Description:
Post-commissioning Controls Enhancements. Overview. Enhancements that will improve performance , reliability and maintainability Includes deferred items not installed prior to commissioning As well as improvements based on recent commissioning experience - PowerPoint PPT Presentation
20
Patrick Krejcik LCLS FAC [email protected] du November 11-12, 2008 1 SLAC National Accelerator Laboratory Post-commissioning Controls Enhancements
Transcript
Page 1: Post-commissioning  Controls Enhancements

Patrick Krejcik

LCLS FAC [email protected]

November 11-12, 20081

SLAC National Accelerator Laboratory

Post-commissioning Controls Enhancements

Page 2: Post-commissioning  Controls Enhancements

Patrick Krejcik

LCLS FAC [email protected]

November 11-12, 20082

SLAC National Accelerator Laboratory

Enhancements that will improve performance, reliability and maintainabilityIncludes deferred items not installed prior to commissioningAs well as improvements based on recent commissioning experienceAnd necessity based on aging plantHardwareSoftware

Overview

… and documentation

Page 3: Post-commissioning  Controls Enhancements

Patrick Krejcik

LCLS FAC [email protected]

November 11-12, 20083

SLAC National Accelerator Laboratory

Hardware Upgrades

Linac controls upgradeTom Himel’s talk addresses mainly Phase I new EPICS controller to bridge to existing CAMAC hardwarePhases II & III involve new hardware & software

BPMsRF and LLRF upgradesTimingMPS Power supplies and controllersNew diagnostics

Page 4: Post-commissioning  Controls Enhancements

Patrick Krejcik

LCLS FAC [email protected]

November 11-12, 20084

SLAC National Accelerator Laboratory

BPMs

Complete Linac BPM upgrade with EPICS digitizersNew BPM cableplant from striplines to processor already installed to 3 locations per linac sectorTiming cable plant to each linac sector also installedInstall VME crates with IOC & EVR together with front end and digitizer in remaining sectorsIn principal agreed to, awaiting account number.

Page 5: Post-commissioning  Controls Enhancements

Patrick Krejcik

LCLS FAC [email protected]

November 11-12, 20085

SLAC National Accelerator Laboratory

RF Systems

Upgrade Phase and Amplitude Detectors (PADs) Replace obsolete, unsupported SLAC PADsWith new LCLS higher resolution digitizersVers. 1 LCLS PAD has bottleneck in the Coldfire PUpgrade with better performing DSP – full BSA

Linac upgrade of MKSU & PIOPsReplace obsolete, unsupported hardwareImprove performance with single pulse RF waveform captureUse embedded timing EVR and optimize design for large number of unitsPreliminary conceptual design with embedded processor, FPGA and PCI

Linac upgrades with sold state subboosters Partially implemented at LCLS injector both reliability and control benefits. Performance and flexibility with individual klystron Phase and Amplitude Control (PAC)

Linac modulator and interlocks upgrade

Page 6: Post-commissioning  Controls Enhancements

Patrick Krejcik

LCLS FAC [email protected]

November 11-12, 20086

SLAC National Accelerator Laboratory

RF Systems (cont.)

Phase reference line and timing fiber backboneBeam based longitudinal feedback on energy and bunch needed to meet performance specificationsFurther stabilizing the reference phase distribution relieves some of the feedback burden and improves performance at low beam rate and recovery from periods of no beam.

Extend the LCLS in-tunnel, temp. stabilized, hard copper phase ref. line to more sectorsDerive new phase reference form the optically stabilized fiber distribution system

Page 7: Post-commissioning  Controls Enhancements

Patrick Krejcik

LCLS FAC [email protected]

November 11-12, 20087

SLAC National Accelerator Laboratory

LBNL Stabilized Fiber SystemJ. Byrd, L. Doolittle, J. Staples, R. Wilcox

New LLRF receiver uses feedforward on RF phase rather than correcting actual fiber length

Page 8: Post-commissioning  Controls Enhancements

Patrick Krejcik

LCLS FAC [email protected]

November 11-12, 20088

SLAC National Accelerator Laboratory

SLAC Test of LBNL Stabilized Fiber

Compare two independently stabilized fibers in the SLAC klystron gallery

Page 9: Post-commissioning  Controls Enhancements

Patrick Krejcik

LCLS FAC [email protected]

November 11-12, 20089

SLAC National Accelerator Laboratory

Fiber Stabilization ResultsMeasure 25 fs noise in 1 ns fiber length change

Can compensate for 1 ps group delay error from carrier down to 35 fs

Page 10: Post-commissioning  Controls Enhancements

Patrick Krejcik

LCLS FAC [email protected]

November 11-12, 200810

SLAC National Accelerator Laboratory

Timing system

The present LCLS Event Generator (EVG) slaves off the SLC Master Pattern Generator (MPG) via PNET

EVG can take over this role but needs to be programmed with non-LCLS beam codes

Event system hardware is proprietary (MicroResearch Finland)

Have started working on an embedded Event Receiver (EVR) into FPGAs used in generic control modules such as the link node chassis

Page 11: Post-commissioning  Controls Enhancements

Patrick Krejcik

LCLS FAC [email protected]

November 11-12, 200811

SLAC National Accelerator Laboratory

Machine Protection System

LCLS relies on a new MPSOld MPS works via the MPG, which is going away.

Upstream linac will need to be converted to new MPS

In conjunction with linac RF upgrades we will integrate klystrons into new MPS

Preemptive beam abort when a klystron cycles

Page 12: Post-commissioning  Controls Enhancements

Patrick Krejcik

LCLS FAC [email protected]

November 11-12, 200812

SLAC National Accelerator Laboratory

Power Supply Upgrades

Included here mainly for completenessContinue with upgrades to PS Controllers implemented for LCLS

Page 13: Post-commissioning  Controls Enhancements

Patrick Krejcik

LCLS FAC [email protected]

November 11-12, 200813

SLAC National Accelerator Laboratory

New Diagnostics

Restore diagnostics cut from the original planLinac BPMs, Wire scanners, dump screen cameras

As the need arises, support new diagnostics forHigher resolution bunch length measurement

THz spectrometer, X-band TCAV

Bunch arrival time monitoring for both photon and electron bunchesEmittance control: laser heater, foils

Page 14: Post-commissioning  Controls Enhancements

Patrick Krejcik

LCLS FAC [email protected]

November 11-12, 200814

SLAC National Accelerator Laboratory

Software Upgrades

Fast feedbackHigh level applicationsDevelopment environmentRelational DataBase

Page 15: Post-commissioning  Controls Enhancements

Patrick Krejcik

LCLS FAC [email protected]

November 11-12, 200815

SLAC National Accelerator Laboratory

Fast Feedback

Timeslot aware controlsData link to photon experimentsNew dedicated network for feedback IOCs – 120 HzNew project kick off, with new team

Due for completion Jan-2010.

Page 16: Post-commissioning  Controls Enhancements

Patrick Krejcik

LCLS FAC [email protected]

November 11-12, 200816

SLAC National Accelerator Laboratory

Proposed Fast Feedback Architecture

Page 17: Post-commissioning  Controls Enhancements

Patrick Krejcik

LCLS FAC [email protected]

November 11-12, 200817

SLAC National Accelerator Laboratory

High Level Applications

New applications, as the need arises for FEL tuningAlternative online modeling engines (MAD)Start to end simulationsReal time comparison between S2E simulation and beam measurementsEnhance the development framework with a Rich Client Platform (RCP)

Page 18: Post-commissioning  Controls Enhancements

Patrick Krejcik

LCLS FAC [email protected]

November 11-12, 200818

SLAC National Accelerator Laboratory

Software Development Environment

Implement a development platform on separate hardware

Software and application testingSLC users were used to a parallel development machine that could be switched to production

Enhance the software deployment tools

Page 19: Post-commissioning  Controls Enhancements

Patrick Krejcik

LCLS FAC [email protected]

November 11-12, 200819

SLAC National Accelerator Laboratory

Relational Database

Oracle was added after the controls architecture was establishedWe have now become dependant on the RDB

Config control, online model etcValidation of consistency between EPICS and Oracle has become key

But, still waiting to hire a DB engineerUltimately move to a situation where Oracle is the master of the EPICS distributed DBs.

Page 20: Post-commissioning  Controls Enhancements

Patrick Krejcik

LCLS FAC [email protected]

November 11-12, 200820

SLAC National Accelerator Laboratory

Further out

Interleaved operation of multiple undulator beamlinesApproval of upstream PPA programs such as FACET, requiring controls upgrades to the remainder of the linac to comply with new systemsBoth of these require simultaneous operation of multiple beams on different timeslots


Recommended