Power Sector Capability Statement OCU Group incorporating: O’Connor Utilities Ltd and Instalcom Ltd Rev 04 1 of 16 Power Sector Capability Statement Underground Cables, Overhead Lines & Substations Instalcom Limited Civil Engineering & Utilities Contractor Delivering Today for Tomorrow
Transcript
Page 1: Power Sector Capability Statement Power Sector Capability ...

Power Sector Capability Statement

OCU Group incorporating: O’Connor Utilities Ltd and Instalcom Ltd Rev 04

1 of 16

Power Sector Capability Statement Underground Cables, Overhead Lines & Substations

Instalcom Limited

Civil Engineering & Utilities Contractor

Delivering Today for Tomorrow

Page 2: Power Sector Capability Statement Power Sector Capability ...

Power Sector Capability Statement

OCU Group incorporating: O’Connor Utilities Ltd and Instalcom Ltd Rev 04

2 of 16

NA

Contents

1. About Us

2. Underground Cable Systems

3. Overhead Lines

4. Substations

5. Financial

6. Insurance

7. Accreditations

8. Assurances

9. Project Controls & Planning

10. Design

11. Memberships

12. Sustainability

13. Supply Chain Management

CONTACT US Want to know more about the Instalcom infrastructure service offering in the following sectors:- ▪ Power ▪ Water ▪ Telecoms ▪ Rail ▪ Oil & Gas ▪ Multi-Utilities ▪ Trenchless Solutions

Contact us at:- Instalcom Ltd Borehamwood Industrial Park, Rowley Lane Borehamwood Hertfordshire WD6 5PZ T: 020 8731 4600 [email protected] www.instalcom.co.uk

Part of OCU Group

Page 3: Power Sector Capability Statement Power Sector Capability ...

Power Sector Capability Statement

OCU Group incorporating: O’Connor Utilities Ltd and Instalcom Ltd Rev 04

3 of 16

1. About Us

Instalcom (part of OCU Group) is a privately-owned civil engineering and utilities contractor in the UK. As a family owned business, we have a proud heritage, notably in the quality of our workforce, self-delivery ethos and strong design and technical capacity.

Headquartered in Borehamwood and with numerous regional offices and depots across England and Wales, we currently employ in excess of 1,000 operatives across our nationwide network with an annual revenue exceeding £200m. Our values of reliability, professionalism and dedication remain at the heart of everything we do.

Instalcom’s Power business unit has been established in the last twenty years as a specialist provider of services for the design, installation and commissioning of underground cable systems, overhead line networks and construction of substations, to include the associated civil engineering, electrical, mechanical and protection and control activities.

Instalcom are experienced in undertaking the role and responsibility of Principal Contractor under the CDM Regulations, where we have robust processes for compliance and co-ordination of supply chain partners and other contractors. In addition, Instalcom holds a Network Rail Principal Contractor Licence (PCL) which we have used to act as Principal Contractor on several projects over the years for power and telecommunication installations, both trackside and for works that interface with the public highway. For additional information on our Rail business please refer to our Rail Capability Statement available via www.instalcom.co.uk.

Sector Expertise

• Transmission up to and including 400kV

• Distribution up to and including 132kV

• Renewables

• Connections

• Diversions

• Maintenance, repairs and decommissioning, including fluid filled cable systems

Sector Activities

• Front End Engineering & Design (FEED)

• In-house cable system design

• Project planning and management including P6 Programming

• NRSWA noticing

• Client support to secure consents & wayleaves

• Stakeholder engagement

• In-house CAD Traffic Management Plans and As-builts

• Civils; Trench excavation, heavy civils and troughs

• Substation civils and building

Today, we have developed into a market leader in the delivery of power transmission and distribution infrastructure projects, and framework contracts for High Voltage (HV) and Extra High Voltage (EHV) networks up to and including 400kV across Southern England.

Our offering combines innovation, best practice and technological advances in what is a very challenging, highly regulated working environment. Our robust solutions add long-term value and merge safety, reliability, efficiency and cost-effectiveness into our clients’ operations of underground cable systems, overhead line networks and substations.

Page 4: Power Sector Capability Statement Power Sector Capability ...

Power Sector Capability Statement

OCU Group incorporating: O’Connor Utilities Ltd and Instalcom Ltd Rev 04

4 of 16

2. Underground Cable Systems

Instalcom’s service offering includes design, installation and commissioning of underground cable systems up to and including 400kV, where our clients include the Transmission and Distribution Network Operators, renewable energy developers, Original Equipment Manufacturers (OEM’s) and main contractors, where we can equally undertake the roles of both Principal Contractor and specialist subcontractor for complex projects or long-term frameworks.

Design & Engineering

• In-house EHV Design Manager & Cable System Designers

• In-house Temporary Works Design

• Cable system design using Cyme software

• Instalcom EHV 0585 Design Procedure and Guidance Document EHV 0512 on the use of:-

➢ EHV 0518 Project Dashboard (capture evaluation of client’s requirements)

➢ EHV 0510A Engineering Recommendations (final design)

➢ EHV 0551 Design Risk Register

• Civil and electrical design support from leading UK Designers

• Collaboration with UK and International cable manufacturers

• Design Manual (updated throughout construction phase)

• Design Assurance by independent body for external validation

Civils

• Haul road construction

• Trench and joint bay excavations, backfilling and permanent reinstatement

• Heavy civils including temporary works

• Traffic management

Electrical

• Cable installation; fully ducted systems, tunnels and direct buried

• Cable jointing and terminations

• Cable management and containment systems

• Cable system monitoring, earthing and bonding installations

• Test and commissioning

• As-built records and H&S files

Page 5: Power Sector Capability Statement Power Sector Capability ...

Power Sector Capability Statement

OCU Group incorporating: O’Connor Utilities Ltd and Instalcom Ltd Rev 04

5 of 16

Selection of Instalcom Underground Cable Projects

Fugglestone Red 132kV

• Distribution Network

• Principle Contractor

• Undergrounding of OHL

• Design, supply and installation 132kV cables

➢ Developed Project Design Intent Document (DiD)

➢ 1.1km 132kV dual circuit

➢ Achieved ZERO harm

East Claydon to Bicester 132kV

• Distribution Network

• Principle Contractor

• Design, supply and installation 132kV cables

➢ 18km 132kV dual circuit ➢ Multiple crossings using HDD techniques ➢ Numerous stakeholders; 28 landowners, National

Grid & Network Rail ➢ Achieved ZERO harm

LPT1 Cable Decommissioning Works

• Transmission Network

• Principle Contractor

• Decommission 44km 275kV fluid filled cables & ancillary plant

• Developed Project Design Intent Document (DiD)

• Complex engineering densely populated environment Three routes; ➢ St John’s Wood to Tottenham

➢ St John’s Wood to Willesden

➢ Willesden to Wimbledon

Iver to Slough 132kV

• Distribution Network

• Principle Contractor

• Design, supply and installation 132kV cables ➢ Developed Project Design Intent Document (DiD) ➢ 11km 132kV dual circuit ➢ Trenchless installation HDD under M25 and flood plain ➢ Dewatering system ➢ Achieved ZERO harm

Page 6: Power Sector Capability Statement Power Sector Capability ...

Power Sector Capability Statement

OCU Group incorporating: O’Connor Utilities Ltd and Instalcom Ltd Rev 04

6 of 16

3. Overhead Lines

Instalcom has a dedicated overhead line team competent in the design, installation and commissioning of overhead line networks up to and including 132kV for a number of the UK’s Distribution Network Operators, where we undertake the role of Principal Contractor for both reinforcement and replacement projects. Our overhead line expertise covers both wood pole and steel tower installations.

OHL Design & Engineering

• In-house EHV Design Manager & Cable System Designers

• In-house Temporary Works Design

• Cable system design using Cyme software

• Instalcom EHV 0585 Design Procedure and Guidance Document EHV 0512 on the use of:-

➢ EHV 0518 Project Dashboard (capture evaluation of client’s requirements)

➢ EHV 0510A Engineering Recommendations (final design)

➢ EHV 0551 Design Risk Register

• Civil and electrical design support from leading UK Designers

• Collaboration with UK and International conductor manufacturers

• Design Manual (updated throughout construction phase)

• Design Assurance by independent body for external validation

OHL Civils

• Haul road construction

• Tower mounted sealing end compound

• Piling

• Foundation plinths

• Trench and joint bay excavations, backfilling and permanent reinstatement

• Heavy civils including temporary works

Page 7: Power Sector Capability Statement Power Sector Capability ...

Power Sector Capability Statement

OCU Group incorporating: O’Connor Utilities Ltd and Instalcom Ltd Rev 04

7 of 16

OHL Electrical

• Conductor installation

• Contract lifts and equipment movements

• Construction of tower mounted sealing end platforms

• Tower mounted sealing end structures

• Cable sealing end terminations

• Cable management and containment systems

• Overhead line system monitoring, earthing and bonding installations

• Test and commissioning

• As-built records and H&S files

Selection of Instalcom Overhead Line Projects

Amersham 132kV Reinforcement

• Distribution Network

• Principle Contractor

• Design, supply and installation 132kV cables

➢ Type Testing Approvals for cable system - cables and terminations ➢ Haul road and compound construction ➢ Senior Authorised Person (SAP) duties ➢ Fluid filled cable decommissioning ➢ Sealing end structure and tower ladder rack bases ➢ Sealing end structure design and installation ➢ Scaffolding design and installations at tower and 132kV substation ➢ Ducted route installation ➢ Cable pulling simulations ➢ Earthing design & installation at tower and substations ➢ Commissioning tests - AC, PD and sheath resistance tests ➢ Achieved ZERO harm

Amesbury – Berwick Down Tunnel Project, Mannington 132kV Cable Reinforcement

• Distribution Network

• Principle Contractor

• Design, Supply and Installation of new 1.3 km, 132kV cables circuit 1 and 2 between Mannington GSP and Tower MS1 on Mannington-Salisbury 132kV circuit ➢ Circa 450m of horizontal directional drilling ➢ Circa 850m of open cut ducting (through existing roads,

substations and agricultural) ➢ Supply and installation of new 132 kV cable terminations on

tower MS1 of Mannington-Salisbury circuit 1 and 2 ➢ Supply and Installation of new 132 kV cable terminations at

Mannington Grid for Salisbury 132kV circuit 1 and 2. ➢ Install and commission the new busbars and connectors

required for new 132kV CSEs on A605 and A1005 circuits ➢ Decommissioning works of existing 132kV Oil Filled Cables

at Mannington GSP for Salisbury 1 and 2 circuits and at Tower MS1 of Mannington-Salisbury circuits

Page 8: Power Sector Capability Statement Power Sector Capability ...

Power Sector Capability Statement

OCU Group incorporating: O’Connor Utilities Ltd and Instalcom Ltd Rev 04

8 of 16

4. 4. Substations

Instalcom’s civil engineering expertise includes the construction of substations and sealing end compounds to include new builds, refurbishments, extensions, decommissioning and demolition projects, where supported by specialist supply chain partners and design consultants Instalcom can provide a turnkey service up to 400kV. Our diverse range of services also includes transformer and switchgear installations working in collaboration with the Original Equipment Manufacturers (OEM’s) to provide clients with a total substation solution.

Substation Design & Engineering

• Civil and building design support from leading UK Designers

• In-house EHV Design Manager & Cable System Designers

• In-house Temporary Works Design

• Instalcom EHV 0585 Design Procedure and Guidance Document EHV 0512 on the use of:-

➢ EHV 0518 Project Dashboard (capture evaluation of client’s requirements)

➢ EHV 0510A Engineering Recommendations (final design)

➢ EHV 0551 Design Risk Register

• Collaboration with Original Equipment Manufacturers (OEM’s)

• Design Manual (updated throughout construction phase)

• Design Assurance by independent body for external validation

Fugglestone Red 132kV

• Distribution Network

• Principle Contractor

• Reconfiguration of existing OHL network

• Design, supply and installation of towers and tower mounted sealing ends

➢ Undergrounding of 132kV dual circuit 1.1km

➢ Fabrication and erection of two new steel towers

➢ Dismantlement and disposal of redundant assets and specifically the overhead line towers and conductors

➢ Achieved ZERO harm

Page 9: Power Sector Capability Statement Power Sector Capability ...

Power Sector Capability Statement

OCU Group incorporating: O’Connor Utilities Ltd and Instalcom Ltd Rev 04

9 of 16

Substation Civils

• New builds, refurbishments and extensions

• Construction of sealing end compounds

• Access roads

• Cable trough and gatic cover installations

• Perimeter and internal security fencing

• Decommissioning and demolition to include removal of ancillary equipment

Substation Electrical

• Switchgear and distribution equipment installations

• SCADA, control and protection

• Earthing and bonding

• Local power, lighting and heating

• Test and commissioning

• As-built records and H&S files

Selection of Instalcom Substation Projects

11kV Substation & Large-Scale TBS

• Distribution Network

• Principle Contractor

• Design & construct 11kV 6MVA MSS to support local network extension

➢ Construct new 11kV Control/Switchroom

➢ Install cable duct routes for 11kV, LV and multicore cables

➢ Package sub foundation

➢ Excavate trenches for earthing grid

➢ Installation of below ground earthing

➢ External works site surfacing

➢ Installation of compound fencing and gates ➢ Achieved ZERO harm

11kV Substation Panel Board Replacement & Switchroom Refurbishment

• Distribution Network

• Principle Contractor

• Design & construct new 11kV Switchroom within existing Primary

➢ Refurbishment existing space inc building services & safety systems

➢ Installation and commissioning of new 11kV switchgear

➢ Installation & termination of 11kv circuits & multicore cables

➢ Installation and commissioning of new battery backup system

➢ Installation and commissioning of new tele-control panel

➢ Transfer of services via series of planned shutdowns ➢ Achieved ZERO harm

Page 10: Power Sector Capability Statement Power Sector Capability ...

Power Sector Capability Statement

OCU Group incorporating: O’Connor Utilities Ltd and Instalcom Ltd Rev 04

10 of 16

11/33kV Substation Construction

• Distribution Network

• Principle Contractor

• Design & construct 2 x new 33/11kV Transformer Bunds & NER Plinths

➢ Construct new 11kV Control/Switchroom ➢ Install cable duct routes for 33kV, 11kV and multicore cables ➢ Package sub foundation ➢ Excavate trenches for earthing grid ➢ Installation of below ground earthing ➢ Fit out Switchhouse with general building services to inc heating,

lighting, dehumidification & cable management systems ➢ External works site surfacing ➢ Internal decoration to switch room walls ➢ Installation of surface and foul water drainage systems ➢ Installation of compound fencing and gates ➢ Achieved ZERO harm

New Build GIS for Rail Infrastructure Interface

• Rail & DNO Interface

• Principle Contractor

• Construction of 132kV Switch Building ➢ Piled foundation with capping beam ➢ Cast in situ concrete floor slab incorporating cable troughing

system. ➢ Excavate trenches for earthing grid ➢ Installation of below ground earthing ➢ Installation of steel portal frame construction with insulated

cladding roof and facade ➢ Installation of building services to include structural cable

management, including heating, lighting, dehumidification, fire protection & stopping.

➢ Supported OEM with equipment installation and commissioning. ➢ External works site surfacing & construct surface and foul water

drainage systems. ➢ Erect 2.4m palisade security fence including gates and

removable fence posts. ➢ Installation of ducting for multicore and power cables – including

draw pits and road crossings. ➢ Construction of site access road and turning head.

Page 11: Power Sector Capability Statement Power Sector Capability ...

Power Sector Capability Statement

OCU Group incorporating: O’Connor Utilities Ltd and Instalcom Ltd Rev 04

11 of 16

5. Financials

Instalcom’s Power Business Unit has successfully delivered complex major projects in excess of £10m, and multiple schemes within framework contracts up to £25m per annum. The turnover for parent company OCU Group for the financial year 2018/19 was £150m, and we forecast 2019/20 will exceed £200m. Detailed report and account information is available and can be provided on request.

6. Insurance

Insurance cover held by Instalcom is renewed on 1st March annually by our brokers UK & Ireland includes [but is not limited to]:

• Contractor’s all risks: £25m

• Employers liability: £10m

• Professional indemnity: <£10m

• Public liability and products: £20m

Full details of this and other specialist insurance cover held are available on request.

11/33kV DNO Substation Extension Leicester

• Construction of 11/33 kV Switch Building, TX Foundations and Bunds with NER Foundations. ➢ Enabling works including site clearance and low-level

bioremediation. ➢ Cast in situ cable basement foundation with complex

temporary works. ➢ Construction of 11/33kV Switch Building – Brick/Block

construction with Bison Hollow core precast concrete slabs for roof and floor level.

➢ Installation of below ground earthing ➢ Construction of 2No. Transformer bunds for 33/11kV

Transformers. ➢ Construction of 2No. NER foundations. ➢ Supported OEM with equipment installation and

commissioning. ➢ External works site surfacing & construct surface and foul

water drainage systems. ➢ Erect 2.4m palisade security fence including gates and

removable fence posts. ➢ Installation of ducting, multicore HV and LV power cables

including draw pits and road crossings. ➢ Construction of site access road and turning head.

Page 12: Power Sector Capability Statement Power Sector Capability ...

Power Sector Capability Statement

OCU Group incorporating: O’Connor Utilities Ltd and Instalcom Ltd Rev 04

12 of 16

7. Accreditations

We hold the following accreditations, but not limited to:-

8. Assurances Rail Sector

• Network Rail Principal Contractor Licence Holder

• Railway Group Standards (RSSB), Company Standards (Network Rail) and National Hazard Directory – Direct online access

• Network Rail’s Possession Planning System (PPS) – Direct online access

• Instalcom also employs a number of Contractor’s Responsible Engineers (CREs) for both design and installation roles

9. Project Controls & Planning

Instalcom employs dedicated and experienced project planners with cross-matrix responsibilities into both the individual project teams and the planning function. The planning process is embedded into the organisation from Tender stage through to project completion in an integrative manner involving all stakeholders. It is closely linked to meeting both internal and client requirements in terms of Programme management and Project Control.

ISO 9001 7604 | ISO 45001 7604 | ISO 14001 7604

Page 13: Power Sector Capability Statement Power Sector Capability ...

Power Sector Capability Statement

OCU Group incorporating: O’Connor Utilities Ltd and Instalcom Ltd Rev 04

13 of 16

Supporting the process, Primavera is the standard planning software for the organisation, providing robust time and resource management for each individual project. Furthermore, the portfolios of project programmes are managed using the Enterprise functionality allowing the organisation to provide the ultimate service across the board. With P6 also being used extensively throughout the rail industry, our capability and experience allows close integration with the client in turn contributing to overall success. The following tools and techniques are used and incorporated into the process:

• Work breakdown structure

• Critical path analysis

• Earned value analysis

• Resource/cost loading

• Programme configuration control

10. Design

Instalcom has experienced of utilising BIM/CAD and we are fully conversant in the following CAD applications:

• Bentley Microstation V8i – Full 3D/BIM capability

• Bentley Building Electrical (3D/BIM)

• Bentley Building Mechanical (3D/BIM)

• Bentley Acosim (3D/BIM)

• AutoCAD Revit (3D/BIM)

• Cad duct

• Projectwise management system (Bentley)

11. Memberships

• British Quality Foundation

• BSI Standards Membership

• Building Services Research and Information Association (BSRIA)

• COMIT (Construction Opportunities for Mobile IT)

• Constructing Excellence

• Constructionline

• CompeteFor

• Council of Registered Gas Installers (CORGI)

• Electrical Contractors’ Association

• Engineering Construction Industry Training Board

• Heating and Ventilating Contractors Association (HVCA)

• Institute of Customer Service

• Institution of Electrical Engineers

• Joint Industry Board

• National Inspection Council for Electrical Installation (NICEIC)

• SELECT

• UK Green Building Council

• CIBSE Patron

• IET Corporate partner

Page 14: Power Sector Capability Statement Power Sector Capability ...

Power Sector Capability Statement

OCU Group incorporating: O’Connor Utilities Ltd and Instalcom Ltd Rev 04

14 of 16

In addition, Instalcom employees are Chartered Members/Members of the following professional bodies and regularly attend their meetings as part of their on-going Continuing Professional Development (CPD).

• Association for Project Management (APM)

• Chartered Institute of Building (CIOB)

• Institute of Civil Engineering (ICE)

• Chartered Institute of Purchasing & Supply

• Chartered Institution of Highways and Transportation

• Institution of Occupational Safety & Health

• Institute of Engineering and Technology IET

• Chartered Institute of Building Service Engineers CIBSE

12. Sustainability

Sustainable Construction

We all have a duty to create buildings that are more efficient and perform better. Our pledged commitment defines a measured and responsible approach to sustainability. We will aim to meet the economic, environmental and social needs of today, without compromising those of the future.

Renewable Technologies

• Biomass Generation

• Daylight Dimming

• Ground Source Heat Pumps

• Heat Recovery Systems

• Interstitial Blinds

• Natural Ventilation

• Passive Sensor Lighting

• Phase Change Materials

• Photovoltaic Glass

• Rainwater Harvesting

• Solar Thermal Collectors

• Sun Pipes

• Waterless Urinals

Protected Species Awareness

• Badgers

• Bats and bat roosts

• Flora

• Great crested newts

• Nesting birds

Page 15: Power Sector Capability Statement Power Sector Capability ...

Power Sector Capability Statement

OCU Group incorporating: O’Connor Utilities Ltd and Instalcom Ltd Rev 04

15 of 16

13. Supply Chain Management

The key role for our procurement activities is to create a sustained competitive edge for Instalcom by managing the acquisition of all externally supplied resources upon which the business depends both now and in the future. The Senior Leadership Team believes that applying best – practice methods to the process of selecting and managing our suppliers is a major contributor to our long – term business success. This will be seen in better solutions for our clients, faster deployment of innovation, low total costs, lower risk and enhanced contribution to our goals. The procurement team are responsible for ensuring best value is achieved for Instalcom, this applies to goods and services associated with operational or overhead spend. To ensure we consistently achieve best value: we operate an approved supplier list, agree T&C’s and pricing, work with internal stakeholders to review and monitor supplier performance, carry out audits on suppliers, continually review potential new products and sources of supply. We work across many different departments and recognise that each have their own exacting needs and demands from the supply chain, we provide specialist support, advice and expertise to project managers.

Our supply chain management team are MCIPS qualified and utilise accepted best practice to drive innovation and achieve a differentiation from our supply base. As part of a £150m+ organisation we also aggregate our spend portfolio group-wide in order to leverage the market more effectively, this ensures we are maximising our utilisation of optimum suppliers and delivering best value throughout the project cycle. All projects are allocated a procurement lead prior to design commencement (or pre-commencement where the client has already undertaken the design) this individual’s responsibility is to develop the project procurement strategy and ensure we achieve the best commercial and technological results for the project. Key projects are allocated procurement resource who will be site based as appropriate to ensure a consistent approach Instalcom’s procurement procedures are cascaded from group level and utilise best practice from across industry to ensure we achieve differentiation from our supply chain, as well as effectively protecting the interests of ourselves and our clients. The procurement team are actively involved with the construction planning process to ensure timely deliveries of key materials (especially those sitting on the critical path). At the initial programme development stage the procurement lead is responsible for the issuing of manufacturers lead-in times to the project planner, these are then incorporated into the baseline construction programme. At all stages through the project this document is utilised as the key tool to ensure the procurement and expediting of materials is undertaken as timely and efficiently as possible. These key dates will also include any commissioning/erection periods as required.

Page 16: Power Sector Capability Statement Power Sector Capability ...

Power Sector Capability Statement

OCU Group incorporating: O’Connor Utilities Ltd and Instalcom Ltd Rev 04

16 of 16