INTRODUCINGMARBLE COST MEASURING &ANALYZE SYSTEM
POWERED BY: SUCCESS LADDER TECHNOLOGIES48 MOTI DUNGRI ALWAR(RAJ)For Sales and Support:0144-2348348
Introduction
This software analyze & measures cost of marbles, before processing of blocks & after their conversion into slabs.It manages purchasing, loading, unloading , processing, sales, purchase of marbles blocks & slabs
Flow Diagram of Application
Loading of Blocks (Purchase Blocks
From Mine)
Receive Blocks(Gate Entry
of each Block)
Block Processing(Conversion of Blocks into
slabs)
Cost Estimation of Block(Analyze &
measures cist of each block)
Block Sales(Selling of
blocks after analyzing actual
area of block)
View Reports(View & Print Reports
overall reports of your process)
Login Page
DashboardAfter Login, you would able to see Last 7 Days Reporting
Purchase Block
Status of Blocks(Received/ Not Received) asR--:: Received
: Not Received
Gate Entry of blocksUnloading of block which you were received from mine and measures weight of each block, assign Factory No ,calculate Approximate weight on the basis of length, breadth, height of block you had entered once you receive block the status of block will green
Block ProcessingAfter receiving blocks ,it will go for its conversion into slabs. Here you can add no. of slabs of blocks ,its length, height and upload image of block also.
Cost Estimation of BlockIn this, you can add complete cost details regarding particular block e.g. Royalty paid by you ,transport cost, job work or any other expenses over block
Block SalesIn this, you can sell block to any party by selecting from dropdown after calculating total sales value of block
Yearly Report
Date-wise ReportingIn this, you would able extract overall report between any date range
Location-Wise ReportingIn this, you would able extract overall information of blocks present at particular location Bl : Blocks
Sold
Factory-Wise ReportIn this, you would able extract overall information of blocks by giving factory No
Mine-Wise ReportIn this, you would able extract overall information of blocks purchased from particular mine between date range
Party-Wise ReportIn this, you would able extract overall information of blocks sold to particular party between date range
Thank You