POWER SITUATION and OUTLOOK Wallace Business Forum 2 nd Quarterly Roundtable 29 April 2013
Transcript

POWER SITUATION and OUTLOOK 

Wallace Business Forum2nd Quarterly Roundtable

29 April 2013

2014‐2020 Power Supply‐Demand Outlook2014 Daily Supply‐Demand Situation, Summer MonthsPower Projects: Committed and Indicative

OUTLINE

LUZON SUPPLY‐DEMAND OUTLOOK 2014‐2020

Notesa. Required Reserve Margin (RM) i.e. 4% regulating reserve and contingency and dispatchable reserve requirement b. 4.2 % peak demand growth rate resulted from observed 0.6 elasticity ratio of demand for electric power with national 

economic growth applied to 7 percent GDP growth rate (GR) target for 2014‐2015.c. 4.8 % peak demand growth rate resulted from observed 0.6 elasticity ratio of demand for electric power with national 

economic growth applied to 8 percent GDP growth rate (GR) target for 2016‐2020.d. Assumed 5.49 percent average forced outage of the total available capacity 

2014Jul : 150 MW Southwest Luzon Coal U1Aug: 135 MW Puting Bato U1 

18 MW Northwind P3Oct: 150 MW Southwest Luzon Coal U2Nov: 20 MW SJCI Biomass

2015Feb: 87 MW Burgos WindMar : 18 MW IBEC Biomass

67 MW Pililia Wind81 MW Caparispisan

Jun: 18 MW CJ Global Biomass200 MW EWC U1 

Jul : 10.8 MW Green BiomassSep: 100 MW Avion NatgasNov: 135 MW Puting Bato U2

2016Mar : 82 MW Anda PowerJune: 200 MW EWC U2

2017June: 200 MW EWC U3

5000

6000

7000

8000

9000

10000

11000

12000

13000

14000

Jan 2014

Mar 2014

May 2014

Jul 2014

Sep 2014

Nov

 2014

Jan 2015

Mar 2015

May 2015

Jul 2015

Sep 2015

Nov

 2015

Jan 2016

Mar 2016

May 2016

Jul 2016

Sep 2016

Nov

 2016

Jan 2017

Mar 2017

May 2017

Jul 2017

Sep 2017

Nov

 2017

Jan 2018

Mar 2018

May 2018

Jul 2018

Sep 2018

Nov

 2018

Jan 2019

Mar 2019

May 2019

Jul 2019

Sep 2019

Nov

 2019

Jan 2020

Mar 2020

May 2020

Jul 2020

Sep 2020

Nov

 2020

Available Capacity Committed Peak Demand Regulating Reserve Contingency & Dispatchable Reserve

0

2000

4000

6000

8000

10000

12000

W1W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14 W15 W16 W17 W18 W19 W20 W21 W22 W23 W24 W25 W26 W27

Available capacity Peak Demand Regulating Reserve Contingency & Dispatchable Reserve

January February March April May June

2014 LUZON DAILY SUPPLY‐DEMAND SITUATIONACTUAL PROJECTED

2014 Projected Peak Demand =8,654  MW (22 May)

2014 Actual Peak Demand =8,225  MW (24 Apr)

Holy Week

COMMITTED POWER PROJECTSLuzon Grid Committed Power Projects, 1,724.65 MW

Type Name of the Project Project Proponent Mother/ JV Company LocationRated

Capacity (MW)

Project Cost (Php Billion)

Target Commissioning

COAL2 X 150 MW SLPGC

Coal-Fired Power Plant Phase I

Southwest Luzon Power Generation

Corporation (Project Company)

DMCI Power Corporation

Brgy. San Rafael, Calaca, Batangas 300 45.4 Unit I – Jul 2014;

Unit II – Oct 2014

COAL135 MW Puting Bato

Coal Fired Power Plant Phase I

South Luzon Thermal Energy Corp.

(SLTEC)

Trans Asia Oil and Energy Development Corporation (TAOil)

Brgy. Puting BatoWest, Calaca,

Batangas135 12.9 Aug 2014

WINDPhase 3:

Bangui Bay Wind Power Project

NorthWind Power Development Corporation

NorthWind Power Development Corporation

Bangui, Ilocos Norte 18 1.5 Aug 2014

BIOMASS

24 MW SJCiPowerRice Husk-Fired

Biomass power Plant Project

San Jose City I Power Corporation

San Jose City I Power Corporation

Brgy. Tulat, San Jose, Nueva Ecija 20.00 1.2 Nov 2014

(Subject to FIT)

WINDPhase 1:

Burgos Wind Power Project

EDC Burgos Wind Power Corporation

Energy Development Corporation (EDC)

Nagsurot-Saoit, Burgos, Ilocos Norte 87 12.8 Feb 2015

WINDPhase 1:

Pililla Wind Power Project

Alternergy Wind One Corporation Alternergy Brgy. Halayhayin,

Pililla, Rizal 67.5 7.7 Mar 2015

WIND Caparispisan Wind Energy Project

Northern Luzon UPC Asia Corporation UPC Asia Corporation

Brgy. Caparispisan, Pagudpud, Ilocos

Norte81 11.2 Mar 2015

BIOMASS 20 MW IBEC Biomass Power Plant

Isabela Biomass Energy Corporation

(IBEC)

Isabela Biomass Energy Corporation (IBEC) Isabela 18 1.9 Mar 2015

(Subject to FIT)

NATGASPagbilao 600 MW

Combined Cycle Gas Fired Power Plant

Energy World Corporation

Energy World Corporation

Brgy. Ibabang Polo, Grande Island,

Pagbilao, Quezon600 12.9

Jun 2015 U1Jun 2016 U2Jun 2017 U3

COMMITTED POWER PROJECTSLuzon Grid Committed Power Projects, 1,724.65 MW

Type Name of the Project Project Proponent Mother/ JV Company LocationRated

Capacity (MW)

Project Cost (Php Billion)

Target Commissioning

BIOMASS

20 MW Waste-to-Energy Project using

Thermal Gasifier Conversion

CJ Global Green Energy Philippine

Corp.

CJ Global Green Energy Philippine Corp. Camarines Sur 18 Jun 2015

BIOMASS 12 MW Biomass Power Plant Project

Green Innovations for Tomorrow

Corporation

Green Innovations for Tomorrow Corporation Nueva Ecija 10.80 Jul 2015

NATGAS 100 MW San Gabriel Avion Project

Prime Meridian PowerGen

Corporation (Project Company)First Gen

Corporation

First Gen Power Corporation

Barangay Bolbok, Batangas 100 10.0 Sep 2015

COAL135 MW Puting Bato

Coal Fired Power Plant Phase II

South Luzon Thermal Energy Corp.

(SLTEC)

Trans Asia Oil and Energy Development Corporation (TAOil)

Brgy. Puting Bato West, Calaca,

Batangas135 9.6 Nov 2015

BIOMASS 3.5 MW Bicol Biomass Energy Corporation

Bicol Biomass Energy Corporation

Bicol Biomass Energy Corporation Camarines Sur 3.15 Dec 2015

BIOMASS12 MW Multi-

Feedstock Biomass Power Plant Project

Cagayan Biomass Energy Corporation

Cagayan Biomass Energy Corporation Cagayan 10.80 Dec 2015

HYDRO Inabasan Ormin Power, Inc. Ormin Power, Inc. San Teodoro, Oriental Mindoro 10.0 Dec 2015

COAL

Anda Power Corporation's 82 MW Circulating Fluidized

Bed Coal Fired Power Plant

Anda Power Corporation

Anda Power Corporation

Brgy. Bundagul, Mabalacat, Pampanga

82 8.6 Mar 2016

COMMITTED POWER PROJECTSLuzon Grid Committed Power Projects, 1,724.65 MW

Type Name of the Project Project Proponent Mother/ JV Company LocationRated

Capacity (MW)

Project Cost (Php Billion)

Target Commissioning

HYDRO Catuiran Sta. Clara Power Corp. Sta. Clara Power Corp. Naujan, Oriental

Mindoro 8.0 Mar 2016

HYDRO Linao-Cawayan (Upper Cascade)

Oriental Mindoro Electric Cooperative,

Inc. (ORMECO)

Oriental Mindoro Electric Cooperative, Inc.

(ORMECO)

Baco, Oriental Mindoro 2.1 0.3 Mar 2016

TOTAL 1,724.65

INDICATIVE POWER PROJECTSLuzon Grid Indicative Power Projects, 10,185.20 MW

8

Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW)

Target Commissioning

300 MW Limay Power Plant Project Phase I

(2x150MW)

SMC Consolidated Power Corporation

SMC Consolidated Power Corporation Brgy. Lamao, Limay, Bataan 300.00

Unit 1 - 150 MW -Feb. 2016

Unit 2 - 150 MW -July 2016

2 X 20 MW FDC Camarines CFB Coal Power Plant FDC Utilities, Inc. FDC Utilities, Inc. Camarines Sur 40.00 Mar 2016

2 X 300 MW Coal-Fired Power Plant

Redondo Peninsula Energy, Inc.

MERALCO MGEN Power Corporation/ Aboitiz Power

Corporation/ Taiwan Cogeneration Corporation

Sitio Naglatore, Cawag, Subic Bay Freeport Zone 600.00 Unit I - Oct 2016

Unit II - Dec 2016

2 X 150 MW SLPGC Coal-Fired Power Plant Phase II

Southwest Luzon Power Generation Corporation

(Project Company)DMCI Power Corporation Brgy. San Rafael, Calaca,

Batangas 300.00 Unit I - 2016 Unit II - 2016

2 X 300 MW Masinloc Expansion

AES Masinloc Power Partners Co., Inc.

AES Philippines Power Partners Co., LTD. Zambales 600.00

Unit 3 (300 MW) -Oct 2017

Unit 4 (300 MW) -Oct 2017

Quezon Power Expansion Project Quezon Power Phils. SMC Consolidated Power

Corporation Mauban, Quezon 500.00 Jul 2017

300 MW Limay Power Plant Project Phase II

(2x150MW)

SMC Consolidated Power Corporation

SMC Consolidated Power Corporation Brgy. Lamao, Limay, Bataan 300.00

Unit 1 - 150 MW -Jan 2017

Unit 2 - 150 MW -Jul 2017

1 x 420 MW Pagbilao Coal-Fired Thermal Power Plant Pagbilao Energy Corporation TeaM Energy / Aboitiz Power

Pagbilao Power Station, Nrgy. Ibabang Polo, Pagbilao, Quezon

420.00 Jan 2018

2 X 600 MW Mariveles Expansion Project

GNPower Mariveles Coal Plant Ltd. Co. GNPower Ltd. Co. Mariveles, Bataan 1,200.00 2018

300 MW Limay Power Plant Project Phase III

1x300MW)

SMC Consolidated Power Corporation

SMC Consolidated Power Corporation Brgy. Lamao, Limay, Bataan 300.00 2019/2020

TOTAL COAL 4,560.00

INDICATIVE POWER PROJECTSLuzon Grid Indicative Power Projects, 10,185.20 MW

9

Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW)

Target Commissioning

Aero Derivative Combined Cycle Power Plant

Calamba Aero Power Corporation

MERALCO MGEN Power Corporation Calamba, Laguna 150.00 TBA

TOTAL OIL-BASED 150.00 San Gabriel Power Plant First Gas Power Corp. First Gen Power Corporation San Gabriel, Batangas 450.00 Dec 2015

2 x 1,200 MW Combined Cycle Gas Turbine Power

Plant Project

Atlantic, Gulf and Pacific Company of Manila, Inc AG&P

Limay, Bataan (PNOC-AFC Industrial

Estate)2,400.00 Unit 1 - Mar 2017

Unit II - Mar 2018

415 MW San Isidro Combined Cycle Gas Turbine Plant

Project

Trans Asia Oil and Energy Development Corporation

(TAOil)

Trans Asia Oil and Energy Development Corporation

(TAOil)

Pilipinas Shell Petroleum Co.'s Tabangao Refinery,

Brgy. San Isidro and Tabangao-Ambulong,

Batangas City

415.00 Sept 2017

LNG-Fired Combined Cycle Power Plant * Onshore

Regasification and Storage Terminal

Meralco PowerGen Corporation and Chubu

Electric Power

MERALCO MGEN Power Corporation Atimonan, Quezon 1,750.00 2018-2019

TOTAL NATGAS 5,015.00

Tanawon Geothermal Project Energy Development Corporation (EDC)

Energy Development Corporation (EDC) Guinlajon, Sorsogon 40.00 Dec 2018

Rangas Geothermal Project Energy Development Corporation (EDC)

Energy Development Corporation (EDC) Bacon District, Sorsogon 40.00 Jun 2019

Kayabon Geothermal Project Energy Development Corporation (EDC)

Energy Development Corporation (EDC) Manito, Albay 40.00 Dec 2019

TOTAL GEOTHERMAL 120.00

INDICATIVE POWER PROJECTSLuzon Grid Indicative Power Projects, 10,185.20 MW

10

Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW)

Target Commissioning

Ibulao Hydroelectric Power Project Hydrocore, Inc. Hydrocore, Inc. Lagawe, Ifugao 4.50 May 2015

Dupinga Hydroelectric Power Project

Constellation Energy Corporation Exelon Corporation Gabaldon, Nueva Ecija 3.00 Oct 2015

Main Aklan Sunwest Water & Electric Co., Inc. (SUWECO)

Sunwest Water & Electric Co., Inc. (SUWECO) Libacao, Albay 15.00 Jul 2016

Tinoc 2 Philnew Hydro Power Corporation Philnew Hydro Power Corporation Tinoc, Ifugao 11.00 Dec 2016

Tinoc 3 Philnew Hydro Power Corporation Philnew Hydro Power Corporation Tinoc, Ifugao 5.00 Jun 2017

Pinacanauan Sunwest Water & Electric Co., Inc.

Sunwest Water & Electric Co., Inc. (SUWECO) Peñablanca, Cagayan 6.00 Jul 2017

Tinoc 1 Quadriver Energy Corp. Quadriver Energy Corp. Tinoc, Ifugao 4.10 Apr 2018

Tinoc 4 Philnew Hydro Power Corporation Philnew Hydro Power Corporation Tinoc, Ifugao 5.00 Apr 2018

TOTAL HYDRO 53.60 Currimao Solar Photovoltaic

Power Project Mirae Asia Energy Corporation Mirae Asia Energy Corporation Currimao, Ilocos Norte 20.00 Aug 2014

Macabud Solar Photovoltaic Power Project

ATN Philippines Solar Energy Group, Inc.

ATN Philippines Solar Energy Group, Inc.

Brgy. Macabud, Rodriguez, Rizal 30.00 Feb 2016

TOTAL SOLAR 50.00 Phase 2:

Burgos Wind Power ProjectEDC Burgos Wind Power

CorporationEnergy Development Corporation

(EDC)Nagsurot-Saoit, Burgos, Ilocos

Norte 63.00 Sep 2014

Balaoi Wind Power Project Northern Luzon UPC Asia Corporation UPC Asia Corporation Brgy. Balaoi, Pagudpud, Ilocos

Norte 45.00 Aug 2015

Phase 2:Mabitac Wind Power Project

Alternergy Sembrano Wind Corporation Alternergy Mt. Sembrano, Mabitac, Laguna 72.00 Apr 2017

Phase 1:Pasuquin East Wind Power

ProjectEnergy Logics Philippines, Inc. Delgado Group of Companies Pasuquin, Ilocos Norte 48.00 Jan 2017

TOTAL WIND 228.00 10 MW Serin CorporationRice

Husk-Fired Power Plant Serin Corporation Tarlac 8.60 TBA

TOTAL BIOMASS 8.60

TOTAL 10,185.20

1000

1500

2000

2500

3000

3500Jan 2014

Mar 2014

May 2014

Jul 2014

Sep 2014

Nov

 2014

Jan 2015

Mar 2015

May 2015

Jul 2015

Sep 2015

Nov

 2015

Jan 2016

Mar 2016

May 2016

Jul 2016

Sep 2016

Nov

 2016

Jan 2017

Mar 2017

May 2017

Jul 2017

Sep 2017

Nov

 2017

Jan 2018

Mar 2018

May 2018

Jul 2018

Sep 2018

Nov

 2018

Jan 2019

Mar 2019

May 2019

Jul  2019

Sep 2019

Nov

 2019

Jan 2020

Mar 2020

May 2020

Jul 2020

Sep 2020

Nov

 2020

Committed Available Capacity Peak Demand Regulating Reserve Contingency & Dispatchable Reserve

VISAYAS SUPPLY‐DEMAND OUTLOOK 2014‐2020

Notesa. Reserve Margin (RM) i.e. 4% regulating reserve and contingency and dispatchable reserve requirement b. 7 % peak demand growth rate resulted from observed 1 elasticity ratio of demand for electric power with national 

economic growth applied to 7 percent GDP growth rate (GR) target for 2014‐2015.c. 8 % peak demand growth rate resulted from observed 1 elasticity ratio of demand for electric power with national 

economic growth applied to 8 percent GDP growth rate (GR) target for 2016‐2020.d. Assumed 4.35 percent average forced outage of the total available capacity

2014Aug: 50 MW Nasulo Geo 

54 MW Sn Lorenzo WindSep: 31 MW UR Biomass

82 MW TPC ExpansionOct: 8 MW Villasiga HEPDec: 50 MW Nabas Wind

3 MW HPC Biomass18 MW SC Biomass

2015Jun: 3.6 MW AES Biomass

2016Jul: 135 MW Concepcion Coal 1Sep: 135 MW Concepcion Coal 2

0

200

400

600

800

1000

1200

1400

1600

1800

2000

W1W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14 W15 W16 W17 W18 W19 W20 W21 W22 W23 W24 W25 W26 W27

Available capacity Peak Demand Regulating Reserve Contingency & Dispatchable Reserve

January February March April May June

2014 VISAYAS DAILY SUPPLY‐DEMAND SITUATIONACTUAL PROJECTED

2014 Projected Peak Demand =1,612 MW (17 Jun)2014 Actual Peak Demand =

1,492 MW (4 Apr)

Holy WeekEarthquake in Leyte

Affected Power Plants:Mahiao Geo (120 MW)

COMMITTED POWER PROJECTSVisayas Grid Committed Power Projects, 579.60 MW

Type Name of the Project Project Proponent Mother/ JV Company LocationRated

Capacity (MW)

Project Cost (Php Billion)

Target Commissioning

GEOTHERMAL Nasulo Geothermal Project

Energy Development Corporation (EDC)

Energy Development Corporation (EDC)

Nasuji, Valencia, Negros Oriental 50.00 4 Aug 2014

WIND54 MW San Lorenzo Wind Power Project

(8 MW & 46 MW)

Trans-Asia Renewable Energy

Corporation

Trans Asia Oil and Energy Development Corporation (TAOil)

San Lorenzo, Guimaras Island 54.00 2.15 Aug 2014

BIOMASS

46 MW Universal Robina Corporation

Bagasse Cogeneration Facility

Universal Robina Corporation JG Summit Holdings Inc. Negros Occidental 31.00 Sep 2014

COAL

TPC Coal-Fired Power Plant

Expansion Project (1 x 82 MW Coal-Fired

Power Plant

Toledo Power Company

Global Business Power Corporation Toledo City, Cebu 82.00 10.2 Sep 2014

HYDRO Villasiga HEPSunwest Water & Electric Co., Inc.

(SUWECO)

Sunwest Water & Electric Co., Inc. (SUWECO)

Brgy. Igsoro, Bugasong, Antique 8.00 1.4 Oct 2014

WIND Nabas Wind Power Project

Petrogreen Energy Corporation

Petrogreen Energy Corporation

Brgy. Pawa, Nabas, Aklan 50.00 5.21 Dec 2014

BIOMASS20 MW SCBiopower

Bagasse-Fired Power Generation Project

San Carlos Biopower Inc. Bronzeoak Philippines Negros Occidental 18.00 1.7 Dec 2014

BIOMASS8.0 MW HPCo

Bagasse Cogeneration Plant

Hawaiian Philippines Company

Hawaiian Philippines Company Negros Occidental 3.00 Dec 2014

BIOMASS

Consolacion Landfill Methane Recovery

and Electricity Generation

Asian Energy System Corporation

Asian Energy System Corporation Cebu 3.60 0.2 Jun 2015

COMMITTED POWER PROJECTSVisayas Grid Committed Power Projects, 579.60 MW

Type Name of the Project Project Proponent Mother/ JV Company LocationRated

Capacity (MW)

Project Cost (Php Billion)

Target Commissioning

COAL

2 X 135 MW Concepcion Coal-fired Power Plant

Phase 1-135MW (1st Unit)

Phase 2-135MW (2nd Unit)

Palm Thermal Consolidated Holdings

Corp.

AC Energy Holdings, Inc./ Palm Thermal

Consolidated Holdings Corporation/ Jin Navitas

Resource, Inc.

Brgy. Nipa, Concepcion, Iloilo 270.00 26.4

1st Unit - Jul 2016 2nd Unit - Sep

2016

TOTAL 579.60

INDICATIVE POWER PROJECTSVisayas Grid Indicative Power Projects, 795.00 MW

Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW)

Target Commissioning

PEDC Expansion ProjectFormer report (1x150 MW Circulating Fluidized Bed (CFB) Coal-Fired Power

Plant)

Panay Energy Development Corporation

(Global Business Power Corporation)

Global Business Power Corporation Brgy. Ingore, La Paz, Iloilo 150.00 2015

1 X 20 MW FDC Danao CFB Coal Power Plant FDC Utilities, Inc. FDC Utilities, Inc. Danao City, Cebu 20.00 2016

300 MW Therma Visayas Energy Project Therma Visayas Inc. Aboitiz Power Corporation Brgy. Bato, Toledo City, Cebu 300.00 Mar 2017

TOTAL COAL 470.00 49 MW Biliran Geothermal

Plant ProjectBiliran Geothermal

Incorporated Orka Energy Philippines (Iceland) Biliran, Biliran 49.00 Dec 2015

Dauin Geothermal Project Energy Development Corporation (EDC)

Energy Development Corporation (EDC) Dauin, Negros Oriental 40.00 Dec 2018

Southern Leyte Geothermal Plant Geothermal Project (formerly known as Mt. Cabalian Geothermal)

Energy Development Corporation

Energy Development Corporation (EDC) Cabalian, Southern Leyte TBA

TOTAL GEOTHERMAL 89.00 San Carlos Solar

Photovoltaic Power ProjectSan Carlos Solar Energy Inc.

(SACASOL) Bronzeoak Philippines San Carlos City, Negros Occidental 20.00 May 2014

Leyte Solar Photovoltaic Power Project Phil. Solar Farm-Leyte, Inc. Phil. Solar Farm-Leyte, Inc. Ormoc City, Leyte 30.00 Jan 2015

TOTAL SOLAR 50.00 Pulupandan Wind Power

ProjectFirst Maxpower International

CorporationFirst Maxpower International

CorporationPulupandan, Negros

Occidental 50.00 Nov 2015

TOTAL WIND 50.00

INDICATIVE POWER PROJECTSVisayas Grid Indicative Power Projects, 795.00 MW

Name of the Project Project Proponent Mother/ JV Company Location Rated Capacity (MW)

Target Commissioning

Igbulo (Bais) Hydroelectric Power Project

Century Peak Energy Corporation

Century Peak Metals Holdings Corp Igbaras, Iloilo 5.10 Jan 2015

Hilabangan (Upper Cascade)

Century Peak Energy Corporation

Century Peak Metals Holdings Corp

Kabankalan, Negros Occidental 4.80 Aug 2015

Hilabangan (Lower Cascade)

Century Peak Energy Corporation

Century Peak Metals Holdings Corp

Kabankalan, Negros Occidental 3.00 Aug 2015

Maninila (Lower Cascade) Century Peak Energy Corporation

Century Peak Metals Holdings Corp San Remigio, Antique 4.50 Oct 2016

Maninila (Upper Cascade) Century Peak Energy Corporation

Century Peak Metals Holdings Corp San Remigio, Antique 3.10 Oct 2016

Sibalom (Upper Cascade) Century Peak Energy Corporation

Century Peak Metals Holdings Corp San Remigio, Antique 4.20 Oct 2016

Sibalom (Middle Cascade) Century Peak Energy Corporation

Century Peak Metals Holdings Corp San Remigio, Antique 4.00 Oct 2016

Sibalom (Lower Cascade) Century Peak Energy Corporation

Century Peak Metals Holdings Corp San Remigio, Antique 3.30 Oct 2016

Timbaban Hydroelectric Power Project

Oriental Energy and Power Generation Corporation

Oriental Peninsula Resources Group Inc (ORE) Madalag, Aklan 18.00 Aug 2017

TOTAL HYDRO 50.00 46 MW Biomass-Fired

Cogeneration Power PlantUniversal Robina

Corporation JG Summit Holdings Inc. Kabankalan, Negros Occidental 46.00 Jul 2014

TOTAL BIOMASS 46.00 40 MW Battery Storage

ProjectAES Philippines Power

Partners Co., LTD.AES Philippines Power Partners

Co., LTD.Kabankalan, Negros

Occidental 40.00 Mar 2015

TOTAL BATTERY 40.00

TOTAL 795.00

2015Mar: 150 MW Therma South 2Jun: 13.2 Sabangan HEPJul:30 MW Puyo HEPSep: 100 MW Sarangani CoalU1Dec: 40 MW Biomass

MINDANAO SUPPLY‐DEMAND OUTLOOK 2014‐20202014

May: 13.6 MW Tudaya15 MW Mapalad Diesel 

Sep: 26.1 MW Peak PowerNov: 150 MW Therma South 1

2016Mar: 25 MW Lake Mainit HEPSep: 270 MW FDC Coal U1 & U2Nov: 100 MW Sarangani Coal U2

Notesa. Required Reserve Margin (RM) i.e. 4% regulating reserve and contingency and dispatchable reserve requirement b. 5.6 % peak demand growth rate resulted from observed 0.8 elasticity ratio of demand for electric power with national economic growth 

applied to 7 percent GDP growth rate (GR) target for 2014‐2015.c. 12.8 % peak demand growth rate resulted from observed 1.6  elasticity ratio of demand for electric power with national economic growth 

applied to 8 percent GDP growth rate (GR) target for 2016d. 8 % peak demand growth rate resulted from observed 1 elasticity ratio of demand for electric power with national economic growth

applied to 8 percent GDP growth rate (GR) target for 2017‐2020e. Assumed 3.3 percent average forced outage of the total dependable capacity

2017Jan: 9 MW Limbatangon HEPSep: 135 MW FDC Coal U3

500

1000

1500

2000

2500

3000

Jan 2014

Mar 2014

May 2014

Jul 2014

Sep 2014

Nov

 2014

Jan 2015

Mar 2015

May 2015

Jul 2015

Sep 2015

Nov

 2015

Jan 2016

Mar 2016

May 2016

Jul 2016

Sep 2016

Nov

 2016

Jan 2017

Mar 2017

May 2017

Jul 2017

Sep 2017

Nov

 2017

Jan 2018

Mar 2018

May 2018

Jul 2018

Sep 2018

Nov

 2018

Jan 2019

Mar 2019

May 2019

Jul 2019

Sep 2019

Nov

 2019

Jan 2020

Mar 2020

May 2020

Jul 2020

Sep 2020

Nov

 2020

Committed Available Capacity Peak Demand Regulating Reserve Contingency & Dispatchable Reserve

0

200

400

600

800

1000

1200

1400

1600

1800

W1W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14 W15 W16 W17 W18 W19 W20 W21 W22 W23 W24 W25 W26 W27

Available capacity Peak Demand Regulating Reserve Contingency & Dispatchable Reserve

January February March April May June

2014 MINDANAO DAILY SUPPLY‐DEMAND SITUATIONACTUAL PROJECTED

2014 Projected Peak Demand =1,400 MW (26 May)

2014 Actual Peak Demand =1,320 MW (22 Apr)

Holy Week

27 Feb 2014Mindanao BlackoutAffected Power Plant

200 MW Mindanao Coal‐fired (MCF) 

Restoration of 200 MW MCFUnit 1 : 4 May 2014Unit 2 : 1 June 2014

COMMITTED POWER PROJECTSMindanao Grid Committed Power Projects, 1,078.5 MW

Type Name of the Project Project Proponent Mother/ JV Company LocationRated

Capacity (MW)

Project Cost (Php

Billion)

Target Commissioning

HYDROTudaya 1

Hydroelectric Power Project

Hedcor Sibulan, Inc. Aboitiz Power Corporation Sta. Cruz, Davao del Sur 6.6 May 2014

HYDROTudaya 2

Hydroelectric Power Project

Hedcor Tudaya, Inc. Aboitiz Power Corporation Sta. Cruz, Davao del Sur 7 May 2014

OIL 15 MW Diesel Power Plant

Mapalad Energy Generating Corporation

Mapalad Power Corporation

Mapalad, Dalipuga, Iligan City 15 0.38 May 2014

OIL3x6.97 MW Bunker-Fired Power Plant Peak Power

Soccsargen, Inc. (PSI)Peak Power Energy Inc. (subsidiary of A Brown)

National Highway, Brgy.Apopong,

General Santos City20.9 1.91 Sep 2014

OIL1x5.2 MW Bunker-Fired Power Plant Peak Power San

Francisco (PSFI)Peak Power Energy Inc. (subsidiary of A Brown)

ASELCO Compound, Brgy. San Isidro,San

Francisco, Agusan del Sur

5.2 0.51 Sep 2014

COAL2 X 150 MW Coal-

Fired Therma South Energy Project

Therma South Inc. Aboitiz Power Corporation

Brgy. Binugao, Toril, Davao City and Brgy. Inawayan, Sta. Cruz,

Davao Del Sur

300 24.00 Nov 2014 U1Mar 2015 U2

HYDRO Sabangan Hedcor Sabangan, Inc.Aboitiz Power Corporation Davao City 13.2 Jun 2015

HYDRO Puyo Hydroelectric Power Project

First Gen Mindanao Hydropower Corp.

First Gen Power Corporation

Jabonga, Agusan del Norte 30 Jul 2015

COAL2 X 100 MW Southern Mindanao Coal Fired

Power Station

Sarangani Energy Corporation Alsons Power Corporation Brgy, Kamanga,

Maasim, Sarangani 200 19.50 Sep 2015 U1Nov 2016 U2

COMMITTED POWER PROJECTSMindanao Grid Committed Power Projects, 1,078.5 MW

Type Name of the Project Project Proponent Mother/ JV Company LocationRated

Capacity (MW)

Project Cost (Php

Billion)

Target Commissioning

BIOMASS

10 MW Kalilangan Bio-Energy

Corporation Multi Feedstock Power

Generating Facility

Kalilangan Bio-Energy Corporation

Kalilangan Bio-Energy Corporation

FIBECO, Anahawan, maramag, Bukidnon 10 Dec 2015

BIOMASS

10 MW Don Carlos Bio-Energy

Corporation Multi Feedstock Power

Generating Facility

Don Carlos Bio-Energy Corporation

Don Carlos Bio-Energy Corporation

FIBECO, Anahawan, maramag, Bukidnon 10 Dec 2015

BIOMASS

10 MW MalaybalayBio-Energy

Corporation Multi Feedstock Power

Generating Facility

Malaybalay Bioenergy Corporation

Malaybalay Bioenergy Corporation

FIBECO, Anahawan, maramag, Bukidnon 10 Dec 2015

BIOMASS 15 MW LPC Biomass Power Plant Project

Lamsan Power Corporation

Lamsan Power Corporation Maguindanao 10.00 Dec 2015

HYDRO Lake Mainit Agusan Power Corporation Tranzen Group Inc. Jabonga, Agusan del

Norte 25.0 Mar 2016

COAL

3 X 135 MW FDC-Misamis Circulating Fluidized Bed (CFB)

Coal-Fired Power Plant Project

FDC Utilities, Inc. FDC Utilities, Inc.Phividec Industrial Estate, Villanueva, Misamis Oriental

405 30.00 Jun 2016 U1 & U2Jun 2017 U3

HYDROLimbatangon

Hydroelectric Power Project

Turbines Resource & Development Corp.

Turbines Resources and Development Corp.

(TRDC)

Cagayan de Oro City, Misamis Oriental 9 Jan 2017

TOTAL 1,078.50

INDICATIVE POWER PROJECTSMindanao Grid Indicative Power Projects, 2,121.6 MW

Name of the Project Project Proponent Mother/ JV Company LocationRated

Capacity (MW)

Target Commissioning

Davao del Norte 20 MW Circulating Fluidized Bed

Biomass-Coal Fired Thermal Power Plant

FDC Utilities, Inc. FDC Utilities, Inc. Maco, Davao del Norte 20 Mar 2015

ZAM 100 MW Circulating Fluidized Bed (CFB) Coal-

Fired Power StationSan Ramon Power Inc. Mapalad Power Corporation Sitio San Ramon, Bgry.

Talisayan, Zamboanga City 100 Dec 2015

300 MW SMC Davao Power Plant Project Phase I

San Miguel Consolidated Power Corporation

San Miguel Consolidated Power Corporation

Brgy. Culaman, Malita, Davao del Sur 300

150 MW - Oct 2015

150 MW - Mar 2016

Sibuguey Power Plant Project

Philippine National Oil Company (PNOC-EC)

Philippine National Oil Company (PNOC) Sibugay, Zamboanga 100 Sep 2016

2x55 MW Balingasag Thermal Power Plant

(Circulating Fluidized Bed Combustion (CFBC) Coal-Fired Power Plant Plant)

Minergy Coal Corporation Minergy Brgy. Mandangoa, Balingasag, Misamis Oriental 110 Jan 2017

3x135 MW PsagCorp Coal-fired Power Plant GN Power GN Power Kauswagan, Lanao del Norte 405 Dec 2017

300 MW SMC Davao Power Plant Project Phase II

San Miguel Consolidated Power Corporation

San Miguel Consolidated Power Corporation

Brgy. Culaman, Malita, Davao del Sur 300 Dec 2018

600 MW SMC Davao Power Plant Project Phase III

San Miguel Consolidated Power Corporation

San Miguel Consolidated Power Corporation

Brgy. Culaman, Malita, Davao del Sur 600

300 MW - Dec 2019

300 MW - Dec 2020

TOTAL COAL 1,935.00

Mindanao 3 Geothermal Energy Development Corporation

Energy Development Corporation Kidapawan, North Cotabato 50 Dec 2017

TOTAL GEO 50.00

INDICATIVE POWER PROJECTSMindanao Grid Indicative Power Projects, 2,121.6 MW

Name of the Project Project Proponent Mother/ JV Company LocationRated

Capacity (MW)

Target Commissioning

Davao del Norte 20 MW Circulating Fluidized Bed

Biomass-Coal Fired Thermal Power Plant

FDC Utilities, Inc. FDC Utilities, Inc. Maco, Davao del Norte 20 Mar 2015

ZAM 100 MW Circulating Fluidized Bed (CFB) Coal-

Fired Power StationSan Ramon Power Inc. Mapalad Power Corporation Sitio San Ramon, Bgry.

Talisayan, Zamboanga City 100 Dec 2015

300 MW SMC Davao Power Plant Project Phase I

San Miguel Consolidated Power Corporation

San Miguel Consolidated Power Corporation

Brgy. Culaman, Malita, Davao del Sur 300

150 MW - Oct 2015

150 MW - Mar 2016

Sibuguey Power Plant Project

Philippine National Oil Company (PNOC-EC)

Philippine National Oil Company (PNOC) Sibugay, Zamboanga 100 Sept 2016

2x55 MW Balingasag Thermal Power Plant

(Circulating Fluidized Bed Combustion (CFBC) Coal-Fired Power Plant Plant)

Minergy Coal Corporation Minergy Brgy. Mandangoa, Balingasag, Misamis Oriental 110 Jan 2017

3x135 MW PsagCorp Coal-fired Power Plant GN Power GN Power Kauswagan, Lanao del Norte 405 Dec 2017

300 MW SMC Davao Power Plant Project Phase II

San Miguel Consolidated Power Corporation

San Miguel Consolidated Power Corporation

Brgy. Culaman, Malita, Davao del Sur 300 Dec 2018

600 MW SMC Davao Power Plant Project Phase III

San Miguel Consolidated Power Corporation

San Miguel Consolidated Power Corporation

Brgy. Culaman, Malita, Davao del Sur 600

300 MW - Dec 2019

300 MW - Dec 2020

TOTAL COAL 1,935.00

Mindanao 3 Geothermal Energy Development Corporation

Energy Development Corporation Kidapawan, North Cotabato 50 Dec 2017

TOTAL GEO 50.00

INDICATIVE POWER PROJECTSMindanao Grid Indicative Power Projects, 2,121.6 MW

Name of the Project Project Proponent Mother/ JV Company LocationRated

Capacity (MW)

Target Commissioning

Tagoloan Hydropower First Gen Mindanao Hydropower Corp. First Gen Power Corporation Impasugong & Sumilao,

Bukidnon 39 Oct 2015

Bubunawan Hydroelectric Power Project

First Gen Mindanao Hydropower Corp. First Gen Power Corporation Baungon and Libona,

Bukidnon 23 Oct 2015

Cabadbaran Hydroelectric Power Project

First Gen Mindanao Hydropower Corp. First Gen Power Corporation Cabadbaran, Agusan del

Norte 9.75 Dec 2015

Tumalaong Hydroelectric Power Project

First Gen Mindanao Hydropower Corp. First Gen Power Corporation Baungon, Bukidnon 9 Oct 2015

Pasonanca Philcarbon, Inc. Philcarbon, Inc. Zamboanga City 0.1 Mar 2017

Culaman Hydroelectric Power Project

Oriental Energy and Power Generation Corporation

Oriental Energy and Power Generation Corporation Manolo Fortich, Bukidnon 10 Jun 2018

TOTAL HYDRO 90.80

Darong Solar Photovoltaic Power Project PhilNew Energy Inc. PhilNew Energy Inc. Sta. Cruz, Davao del Sur 35 Sept 2015

(Subject to FIT)

TOTAL SOLAR 35.00 12 MW Biomass Power

Plant Project Misamis Oriental Bio-Energy

CorporationsMisamis Oriental Bio-Energy

Corporations Misamis Oriental 10.80 2015

TOTAL BIOMASS 10.80

POWER SITUATION and OUTLOOK 

Wallace Business Forum2nd Quarterly Roundtable

29 April 2013

End of Presentation