of 15
7/28/2019 PowerDrive Archer AADE Presentation Mar 2011
1/15
PowerDrivePowerDrive ArcherArcher
High Build Rate
7/28/2019 PowerDrive Archer AADE Presentation Mar 2011
2/15
Why PowerDrive Archer?
7/28/2019 PowerDrive Archer AADE Presentation Mar 2011
3/15
PowerDrive Archer RSS
Delivers well profiles previously only possible with motorsyet
with the ROP and wellbore quality of a fully rotating RSS
PowerDrive X6 control unit
Unique hybridsteering unit
components rotate
7/28/2019 PowerDrive Archer AADE Presentation Mar 2011
4/15
PowerDrive Archer
7/28/2019 PowerDrive Archer AADE Presentation Mar 2011
5/15
PowerDrive Archer
7/28/2019 PowerDrive Archer AADE Presentation Mar 2011
6/15
Engineered Bits and BHAs
High build curves demand high
Engineered bit and BHA designs IDEAS* modeling software
Drillin en ineerin DOX* and i-Drill
Designs tested
Horizontal wells at Schlumberger
drilling technology center
Proven in the field
Approved bit and BHA catalog
7/28/2019 PowerDrive Archer AADE Presentation Mar 2011
7/15
An Invisible DangerFatigue
4 Hours4 Hours
Infinite LifeInfinite Life
7/28/2019 PowerDrive Archer AADE Presentation Mar 2011
8/15
Reducing Risk of Fatigue Through Engineering
7/28/2019 PowerDrive Archer AADE Presentation Mar 2011
9/15
PowerDrive Archer Features
True hybrid of push and point the bit
Accurately kicks off from vertical Measures Magnetic Tool Face
e vers u u rate capa ty mme atey
Up to 17/100 ft DLS
Control system from new generation PowerDrive X6
O enhole sidetrack at an oint in the well
9
7/28/2019 PowerDrive Archer AADE Presentation Mar 2011
10/15
Extensive Field Test
100 wells
> rs
> 13800ft drilled
4000
5000
6000
7000
80
100
120
ours
age,
kft
Collaboration with clients
Fine tune BHA & bit design
Overcome challenges 0
1000
2000
3000
0
20
40Foot
Experience builtCummulativeFootage CumulativeHours
7/28/2019 PowerDrive Archer AADE Presentation Mar 2011
11/15
Case Studies
Marcellus $1million USD saved 170% increase in ROP
Woodford ROPs increased by 80% Tortuosity reduced by 20 10 days saved
Eagle Ford s ncrease y
Cost per foot reduced Casing run to bottom without
rotation forfirst time
Cotton Valley Halved time to drill curve 8 days down to 4 days
7/28/2019 PowerDrive Archer AADE Presentation Mar 2011
12/15
PowerDrive Archer RSS
Delivers well profiles previously only possible with motorsyet
with the ROP and wellbore quality of a fully rotating RSS
e uce rs
Reduce cost
7/28/2019 PowerDrive Archer AADE Presentation Mar 2011
13/15
And finally..
7/28/2019 PowerDrive Archer AADE Presentation Mar 2011
14/15
The PowerDrive Archer Tour
7/28/2019 PowerDrive Archer AADE Presentation Mar 2011
15/15
. .
An asterisk is used throughout this presentation to denote a mark of Schlumberger. Othercompany, pro uc , an servce names are e proper es o er respec ve owners.
Initials 3/28/2011