{ Power Plant cycle for Power Plant cycle for Main plant Main plant By By Raj Rampally Raj Rampally
Transcript
Page 1: Power Plant Water and Steam Cycle

8/2/2019 Power Plant Water and Steam Cycle

http://slidepdf.com/reader/full/power-plant-water-and-steam-cycle 1/8

{{

Power Plant cycle for Power Plant cycle for Main plantMain plant

ByBy

Raj RampallyRaj Rampally

Page 2: Power Plant Water and Steam Cycle

8/2/2019 Power Plant Water and Steam Cycle

http://slidepdf.com/reader/full/power-plant-water-and-steam-cycle 2/8

The coal from the coal jetty is bought to the GroundThe coal from the coal jetty is bought to the Ground

Hopper system located in the site.Hopper system located in the site.

Through Stacker Through Stacker reclaimer reclaimer the coal from coal stock yardthe coal from coal stock yardis sent to the crusher house through conveyor belt.is sent to the crusher house through conveyor belt.

In the crusher house the coal is being crushed to the sizeIn the crusher house the coal is being crushed to the size

of up to 6 to 8 mm.of up to 6 to 8 mm.

The coal is sent from crusher house to coal bunkers.The coal is sent from crusher house to coal bunkers.

Usually there will be 4 to 5 coal bunkers for the storage.Usually there will be 4 to 5 coal bunkers for the storage.

From the coal bunker the coal Is transferred to Boiler From the coal bunker the coal Is transferred to Boiler 

Furnace bed.Furnace bed.

Coal Linkage to boiler Coal Linkage to boiler 

Page 3: Power Plant Water and Steam Cycle

8/2/2019 Power Plant Water and Steam Cycle

http://slidepdf.com/reader/full/power-plant-water-and-steam-cycle 3/8

The coal directly falls on the furnace bed, the bed it self isThe coal directly falls on the furnace bed, the bed it self is

filled with fine sand and the necessary fuel for start up of thefilled with fine sand and the necessary fuel for start up of thepower plant is LDO.power plant is LDO.

The burners would be located both on the bottom and top of The burners would be located both on the bottom and top of 

the bed.the bed.

Through the burners the coal get ignited, the LDO is used asThrough the burners the coal get ignited, the LDO is used as

a start up only.a start up only.

What's happening onWhat's happening on

Furnace bed?Furnace bed?

Page 4: Power Plant Water and Steam Cycle

8/2/2019 Power Plant Water and Steam Cycle

http://slidepdf.com/reader/full/power-plant-water-and-steam-cycle 4/8

The furnace is formed by water wall tubes. TheThe furnace is formed by water wall tubes. Thewater wall tubes are designed in such a way thatwater wall tubes are designed in such a way thatit forms a boiler surrounding the Furnace Bed.it forms a boiler surrounding the Furnace Bed.

The water wall tubes are connected to the boiler The water wall tubes are connected to the boiler drum which is the major component for formationdrum which is the major component for formationof steam.of steam.

The boiler drum as got other separators in it andThe boiler drum as got other separators in it andit half filled with the water and same water isit half filled with the water and same water iscirculated through the water wall tubes for circulated through the water wall tubes for formation of steamformation of steam..

What exactly forms a FurnaceWhat exactly forms a Furnace??

Page 5: Power Plant Water and Steam Cycle

8/2/2019 Power Plant Water and Steam Cycle

http://slidepdf.com/reader/full/power-plant-water-and-steam-cycle 5/8

The water to the boiler drum is pumped using the BFP motorsThe water to the boiler drum is pumped using the BFP motors

which vary with size depending in the capacity of the plant.which vary with size depending in the capacity of the plant. The water is primarily sent to HP heater The water is primarily sent to HP heater --1 and HP heater 1 and HP heater --2 to2 to

reach up to the a temperature of 245 Degrees.reach up to the a temperature of 245 Degrees.

The water is sent to Economizer and thus further theThe water is sent to Economizer and thus further the

temperature is increased and the same water is sent to Boiler temperature is increased and the same water is sent to Boiler 

drum and th

us to water wall tubes.drum and th

us to water wall tubes. Due to the temperatures around the water wall tubes the water Due to the temperatures around the water wall tubes the water 

which is formed at the bottom of the bed is sent to drum usingwhich is formed at the bottom of the bed is sent to drum using

risers.risers.

Water to Boiler DrumWater to Boiler Drum ..

Page 6: Power Plant Water and Steam Cycle

8/2/2019 Power Plant Water and Steam Cycle

http://slidepdf.com/reader/full/power-plant-water-and-steam-cycle 6/8

The boiler drum has various sources of inletsThe boiler drum has various sources of inlets

and outletsand outlets

The water The water fromfrom Economizer.Economizer.

The water The water fromfrom Risers.Risers.

Water Water toto Down comersDown comers SteamSteam toto Super Heater.Super Heater.

Boiler DrumBoiler Drum

Page 7: Power Plant Water and Steam Cycle

8/2/2019 Power Plant Water and Steam Cycle

http://slidepdf.com/reader/full/power-plant-water-and-steam-cycle 7/8

The steam from the Boiler drum is sent to Super Heater which The steam from the Boiler drum is sent to Super Heater which 

further increases the temperatures of steam up to 540further increases the temperatures of steam up to 540

Degrees.Degrees. The super heater is connected to Turbine through main steamThe super heater is connected to Turbine through main steam

line and the steam hits the HP turbine blades at a pressure of line and the steam hits the HP turbine blades at a pressure of 

132.4 Bar and 540 Degrees for turbine rotation.132.4 Bar and 540 Degrees for turbine rotation.

Turbine usually have 3 stages HP,IP,LP located on the singleTurbine usually have 3 stages HP,IP,LP located on the single

shaft.shaft.  After the HP turbine the steam which falls of pressure and After the HP turbine the steam which falls of pressure and

temperature will be sent to retemperature will be sent to re--heater where it builds up theheater where it builds up the

temp and through reheat line the steam is sent to IP turbine ,temp and through reheat line the steam is sent to IP turbine ,

and from the IP the unutilized steam hits the LP turbineand from the IP the unutilized steam hits the LP turbine..

Turbine Cycle and operationTurbine Cycle and operation

Page 8: Power Plant Water and Steam Cycle

8/2/2019 Power Plant Water and Steam Cycle

http://slidepdf.com/reader/full/power-plant-water-and-steam-cycle 8/8

The primary principle of condenser is to convert steam toThe primary principle of condenser is to convert steam towater. After the LP turbine the unused steam is collected inwater. After the LP turbine the unused steam is collected inthe condenser and through condenser extraction pump thethe condenser and through condenser extraction pump thewater is sent to make up water tank near BFP.water is sent to make up water tank near BFP.

In between certain stages of the water is also included in thisIn between certain stages of the water is also included in thisfeed water cycle.feed water cycle.

The Unused steam sent from IPThe Unused steam sent from IP--Turbine to LP Heaters, thereTurbine to LP Heaters, therewill be series of LP heaters depending on the plant capacity.will be series of LP heaters depending on the plant capacity.

 All the water is sent through De All the water is sent through De--aerator to the BFP make upaerator to the BFP make uptank.tank.

Even the Water collected at the LP turbine also is sent to theEven the Water collected at the LP turbine also is sent to theLP HP heaters.LP HP heaters.

The Main objective of interconnecting everything is toThe Main objective of interconnecting everything is tocomplete a closed cycle where the maximum utilization of thecomplete a closed cycle where the maximum utilization of theresources is done and by increasing the boiler efficiency.resources is done and by increasing the boiler efficiency.

Condenser Condenser 