POSSIBILITIES FOR FLEXIBLE MANUFACTURING CAPABILITIES FOR V ACCINE PRODUCTION KIM L. NELSON, PH.D. CRB CONSULTING ENGINEERS INTERPHEX 2011 30 MARCH 2011 NEW YORK
Transcript
Page 1: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

POSSIBILITIES FOR FLEXIBLEMANUFACTURING CAPABILITIES FOR

VACCINE PRODUCTION

KIM L. NELSON, PH.D.CRB CONSULTING ENGINEERS

INTERPHEX 2011

30 MARCH 2011NEW YORK

Page 2: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

TOPICS

Current gaps in vaccine manufacturing capacity Enabling Technologies FutureFacility

• Responsive facilities providing increased flexibility / adaptability, providing a fast response to changing needs such as number of doses, titer, strain or process

• Reduced capital cost • Reduced time to market

Sustainable vaccine production capacity.

Page 3: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

BEING MORE COMPETITIVE

Flexibility: Easy to Modify Adaptable for Multiple Products Adaptable for Multiple Business Units Accommodate Future Technologies Easy to Expand

High Value:

Initial Capital Cost & Operating Cost Reusable / Adaptable Asset Fits Changing Business Needs Adjustable Supply Chain Capacity

Lower Risk:

Project Risk Business Risk Compliance Risk Supply Chain Risk Process Risk Time-to-Market Speed to Adapt

Page 4: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

CURRENT GAPS IN VACCINE CAPACITY

Egg-based throughput constraints Fundable initial capital investment costs Acceptable cost of goods Flexibility

• Adaptability for deploying of new processes• Expandability for surge demands

Experience with available enabling technologies

Page 5: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

SYSTEM CLOSURE:AN ENABLING TECHNOLOGY

Very important principle Adopted in ISPE Baseline Guide for Biopharmaceutical

Facilities With a closed process, you can lower the room classification

Page 6: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

SOURCES OF POTENTIAL PRODUCT ADULTERATION

Batch 1

CARRYOVER

ENVIRONMENTALCONTAMINATION

PROCESS AREA

Batch 2

Product1

Product2

CROSSCONTAMINATION

Batch

RAWMATERIALS

SO LET’S LOOK AT THE ENVIRONMENT⋯.

Page 7: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

ISO VS EU GRADE CLASSIFICATIONS

ISO does not distinguish “At Rest” vs. “In-Operation”• e.g. ISO 7 is Grade C at rest

and Grade B in operation…

EU Grade particle counts are NOT exactly equal to corresponding ISO classes. • e.g. Grade A permits only

3500 particles 0.5 per m3

vs. 3520 particles per m3 for ISO 5

• Similar differences are seen in other ISO classes vs EU Grades

Page 8: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

WHAT IS THE IMPACT OF THE ROOM ENVIRONMENT

If you have an OPEN operation, which is not subsequently filtered, it makes a difference by decreasing the probability of a contamination entering from the room air.

If the processes is RENDERED CLOSED (such as by filtration into a closed tank or bag), it makes no difference.

If you have a CLOSED processes, the environment makes no difference at all.

Page 9: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

WHICH HAS HIGHER RISK OF CONTAMINATION ?

CLOSED OPEN

Page 10: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

IS LIKELIHOOD OR IN ISO 7 VS CNC ?

CLOSED OPEN

Page 11: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

IS SEVERITY OR IN ISO 7 VS CNC ?

CLOSED OPEN

Page 12: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

IS DETECTABILITY OR IN ISO 7 VS CNC ?

CLOSED OPEN

Page 13: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

Clean Rooms Isolators

Virgin Closed SystemsCIP and/or SIP of

System After Closure

To Mitigate Risk of Product

Adulteration

Improve Equipment

Integrity

Improve Environment

Quality

OR

AND(until now!?)

SOURCES OF POTENTIAL PRODUCT ADULTERATION

Page 14: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

ARE ISO 7 COVING, AIR CHANGES & GOWNINGEFFECTIVE FOR CLOSED ASEPTIC OPERATIONS?

Page 15: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

This is commonly done and approved by regulatory agencies.

Why??? BECAUSE THEY ARE CLOSED SYSTEMS

BIOREACTORS IN CLEANROOM AREAS….. WHAT DO YOU GAIN?

Page 16: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

Low Risk High Risk

Page 17: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

112,32,3

55

2525

1111

13-1713-17

7,87,8 99

1818 1919

22,2322,232424

29-3129-31

1212

2020 2121

1010

44

66

2626

27,2827,28

E.G. CHROMATOGRAPHY

Page 18: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

FAULT TREE ANALYSIS OF RISK ELEMENTS

QUESTION (1)DOES THE CONNECTION EFFECTIVELY ISOLATE THE

PROCESS FROM THE ENVIRONMENT

QUESTION (1)DOES THE CONNECTION EFFECTIVELY ISOLATE THE

PROCESS FROM THE ENVIRONMENT

QUESTION (2)IS THE SYSTEM CLOSURE CONSISTENT WITH THE USEROR PROCESS REQUIREMENTS ?

QUESTION (2)IS THE SYSTEM CLOSURE CONSISTENT WITH THE USEROR PROCESS REQUIREMENTS ?

QUESTION (3)ARE THERE DOWNSTREAM CONTROLS THATEFFECTIVELY MITIGATE THE RISK?

QUESTION (3)ARE THERE DOWNSTREAM CONTROLS THATEFFECTIVELY MITIGATE THE RISK?

UPGRADE SURROUNDINGENVIRONMENTUPGRADE SURROUNDINGENVIRONMENT

REDESIGN CLOSURESYSTEMREDESIGN CLOSURESYSTEM

MITIGATE USING DOWNSTREAM STEPMITIGATE USING DOWNSTREAM STEP

QUESTION (1)DOES THE CONNECTION EFFECTIVELY ISOLATE THE

PROCESS FROM THE ENVIRONMENT

QUESTION (2)IS THE SYSTEM CLOSURE CONSISTENT WITH THE USEROR PROCESS REQUIREMENTS ?

QUESTION (3)ARE THERE DOWNSTREAM CONTROLS THATEFFECTIVELY MITIGATE THE RISK?

UPGRADE SURROUNDINGENVIRONMENT

REDESIGN CLOSURESYSTEM

MITIGATE USING DOWNSTREAM STEP

Page 19: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

SUMMARIZE CLOSURE BREAKDOWN

Page 20: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

IMPACT OF CLOSED PROCESSING

Traditional FutureFacility(GLSP Biotech)

FutureFacility(BSL / Containment)

Inoculum Prep

Upstream Processing

Initial Purification

Final Purification

Bulk Fill

MediaPrep /

Hold

Single Ballroom(Closed Processing)

Inoculum Prep(Open Processing)

Virus / ActiveCell Processing

(Closed Processing)

Cell Scale-up

InactivatedCell Processing /

Support Operations(Closed Processing)

BufferPrep /

Hold

IS0 7

IS0 8

Controlled Non Classified (CNC)

Page 21: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

DECREASED CAPITAL $$$

INCREASED FLEXIBILITY / ADAPTABILITY

INCREASED VALUE

DECREASED RISK

Page 22: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

SINGLE USE SYSTEMSAN ENABLING TECHNOLOGY

Page 23: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

Advantages of Disposables Reduces capital cost Provides great flexibility in volumes

and changing processes Speeds delivery of facility Reduces labor and validation

associated with CIP and SIP Reduces water usage Reduces wastewater discharge reduces maintenance and calibration

costs with decreased number of I/O points

VALUE-ADDED SOLUTIONS - DISPOSABLES

Page 24: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

Drawbacks risk of major leakage or breach of the

bag integrity which could result in discarding product

Not a”Copy Exactly”of existing Leachable/Extractable Testing Cost of bags Cost of waste disposal Limited volumes Warehouse stocking Movement of bags through facility complex supply chains for high

number of components that make up systems

Increased staging space required

VALUE-ADDED SOLUTIONS - DISPOSABLES

Page 25: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

Buffer Hold

Buffer PrepMedia Prep

L1

L2

L3Cell

Growth

B1CIP Skid

CIP Skid

CIP Skid

CIP Skid

Tote

BufferPrep Tank

Media Prep Tank

Platform

NutrientFeed

Clarification

CIP Skid

CIP Skid

VirusInactivation

ToFill /

Finish

0.22filtrationHarvest

Tank

Seed Biorxt

Seed Biorxt

5,000 L Bioreactor

Seed Biorxt

5,000 L Bioreactor

BreakTank

Virus Production

Centrifugation InactivationMix Tank

2nd DNA Digestion

HarvestTank

InactivationHold Tank

1st DNA DigestionPrior to Harvest

BufferHold

Tanks

Detergent Disruption

HarvestTank

DetergentTank

Chromatography

Homogenization

ZonalUltracentrifuge

HarvestTank

Zonal LoadTank

Detergent

ResinFor Batchdetergentremoval

CIP Skid

CIP Skid

CellInoc

VirusInoc Purification

OPPORTUNITIES FOR SINGLE-USE SYSTEMS IN INFLUENZA VACCINE MFGR

Page 25

Page 26: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

HANDLING BIOCONTAINMENT

Page 27: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

RESPONSIVE FACILITIES

Modularity of Plug-and-Play Operation provides great manufacturing flexibility

Page 28: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

BENEFITS OF CLOSED PROCESSING & FUTURE FACILITY CONCEPTS

Reduced manufacturing area (15-30%) Reduced HVAC

• Reduced room classifications• Reduced cleanroom areas• Reduced air changes per hours• Reduced fan power demand• Reduced number of air handling units• Reduced maintenance

Page 29: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

BENEFITS OF CLOSED PROCESSING & FUTURE FACILITY CONCEPTS

Reduced Utilities• Using single use systems can reduce clean steam and WFI requirements (up to 80-90% reductions)

• Reduced chilled water and steam demands (up to 60% savings)

• Reduced wastewater Reduced Construction & Start-up Schedule

• Up to 50% schedule savings Reduced COGs (situation dependent)

Page 30: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

REDUCED TIME TO MARKET

FutureFacilityFutureFacility

T = 23 mo.

Engineering/ Design

Engineering/ Design ConstructionConstruction

CommissioningCommissioning

Start upStart up ValidationValidation

MechanicallyComplete

MechanicallyComplete

Engineering/ Design

Engineering/ Design ConstructionConstruction

CommissioningCommissioning

Start upStart up ValidationValidation

MechanicallyComplete

MechanicallyComplete

TraditionalFacility

TraditionalFacility

Traditional FutureFacility % ChangeSCHEDULE Months Months

Engineering / Design 9 6 -33%

Construction / Mech Completion 18 6 -67%

Start-up 3 2 -33%

Commissioning 6 2 -67%

Validation 12 9 -25%

Totals 48 25 -48%

Page 31: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

QUICKER PROJECT TIMELINE ALLOWS OPTIONS

Improved Timeto Market

Additional Timefor Process Developmentand Business Planning

Strategy AStrategy A

Strategy BStrategy B

Process / Clinical Development

Process / Clinical Development

Process / Clinical Development

Traditional Project

FutureFacilityProject

Facility Licensing

Facility Licensing

Facility Licensing

Page 32: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

SUSTAINABLE IMPROVEMENT

75-95% Water Usage Reduction 50-95% Chemical Reduction 50%+ Energy Reduction 25-50% Smaller Carbon Footprint 30-40% Smaller Land Requirement

Future Facility concepts can reduce footprint, lower energy costs and use less water, making the FutureFacility much more green ⋯

Page 33: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

SUMMARY

Flexible, Adaptable & Expandable facilities are possible and cost effective

Process Closure provides superior product protectionAND allows lower room classifications

Single-Use systems offer process flexibility, shortened construction schedule and start-up/validation schedule, and decreased utilities

Page | 33

Page 34: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

ACKNOWLEDGEMENTS

Lee Emel Mark von Stwolinski Marc Pelletier Avi Page and many others at CRB

Page 35: Possibilities for flexible manufacturing capabilities for ... · PDF fileClean Rooms Isolators ... (Closed Processing) Buffer Prep / Hold IS0 7 IS0 8 ... Possibilities for flexible

THANK YOU FOR YOUR ATTENTION !

Kim L. Nelson, Ph.D.Director, Strategic ConsultingCRB Consulting Engineers220 W. Germantown Pike, Suite 170Plymouth Meeting, PA 19462USA

(610)-278-7644 office(215)-435-0390 [email protected]

Page 35


Recommended