+ All Categories
Home > Documents > PowerPoint Presentation · 2018. 3. 14. · Functional Classification Project Limits...

PowerPoint Presentation · 2018. 3. 14. · Functional Classification Project Limits...

Date post: 25-Sep-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
19
Transcript
Page 1: PowerPoint Presentation · 2018. 3. 14. · Functional Classification Project Limits Segment/project length AM peak capacity (list hourly if HCM based, or peak-period if model based)
Page 2: PowerPoint Presentation · 2018. 3. 14. · Functional Classification Project Limits Segment/project length AM peak capacity (list hourly if HCM based, or peak-period if model based)
Page 3: PowerPoint Presentation · 2018. 3. 14. · Functional Classification Project Limits Segment/project length AM peak capacity (list hourly if HCM based, or peak-period if model based)

Page 4: PowerPoint Presentation · 2018. 3. 14. · Functional Classification Project Limits Segment/project length AM peak capacity (list hourly if HCM based, or peak-period if model based)

Page 5: PowerPoint Presentation · 2018. 3. 14. · Functional Classification Project Limits Segment/project length AM peak capacity (list hourly if HCM based, or peak-period if model based)

Page 6: PowerPoint Presentation · 2018. 3. 14. · Functional Classification Project Limits Segment/project length AM peak capacity (list hourly if HCM based, or peak-period if model based)

Page 7: PowerPoint Presentation · 2018. 3. 14. · Functional Classification Project Limits Segment/project length AM peak capacity (list hourly if HCM based, or peak-period if model based)

Page 8: PowerPoint Presentation · 2018. 3. 14. · Functional Classification Project Limits Segment/project length AM peak capacity (list hourly if HCM based, or peak-period if model based)

Page 9: PowerPoint Presentation · 2018. 3. 14. · Functional Classification Project Limits Segment/project length AM peak capacity (list hourly if HCM based, or peak-period if model based)

Page 10: PowerPoint Presentation · 2018. 3. 14. · Functional Classification Project Limits Segment/project length AM peak capacity (list hourly if HCM based, or peak-period if model based)

Page 11: PowerPoint Presentation · 2018. 3. 14. · Functional Classification Project Limits Segment/project length AM peak capacity (list hourly if HCM based, or peak-period if model based)

Page 12: PowerPoint Presentation · 2018. 3. 14. · Functional Classification Project Limits Segment/project length AM peak capacity (list hourly if HCM based, or peak-period if model based)

Average crashes per year

ADT x Roadway length

Page 13: PowerPoint Presentation · 2018. 3. 14. · Functional Classification Project Limits Segment/project length AM peak capacity (list hourly if HCM based, or peak-period if model based)

••

Page 14: PowerPoint Presentation · 2018. 3. 14. · Functional Classification Project Limits Segment/project length AM peak capacity (list hourly if HCM based, or peak-period if model based)

Functional ClassificationProject LimitsSegment/project lengthAM peak capacity (list hourly if HCM based, or peak-period if model based)

ADT# Vehicles passing the installation

Pre-trip viewsAverage vehicles for Travel Improvement MeasureAverage speeds (before implementation)Speed LimitNumber of lanes affected

Page 15: PowerPoint Presentation · 2018. 3. 14. · Functional Classification Project Limits Segment/project length AM peak capacity (list hourly if HCM based, or peak-period if model based)

Page 16: PowerPoint Presentation · 2018. 3. 14. · Functional Classification Project Limits Segment/project length AM peak capacity (list hourly if HCM based, or peak-period if model based)

Page 17: PowerPoint Presentation · 2018. 3. 14. · Functional Classification Project Limits Segment/project length AM peak capacity (list hourly if HCM based, or peak-period if model based)

Page 18: PowerPoint Presentation · 2018. 3. 14. · Functional Classification Project Limits Segment/project length AM peak capacity (list hourly if HCM based, or peak-period if model based)

Page 19: PowerPoint Presentation · 2018. 3. 14. · Functional Classification Project Limits Segment/project length AM peak capacity (list hourly if HCM based, or peak-period if model based)

Recommended