+ All Categories
Home > Documents > POWERED BY - aib.org.au CPD Online is powered by Asta Powerproject. ... and The Building Code of...

POWERED BY - aib.org.au CPD Online is powered by Asta Powerproject. ... and The Building Code of...

Date post: 05-Jul-2018
Category:
Upload: trinhdung
View: 223 times
Download: 0 times
Share this document with a friend
6
AIB CPD ONLINE: CONTINUING PROFESSIONAL DEVELOPMENT VISIT AIB CPD ONLINE aib.org.au/cpdonline POWERED BY
Transcript

AIB CPD ONLINE: CONTINUING PROFESSIONAL DEVELOPMENT

VISIT AIB CPD ONLINE

aib.org.au/cpdonline

POWERED BY

One of the strongest messages that I take with me when I am either ‘on the road’ or in speaking with members over the phone is that if we (AIB) can demonstrate how we can help the individual and/or their business grow through education, then we really are doing our job.

The Australian Institute of Building is committed to delivering first class and relevant Continuing Professional Development (CPD). With this, we believe that it is paramount that you continually bring yourself up to speed with everything from innovation, trends, legislation and the like.

If you are not currently a member, and would like to take advantage of all the member benefits please visit www.aib.org.au/membership

For all our members, I trust you enjoy our refreshed CPD program – we look forward to bringing you regular and new material in the future.

AIB CPD Online is powered by Asta Powerproject. Asta Powerproject was designed to support the way construction planners work. Easy-to-use, yet extremely powerful, it is the software of choice for thousands of construction professionals throughout the world. To find out more, please visit http://www.elecosoft.com/astapowerproject

Greg HughesChief Executive Officer AIB

A MESSAGE FROM THE CEO

BUSINESS

Payment Mastery: Getting Paid for your WorkThis course will give you an overview on ‘Getting Paid’ Strategies from the Construction Debt Recovery Expert.

COMMERCIAL

Insolvency and LiquidationsThis course is designed to give you an overview of the major factors that affect all businesses in respect of insolvency.

InsuranceThis course aims to show the learner how to identify common insurance issues faced by building practitioners and the overall benefits of understanding insurance.

COMPANY ADMINISTRATION

Dispute Resolution and MediationThis course aims to identify the different types of alternate dispute resolution systems available to building and construction practitioners in the event of a dispute.

How to Manage Design Risk and Reduce DisputesIn this course presenter Wendy Poulton outlines systems to help you deal with the risks associated with issues such as: project fit; complying with codes, standards and planning conditions.

Risk ManagementThe Risk Management Online Training is all about Risk Management Safety Essentials - it’s all about your safety and the safety of others you work with every day.

Waste: Risk ManagementThis course covers the importance of Risk Assessment and Management on a building site.

ENERGY EFFICIENCY

12points

2points

2points

2points

2points

2points

2points

FOR FURTHER INFORMATION ON COURSE COSTS PLEASE VISIT AIB.ORG.AU/CPDONLINE

FOR FURTHER INFORMATION ON COURSE COSTS PLEASE VISIT AIB.ORG.AU/CPDONLINE

HEALTH & SAFETY

LEGAL

Employment LawThis course aims to inform the learner about industrial relations law including the Fair Work Act 2009 and the Fair Work Amendment Act 2012.

The Building Code of AustraliaThis course will introduce you to the Building Code of Australia (BCA) and to those building standards commonly raised in residential building disputes.

The Security of Payment ActThis course aims to educate builders, contractors, consultants and suppliers working in the industry about the Building and Construction Industry Security of Payment Act 1999 (NSW).

Legal BundleThis Bundle includes courses on a range of legal topics including the Security of Payment Act, Employment Law, and The Building Code of Australia.

Bullying in the WorkplaceThis course on workplace bullying is designed for people working in the building sector.

2points

Safe Work Method StatementsThis course aims to ensure you understand your legal obligations with regard to SWMS.

2points

Understanding the Changes to WHS LegislationThis training module is aimed at educating the student about the changes to the WHS legislation, ensuring an understanding of the new terminology and interpretation of the legislation can occur.

2points

WHS Programs in the Construction IndustryWith the introduction of the new WHS legislation and the move towards harmonising the legislation across the states there are new specific requirements for construction operators to implement within their current WHS systems or programs.

The aim of this training module is to give operators the information they need to update their existing WHS systems using the legislation changes. This training module will also be useful for construction operators who are developing a new WHS program for their business. 2

points

2points

2points

2points

6points

Work Place Health and Safety BundleThe Health and Safety Bundle focuses on developing your knowledge in Work Health and Safety Legislation and using a Risk Assessment Approach in creating safety in the workplace.

8points

FOR FURTHER INFORMATION ON COURSE COSTS PLEASE VISIT AIB.ORG.AU/CPDONLINE

TECHNICAL

Asbestos AwarenessAsbestos Awareness Online Training gives you suitable awareness of asbestos products and the hazards and risks associated with their fibres.

Detailing for Water: Why do buildings leak?Ric Bonaldi offers practical solutions on preventing water ingress. The course covers detailing for roofs and parapets, windows and walls, basements and footings.

Slips and Trips: An Introduction to Slip Resistant FlooringSlips, trips and falls within a building generate two-thirds of worker’s compensation claims.

Section J of NCC Volume One – Course 1This course is written in conjunction with the Association of Accredited Certifiers (AAC).

Section J of NCC Volume One – Course 2This course is written in conjunction with the Association of Accredited Certifiers (AAC).

Section J NCC BundleThis Bundle includes Course One and Two of the Section J NCC Volume One.

Waterproofing in BuildingsRoss Taylor’s presentation looks at the legal exposure of Architects to the increasing problem of water related defects in new buildings.

NATIONAL CONSTRUCTION CODE

2points

2points

2points

2points

2points

2points

4points

10 points earned from AIB CPD Online can be accrued towards your minimum requirement of 20 hours per year.

For more information and to view the AIB’s CPD policy, please visit:www.aib.org.au/cpdonline

For any enquiries about AIB CPD Online, please contact us:

P: 02 6253 1100F: 02 6253 4411

E: [email protected]

All courses written by industry experts

Complete your training whenever,

wherever it suits you

No travel required or time off work

WHY CHOOSE AIB CPD ONLINE?


Recommended