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
152 Possession of site 110 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0153 Diaphragm Wall 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0154 Foundation Works 115 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0155 Bulk Excavation - soft 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0156 Concrete Works 110 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0157 Top Down Excavation - Soft 110 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0158 Top Down Concrete Works 103 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0159 Top Down Excavation - Hard 113 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0160 Backfilling Works 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
161 ABWF Works for WKT building 106 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
162 Possession of site 110 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0163 Diaphragm Wall 107 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0164 Foundation Works 114 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0165 Bulk Excavation - soft 108 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0166 Bulk Excavation - rock 114 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0167 Concrete Works 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0168 Top Down Excavation - Soft 113 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
169 Top Down Concrete Works 103 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
170 Top Down Excavation - Hard 114 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0171 Backfilling Works 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0172 ABWF Works for WKT building 106 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
173 Diaphragm Wall 109 148 61 0 0 0 0 0 0 0 0 61 61 61 61 61 61 61 61 0 0 61 61 61 61 61 61 61 61 61 61 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0174 Foundation Works 112 157 63 0 0 0 0 0 0 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0175 Bulk Excavation - soft 109 157 61 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0176 Bulk Excavation - hard 114 157 65 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 65 65 65 65 65 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0177 Concrete Works 105 157 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 0 0 0178 ABWF Works for PTI and CLP substation 106 59 65 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 0 0 0179 Backfilling Works 109 157 60 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 60 60 60 60 60 60 60 60 60 60 60 60 60 0 0 0
180 Diaphragm Wall 109 197 58 0 0 0 0 0 0 0 0 58 58 58 58 58 58 58 58 58 58 58 58 58 58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0181 Bulk Excavation - soft 103 230 51 0 0 0 0 0 0 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 51 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0182 Concrete Works 105 230 52 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 52 52 52 52 52 52 52 52 52 52 52 52 52 52 52 52 52 52 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0183 Backfilling Works 109 230 57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 57 57 57 57 57 57 57 57 57 57 57 57 57 0 0 0
184 Barging and Stockpiling 116 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Total SPL, dB(A) - - - - 54 54 64 63 66 66 66 66 66 66 66 66 64 64 67 67 67 67 67 67 64 64 64 64 63 63 63 63 63 63 63 63 63 66 66 66 66 66 66 66 66 67 67 67 67 67 67 67 67 67 67 67 67 67 - - -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Remarks:1. Noise sources at more than 300m from the sensitive receiver are not considered in cumulative noise assessment due to large distance attenuation effect.2. For the calculation of sound pressure levels (SPL), the PMEs are assumed to be placed at the notional source position according to the "Technical Memorandum on Noise from Construction Work other than Percussive Piling" by EPD.
Works Area W: Barging and Stockpiling
Works Area V: Hoi Ting Road Works Area
Works Area V: WKT- Zone 2
Works Area V: WKT-Zone 3
Works Area V: C&C Tunnel Zone 5
Works Area V: WKT- Zone 1
Works Area V: C&C Tunnel Zone 4
20142012 2013
Exceedance
2011
Appendix 3.18 Construction Noise Impact of Express Rail Link on Identified Noise Sensitive Receivers
SWL Dist1
Works Area U: Hoi Ting Road Works Area
2010
Act No. Construction Element SPL2
2009Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61
130 Possession of site 110 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0131 Site storage 101 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
132 Possession of site 107 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0133 Diaphragm Wall 112 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0134 Bulk Excavation/Fill - Soft 107 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0135 Concrete Works 105 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
136 TBM Removal 104 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
137 Ventilation building construction 105 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0138 Backfilling Works 106 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
139 Possession of site 110 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0140 Diaphragm Wall 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0141 Foundation Works 113 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0142 Bulk Excavation - soft 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0143 Bulk Excavation - hard 113 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0144 Concrete Works 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
145 Top Down Excavation - Soft 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
146 Top Down Concrete Works 102 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0147 Top Down Excavation - Hard 117 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0148 Backfilling Works 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0149 Concrete Batching Plant - Construction
Stage 110 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0150 Concrete Batching Plant - Operation Stage 108 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0151 Concrete Batching Plant - Demolition 106 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
152 Possession of site 110 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0153 Diaphragm Wall 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0154 Foundation Works 115 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0155 Bulk Excavation - soft 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0156 Concrete Works 110 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0157 Top Down Excavation - Soft 110 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0158 Top Down Concrete Works 103 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0159 Top Down Excavation - Hard 113 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0160 Backfilling Works 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
161 ABWF Works for WKT building 106 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
162 Possession of site 110 241 57 57 57 57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0163 Diaphragm Wall 107 176 57 0 0 0 57 57 57 57 57 57 57 57 57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0164 Foundation Works 114 247 61 0 0 0 61 61 61 61 61 61 61 61 61 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
165 Bulk Excavation - soft 108 247 55 0 0 0 0 0 0 0 0 0 0 0 0 55 55 55 55 55 55 55 55 55 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
166 Bulk Excavation - rock 114 247 61 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 61 61 61 61 61 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0167 Concrete Works 109 247 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 56 56 56 56 56 56 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0168 Top Down Excavation - Soft 113 247 60 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 60 0 60 0 60 0 60 0 60 60 0 60 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
169 Top Down Concrete Works 103 247 50 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 50 0 50 0 50 0 50 0 0 50 0 50 0 50 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
170 Top Down Excavation - Hard 114 247 62 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 62 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0171 Backfilling Works 109 247 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 56 56 56 56 56 56 56 56172 ABWF Works for WKT building 106 246 53 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 53 0
173 Diaphragm Wall 109 104 64 0 0 0 0 0 0 0 0 64 64 64 64 64 64 64 64 0 0 64 64 64 64 64 64 64 64 64 64 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0174 Foundation Works 112 132 64 0 0 0 0 0 0 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0175 Bulk Excavation - soft 109 132 62 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0176 Bulk Excavation - hard 114 132 67 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 67 67 67 67 67 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0177 Concrete Works 105 132 57 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 0 0 0178 ABWF Works for PTI and CLP substation 106 140 58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 0 0 0179 Backfilling Works 109 132 62 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 62 62 62 62 62 62 62 62 62 62 62 62 62 0 0 0
180 Diaphragm Wall 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0181 Bulk Excavation - soft 103 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0182 Concrete Works 105 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0183 Backfilling Works 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
184 Barging and Stockpiling 116 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Total SPL, dB(A) 57 57 57 62 62 62 66 66 68 68 68 68 67 67 67 67 65 65 67 68 68 68 69 69 67 67 67 67 64 64 64 65 63 65 63 65 63 68 67 68 68 67 63 62 65 65 65 65 65 65 65 65 65 65 65 65 65 65 58 58 56
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Remarks:1. Noise sources at more than 300m from the sensitive receiver are not considered in cumulative noise assessment due to large distance attenuation effect.2. For the calculation of sound pressure levels (SPL), the PMEs are assumed to be placed at the notional source position according to the "Technical Memorandum on Noise from Construction Work other than Percussive Piling" by EPD.
Works Area V: C&C Tunnel Zone 5
Works Area W: Barging and Stockpiling
Exceedance
Works Area U: Hoi Ting Road Works Area
Works Area V: Hoi Ting Road Works Area
Works Area V: WKT- Zone 1
Works Area V: WKT- Zone 2
Works Area V: WKT-Zone 3
Works Area V: C&C Tunnel Zone 4
2012 2013 2014
Act No. Construction Element SWL Dist1 SPL2
MC1- Man Yiu Building2010 2011
Appendix 3.18 Construction Noise Impact of Express Rail Link on Identified Noise Sensitive Receivers
2009Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61
130 Possession of site 110 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0131 Site storage 101 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
132 Possession of site 107 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0133 Diaphragm Wall 112 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0134 Bulk Excavation/Fill - Soft 107 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0135 Concrete Works 105 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0136 TBM Removal 104 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0137 Ventilation building construction 105 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0138 Backfilling Works 106 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
139 Possession of site 110 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0140 Diaphragm Wall 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0141 Foundation Works 113 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0142 Bulk Excavation - soft 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0143 Bulk Excavation - hard 113 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0144 Concrete Works 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0145 Top Down Excavation - Soft 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0146 Top Down Concrete Works 102 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0147 Top Down Excavation - Hard 117 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0148 Backfilling Works 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0149 Concrete Batching Plant - Construction
Stage 110 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0150 Concrete Batching Plant - Operation Stage 108 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0151 Concrete Batching Plant - Demolition 106 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
152 Possession of site 110 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0153 Diaphragm Wall 109 297 55 0 0 0 55 55 55 55 55 55 55 55 55 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0154 Foundation Works 115 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0155 Bulk Excavation - soft 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0156 Concrete Works 110 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0157 Top Down Excavation - Soft 110 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0158 Top Down Concrete Works 103 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0159 Top Down Excavation - Hard 113 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0160 Backfilling Works 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
161 ABWF Works for WKT building 106 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
162 Possession of site 110 158 61 61 61 61 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0163 Diaphragm Wall 107 92 63 0 0 0 63 63 63 63 63 63 63 63 63 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0164 Foundation Works 114 161 64 0 0 0 64 64 64 64 64 64 64 64 64 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
165 Bulk Excavation - soft 108 161 58 0 0 0 0 0 0 0 0 0 0 0 0 58 58 58 58 58 58 58 58 58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
166 Bulk Excavation - rock 114 161 65 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 65 65 65 65 65 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0167 Concrete Works 109 161 60 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 60 60 60 60 60 60 60 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0168 Top Down Excavation - Soft 113 161 64 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 64 0 64 0 64 0 64 0 64 64 0 64 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
169 Top Down Concrete Works 103 161 54 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 54 0 54 0 54 0 54 0 0 54 0 54 0 54 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
170 Top Down Excavation - Hard 114 161 65 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 65 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0171 Backfilling Works 109 161 60 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 60 60 60 60 60 60 60 60172 ABWF Works for WKT building 106 164 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 0
173 Diaphragm Wall 109 55 69 0 0 0 0 0 0 0 0 69 69 69 69 69 69 69 69 0 0 69 69 69 69 69 69 69 69 69 69 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0174 Foundation Works 112 92 67 0 0 0 0 0 0 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0175 Bulk Excavation - soft 109 92 65 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0176 Bulk Excavation - hard 114 92 70 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 70 70 70 70 70 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0177 Concrete Works 105 92 61 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 0 0 0178 ABWF Works for PTI and CLP substation 106 74 63 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 0 0 0179 Backfilling Works 109 92 65 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 65 65 65 65 65 65 65 65 65 65 65 65 65 0 0 0
180 Diaphragm Wall 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0181 Bulk Excavation - soft 103 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0182 Concrete Works 105 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0183 Backfilling Works 109 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
184 Barging and Stockpiling 116 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Total SPL, dB(A) 61 61 61 67 67 67 70 70 72 72 72 72 71 71 71 71 68 68 71 72 72 72 73 73 71 71 71 71 67 67 67 68 67 68 67 68 67 71 71 71 71 71 68 66 68 68 68 68 68 68 68 68 68 69 69 69 69 69 61 61 60
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Remarks:1. Noise sources at more than 300m from the sensitive receiver are not considered in cumulative noise assessment due to large distance attenuation effect.2. For the calculation of sound pressure levels (SPL), the PMEs are assumed to be placed at the notional source position according to the "Technical Memorandum on Noise from Construction Work other than Percussive Piling" by EPD.
Works Area V: C&C Tunnel Zone 5
Works Area W: Barging and Stockpiling
Exceedance
Works Area U: Hoi Ting Road Works Area
Works Area V: Hoi Ting Road Works Area
Works Area V: WKT- Zone 1
Works Area V: WKT- Zone 2
Works Area V: WKT-Zone 3
Works Area V: C&C Tunnel Zone 4
2012 2013 2014
Act No. Construction Element SWL Dist1 SPL2
MC3 - Man King Building2010 2011
Appendix 3.18 Construction Noise Impact of Express Rail Link on Identified Noise Sensitive Receivers