Projects and Project Plans (PPP07)
PMs Procedures and Projects Track
1 Open Internet Explorer 2 Type into the address bar wwwmaintenanceconnectioncom 3 Click Log In button 4 Enter the following
Member ID PPP_CHECKPOINT Password Checkpoint2014
Note During the seminar please do not ldquoSaverdquo while following along with a specific example unless directed to do so by your course instructor
Wireless SSID CHECKPOINT Wireless Password CHECKPOINT
Logon Instructions
Presenter Name Ange Garner
Background information
bull Role and expertise at Maintenance Connection
bull Fun Fact
Presenter Bio
Projects Defined
Project Tabs
Common Project Tasks
Project Plans Defined
Project Plan Tabs
Agenda
Projects Overview
Projects Defined
Organize groups of Work Orders and track progress together
Functionality is different than Work Order Groups
Projects Overview
Integrates with Project Plans Module
Easily create Asset group for reporting purposes
Projects Overview (contrsquod)
Details
Work Orders
Assets Locations
Attach
Schedule
Report
Projects Tabs
General Info
bull Name of project
bull Organizational attributes
bull Asset Location associated with project
Details
Schedule Info
bull Target date for completion
bull Estimated Start and End dates
bull Actual Start and End dates
bull Zone
Details (contrsquod)
Status
bull Constraints can be placed on changing status until approval
bull Status changed via Action control
bull Options include Requested Started Denied On-Hold Canceled Closed and Delete
Details (contrsquod)
Approval
bull Organization specific
bull Can require multiple levels of approval
bull Visual indicator used to identify approval state
bull Approve or Reject options
Details (contrsquod)
Budget Comments and Photo
bull Manually-entered Budget information (reference only)
bull Additional comments regarding Project
bull Upload photos for reference
Details (contrsquod)
Lists all Work Orders belonging to Project
Very similar to the Expanded Work Order Explorer
Work Orders
Icon used to represent current approval state
PM Route Order defined for Asset
Work Orders (contrsquod)
Add Remove or Create a new Work Order for Project
bull Removing will disassociate from Project
Work Orders will be automatically associated with the Project
Work Orders (contrsquod)
Auto-link Assets from Project Work Orders
List Group set of Assets together
Assets listed through Work Order association cannot be removed
Assets Locations
Selection Box Name ID and Location displayed for each Asset
Only manually added Assets have control to available to remove them
Assets Locations (contrsquod)
Documents and Notes stored on Attach tab for displayed Project
Features to add edit remove etc are similar in all modules
Attach
Calendar view of Work Orders
Work Order details and functionality same as standard Calendar
Schedule
Cost summary of Work Orders for Project
Labor materials (parts) other costs and total costs
Print export or email displayed data
Report
Change Project Status
Approve Project
View Project History (Audit Trail)
Delete Project
Common Project Tasks
Project progression involves status changes
Typical Status changes
bull Requested Started Completed Closed
bull Requested Denied or On-Hold
Change Project Status
Approvals must be setup in Access Group Rights
Level of Approval set will be displayed
Approve Project
History of important changes made to Projects
Useful for tracking information from audit trail
View Project History (Audit Trail)
Projects can be deleted permanently
Highly recommended to Deny or Cancel
Delete Project
Project Plans Overview
Sequence and Dependencies
Project Plans and PMs
Project Plans Defined
Automates generation and scheduling of associated Work Orders
Can define dependencies
Define project template for recurring Projects
Project Plans Overview
Work Orders defined by Project Plan Procedures may have defined dependencies
Project is created to manage and schedule this group of Work Orders
Project Plans Overview (contrsquod)
Manually generated or scheduled using PM Module
Can be added to PM Schedule on Procedures Tab
Project Plans Overview (contrsquod)
Sequence is the order that the Procedure is listed
Dependency is based on sequence and defined status
Sequence and Dependencies
Example of sequence and dependencies
Sequence and Dependencies (contrsquod)
Listed project results in generation of set of predefined Work Orders
Adding Project Plan functions similarly to Procedures
Project Plans and PMs
In this example a Project Plan will be created for street paving and will include the following steps
bull Set Details of Project Plan
bull Add Procedures
bull Define dependencies sequence
bull Generate Project Plan
bull Schedule Work Orders on Project Calendar
Generate Project Plan Example
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
1 Open Internet Explorer 2 Type into the address bar wwwmaintenanceconnectioncom 3 Click Log In button 4 Enter the following
Member ID PPP_CHECKPOINT Password Checkpoint2014
Note During the seminar please do not ldquoSaverdquo while following along with a specific example unless directed to do so by your course instructor
Wireless SSID CHECKPOINT Wireless Password CHECKPOINT
Logon Instructions
Presenter Name Ange Garner
Background information
bull Role and expertise at Maintenance Connection
bull Fun Fact
Presenter Bio
Projects Defined
Project Tabs
Common Project Tasks
Project Plans Defined
Project Plan Tabs
Agenda
Projects Overview
Projects Defined
Organize groups of Work Orders and track progress together
Functionality is different than Work Order Groups
Projects Overview
Integrates with Project Plans Module
Easily create Asset group for reporting purposes
Projects Overview (contrsquod)
Details
Work Orders
Assets Locations
Attach
Schedule
Report
Projects Tabs
General Info
bull Name of project
bull Organizational attributes
bull Asset Location associated with project
Details
Schedule Info
bull Target date for completion
bull Estimated Start and End dates
bull Actual Start and End dates
bull Zone
Details (contrsquod)
Status
bull Constraints can be placed on changing status until approval
bull Status changed via Action control
bull Options include Requested Started Denied On-Hold Canceled Closed and Delete
Details (contrsquod)
Approval
bull Organization specific
bull Can require multiple levels of approval
bull Visual indicator used to identify approval state
bull Approve or Reject options
Details (contrsquod)
Budget Comments and Photo
bull Manually-entered Budget information (reference only)
bull Additional comments regarding Project
bull Upload photos for reference
Details (contrsquod)
Lists all Work Orders belonging to Project
Very similar to the Expanded Work Order Explorer
Work Orders
Icon used to represent current approval state
PM Route Order defined for Asset
Work Orders (contrsquod)
Add Remove or Create a new Work Order for Project
bull Removing will disassociate from Project
Work Orders will be automatically associated with the Project
Work Orders (contrsquod)
Auto-link Assets from Project Work Orders
List Group set of Assets together
Assets listed through Work Order association cannot be removed
Assets Locations
Selection Box Name ID and Location displayed for each Asset
Only manually added Assets have control to available to remove them
Assets Locations (contrsquod)
Documents and Notes stored on Attach tab for displayed Project
Features to add edit remove etc are similar in all modules
Attach
Calendar view of Work Orders
Work Order details and functionality same as standard Calendar
Schedule
Cost summary of Work Orders for Project
Labor materials (parts) other costs and total costs
Print export or email displayed data
Report
Change Project Status
Approve Project
View Project History (Audit Trail)
Delete Project
Common Project Tasks
Project progression involves status changes
Typical Status changes
bull Requested Started Completed Closed
bull Requested Denied or On-Hold
Change Project Status
Approvals must be setup in Access Group Rights
Level of Approval set will be displayed
Approve Project
History of important changes made to Projects
Useful for tracking information from audit trail
View Project History (Audit Trail)
Projects can be deleted permanently
Highly recommended to Deny or Cancel
Delete Project
Project Plans Overview
Sequence and Dependencies
Project Plans and PMs
Project Plans Defined
Automates generation and scheduling of associated Work Orders
Can define dependencies
Define project template for recurring Projects
Project Plans Overview
Work Orders defined by Project Plan Procedures may have defined dependencies
Project is created to manage and schedule this group of Work Orders
Project Plans Overview (contrsquod)
Manually generated or scheduled using PM Module
Can be added to PM Schedule on Procedures Tab
Project Plans Overview (contrsquod)
Sequence is the order that the Procedure is listed
Dependency is based on sequence and defined status
Sequence and Dependencies
Example of sequence and dependencies
Sequence and Dependencies (contrsquod)
Listed project results in generation of set of predefined Work Orders
Adding Project Plan functions similarly to Procedures
Project Plans and PMs
In this example a Project Plan will be created for street paving and will include the following steps
bull Set Details of Project Plan
bull Add Procedures
bull Define dependencies sequence
bull Generate Project Plan
bull Schedule Work Orders on Project Calendar
Generate Project Plan Example
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Presenter Name Ange Garner
Background information
bull Role and expertise at Maintenance Connection
bull Fun Fact
Presenter Bio
Projects Defined
Project Tabs
Common Project Tasks
Project Plans Defined
Project Plan Tabs
Agenda
Projects Overview
Projects Defined
Organize groups of Work Orders and track progress together
Functionality is different than Work Order Groups
Projects Overview
Integrates with Project Plans Module
Easily create Asset group for reporting purposes
Projects Overview (contrsquod)
Details
Work Orders
Assets Locations
Attach
Schedule
Report
Projects Tabs
General Info
bull Name of project
bull Organizational attributes
bull Asset Location associated with project
Details
Schedule Info
bull Target date for completion
bull Estimated Start and End dates
bull Actual Start and End dates
bull Zone
Details (contrsquod)
Status
bull Constraints can be placed on changing status until approval
bull Status changed via Action control
bull Options include Requested Started Denied On-Hold Canceled Closed and Delete
Details (contrsquod)
Approval
bull Organization specific
bull Can require multiple levels of approval
bull Visual indicator used to identify approval state
bull Approve or Reject options
Details (contrsquod)
Budget Comments and Photo
bull Manually-entered Budget information (reference only)
bull Additional comments regarding Project
bull Upload photos for reference
Details (contrsquod)
Lists all Work Orders belonging to Project
Very similar to the Expanded Work Order Explorer
Work Orders
Icon used to represent current approval state
PM Route Order defined for Asset
Work Orders (contrsquod)
Add Remove or Create a new Work Order for Project
bull Removing will disassociate from Project
Work Orders will be automatically associated with the Project
Work Orders (contrsquod)
Auto-link Assets from Project Work Orders
List Group set of Assets together
Assets listed through Work Order association cannot be removed
Assets Locations
Selection Box Name ID and Location displayed for each Asset
Only manually added Assets have control to available to remove them
Assets Locations (contrsquod)
Documents and Notes stored on Attach tab for displayed Project
Features to add edit remove etc are similar in all modules
Attach
Calendar view of Work Orders
Work Order details and functionality same as standard Calendar
Schedule
Cost summary of Work Orders for Project
Labor materials (parts) other costs and total costs
Print export or email displayed data
Report
Change Project Status
Approve Project
View Project History (Audit Trail)
Delete Project
Common Project Tasks
Project progression involves status changes
Typical Status changes
bull Requested Started Completed Closed
bull Requested Denied or On-Hold
Change Project Status
Approvals must be setup in Access Group Rights
Level of Approval set will be displayed
Approve Project
History of important changes made to Projects
Useful for tracking information from audit trail
View Project History (Audit Trail)
Projects can be deleted permanently
Highly recommended to Deny or Cancel
Delete Project
Project Plans Overview
Sequence and Dependencies
Project Plans and PMs
Project Plans Defined
Automates generation and scheduling of associated Work Orders
Can define dependencies
Define project template for recurring Projects
Project Plans Overview
Work Orders defined by Project Plan Procedures may have defined dependencies
Project is created to manage and schedule this group of Work Orders
Project Plans Overview (contrsquod)
Manually generated or scheduled using PM Module
Can be added to PM Schedule on Procedures Tab
Project Plans Overview (contrsquod)
Sequence is the order that the Procedure is listed
Dependency is based on sequence and defined status
Sequence and Dependencies
Example of sequence and dependencies
Sequence and Dependencies (contrsquod)
Listed project results in generation of set of predefined Work Orders
Adding Project Plan functions similarly to Procedures
Project Plans and PMs
In this example a Project Plan will be created for street paving and will include the following steps
bull Set Details of Project Plan
bull Add Procedures
bull Define dependencies sequence
bull Generate Project Plan
bull Schedule Work Orders on Project Calendar
Generate Project Plan Example
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Projects Defined
Project Tabs
Common Project Tasks
Project Plans Defined
Project Plan Tabs
Agenda
Projects Overview
Projects Defined
Organize groups of Work Orders and track progress together
Functionality is different than Work Order Groups
Projects Overview
Integrates with Project Plans Module
Easily create Asset group for reporting purposes
Projects Overview (contrsquod)
Details
Work Orders
Assets Locations
Attach
Schedule
Report
Projects Tabs
General Info
bull Name of project
bull Organizational attributes
bull Asset Location associated with project
Details
Schedule Info
bull Target date for completion
bull Estimated Start and End dates
bull Actual Start and End dates
bull Zone
Details (contrsquod)
Status
bull Constraints can be placed on changing status until approval
bull Status changed via Action control
bull Options include Requested Started Denied On-Hold Canceled Closed and Delete
Details (contrsquod)
Approval
bull Organization specific
bull Can require multiple levels of approval
bull Visual indicator used to identify approval state
bull Approve or Reject options
Details (contrsquod)
Budget Comments and Photo
bull Manually-entered Budget information (reference only)
bull Additional comments regarding Project
bull Upload photos for reference
Details (contrsquod)
Lists all Work Orders belonging to Project
Very similar to the Expanded Work Order Explorer
Work Orders
Icon used to represent current approval state
PM Route Order defined for Asset
Work Orders (contrsquod)
Add Remove or Create a new Work Order for Project
bull Removing will disassociate from Project
Work Orders will be automatically associated with the Project
Work Orders (contrsquod)
Auto-link Assets from Project Work Orders
List Group set of Assets together
Assets listed through Work Order association cannot be removed
Assets Locations
Selection Box Name ID and Location displayed for each Asset
Only manually added Assets have control to available to remove them
Assets Locations (contrsquod)
Documents and Notes stored on Attach tab for displayed Project
Features to add edit remove etc are similar in all modules
Attach
Calendar view of Work Orders
Work Order details and functionality same as standard Calendar
Schedule
Cost summary of Work Orders for Project
Labor materials (parts) other costs and total costs
Print export or email displayed data
Report
Change Project Status
Approve Project
View Project History (Audit Trail)
Delete Project
Common Project Tasks
Project progression involves status changes
Typical Status changes
bull Requested Started Completed Closed
bull Requested Denied or On-Hold
Change Project Status
Approvals must be setup in Access Group Rights
Level of Approval set will be displayed
Approve Project
History of important changes made to Projects
Useful for tracking information from audit trail
View Project History (Audit Trail)
Projects can be deleted permanently
Highly recommended to Deny or Cancel
Delete Project
Project Plans Overview
Sequence and Dependencies
Project Plans and PMs
Project Plans Defined
Automates generation and scheduling of associated Work Orders
Can define dependencies
Define project template for recurring Projects
Project Plans Overview
Work Orders defined by Project Plan Procedures may have defined dependencies
Project is created to manage and schedule this group of Work Orders
Project Plans Overview (contrsquod)
Manually generated or scheduled using PM Module
Can be added to PM Schedule on Procedures Tab
Project Plans Overview (contrsquod)
Sequence is the order that the Procedure is listed
Dependency is based on sequence and defined status
Sequence and Dependencies
Example of sequence and dependencies
Sequence and Dependencies (contrsquod)
Listed project results in generation of set of predefined Work Orders
Adding Project Plan functions similarly to Procedures
Project Plans and PMs
In this example a Project Plan will be created for street paving and will include the following steps
bull Set Details of Project Plan
bull Add Procedures
bull Define dependencies sequence
bull Generate Project Plan
bull Schedule Work Orders on Project Calendar
Generate Project Plan Example
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Projects Overview
Projects Defined
Organize groups of Work Orders and track progress together
Functionality is different than Work Order Groups
Projects Overview
Integrates with Project Plans Module
Easily create Asset group for reporting purposes
Projects Overview (contrsquod)
Details
Work Orders
Assets Locations
Attach
Schedule
Report
Projects Tabs
General Info
bull Name of project
bull Organizational attributes
bull Asset Location associated with project
Details
Schedule Info
bull Target date for completion
bull Estimated Start and End dates
bull Actual Start and End dates
bull Zone
Details (contrsquod)
Status
bull Constraints can be placed on changing status until approval
bull Status changed via Action control
bull Options include Requested Started Denied On-Hold Canceled Closed and Delete
Details (contrsquod)
Approval
bull Organization specific
bull Can require multiple levels of approval
bull Visual indicator used to identify approval state
bull Approve or Reject options
Details (contrsquod)
Budget Comments and Photo
bull Manually-entered Budget information (reference only)
bull Additional comments regarding Project
bull Upload photos for reference
Details (contrsquod)
Lists all Work Orders belonging to Project
Very similar to the Expanded Work Order Explorer
Work Orders
Icon used to represent current approval state
PM Route Order defined for Asset
Work Orders (contrsquod)
Add Remove or Create a new Work Order for Project
bull Removing will disassociate from Project
Work Orders will be automatically associated with the Project
Work Orders (contrsquod)
Auto-link Assets from Project Work Orders
List Group set of Assets together
Assets listed through Work Order association cannot be removed
Assets Locations
Selection Box Name ID and Location displayed for each Asset
Only manually added Assets have control to available to remove them
Assets Locations (contrsquod)
Documents and Notes stored on Attach tab for displayed Project
Features to add edit remove etc are similar in all modules
Attach
Calendar view of Work Orders
Work Order details and functionality same as standard Calendar
Schedule
Cost summary of Work Orders for Project
Labor materials (parts) other costs and total costs
Print export or email displayed data
Report
Change Project Status
Approve Project
View Project History (Audit Trail)
Delete Project
Common Project Tasks
Project progression involves status changes
Typical Status changes
bull Requested Started Completed Closed
bull Requested Denied or On-Hold
Change Project Status
Approvals must be setup in Access Group Rights
Level of Approval set will be displayed
Approve Project
History of important changes made to Projects
Useful for tracking information from audit trail
View Project History (Audit Trail)
Projects can be deleted permanently
Highly recommended to Deny or Cancel
Delete Project
Project Plans Overview
Sequence and Dependencies
Project Plans and PMs
Project Plans Defined
Automates generation and scheduling of associated Work Orders
Can define dependencies
Define project template for recurring Projects
Project Plans Overview
Work Orders defined by Project Plan Procedures may have defined dependencies
Project is created to manage and schedule this group of Work Orders
Project Plans Overview (contrsquod)
Manually generated or scheduled using PM Module
Can be added to PM Schedule on Procedures Tab
Project Plans Overview (contrsquod)
Sequence is the order that the Procedure is listed
Dependency is based on sequence and defined status
Sequence and Dependencies
Example of sequence and dependencies
Sequence and Dependencies (contrsquod)
Listed project results in generation of set of predefined Work Orders
Adding Project Plan functions similarly to Procedures
Project Plans and PMs
In this example a Project Plan will be created for street paving and will include the following steps
bull Set Details of Project Plan
bull Add Procedures
bull Define dependencies sequence
bull Generate Project Plan
bull Schedule Work Orders on Project Calendar
Generate Project Plan Example
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Organize groups of Work Orders and track progress together
Functionality is different than Work Order Groups
Projects Overview
Integrates with Project Plans Module
Easily create Asset group for reporting purposes
Projects Overview (contrsquod)
Details
Work Orders
Assets Locations
Attach
Schedule
Report
Projects Tabs
General Info
bull Name of project
bull Organizational attributes
bull Asset Location associated with project
Details
Schedule Info
bull Target date for completion
bull Estimated Start and End dates
bull Actual Start and End dates
bull Zone
Details (contrsquod)
Status
bull Constraints can be placed on changing status until approval
bull Status changed via Action control
bull Options include Requested Started Denied On-Hold Canceled Closed and Delete
Details (contrsquod)
Approval
bull Organization specific
bull Can require multiple levels of approval
bull Visual indicator used to identify approval state
bull Approve or Reject options
Details (contrsquod)
Budget Comments and Photo
bull Manually-entered Budget information (reference only)
bull Additional comments regarding Project
bull Upload photos for reference
Details (contrsquod)
Lists all Work Orders belonging to Project
Very similar to the Expanded Work Order Explorer
Work Orders
Icon used to represent current approval state
PM Route Order defined for Asset
Work Orders (contrsquod)
Add Remove or Create a new Work Order for Project
bull Removing will disassociate from Project
Work Orders will be automatically associated with the Project
Work Orders (contrsquod)
Auto-link Assets from Project Work Orders
List Group set of Assets together
Assets listed through Work Order association cannot be removed
Assets Locations
Selection Box Name ID and Location displayed for each Asset
Only manually added Assets have control to available to remove them
Assets Locations (contrsquod)
Documents and Notes stored on Attach tab for displayed Project
Features to add edit remove etc are similar in all modules
Attach
Calendar view of Work Orders
Work Order details and functionality same as standard Calendar
Schedule
Cost summary of Work Orders for Project
Labor materials (parts) other costs and total costs
Print export or email displayed data
Report
Change Project Status
Approve Project
View Project History (Audit Trail)
Delete Project
Common Project Tasks
Project progression involves status changes
Typical Status changes
bull Requested Started Completed Closed
bull Requested Denied or On-Hold
Change Project Status
Approvals must be setup in Access Group Rights
Level of Approval set will be displayed
Approve Project
History of important changes made to Projects
Useful for tracking information from audit trail
View Project History (Audit Trail)
Projects can be deleted permanently
Highly recommended to Deny or Cancel
Delete Project
Project Plans Overview
Sequence and Dependencies
Project Plans and PMs
Project Plans Defined
Automates generation and scheduling of associated Work Orders
Can define dependencies
Define project template for recurring Projects
Project Plans Overview
Work Orders defined by Project Plan Procedures may have defined dependencies
Project is created to manage and schedule this group of Work Orders
Project Plans Overview (contrsquod)
Manually generated or scheduled using PM Module
Can be added to PM Schedule on Procedures Tab
Project Plans Overview (contrsquod)
Sequence is the order that the Procedure is listed
Dependency is based on sequence and defined status
Sequence and Dependencies
Example of sequence and dependencies
Sequence and Dependencies (contrsquod)
Listed project results in generation of set of predefined Work Orders
Adding Project Plan functions similarly to Procedures
Project Plans and PMs
In this example a Project Plan will be created for street paving and will include the following steps
bull Set Details of Project Plan
bull Add Procedures
bull Define dependencies sequence
bull Generate Project Plan
bull Schedule Work Orders on Project Calendar
Generate Project Plan Example
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Integrates with Project Plans Module
Easily create Asset group for reporting purposes
Projects Overview (contrsquod)
Details
Work Orders
Assets Locations
Attach
Schedule
Report
Projects Tabs
General Info
bull Name of project
bull Organizational attributes
bull Asset Location associated with project
Details
Schedule Info
bull Target date for completion
bull Estimated Start and End dates
bull Actual Start and End dates
bull Zone
Details (contrsquod)
Status
bull Constraints can be placed on changing status until approval
bull Status changed via Action control
bull Options include Requested Started Denied On-Hold Canceled Closed and Delete
Details (contrsquod)
Approval
bull Organization specific
bull Can require multiple levels of approval
bull Visual indicator used to identify approval state
bull Approve or Reject options
Details (contrsquod)
Budget Comments and Photo
bull Manually-entered Budget information (reference only)
bull Additional comments regarding Project
bull Upload photos for reference
Details (contrsquod)
Lists all Work Orders belonging to Project
Very similar to the Expanded Work Order Explorer
Work Orders
Icon used to represent current approval state
PM Route Order defined for Asset
Work Orders (contrsquod)
Add Remove or Create a new Work Order for Project
bull Removing will disassociate from Project
Work Orders will be automatically associated with the Project
Work Orders (contrsquod)
Auto-link Assets from Project Work Orders
List Group set of Assets together
Assets listed through Work Order association cannot be removed
Assets Locations
Selection Box Name ID and Location displayed for each Asset
Only manually added Assets have control to available to remove them
Assets Locations (contrsquod)
Documents and Notes stored on Attach tab for displayed Project
Features to add edit remove etc are similar in all modules
Attach
Calendar view of Work Orders
Work Order details and functionality same as standard Calendar
Schedule
Cost summary of Work Orders for Project
Labor materials (parts) other costs and total costs
Print export or email displayed data
Report
Change Project Status
Approve Project
View Project History (Audit Trail)
Delete Project
Common Project Tasks
Project progression involves status changes
Typical Status changes
bull Requested Started Completed Closed
bull Requested Denied or On-Hold
Change Project Status
Approvals must be setup in Access Group Rights
Level of Approval set will be displayed
Approve Project
History of important changes made to Projects
Useful for tracking information from audit trail
View Project History (Audit Trail)
Projects can be deleted permanently
Highly recommended to Deny or Cancel
Delete Project
Project Plans Overview
Sequence and Dependencies
Project Plans and PMs
Project Plans Defined
Automates generation and scheduling of associated Work Orders
Can define dependencies
Define project template for recurring Projects
Project Plans Overview
Work Orders defined by Project Plan Procedures may have defined dependencies
Project is created to manage and schedule this group of Work Orders
Project Plans Overview (contrsquod)
Manually generated or scheduled using PM Module
Can be added to PM Schedule on Procedures Tab
Project Plans Overview (contrsquod)
Sequence is the order that the Procedure is listed
Dependency is based on sequence and defined status
Sequence and Dependencies
Example of sequence and dependencies
Sequence and Dependencies (contrsquod)
Listed project results in generation of set of predefined Work Orders
Adding Project Plan functions similarly to Procedures
Project Plans and PMs
In this example a Project Plan will be created for street paving and will include the following steps
bull Set Details of Project Plan
bull Add Procedures
bull Define dependencies sequence
bull Generate Project Plan
bull Schedule Work Orders on Project Calendar
Generate Project Plan Example
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Details
Work Orders
Assets Locations
Attach
Schedule
Report
Projects Tabs
General Info
bull Name of project
bull Organizational attributes
bull Asset Location associated with project
Details
Schedule Info
bull Target date for completion
bull Estimated Start and End dates
bull Actual Start and End dates
bull Zone
Details (contrsquod)
Status
bull Constraints can be placed on changing status until approval
bull Status changed via Action control
bull Options include Requested Started Denied On-Hold Canceled Closed and Delete
Details (contrsquod)
Approval
bull Organization specific
bull Can require multiple levels of approval
bull Visual indicator used to identify approval state
bull Approve or Reject options
Details (contrsquod)
Budget Comments and Photo
bull Manually-entered Budget information (reference only)
bull Additional comments regarding Project
bull Upload photos for reference
Details (contrsquod)
Lists all Work Orders belonging to Project
Very similar to the Expanded Work Order Explorer
Work Orders
Icon used to represent current approval state
PM Route Order defined for Asset
Work Orders (contrsquod)
Add Remove or Create a new Work Order for Project
bull Removing will disassociate from Project
Work Orders will be automatically associated with the Project
Work Orders (contrsquod)
Auto-link Assets from Project Work Orders
List Group set of Assets together
Assets listed through Work Order association cannot be removed
Assets Locations
Selection Box Name ID and Location displayed for each Asset
Only manually added Assets have control to available to remove them
Assets Locations (contrsquod)
Documents and Notes stored on Attach tab for displayed Project
Features to add edit remove etc are similar in all modules
Attach
Calendar view of Work Orders
Work Order details and functionality same as standard Calendar
Schedule
Cost summary of Work Orders for Project
Labor materials (parts) other costs and total costs
Print export or email displayed data
Report
Change Project Status
Approve Project
View Project History (Audit Trail)
Delete Project
Common Project Tasks
Project progression involves status changes
Typical Status changes
bull Requested Started Completed Closed
bull Requested Denied or On-Hold
Change Project Status
Approvals must be setup in Access Group Rights
Level of Approval set will be displayed
Approve Project
History of important changes made to Projects
Useful for tracking information from audit trail
View Project History (Audit Trail)
Projects can be deleted permanently
Highly recommended to Deny or Cancel
Delete Project
Project Plans Overview
Sequence and Dependencies
Project Plans and PMs
Project Plans Defined
Automates generation and scheduling of associated Work Orders
Can define dependencies
Define project template for recurring Projects
Project Plans Overview
Work Orders defined by Project Plan Procedures may have defined dependencies
Project is created to manage and schedule this group of Work Orders
Project Plans Overview (contrsquod)
Manually generated or scheduled using PM Module
Can be added to PM Schedule on Procedures Tab
Project Plans Overview (contrsquod)
Sequence is the order that the Procedure is listed
Dependency is based on sequence and defined status
Sequence and Dependencies
Example of sequence and dependencies
Sequence and Dependencies (contrsquod)
Listed project results in generation of set of predefined Work Orders
Adding Project Plan functions similarly to Procedures
Project Plans and PMs
In this example a Project Plan will be created for street paving and will include the following steps
bull Set Details of Project Plan
bull Add Procedures
bull Define dependencies sequence
bull Generate Project Plan
bull Schedule Work Orders on Project Calendar
Generate Project Plan Example
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
General Info
bull Name of project
bull Organizational attributes
bull Asset Location associated with project
Details
Schedule Info
bull Target date for completion
bull Estimated Start and End dates
bull Actual Start and End dates
bull Zone
Details (contrsquod)
Status
bull Constraints can be placed on changing status until approval
bull Status changed via Action control
bull Options include Requested Started Denied On-Hold Canceled Closed and Delete
Details (contrsquod)
Approval
bull Organization specific
bull Can require multiple levels of approval
bull Visual indicator used to identify approval state
bull Approve or Reject options
Details (contrsquod)
Budget Comments and Photo
bull Manually-entered Budget information (reference only)
bull Additional comments regarding Project
bull Upload photos for reference
Details (contrsquod)
Lists all Work Orders belonging to Project
Very similar to the Expanded Work Order Explorer
Work Orders
Icon used to represent current approval state
PM Route Order defined for Asset
Work Orders (contrsquod)
Add Remove or Create a new Work Order for Project
bull Removing will disassociate from Project
Work Orders will be automatically associated with the Project
Work Orders (contrsquod)
Auto-link Assets from Project Work Orders
List Group set of Assets together
Assets listed through Work Order association cannot be removed
Assets Locations
Selection Box Name ID and Location displayed for each Asset
Only manually added Assets have control to available to remove them
Assets Locations (contrsquod)
Documents and Notes stored on Attach tab for displayed Project
Features to add edit remove etc are similar in all modules
Attach
Calendar view of Work Orders
Work Order details and functionality same as standard Calendar
Schedule
Cost summary of Work Orders for Project
Labor materials (parts) other costs and total costs
Print export or email displayed data
Report
Change Project Status
Approve Project
View Project History (Audit Trail)
Delete Project
Common Project Tasks
Project progression involves status changes
Typical Status changes
bull Requested Started Completed Closed
bull Requested Denied or On-Hold
Change Project Status
Approvals must be setup in Access Group Rights
Level of Approval set will be displayed
Approve Project
History of important changes made to Projects
Useful for tracking information from audit trail
View Project History (Audit Trail)
Projects can be deleted permanently
Highly recommended to Deny or Cancel
Delete Project
Project Plans Overview
Sequence and Dependencies
Project Plans and PMs
Project Plans Defined
Automates generation and scheduling of associated Work Orders
Can define dependencies
Define project template for recurring Projects
Project Plans Overview
Work Orders defined by Project Plan Procedures may have defined dependencies
Project is created to manage and schedule this group of Work Orders
Project Plans Overview (contrsquod)
Manually generated or scheduled using PM Module
Can be added to PM Schedule on Procedures Tab
Project Plans Overview (contrsquod)
Sequence is the order that the Procedure is listed
Dependency is based on sequence and defined status
Sequence and Dependencies
Example of sequence and dependencies
Sequence and Dependencies (contrsquod)
Listed project results in generation of set of predefined Work Orders
Adding Project Plan functions similarly to Procedures
Project Plans and PMs
In this example a Project Plan will be created for street paving and will include the following steps
bull Set Details of Project Plan
bull Add Procedures
bull Define dependencies sequence
bull Generate Project Plan
bull Schedule Work Orders on Project Calendar
Generate Project Plan Example
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Schedule Info
bull Target date for completion
bull Estimated Start and End dates
bull Actual Start and End dates
bull Zone
Details (contrsquod)
Status
bull Constraints can be placed on changing status until approval
bull Status changed via Action control
bull Options include Requested Started Denied On-Hold Canceled Closed and Delete
Details (contrsquod)
Approval
bull Organization specific
bull Can require multiple levels of approval
bull Visual indicator used to identify approval state
bull Approve or Reject options
Details (contrsquod)
Budget Comments and Photo
bull Manually-entered Budget information (reference only)
bull Additional comments regarding Project
bull Upload photos for reference
Details (contrsquod)
Lists all Work Orders belonging to Project
Very similar to the Expanded Work Order Explorer
Work Orders
Icon used to represent current approval state
PM Route Order defined for Asset
Work Orders (contrsquod)
Add Remove or Create a new Work Order for Project
bull Removing will disassociate from Project
Work Orders will be automatically associated with the Project
Work Orders (contrsquod)
Auto-link Assets from Project Work Orders
List Group set of Assets together
Assets listed through Work Order association cannot be removed
Assets Locations
Selection Box Name ID and Location displayed for each Asset
Only manually added Assets have control to available to remove them
Assets Locations (contrsquod)
Documents and Notes stored on Attach tab for displayed Project
Features to add edit remove etc are similar in all modules
Attach
Calendar view of Work Orders
Work Order details and functionality same as standard Calendar
Schedule
Cost summary of Work Orders for Project
Labor materials (parts) other costs and total costs
Print export or email displayed data
Report
Change Project Status
Approve Project
View Project History (Audit Trail)
Delete Project
Common Project Tasks
Project progression involves status changes
Typical Status changes
bull Requested Started Completed Closed
bull Requested Denied or On-Hold
Change Project Status
Approvals must be setup in Access Group Rights
Level of Approval set will be displayed
Approve Project
History of important changes made to Projects
Useful for tracking information from audit trail
View Project History (Audit Trail)
Projects can be deleted permanently
Highly recommended to Deny or Cancel
Delete Project
Project Plans Overview
Sequence and Dependencies
Project Plans and PMs
Project Plans Defined
Automates generation and scheduling of associated Work Orders
Can define dependencies
Define project template for recurring Projects
Project Plans Overview
Work Orders defined by Project Plan Procedures may have defined dependencies
Project is created to manage and schedule this group of Work Orders
Project Plans Overview (contrsquod)
Manually generated or scheduled using PM Module
Can be added to PM Schedule on Procedures Tab
Project Plans Overview (contrsquod)
Sequence is the order that the Procedure is listed
Dependency is based on sequence and defined status
Sequence and Dependencies
Example of sequence and dependencies
Sequence and Dependencies (contrsquod)
Listed project results in generation of set of predefined Work Orders
Adding Project Plan functions similarly to Procedures
Project Plans and PMs
In this example a Project Plan will be created for street paving and will include the following steps
bull Set Details of Project Plan
bull Add Procedures
bull Define dependencies sequence
bull Generate Project Plan
bull Schedule Work Orders on Project Calendar
Generate Project Plan Example
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Status
bull Constraints can be placed on changing status until approval
bull Status changed via Action control
bull Options include Requested Started Denied On-Hold Canceled Closed and Delete
Details (contrsquod)
Approval
bull Organization specific
bull Can require multiple levels of approval
bull Visual indicator used to identify approval state
bull Approve or Reject options
Details (contrsquod)
Budget Comments and Photo
bull Manually-entered Budget information (reference only)
bull Additional comments regarding Project
bull Upload photos for reference
Details (contrsquod)
Lists all Work Orders belonging to Project
Very similar to the Expanded Work Order Explorer
Work Orders
Icon used to represent current approval state
PM Route Order defined for Asset
Work Orders (contrsquod)
Add Remove or Create a new Work Order for Project
bull Removing will disassociate from Project
Work Orders will be automatically associated with the Project
Work Orders (contrsquod)
Auto-link Assets from Project Work Orders
List Group set of Assets together
Assets listed through Work Order association cannot be removed
Assets Locations
Selection Box Name ID and Location displayed for each Asset
Only manually added Assets have control to available to remove them
Assets Locations (contrsquod)
Documents and Notes stored on Attach tab for displayed Project
Features to add edit remove etc are similar in all modules
Attach
Calendar view of Work Orders
Work Order details and functionality same as standard Calendar
Schedule
Cost summary of Work Orders for Project
Labor materials (parts) other costs and total costs
Print export or email displayed data
Report
Change Project Status
Approve Project
View Project History (Audit Trail)
Delete Project
Common Project Tasks
Project progression involves status changes
Typical Status changes
bull Requested Started Completed Closed
bull Requested Denied or On-Hold
Change Project Status
Approvals must be setup in Access Group Rights
Level of Approval set will be displayed
Approve Project
History of important changes made to Projects
Useful for tracking information from audit trail
View Project History (Audit Trail)
Projects can be deleted permanently
Highly recommended to Deny or Cancel
Delete Project
Project Plans Overview
Sequence and Dependencies
Project Plans and PMs
Project Plans Defined
Automates generation and scheduling of associated Work Orders
Can define dependencies
Define project template for recurring Projects
Project Plans Overview
Work Orders defined by Project Plan Procedures may have defined dependencies
Project is created to manage and schedule this group of Work Orders
Project Plans Overview (contrsquod)
Manually generated or scheduled using PM Module
Can be added to PM Schedule on Procedures Tab
Project Plans Overview (contrsquod)
Sequence is the order that the Procedure is listed
Dependency is based on sequence and defined status
Sequence and Dependencies
Example of sequence and dependencies
Sequence and Dependencies (contrsquod)
Listed project results in generation of set of predefined Work Orders
Adding Project Plan functions similarly to Procedures
Project Plans and PMs
In this example a Project Plan will be created for street paving and will include the following steps
bull Set Details of Project Plan
bull Add Procedures
bull Define dependencies sequence
bull Generate Project Plan
bull Schedule Work Orders on Project Calendar
Generate Project Plan Example
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Approval
bull Organization specific
bull Can require multiple levels of approval
bull Visual indicator used to identify approval state
bull Approve or Reject options
Details (contrsquod)
Budget Comments and Photo
bull Manually-entered Budget information (reference only)
bull Additional comments regarding Project
bull Upload photos for reference
Details (contrsquod)
Lists all Work Orders belonging to Project
Very similar to the Expanded Work Order Explorer
Work Orders
Icon used to represent current approval state
PM Route Order defined for Asset
Work Orders (contrsquod)
Add Remove or Create a new Work Order for Project
bull Removing will disassociate from Project
Work Orders will be automatically associated with the Project
Work Orders (contrsquod)
Auto-link Assets from Project Work Orders
List Group set of Assets together
Assets listed through Work Order association cannot be removed
Assets Locations
Selection Box Name ID and Location displayed for each Asset
Only manually added Assets have control to available to remove them
Assets Locations (contrsquod)
Documents and Notes stored on Attach tab for displayed Project
Features to add edit remove etc are similar in all modules
Attach
Calendar view of Work Orders
Work Order details and functionality same as standard Calendar
Schedule
Cost summary of Work Orders for Project
Labor materials (parts) other costs and total costs
Print export or email displayed data
Report
Change Project Status
Approve Project
View Project History (Audit Trail)
Delete Project
Common Project Tasks
Project progression involves status changes
Typical Status changes
bull Requested Started Completed Closed
bull Requested Denied or On-Hold
Change Project Status
Approvals must be setup in Access Group Rights
Level of Approval set will be displayed
Approve Project
History of important changes made to Projects
Useful for tracking information from audit trail
View Project History (Audit Trail)
Projects can be deleted permanently
Highly recommended to Deny or Cancel
Delete Project
Project Plans Overview
Sequence and Dependencies
Project Plans and PMs
Project Plans Defined
Automates generation and scheduling of associated Work Orders
Can define dependencies
Define project template for recurring Projects
Project Plans Overview
Work Orders defined by Project Plan Procedures may have defined dependencies
Project is created to manage and schedule this group of Work Orders
Project Plans Overview (contrsquod)
Manually generated or scheduled using PM Module
Can be added to PM Schedule on Procedures Tab
Project Plans Overview (contrsquod)
Sequence is the order that the Procedure is listed
Dependency is based on sequence and defined status
Sequence and Dependencies
Example of sequence and dependencies
Sequence and Dependencies (contrsquod)
Listed project results in generation of set of predefined Work Orders
Adding Project Plan functions similarly to Procedures
Project Plans and PMs
In this example a Project Plan will be created for street paving and will include the following steps
bull Set Details of Project Plan
bull Add Procedures
bull Define dependencies sequence
bull Generate Project Plan
bull Schedule Work Orders on Project Calendar
Generate Project Plan Example
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Budget Comments and Photo
bull Manually-entered Budget information (reference only)
bull Additional comments regarding Project
bull Upload photos for reference
Details (contrsquod)
Lists all Work Orders belonging to Project
Very similar to the Expanded Work Order Explorer
Work Orders
Icon used to represent current approval state
PM Route Order defined for Asset
Work Orders (contrsquod)
Add Remove or Create a new Work Order for Project
bull Removing will disassociate from Project
Work Orders will be automatically associated with the Project
Work Orders (contrsquod)
Auto-link Assets from Project Work Orders
List Group set of Assets together
Assets listed through Work Order association cannot be removed
Assets Locations
Selection Box Name ID and Location displayed for each Asset
Only manually added Assets have control to available to remove them
Assets Locations (contrsquod)
Documents and Notes stored on Attach tab for displayed Project
Features to add edit remove etc are similar in all modules
Attach
Calendar view of Work Orders
Work Order details and functionality same as standard Calendar
Schedule
Cost summary of Work Orders for Project
Labor materials (parts) other costs and total costs
Print export or email displayed data
Report
Change Project Status
Approve Project
View Project History (Audit Trail)
Delete Project
Common Project Tasks
Project progression involves status changes
Typical Status changes
bull Requested Started Completed Closed
bull Requested Denied or On-Hold
Change Project Status
Approvals must be setup in Access Group Rights
Level of Approval set will be displayed
Approve Project
History of important changes made to Projects
Useful for tracking information from audit trail
View Project History (Audit Trail)
Projects can be deleted permanently
Highly recommended to Deny or Cancel
Delete Project
Project Plans Overview
Sequence and Dependencies
Project Plans and PMs
Project Plans Defined
Automates generation and scheduling of associated Work Orders
Can define dependencies
Define project template for recurring Projects
Project Plans Overview
Work Orders defined by Project Plan Procedures may have defined dependencies
Project is created to manage and schedule this group of Work Orders
Project Plans Overview (contrsquod)
Manually generated or scheduled using PM Module
Can be added to PM Schedule on Procedures Tab
Project Plans Overview (contrsquod)
Sequence is the order that the Procedure is listed
Dependency is based on sequence and defined status
Sequence and Dependencies
Example of sequence and dependencies
Sequence and Dependencies (contrsquod)
Listed project results in generation of set of predefined Work Orders
Adding Project Plan functions similarly to Procedures
Project Plans and PMs
In this example a Project Plan will be created for street paving and will include the following steps
bull Set Details of Project Plan
bull Add Procedures
bull Define dependencies sequence
bull Generate Project Plan
bull Schedule Work Orders on Project Calendar
Generate Project Plan Example
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Lists all Work Orders belonging to Project
Very similar to the Expanded Work Order Explorer
Work Orders
Icon used to represent current approval state
PM Route Order defined for Asset
Work Orders (contrsquod)
Add Remove or Create a new Work Order for Project
bull Removing will disassociate from Project
Work Orders will be automatically associated with the Project
Work Orders (contrsquod)
Auto-link Assets from Project Work Orders
List Group set of Assets together
Assets listed through Work Order association cannot be removed
Assets Locations
Selection Box Name ID and Location displayed for each Asset
Only manually added Assets have control to available to remove them
Assets Locations (contrsquod)
Documents and Notes stored on Attach tab for displayed Project
Features to add edit remove etc are similar in all modules
Attach
Calendar view of Work Orders
Work Order details and functionality same as standard Calendar
Schedule
Cost summary of Work Orders for Project
Labor materials (parts) other costs and total costs
Print export or email displayed data
Report
Change Project Status
Approve Project
View Project History (Audit Trail)
Delete Project
Common Project Tasks
Project progression involves status changes
Typical Status changes
bull Requested Started Completed Closed
bull Requested Denied or On-Hold
Change Project Status
Approvals must be setup in Access Group Rights
Level of Approval set will be displayed
Approve Project
History of important changes made to Projects
Useful for tracking information from audit trail
View Project History (Audit Trail)
Projects can be deleted permanently
Highly recommended to Deny or Cancel
Delete Project
Project Plans Overview
Sequence and Dependencies
Project Plans and PMs
Project Plans Defined
Automates generation and scheduling of associated Work Orders
Can define dependencies
Define project template for recurring Projects
Project Plans Overview
Work Orders defined by Project Plan Procedures may have defined dependencies
Project is created to manage and schedule this group of Work Orders
Project Plans Overview (contrsquod)
Manually generated or scheduled using PM Module
Can be added to PM Schedule on Procedures Tab
Project Plans Overview (contrsquod)
Sequence is the order that the Procedure is listed
Dependency is based on sequence and defined status
Sequence and Dependencies
Example of sequence and dependencies
Sequence and Dependencies (contrsquod)
Listed project results in generation of set of predefined Work Orders
Adding Project Plan functions similarly to Procedures
Project Plans and PMs
In this example a Project Plan will be created for street paving and will include the following steps
bull Set Details of Project Plan
bull Add Procedures
bull Define dependencies sequence
bull Generate Project Plan
bull Schedule Work Orders on Project Calendar
Generate Project Plan Example
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Icon used to represent current approval state
PM Route Order defined for Asset
Work Orders (contrsquod)
Add Remove or Create a new Work Order for Project
bull Removing will disassociate from Project
Work Orders will be automatically associated with the Project
Work Orders (contrsquod)
Auto-link Assets from Project Work Orders
List Group set of Assets together
Assets listed through Work Order association cannot be removed
Assets Locations
Selection Box Name ID and Location displayed for each Asset
Only manually added Assets have control to available to remove them
Assets Locations (contrsquod)
Documents and Notes stored on Attach tab for displayed Project
Features to add edit remove etc are similar in all modules
Attach
Calendar view of Work Orders
Work Order details and functionality same as standard Calendar
Schedule
Cost summary of Work Orders for Project
Labor materials (parts) other costs and total costs
Print export or email displayed data
Report
Change Project Status
Approve Project
View Project History (Audit Trail)
Delete Project
Common Project Tasks
Project progression involves status changes
Typical Status changes
bull Requested Started Completed Closed
bull Requested Denied or On-Hold
Change Project Status
Approvals must be setup in Access Group Rights
Level of Approval set will be displayed
Approve Project
History of important changes made to Projects
Useful for tracking information from audit trail
View Project History (Audit Trail)
Projects can be deleted permanently
Highly recommended to Deny or Cancel
Delete Project
Project Plans Overview
Sequence and Dependencies
Project Plans and PMs
Project Plans Defined
Automates generation and scheduling of associated Work Orders
Can define dependencies
Define project template for recurring Projects
Project Plans Overview
Work Orders defined by Project Plan Procedures may have defined dependencies
Project is created to manage and schedule this group of Work Orders
Project Plans Overview (contrsquod)
Manually generated or scheduled using PM Module
Can be added to PM Schedule on Procedures Tab
Project Plans Overview (contrsquod)
Sequence is the order that the Procedure is listed
Dependency is based on sequence and defined status
Sequence and Dependencies
Example of sequence and dependencies
Sequence and Dependencies (contrsquod)
Listed project results in generation of set of predefined Work Orders
Adding Project Plan functions similarly to Procedures
Project Plans and PMs
In this example a Project Plan will be created for street paving and will include the following steps
bull Set Details of Project Plan
bull Add Procedures
bull Define dependencies sequence
bull Generate Project Plan
bull Schedule Work Orders on Project Calendar
Generate Project Plan Example
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Add Remove or Create a new Work Order for Project
bull Removing will disassociate from Project
Work Orders will be automatically associated with the Project
Work Orders (contrsquod)
Auto-link Assets from Project Work Orders
List Group set of Assets together
Assets listed through Work Order association cannot be removed
Assets Locations
Selection Box Name ID and Location displayed for each Asset
Only manually added Assets have control to available to remove them
Assets Locations (contrsquod)
Documents and Notes stored on Attach tab for displayed Project
Features to add edit remove etc are similar in all modules
Attach
Calendar view of Work Orders
Work Order details and functionality same as standard Calendar
Schedule
Cost summary of Work Orders for Project
Labor materials (parts) other costs and total costs
Print export or email displayed data
Report
Change Project Status
Approve Project
View Project History (Audit Trail)
Delete Project
Common Project Tasks
Project progression involves status changes
Typical Status changes
bull Requested Started Completed Closed
bull Requested Denied or On-Hold
Change Project Status
Approvals must be setup in Access Group Rights
Level of Approval set will be displayed
Approve Project
History of important changes made to Projects
Useful for tracking information from audit trail
View Project History (Audit Trail)
Projects can be deleted permanently
Highly recommended to Deny or Cancel
Delete Project
Project Plans Overview
Sequence and Dependencies
Project Plans and PMs
Project Plans Defined
Automates generation and scheduling of associated Work Orders
Can define dependencies
Define project template for recurring Projects
Project Plans Overview
Work Orders defined by Project Plan Procedures may have defined dependencies
Project is created to manage and schedule this group of Work Orders
Project Plans Overview (contrsquod)
Manually generated or scheduled using PM Module
Can be added to PM Schedule on Procedures Tab
Project Plans Overview (contrsquod)
Sequence is the order that the Procedure is listed
Dependency is based on sequence and defined status
Sequence and Dependencies
Example of sequence and dependencies
Sequence and Dependencies (contrsquod)
Listed project results in generation of set of predefined Work Orders
Adding Project Plan functions similarly to Procedures
Project Plans and PMs
In this example a Project Plan will be created for street paving and will include the following steps
bull Set Details of Project Plan
bull Add Procedures
bull Define dependencies sequence
bull Generate Project Plan
bull Schedule Work Orders on Project Calendar
Generate Project Plan Example
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Auto-link Assets from Project Work Orders
List Group set of Assets together
Assets listed through Work Order association cannot be removed
Assets Locations
Selection Box Name ID and Location displayed for each Asset
Only manually added Assets have control to available to remove them
Assets Locations (contrsquod)
Documents and Notes stored on Attach tab for displayed Project
Features to add edit remove etc are similar in all modules
Attach
Calendar view of Work Orders
Work Order details and functionality same as standard Calendar
Schedule
Cost summary of Work Orders for Project
Labor materials (parts) other costs and total costs
Print export or email displayed data
Report
Change Project Status
Approve Project
View Project History (Audit Trail)
Delete Project
Common Project Tasks
Project progression involves status changes
Typical Status changes
bull Requested Started Completed Closed
bull Requested Denied or On-Hold
Change Project Status
Approvals must be setup in Access Group Rights
Level of Approval set will be displayed
Approve Project
History of important changes made to Projects
Useful for tracking information from audit trail
View Project History (Audit Trail)
Projects can be deleted permanently
Highly recommended to Deny or Cancel
Delete Project
Project Plans Overview
Sequence and Dependencies
Project Plans and PMs
Project Plans Defined
Automates generation and scheduling of associated Work Orders
Can define dependencies
Define project template for recurring Projects
Project Plans Overview
Work Orders defined by Project Plan Procedures may have defined dependencies
Project is created to manage and schedule this group of Work Orders
Project Plans Overview (contrsquod)
Manually generated or scheduled using PM Module
Can be added to PM Schedule on Procedures Tab
Project Plans Overview (contrsquod)
Sequence is the order that the Procedure is listed
Dependency is based on sequence and defined status
Sequence and Dependencies
Example of sequence and dependencies
Sequence and Dependencies (contrsquod)
Listed project results in generation of set of predefined Work Orders
Adding Project Plan functions similarly to Procedures
Project Plans and PMs
In this example a Project Plan will be created for street paving and will include the following steps
bull Set Details of Project Plan
bull Add Procedures
bull Define dependencies sequence
bull Generate Project Plan
bull Schedule Work Orders on Project Calendar
Generate Project Plan Example
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Selection Box Name ID and Location displayed for each Asset
Only manually added Assets have control to available to remove them
Assets Locations (contrsquod)
Documents and Notes stored on Attach tab for displayed Project
Features to add edit remove etc are similar in all modules
Attach
Calendar view of Work Orders
Work Order details and functionality same as standard Calendar
Schedule
Cost summary of Work Orders for Project
Labor materials (parts) other costs and total costs
Print export or email displayed data
Report
Change Project Status
Approve Project
View Project History (Audit Trail)
Delete Project
Common Project Tasks
Project progression involves status changes
Typical Status changes
bull Requested Started Completed Closed
bull Requested Denied or On-Hold
Change Project Status
Approvals must be setup in Access Group Rights
Level of Approval set will be displayed
Approve Project
History of important changes made to Projects
Useful for tracking information from audit trail
View Project History (Audit Trail)
Projects can be deleted permanently
Highly recommended to Deny or Cancel
Delete Project
Project Plans Overview
Sequence and Dependencies
Project Plans and PMs
Project Plans Defined
Automates generation and scheduling of associated Work Orders
Can define dependencies
Define project template for recurring Projects
Project Plans Overview
Work Orders defined by Project Plan Procedures may have defined dependencies
Project is created to manage and schedule this group of Work Orders
Project Plans Overview (contrsquod)
Manually generated or scheduled using PM Module
Can be added to PM Schedule on Procedures Tab
Project Plans Overview (contrsquod)
Sequence is the order that the Procedure is listed
Dependency is based on sequence and defined status
Sequence and Dependencies
Example of sequence and dependencies
Sequence and Dependencies (contrsquod)
Listed project results in generation of set of predefined Work Orders
Adding Project Plan functions similarly to Procedures
Project Plans and PMs
In this example a Project Plan will be created for street paving and will include the following steps
bull Set Details of Project Plan
bull Add Procedures
bull Define dependencies sequence
bull Generate Project Plan
bull Schedule Work Orders on Project Calendar
Generate Project Plan Example
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Documents and Notes stored on Attach tab for displayed Project
Features to add edit remove etc are similar in all modules
Attach
Calendar view of Work Orders
Work Order details and functionality same as standard Calendar
Schedule
Cost summary of Work Orders for Project
Labor materials (parts) other costs and total costs
Print export or email displayed data
Report
Change Project Status
Approve Project
View Project History (Audit Trail)
Delete Project
Common Project Tasks
Project progression involves status changes
Typical Status changes
bull Requested Started Completed Closed
bull Requested Denied or On-Hold
Change Project Status
Approvals must be setup in Access Group Rights
Level of Approval set will be displayed
Approve Project
History of important changes made to Projects
Useful for tracking information from audit trail
View Project History (Audit Trail)
Projects can be deleted permanently
Highly recommended to Deny or Cancel
Delete Project
Project Plans Overview
Sequence and Dependencies
Project Plans and PMs
Project Plans Defined
Automates generation and scheduling of associated Work Orders
Can define dependencies
Define project template for recurring Projects
Project Plans Overview
Work Orders defined by Project Plan Procedures may have defined dependencies
Project is created to manage and schedule this group of Work Orders
Project Plans Overview (contrsquod)
Manually generated or scheduled using PM Module
Can be added to PM Schedule on Procedures Tab
Project Plans Overview (contrsquod)
Sequence is the order that the Procedure is listed
Dependency is based on sequence and defined status
Sequence and Dependencies
Example of sequence and dependencies
Sequence and Dependencies (contrsquod)
Listed project results in generation of set of predefined Work Orders
Adding Project Plan functions similarly to Procedures
Project Plans and PMs
In this example a Project Plan will be created for street paving and will include the following steps
bull Set Details of Project Plan
bull Add Procedures
bull Define dependencies sequence
bull Generate Project Plan
bull Schedule Work Orders on Project Calendar
Generate Project Plan Example
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Calendar view of Work Orders
Work Order details and functionality same as standard Calendar
Schedule
Cost summary of Work Orders for Project
Labor materials (parts) other costs and total costs
Print export or email displayed data
Report
Change Project Status
Approve Project
View Project History (Audit Trail)
Delete Project
Common Project Tasks
Project progression involves status changes
Typical Status changes
bull Requested Started Completed Closed
bull Requested Denied or On-Hold
Change Project Status
Approvals must be setup in Access Group Rights
Level of Approval set will be displayed
Approve Project
History of important changes made to Projects
Useful for tracking information from audit trail
View Project History (Audit Trail)
Projects can be deleted permanently
Highly recommended to Deny or Cancel
Delete Project
Project Plans Overview
Sequence and Dependencies
Project Plans and PMs
Project Plans Defined
Automates generation and scheduling of associated Work Orders
Can define dependencies
Define project template for recurring Projects
Project Plans Overview
Work Orders defined by Project Plan Procedures may have defined dependencies
Project is created to manage and schedule this group of Work Orders
Project Plans Overview (contrsquod)
Manually generated or scheduled using PM Module
Can be added to PM Schedule on Procedures Tab
Project Plans Overview (contrsquod)
Sequence is the order that the Procedure is listed
Dependency is based on sequence and defined status
Sequence and Dependencies
Example of sequence and dependencies
Sequence and Dependencies (contrsquod)
Listed project results in generation of set of predefined Work Orders
Adding Project Plan functions similarly to Procedures
Project Plans and PMs
In this example a Project Plan will be created for street paving and will include the following steps
bull Set Details of Project Plan
bull Add Procedures
bull Define dependencies sequence
bull Generate Project Plan
bull Schedule Work Orders on Project Calendar
Generate Project Plan Example
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Cost summary of Work Orders for Project
Labor materials (parts) other costs and total costs
Print export or email displayed data
Report
Change Project Status
Approve Project
View Project History (Audit Trail)
Delete Project
Common Project Tasks
Project progression involves status changes
Typical Status changes
bull Requested Started Completed Closed
bull Requested Denied or On-Hold
Change Project Status
Approvals must be setup in Access Group Rights
Level of Approval set will be displayed
Approve Project
History of important changes made to Projects
Useful for tracking information from audit trail
View Project History (Audit Trail)
Projects can be deleted permanently
Highly recommended to Deny or Cancel
Delete Project
Project Plans Overview
Sequence and Dependencies
Project Plans and PMs
Project Plans Defined
Automates generation and scheduling of associated Work Orders
Can define dependencies
Define project template for recurring Projects
Project Plans Overview
Work Orders defined by Project Plan Procedures may have defined dependencies
Project is created to manage and schedule this group of Work Orders
Project Plans Overview (contrsquod)
Manually generated or scheduled using PM Module
Can be added to PM Schedule on Procedures Tab
Project Plans Overview (contrsquod)
Sequence is the order that the Procedure is listed
Dependency is based on sequence and defined status
Sequence and Dependencies
Example of sequence and dependencies
Sequence and Dependencies (contrsquod)
Listed project results in generation of set of predefined Work Orders
Adding Project Plan functions similarly to Procedures
Project Plans and PMs
In this example a Project Plan will be created for street paving and will include the following steps
bull Set Details of Project Plan
bull Add Procedures
bull Define dependencies sequence
bull Generate Project Plan
bull Schedule Work Orders on Project Calendar
Generate Project Plan Example
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Change Project Status
Approve Project
View Project History (Audit Trail)
Delete Project
Common Project Tasks
Project progression involves status changes
Typical Status changes
bull Requested Started Completed Closed
bull Requested Denied or On-Hold
Change Project Status
Approvals must be setup in Access Group Rights
Level of Approval set will be displayed
Approve Project
History of important changes made to Projects
Useful for tracking information from audit trail
View Project History (Audit Trail)
Projects can be deleted permanently
Highly recommended to Deny or Cancel
Delete Project
Project Plans Overview
Sequence and Dependencies
Project Plans and PMs
Project Plans Defined
Automates generation and scheduling of associated Work Orders
Can define dependencies
Define project template for recurring Projects
Project Plans Overview
Work Orders defined by Project Plan Procedures may have defined dependencies
Project is created to manage and schedule this group of Work Orders
Project Plans Overview (contrsquod)
Manually generated or scheduled using PM Module
Can be added to PM Schedule on Procedures Tab
Project Plans Overview (contrsquod)
Sequence is the order that the Procedure is listed
Dependency is based on sequence and defined status
Sequence and Dependencies
Example of sequence and dependencies
Sequence and Dependencies (contrsquod)
Listed project results in generation of set of predefined Work Orders
Adding Project Plan functions similarly to Procedures
Project Plans and PMs
In this example a Project Plan will be created for street paving and will include the following steps
bull Set Details of Project Plan
bull Add Procedures
bull Define dependencies sequence
bull Generate Project Plan
bull Schedule Work Orders on Project Calendar
Generate Project Plan Example
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Project progression involves status changes
Typical Status changes
bull Requested Started Completed Closed
bull Requested Denied or On-Hold
Change Project Status
Approvals must be setup in Access Group Rights
Level of Approval set will be displayed
Approve Project
History of important changes made to Projects
Useful for tracking information from audit trail
View Project History (Audit Trail)
Projects can be deleted permanently
Highly recommended to Deny or Cancel
Delete Project
Project Plans Overview
Sequence and Dependencies
Project Plans and PMs
Project Plans Defined
Automates generation and scheduling of associated Work Orders
Can define dependencies
Define project template for recurring Projects
Project Plans Overview
Work Orders defined by Project Plan Procedures may have defined dependencies
Project is created to manage and schedule this group of Work Orders
Project Plans Overview (contrsquod)
Manually generated or scheduled using PM Module
Can be added to PM Schedule on Procedures Tab
Project Plans Overview (contrsquod)
Sequence is the order that the Procedure is listed
Dependency is based on sequence and defined status
Sequence and Dependencies
Example of sequence and dependencies
Sequence and Dependencies (contrsquod)
Listed project results in generation of set of predefined Work Orders
Adding Project Plan functions similarly to Procedures
Project Plans and PMs
In this example a Project Plan will be created for street paving and will include the following steps
bull Set Details of Project Plan
bull Add Procedures
bull Define dependencies sequence
bull Generate Project Plan
bull Schedule Work Orders on Project Calendar
Generate Project Plan Example
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Approvals must be setup in Access Group Rights
Level of Approval set will be displayed
Approve Project
History of important changes made to Projects
Useful for tracking information from audit trail
View Project History (Audit Trail)
Projects can be deleted permanently
Highly recommended to Deny or Cancel
Delete Project
Project Plans Overview
Sequence and Dependencies
Project Plans and PMs
Project Plans Defined
Automates generation and scheduling of associated Work Orders
Can define dependencies
Define project template for recurring Projects
Project Plans Overview
Work Orders defined by Project Plan Procedures may have defined dependencies
Project is created to manage and schedule this group of Work Orders
Project Plans Overview (contrsquod)
Manually generated or scheduled using PM Module
Can be added to PM Schedule on Procedures Tab
Project Plans Overview (contrsquod)
Sequence is the order that the Procedure is listed
Dependency is based on sequence and defined status
Sequence and Dependencies
Example of sequence and dependencies
Sequence and Dependencies (contrsquod)
Listed project results in generation of set of predefined Work Orders
Adding Project Plan functions similarly to Procedures
Project Plans and PMs
In this example a Project Plan will be created for street paving and will include the following steps
bull Set Details of Project Plan
bull Add Procedures
bull Define dependencies sequence
bull Generate Project Plan
bull Schedule Work Orders on Project Calendar
Generate Project Plan Example
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
History of important changes made to Projects
Useful for tracking information from audit trail
View Project History (Audit Trail)
Projects can be deleted permanently
Highly recommended to Deny or Cancel
Delete Project
Project Plans Overview
Sequence and Dependencies
Project Plans and PMs
Project Plans Defined
Automates generation and scheduling of associated Work Orders
Can define dependencies
Define project template for recurring Projects
Project Plans Overview
Work Orders defined by Project Plan Procedures may have defined dependencies
Project is created to manage and schedule this group of Work Orders
Project Plans Overview (contrsquod)
Manually generated or scheduled using PM Module
Can be added to PM Schedule on Procedures Tab
Project Plans Overview (contrsquod)
Sequence is the order that the Procedure is listed
Dependency is based on sequence and defined status
Sequence and Dependencies
Example of sequence and dependencies
Sequence and Dependencies (contrsquod)
Listed project results in generation of set of predefined Work Orders
Adding Project Plan functions similarly to Procedures
Project Plans and PMs
In this example a Project Plan will be created for street paving and will include the following steps
bull Set Details of Project Plan
bull Add Procedures
bull Define dependencies sequence
bull Generate Project Plan
bull Schedule Work Orders on Project Calendar
Generate Project Plan Example
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Projects can be deleted permanently
Highly recommended to Deny or Cancel
Delete Project
Project Plans Overview
Sequence and Dependencies
Project Plans and PMs
Project Plans Defined
Automates generation and scheduling of associated Work Orders
Can define dependencies
Define project template for recurring Projects
Project Plans Overview
Work Orders defined by Project Plan Procedures may have defined dependencies
Project is created to manage and schedule this group of Work Orders
Project Plans Overview (contrsquod)
Manually generated or scheduled using PM Module
Can be added to PM Schedule on Procedures Tab
Project Plans Overview (contrsquod)
Sequence is the order that the Procedure is listed
Dependency is based on sequence and defined status
Sequence and Dependencies
Example of sequence and dependencies
Sequence and Dependencies (contrsquod)
Listed project results in generation of set of predefined Work Orders
Adding Project Plan functions similarly to Procedures
Project Plans and PMs
In this example a Project Plan will be created for street paving and will include the following steps
bull Set Details of Project Plan
bull Add Procedures
bull Define dependencies sequence
bull Generate Project Plan
bull Schedule Work Orders on Project Calendar
Generate Project Plan Example
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Project Plans Overview
Sequence and Dependencies
Project Plans and PMs
Project Plans Defined
Automates generation and scheduling of associated Work Orders
Can define dependencies
Define project template for recurring Projects
Project Plans Overview
Work Orders defined by Project Plan Procedures may have defined dependencies
Project is created to manage and schedule this group of Work Orders
Project Plans Overview (contrsquod)
Manually generated or scheduled using PM Module
Can be added to PM Schedule on Procedures Tab
Project Plans Overview (contrsquod)
Sequence is the order that the Procedure is listed
Dependency is based on sequence and defined status
Sequence and Dependencies
Example of sequence and dependencies
Sequence and Dependencies (contrsquod)
Listed project results in generation of set of predefined Work Orders
Adding Project Plan functions similarly to Procedures
Project Plans and PMs
In this example a Project Plan will be created for street paving and will include the following steps
bull Set Details of Project Plan
bull Add Procedures
bull Define dependencies sequence
bull Generate Project Plan
bull Schedule Work Orders on Project Calendar
Generate Project Plan Example
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Automates generation and scheduling of associated Work Orders
Can define dependencies
Define project template for recurring Projects
Project Plans Overview
Work Orders defined by Project Plan Procedures may have defined dependencies
Project is created to manage and schedule this group of Work Orders
Project Plans Overview (contrsquod)
Manually generated or scheduled using PM Module
Can be added to PM Schedule on Procedures Tab
Project Plans Overview (contrsquod)
Sequence is the order that the Procedure is listed
Dependency is based on sequence and defined status
Sequence and Dependencies
Example of sequence and dependencies
Sequence and Dependencies (contrsquod)
Listed project results in generation of set of predefined Work Orders
Adding Project Plan functions similarly to Procedures
Project Plans and PMs
In this example a Project Plan will be created for street paving and will include the following steps
bull Set Details of Project Plan
bull Add Procedures
bull Define dependencies sequence
bull Generate Project Plan
bull Schedule Work Orders on Project Calendar
Generate Project Plan Example
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Work Orders defined by Project Plan Procedures may have defined dependencies
Project is created to manage and schedule this group of Work Orders
Project Plans Overview (contrsquod)
Manually generated or scheduled using PM Module
Can be added to PM Schedule on Procedures Tab
Project Plans Overview (contrsquod)
Sequence is the order that the Procedure is listed
Dependency is based on sequence and defined status
Sequence and Dependencies
Example of sequence and dependencies
Sequence and Dependencies (contrsquod)
Listed project results in generation of set of predefined Work Orders
Adding Project Plan functions similarly to Procedures
Project Plans and PMs
In this example a Project Plan will be created for street paving and will include the following steps
bull Set Details of Project Plan
bull Add Procedures
bull Define dependencies sequence
bull Generate Project Plan
bull Schedule Work Orders on Project Calendar
Generate Project Plan Example
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Manually generated or scheduled using PM Module
Can be added to PM Schedule on Procedures Tab
Project Plans Overview (contrsquod)
Sequence is the order that the Procedure is listed
Dependency is based on sequence and defined status
Sequence and Dependencies
Example of sequence and dependencies
Sequence and Dependencies (contrsquod)
Listed project results in generation of set of predefined Work Orders
Adding Project Plan functions similarly to Procedures
Project Plans and PMs
In this example a Project Plan will be created for street paving and will include the following steps
bull Set Details of Project Plan
bull Add Procedures
bull Define dependencies sequence
bull Generate Project Plan
bull Schedule Work Orders on Project Calendar
Generate Project Plan Example
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Sequence is the order that the Procedure is listed
Dependency is based on sequence and defined status
Sequence and Dependencies
Example of sequence and dependencies
Sequence and Dependencies (contrsquod)
Listed project results in generation of set of predefined Work Orders
Adding Project Plan functions similarly to Procedures
Project Plans and PMs
In this example a Project Plan will be created for street paving and will include the following steps
bull Set Details of Project Plan
bull Add Procedures
bull Define dependencies sequence
bull Generate Project Plan
bull Schedule Work Orders on Project Calendar
Generate Project Plan Example
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Example of sequence and dependencies
Sequence and Dependencies (contrsquod)
Listed project results in generation of set of predefined Work Orders
Adding Project Plan functions similarly to Procedures
Project Plans and PMs
In this example a Project Plan will be created for street paving and will include the following steps
bull Set Details of Project Plan
bull Add Procedures
bull Define dependencies sequence
bull Generate Project Plan
bull Schedule Work Orders on Project Calendar
Generate Project Plan Example
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Listed project results in generation of set of predefined Work Orders
Adding Project Plan functions similarly to Procedures
Project Plans and PMs
In this example a Project Plan will be created for street paving and will include the following steps
bull Set Details of Project Plan
bull Add Procedures
bull Define dependencies sequence
bull Generate Project Plan
bull Schedule Work Orders on Project Calendar
Generate Project Plan Example
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
In this example a Project Plan will be created for street paving and will include the following steps
bull Set Details of Project Plan
bull Add Procedures
bull Define dependencies sequence
bull Generate Project Plan
bull Schedule Work Orders on Project Calendar
Generate Project Plan Example
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Details are added for Project Plan
Generate Project Plan Example (contrsquod)
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
6 Procedures are added
Generate Project Plan Example (contrsquod)
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Dependencies and Sequences are defined
Generate Project Plan Example (contrsquod)
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Project Plan is manually generated
Generate Project Plan Example (contrsquod)
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Work Orders are scheduled on Project Calendar
Generate Project Plan Example (contrsquod)
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Details
Procedures
Attach
Project Plan Tabs
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Project Plan Info
bull ID and Name
bull Category (lighting capital etc)
Details
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Details
bull Organizational attributes
Status and Photo
bull Active or inactive
bull Photo for identification
Details (contrsquod)
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Each Procedure results in associated Work Order after generation
Add or remove functionality same as PM Module
Procedures
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Documents and notes associated with project plan
Reference information only (not populated onto Work Orders)
Attach
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
For access to documentation and tutorials reference wwwmcuserconnectcom
MC User Connect
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
MCUC Documentation Tutorials Article PDF Video Tutorial
User Guide
Project Module Overview
Project Plans Overview
Generate Project Plan
Additional Resources
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip
Did you know you can take a Quiz to test your knowledge of todayrsquos content
bull Check it out on MC User Connect (wwwmcuserconnectcom)
bull Located in the MC eLearning folder PMs Procedures and Projects Course Quizzes
Test Your Knowledgehellip