Date post: | 28-May-2015 |
Category: |
Business |
Upload: | be2camp-admin |
View: | 1,125 times |
Download: | 1 times |
Potted History of BIM from an
MEP Perspective
Eddie Murphy Technical Director
14 December 2011
Virtual or Real?
2006 Vulcan House Bid Image in StudioMax
Calculation Model
2006 Designbuilder/Energy Plus Thermal Modelling
Lighting Models
Relux Radiance
2008: IES Model Arts Tower, University of Sheffield
CFD
•Grade II* listed building •Office made to fit an academic use •Hot in Summer •Draughty in Winter •Over occupation
3D CAD
2008: Arts Tower Existing Riser in Autodesk MEP
Organic Improvement
2008 - 2010
Level1+
2010 Halton School Revit MEP
Implications of Step Change
Client Engagement
Virtual Construction
Actual Construction
Post Handover
Programme
Supply Chain
Skills base
Co- ordination
Cost Final Detailing
Logistics
Design
Skills Transfer
Spatial Skills
Component Knowledge
Technical Understanding
Example
Wide Sweep Screwed
Mapress Stainless
Butt Equal Tee Galv. Painted Equal Tee
New Language/New Methodology
Common View on Risks and Rewards
Incentive needs to be…
“committed leadership, a focus on the customer, integrated processes and teams, a quality driven agenda and commitment to people”
Founded upon…
Partnering
So we can Catch Up…
Boeing 777; Paperless design and construct to less than 0.6mm tolerance
Our Approach
Collaborating Offline
Summary
• Yes BIM is here… but… – Is it a marketing tool or the beginnings of a
new epoc for the Industry?
– Are the Rewards and Reduced Risk enough for the whole industry to completely revolutionise how we do things?
– Will historic lack of investment in our industry frustrate progress to Level 2 and beyond?
– Can this industry step up to the plate to us BIM as the vehicle to deliver real value for its customers?