+ All Categories
Home > Documents > Power Point CV-2016

Power Point CV-2016

Date post: 14-Apr-2017
Category:
Upload: patrick-walsh
View: 159 times
Download: 3 times
Share this document with a friend
4
Patrick James Walsh Senior Architectural Technician/ Contract Administrator FORT SASKATCHEWAN COMMUNITY HOSPITAL 19 The Chilterns Hull, East Yorkshire UK, HU94QL [email protected] 075150955091 My Role in Your Project. As a Senior Architectural Technical Lead and Contract Administrator, I approach my role on all Architectural projects as been that of a construction facilitator; in so much that I see it as my remit to develop the designers brief into technically comprehensive documents, from which your project will develop into a tangible structure. Furthermore, part of my duties will be to act on your behalf as a contract administrator, endeavouring to ensure that the construction of your project follows your expectations. It has become apparent over my 30 years in the Architectural industry in the UK, Australia and Canada (working on projects as varied as the University of Adelaide’s Profession building to Industrial Garages for unsealed road builders in the Canadian Boreal ‘Oil Patch’), that my mission in the architectural field is to take designers aspirations and develop them technically, into tangible, and if possible, Inspiring structures. Obviously not all designers are Frank Lloyd Wright, and not all designs are Notre Dame. However, be it a humble Industrial unit in West Yorkshire or a Municipal RCMP facility in the BC Hinterland, I like to believe that I engage the same professional commitment no matter what the size of the project. For me to “Fun” in the activity of architecture is understanding the concept of a desired space, assisting to develop its final form and then helping to create the physical form for which it is intended. My personal interests include Film, Coaching and participating in football; when the time affords me to do so. Motorsport, when finance allows me to do so, and creative writing when I have enough Ink in my Pen!
Transcript

Patrick James WalshSenior Architectural Technician/ Contract Administrator

FORT SASKATCHEWAN COMMUNITY HOSPITAL

19 The ChilternsHull, East Yorkshire UK, [email protected]

My Role in Your Project.As a Senior Architectural Technical Lead and Contract Administrator, I approach my role on all Architectural projects as been that of a construction facilitator; in so much that I see it as my remit to develop the designers brief into technically comprehensive documents, from which your project will develop into a tangible structure. Furthermore, part of my duties will be to act on your behalf as a contract administrator, endeavouring to ensure that the construction of your project follows your expectations.

It has become apparent over my 30 years in the Architectural industry in the UK, Australia and Canada (working on projects as varied as the University of Adelaide’s Profession building to Industrial Garages for unsealed road builders in the Canadian Boreal ‘Oil Patch’), that my mission in the architectural field is to take designers aspirations and develop them technically, into tangible, and if possible, Inspiring structures. Obviously not all designers are Frank Lloyd Wright, and not all designs are Notre Dame. However, be it a humble Industrial unit in West Yorkshire or a Municipal RCMP facility in the BC Hinterland, I like to believe that I engage the same professional commitment no matter what the size of the project. For me to “Fun” in the activity of architecture is understanding the concept of a desired space, assisting to develop its final form and then helping to create thephysical form for which it is intended.My personal interests include Film, Coaching and participating in football; when the time affords me to do so. Motorsport, when finance allows me to do so, and creative writing when I have enough Ink in my Pen!

SKILL SETTransferable Cad Skills up to and including AutoCAD 2014/ 2016LT.Autodesk Revit trained on 2010- Working on Revit 2016 BIM level 2.Hand Sketching- for project development and subordinate education.Knowledge of UK/ Australian/ Canadian Building Regulations.Multiple sector knowledge including:Healthcare, Education, Automotive, Government, Retail & Commercial, Housing. Alternate Energy and Petrochemical (Oil sands).Contract Administration/ Documentation and Product review.Project team co-ordination during Key build stages and post project completion (collation of building manuals).Client Liaison, Problem Solving and Mentoring.First Aid with AED.

EDUCATION- QualificationsB.A. Honours, Architectural StudiesJohn Moores’ university, Liverpool United Kingdom.CSC –Principles Of Construction Documentation.Southern Alberta Institute of Technology AB, CanadaRevit Fundamentals 2010. AutodeskImaginit Technologies Edmonton AB, Canada

International Experience- Canada. (7 years)IBI Group Edmonton AB, CanadaSenior Technician/ Contract Administrator: October 2007 – November 2014Healthcare: Lloydminster Hospital ICU - >$2M for Prairie North Regional Health Authority. Lead technical support from 2013 to present, producing co-ordinated tender package drawings and construction package information.Strathcona Urgent Care Centre - >$100M Urgent Care and Emergency Facility for Alberta Health Services (Canada). Senior Architectural Technologist/ Contract Administrator, producing contract documentation and construction information; reporting directly back to Associate Director. Preparation of Change Notices, editing of schedules and tracking of submittals. Occasional direction of contractors and sub trades.Fort Saskatchewan Community Hospital: $180M regional Facility for Alberta Heath Services (CAN): Lead Contract Administrator from 2008 to Completion, producing and coordinating IFT and IFC packages. Writing and editing of specifications, tracking of submittals, Issuing direction to the principle contractors and sub trades. (CAN)Government/ Civil Facilities Projects: South Transit Garage Facility, Fort McMurray, AB - $35M principle (new build) Transit Facility for the Regional Municipality of Wood Buffalo. The “Bus Barn” is located off Highway 63 and is to be a LEED Gold signature building for the City of Fort McMurray. Project initiated in 2013.Arena Upgrade/Swimming Pool, Fort Chipewyan - $25M Phase II development of the Archie Simpson Arena for the Regional Municipality of Wood Buffalo. New Pool and Existing arena upgrades.Prince George, (BC) RCMP Municipal Facility - $25M Regional Police facility in British Columbia, Production of ongoing site information and change documentation, review of submittals and preparation of site instructions for Associate Director to action on site.City of Saint Albert (AB) Canada- Aesthetic and technical design of storm water lift stations for new residential sub-divisions currently positioned in semi-rural areas.Production Facilities, Alternate Energy and Petrochemical:Firebag, Fort McMurray- Oil sands facility for extraction of heavy crude oil using Steam Assisted Gravity Drainage (SADG- thermal recovery of oil sands deposits limiting surface land disturbance) $50million project included Control services, Office, Maintenance buildings and accommodation in one of the most remote areas of Northern Alberta.

AUTO CAD

REVIT

Recent Experience- December 2014 to January 2016.Healthcare:DWA Architects York, North Yorkshire (UK): Working within a private healthcare team of a multi-discipline practice (including Ward Engineering and Ward PM) Projects include 75+ bed Residential care homes designed to CQC standards ranging from primary domestic to fully assisted living facilities. Principal responsibility for redesigning the “Shell and Core” envelope from a traditional heavy Masonry construction into a fully sealed (AVB) lightweight SFS structure.Ar2 Architects in Brough Humberside (UK): working on various new and existing private Care homes, Schools and Medical facilities under CQC latest guidelines and requirements.YEME Architects Bradford West Yorkshire (UK): Housing/ Student Accommodation (Standard House Huddersfield) listed property; top two floors been an additional timber fame extension. Principle role was to direct the design of the external timber frame envelope and provide detailed drawings for the vertical circulation areas.YEME Architects Bradford West Yorkshire. Renovation and rehabilitation of a derelict Public House on the London Road (Nags Head, High Wycombe) into16 residential apartments. Project was designed in Revit and Executed in AutoCAD.Production Facilities, Alternate Energy and Petrochemical:Gelder and Kitchen Hull, East Yorkshire (UK): Allied Bakeries Stockport /Iceland Manchester- Recruited to work on Revit models for both food industry clients over a seven-week period. Revit models for both projects were created by use of Point Cloud insertion. Models were then forwarded to the structural engineer for addition of structural remediation worksAr2 Architects in Brough Humberside (UK): £10million Anaerobic Digestive production facility (3AD3 Beverley). Project to be taken to full operational stage dependent upon ongoing full site design for planning.Earlier Representative ExperienceEducational Establishments:Darton Elgee Architects; Leeds (UK): Huddersfield University- Eden and Milton School of Drama: Design and site management relating to major conservation project. Conversion of 150-year-old Church and Tabernacle into 2 theatres spaces and, teaching rooms. Project required significant liaison with English Heritage. Cost $10-15m (March 2003- April 2005) Automotive:SDA Architect Designers; Leeds West Yorkshire (UK),Creation of Audi UK’s technical manual for ‘The Hanger’ building drawings. This document constituted Audi UK’s Principle design and specification guide for all UK architects, commissioned in the construction of Showroom / Maintenance facilities. (UK)Production of ‘Turnkey’ packages for Leading Automotive Companies in the UK. Including; Audi, Ford, General Motors and Aston Martin. Large scale facilities include Gilders’ Motor world in Norton Sheffield (UK) and DAF truck Facilities in Chester-le–Street for Pendragon (UK)(June 2005 to August 2007).Retail & Commercial:Seymour Harris Partnership; Leeds West Yorkshire (UK): Debenhams (UK) - Design and site management relating to £10m in Redditch, West Midlands. Duties included specification of materials, working on construction drawings and liaison with site operatives- (2000- 2001)ASDA/ Walmart Stores; Leeds West Yorkshire (UK): Store planning and facilities management. Specifications and the design and management of department roll- outs for ASDA/ Walmart Stores throughout the UK to meet regulatory changes for ‘Barrier Free’ access throughout the company’s’ facilities portfolio. - 1995-ASDA Stores Ltd, (Wal-Mart) Leeds.Housing/ Student Accommodation:The Harris Partnership; Wakefield West Yorkshire (UK): Leeds University – James Ballie Flats. Design Site management relating to $20m large scale student accommodation project within Historic conservation area. Also with the Harris Partnership, work was undertaken to produce housing scheme and detail design and building regulation plans for the Newport Pagnell office for domestic housing projects in the Berkshire area. - (2001 – 2003)


Recommended