Corporate Alignment Logo
Corporate MVV
• A subsidiary of ENKA (ENR 2014 Top 52nd International Contractor, +50 companies,
4 continents, 45 countries, 21,500 people, +5.8 billion US$ turnover)
• Incorporated in 1973 in Turkey as a local steel fabricator now an EPFI group of 5 companies in
Turkey (4), P.R. China (1).
• Three fabrication shops and one module & shipyard located in the Marmara Region, Turkey.
• 2,800 people including 260 engineers
• With Activities in
• Engineering (structural, pressure vessels, piping, plant engineering)
• Fabrication (5 shops (4 in Turkey, 1 in China) over 100,000 tons/year total capacity)
• Installation - Structural & Mechanical (domestic and overseas jobsites)
• Modularization (module and shipyard, 208,500 sqm, 60,000 dwt)
Cimtas Group Profile
Çimtaş Precision Machining
Cimtas Group Company Locations
Cimtas Fabrication Shop Locations, Gemlik/Turkey
Cimtas Gemlik Works
Cimtas Pipe
Cimtas Precision Machining
Cimtas Pipe Fabrication and Trading Ltd. Co.
• Power, Process and OEM Piping Systems• Integrated Design & Engineering, Material Procurement
Fabrication, Surface Treatment, Packing, Framing• Induction Bending (2 machines, 40 and 108 mm thk. P92)• ASME NPT, NS, NA, KTA1401 Nuclear Certificates• 22 Bays, 49 Overhead Cranes• Fenced Area: 93,000 sqm • Covered Shop Area: 38,000 sqm• 3,500 tons/month Fabrication Capacity
Business Lines
Power, Process and OEM Piping Fabrication
Modularization Pressurized Equipment Fabrication
Plant Design and Engineering
PMP® certified project managers and coordinators support the objectives to implement solutions with the lowest overall risk and highest customer satisfaction.
Project Management
• Integrated change control to centrally manage and document change orders
• Communication Plan to clearly define how to communicate the right information to the
right stakeholder at the right time
• Integrating, communicating and managing technical changes
• Managing suppliers and sub-contractors through cost, schedule and quality baselines
Procurement
• Pipes• Pipe Supports• Fittings• Flanges• Valves• Instruments• Process Equipment Packages
• Cost-efficient supply chain management
• Global sourcing
• Knowledge of local and int.’l markets and customs
• Wide range of approved well known suppliers
• Multi location central managed sourcing
• Experienced sourcing and procurement engineers
• Supplier qualification and evaluation
Butterfly steam control valveVendor Inspection
Scope
2008- 2014 Total : $ 270 MGlobal Sourcing
Engineering
• Plant Design Engineering:
• Power
• Refineries
• Petrochemical
• Process Design
• Power and Process Piping
• OEM Piping
• Presssure Vessels
• Heat Exchanger
• Storage Tanks
• Civil and Structural Design
• Gas Processing Equipment
• BOP Equipment
• Reverse Engineering-Laser Scanning
• Technical Procurement:
• Valves
• Instruments
• Pipe Supports
• Process Equipment Packages
Cimtas Plant Design and Engineering Group provides various engineering and design
services including conceptual, basic and detail engineering for the power, oil and gas,
chemical, process and offshore industries.
Scope
Engineering Software
Stress & Structural Analysis
PDMS/Aveva
MDS/Aveva
PDMS LMI/Aveva
Smart Plant 3D & PID
PDS
Cloudworks/Lieca
SPR (review)
Tekla Structures
Solidworks
Catia v5
3D Design & Modeling Process and Flow Analysis
I&C – Electrical
Drafting
ChemCad
Flow Consultant
Sinetz
Thermoflow
ETAP
Dialux
ePlan
AutoCAD
Spoolgen
Isogen
Microstation
Smartsketch
Rohr2
Caesar II
Compress
Ansys
PVElite
Abaqus
ETABS
SAP 2000
STAAD Pro
Engineering Experience
3x42 MW SCGT Power PlantWest Qurna-2 Oilfield, Iraq ENKA
Propylene Storage Tanks, Turkey, PETKIM
Muscat Int.’l Airport 3D Model, Oman, ENKA
Interconnecting Piping, DLN 1 Upgrade, China, GE
Pressure Vessels D107-D203, Turkey, PETKIM
111 MW KPS 6, Powership, Turkey , KARADENIZ ENERGY
Compressor Manifold Skid,SGP, TCO, KAZAKHSTAN
Fabrication Scope
• Material Storage and Handling • Pre-fabrication• Induction Bending (from 2,5” to 34”, 40mm and 108 mm thk. P92) • CNC and Semi-Automatic Cold Bending (from ½” to 10”)• Plate Cutting• Welding (Robotic, Automated & Manual) • PWHT and Normalization • Testing (PMI, RT, UT, MT, PT, Hydro, Video Boroscope and CMM Inspection)• Surface Treatment (Manual and Automated Blasting, Pickling, Passivation)• Painting
* All processes are verified and traced through the ERP system.
Materials
CS & LTCSFINE GRAIN MODERATE
L.A. STEELS ALLOY STEELS STAINLESS STEELS NICKEL ALLOYS SPECIAL ALLOYS
A234 WPB 16Mo3 SA335 P11 SA335 P5A790 UNS31803
(duplex ss)SB564 UNS N06625
(Inconel)SB 862 UNS R50400
(Titanium)
A420 WPL 6 15Mo3 SA335 P22 SA335 P9 SA312 S31254SB407 UNS N08811
(Incoloy)
SA105 SA335 P23 SA335 P91 SA312 TP304 / 304LSB165 UNS N04400
(Monel)
A672 GrC70 13CrMo4-5 X10CrMoVNb9-1 SA312 TP304H
API 5L B 10CrMo9-10 X10CrWMoVNb9-2 SA312 TP316 / 316L
API 5L X65 15NiCuMoNb5-6-4 SA312 TP316H
P235GH SA312 TP317 / 317L
P250GH SA312 TP321
P265GH SA312 TP321H
P355 NH SA312 TP347
SA 350 LF1&LF2 X5CrNi18-10,
SA106 GrB&GrC X5CrNiMoTi19-11-2
SA333 Gr6 X6CrNiMoTi17-12-2
SA516 Gr60&Gr70 X6CrNiTi18-10
SA671 CC60
• Welders Training Center
• Certified Mechanical Testing Laboratory (Cimtas Steel)
• Robotic, Automated and Manual Welding
• 600 PQR and 1,200 WPS in library
• Carbon, Low Alloy and Stainless Steel
• SAW/UP, SMAW/E 111, GTAW/TIG 141,
GMAW/MIG&MAG, FCAW , GTAW/TIG Hotwire,
STT/RMD, Orbital TIG, Orbital FCAW /Tubular Cored
Welding
Heat Treatment
• Top Hat, Dual Hearth, Natural Gas Fired Furnace
• 1,200⁰C Rated, 11.4 m L x 4.4m W x 2.2m H, Max 40t loading
• Gas Fired Boogie Hearth Furnace
• 1,100⁰C Rated, 10m L x 4m W x 3m H, Max 40t loading
• Certified According to AD HP 7/1 for PWHT and Normalization
Surface Treatment and Painting
• Dedicated in-house;
• Blasting
• Passivation
• Pickling
• Painting
• Humidity and temperature controlled painting hall
• NACE Level I,II and III and SSPC Level II inspectors
• Full coat top quality finishing of the products
Quality
• On-line documentation and traceability • In-house Level I, II, III NDT personnel
SNT-TC-1A & PED 97/23, EN 473• Radiographic testing (RT)• Manual and automated ultrasonic testing (UT)• Magnetic testing (MT), Dye Penetrant Testing (PT)• Digital radiography system • Positive Material Identification (PMI)• Hydro Testing, Hardness Testing
Cimtas Lean Production Approach
Design and Plan Each Process
See Problems
Solve Problems
Share What You Learned
Lead
TEAM ORGANIZATIONQUALITY AT SOURCE
VALUE STREAM MAP
Lean Tools at Cimtas
EMPOWER PEOPLE
Modularization
• Modules• Pre-assembled Process Units (PAU)• Pre-assembled Racks (PAR)
• Process Skids• Turbine Machinery Skids• Flow Divider & Measuring Units
• Detail Design and Engineering
• Procurement and/or Prefabrication of;
• Structural Steel, Enclosure and Supports
• Piping Systems
• Manual and Automated Valves
• Electrical and Instrumentation
• Engineered Equipment
• Insulation and Heat Tracing
• Pressure Vessels
• Assembly of;• Mechanical systems • E & I Systems • Tubing • Insulation and Heat Tracing
• Complete unit Testing ;• Hydrostatic Testing• Functional Testing• Electrical Testing
• Trial Assembly• Packaging and Delivery
Scope
Products
Modularization Experience
Water Injection Module, GEFuel Gas Module, GE Liquid Fuel & Atomizing Air Unit, GE
Turbine Machinery Skids MHI
Modularization Experience
Rominserv Storage Tanks Farm Revamping Romania, EMERSON-DANIEL
PSA and Burner Control Skid, Atyrau Refinery Reconstruction, Kazakhstan, AXSIA HOWMAR
Sour Gas Sieve Skid, Tengiz Oil Field Kazakhstan, TCO
6 Modules, 613 tons, Petrobrazi Plant CCR Tower, Romania UOP
Logistics
• Procurement, material handling, storage, packing
• Crating, Bundling, Containerizing, Framing
• 21 Portal & Semi-Portal cranes up to 30 tons capacity
• 46 Overhead cranes up to 25 tons capacity
• 100 logistics staff
• 2 hrs/ 200 kms from Istanbul
• 2 kms from 4 International Deep Sea Ports
• 50,000 sqm stock area
Worldwide Deliveries Over 40 countries
for effective management of interfaces, changes, revisions, material shorts and priorities
PROJECT PORTALS
ORACLE ERP SYSTEM
Information Technology and Sharing Tools
Certificates
Cimtas Group Awards
Hitachi Ltd. Power Systems (2009)
GE Power Systems & GE Energy
Bechtel (2004)EFQM Bursa
Award (2005)
National QualitySuccess Award (2007) Bechtel (2014)
Health Safety Environment
OSHA (U.S.A.): 2.90 (2013) MESS (Turkey): 4.52 (2013)
*Best Performance: 1, 450 days 4,646,000 Mh without LTA
0,00
0,93
0,35
0,00 0,00
0,13 0,11
0,00
0,32
0,00
0,17 0,20
0,11
0,00
0,75
0,54
0,40
0,290,24
0,21
0,10 0,13 0,12 0,12 0,13 0,12
0,0
0,1
0,2
0,3
0,4
0,5
0,6
0,7
0,8
0,9
1,0
2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
Rat
e
LTA,Annual LTA,Cumulative
• Zero Accident Programme
• Corporate HSE Programme
• Risk Analysis
• Preventive Measures and Training
• Lessons Learned
• Best Practices
Business References
Business References
Business References Engineering
West Qurna-2 Oilfield, SCGT, 3 x 42 MW
Owner : Lukoil,Statoil,SOCEPC : ENKALocation : IraqCompletion : 2014Scope of works : Conceptual, Basic and Detail DesignHighligths : 140 Documents ( Lay-out, PFD, P&ID,
MR, Stress Calculations, MTO list , etc.)1084 Isometrics produced, Spooling,3D Design, PDMS Administration
KPS Powerships
Owner : Karadeniz EnergyEPC : CimtasCompletion : 2012Scope of works : Plant design, modelling, detail engineering
Procurement, Piping, Pipe Stress, Pipe Support, Air Intake and Exhaust, Ventilation Systems, Mechanical & Electrical Installation, Piping and Equipment Installation, Coating,Painting,Isolation
Highlights : 3,800 lines, 7,000 isometrics, 22,000 supports
Yajva State District Power Plant, CCPP, 411 MW
* The Best Project in the Power/Industrial categoryin 2013 Global Best Projects Competition of ENR
Owner/Customer: E.ON / ENKALocation : Perm Region/ Russian Federation Completion : 2010Scope of works:
Piping : 594 tons of BOP and boiler pipingFabrication : 3.200 tons of structural steel, LP/IP drum
& blow down tank fabrication (Cimtas Steel)Installation : 11.250 tons of steel structure, mechanical above
& underground piping installation (Cimtas Steel)
Irsching IV CCGT Power Station, 530 MW
Owner : E.ONCustomer : Siemens AG AustriaLocation : GermanyCompletion : 2010Scope of works:
Piping : 283 tons of HP, IP, Live Steam, Feed Water, Eco Drum PipingBending: Including from 88 mm to 610 mm outside diameter, from 10 mm up to 44 mm wall
thickness X10CrWMoVNb9-2 (ASME SA 335 P92), 15NiCuMoNb5-6-4 (WB36), 16Mo3, 13CrMo4-5 (P11), X10CrMoVNb9-1 (P91), X10CrWMoVNb9-2 (P92 materials)
Wilhemshaven Coal Fired Power Station, 790 MW
Owner : Electrabel SuezCustomer : Hitachi EuropeLocation : GermanyCompletion : 2010Scope of works:
Piping : 128 tons of HP, LP Carbon, Stainless, and Alloy Steel Power PipingBending: Including from 88 mm to 518 mm outside diameter, from 22 mm up to 108 mm wall
thickness X10CrWMoVNb9-2 (ASME SA 335 P92) materials
www.cimtaspipe.com