+ All Categories
Home > Documents > PProduct Catalogroduct Catalog - Earthsafe Systems Product Catalog_0...The new UL approved double...

PProduct Catalogroduct Catalog - Earthsafe Systems Product Catalog_0...The new UL approved double...

Date post: 16-Mar-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
26
Product Catalog Product Catalog protecting your liquid assets
Transcript
Page 1: PProduct Catalogroduct Catalog - Earthsafe Systems Product Catalog_0...The new UL approved double wall secondary containment pipe is an integral pipe. The secondary pipe now has a

Product CatalogProduct Catalog

protecting your liquid assets

Page 2: PProduct Catalogroduct Catalog - Earthsafe Systems Product Catalog_0...The new UL approved double wall secondary containment pipe is an integral pipe. The secondary pipe now has a

Pipework 4

Single Wall Fittings 5-6

Termination Fittings 7

Double Wall Fittings 8-10

Sumps and Entry Fittings 11-13

Welding Units 14

Tools 15-17

Seal / Holesaw / Clamp Matrix 18

Product Weights 19

Typical Site Drawing 20-21

Electrofusion System & Overview 22-23

UL971 24-25

Section Page

CONTENTS

Page 3: PProduct Catalogroduct Catalog - Earthsafe Systems Product Catalog_0...The new UL approved double wall secondary containment pipe is an integral pipe. The secondary pipe now has a

When your pipe is this good, why change it?Same pipe constructionPetroTechnik’s UPP System has met the revised specifi cation for the UL and cUL 971 2005; covering underground non-metallic pipe and fi ttings intended for use in the distribution and secondary containment of fl ammable liquids.

PetroTechnik has made some minor revisions to its existing product range keeping the basic pipe construction the same. This means that the UPP System is proven in the fi eld and not just in the lab. It also means pricing can remain extremely competitive.

New added benefi tsThe new UL approved double wall secondary containment pipe is an integral pipe. The secondary pipe now has a thicker wall and an inner permeation liner the same as in the primary pipe.

The secondary containment of 3" double wall pipe has been reduced to only 4" (down from 6") achieving a 90% reduction in the interstitial space volume. As a result the 3" double wall system is less bulky and now standard UPP tools can be used when installing the pipe.

UL approval initially covers:

1½", 2", 3" and 4" Double wall product pipe

1½", 2", 3" and 4" Single wall and double wall vent and vapor recovery pipe.

The double wall (coaxial pipes) include lined secondary containment without ribs or stand-offs in the secondary layer. A full annular interstitial space exists between the primary and secondary pipes

No compatibility issuesThe new UL approved UPP System is still as fl exible as it has always been, allowing it to snake and bend on site without the need for elbow joints.

However, it is rigid enough to be certifi ed by CARB for vapor recovery applications.

The new pipe is also still entirely electrofusable and existing fi ttings and electrofusion seals are compatible.

Sliding reducers are now available to make secondary in line joint connections and/or direct buried double wall tees and elbows.

All rubber test boots have been eliminated and replaced by welded polyethylene boots that will not degrade over time.

Over 46 million feet of UPP pipe has been installed in over 145 countries since 1981, that’s over 26 years of genuine fi eld testing.

Concentrated fuels (CT) – alternate un-blended fuels for up

to 100% concentrations of Toluene, Methanol and

EthanolHigh

blend fuels (HB) – fuels with higher than

normal gasoline blends with max 50% Methanol or 50%

Ethanol Aviation and marine fuels

(A&M) – specialty aviation and marine use fuels for up to 100% kerosene or leaded gasoline

Motor vehicle fuels

(MV) – petroleum-based hydrocarbon fuels typically found in

consumer dispensing stations, such as gasoline or diesel, including blended

fuels with max 15% MTBE, 15% Methanol or 30% Ethanol

UL FUEL APPROVALS,UL FUEL APPROVALS,

we’ve got them all...we’ve got them all...

Page 4: PProduct Catalogroduct Catalog - Earthsafe Systems Product Catalog_0...The new UL approved double wall secondary containment pipe is an integral pipe. The secondary pipe now has a

4

UPP Extra Pipe - lined - UL971Double Wall - Product, Vent & Vapor

Ø (") Description Product Code Unit

1½ Double wall lined pipe001.063.050.033PS Stick 33’

001.063.050.165PS coil 165'

2 Double wall lined pipe

001.075.063.033PS Stick 33'

001.075.063.038PS Stick 38'

001.075.063.100PS Coil 100’

001.075.063.165PS Coil 165'

3 Double wall lined pipe 001.110.090.019PS Stick 19'

4 Double wall lined pipe 001.125.110.019PS stick 19'

UPP Extra Pipe - lined - UL971Single Wall - Vent & Vapor

Ø (") Description Product Code Unit

2 Single wall lined pipe 001.063.019V Stick 19'

3 Single wall lined pipe 001.090.019V Stick 19'

PIPEWORK

• UL 971 Approval File MH25274

• Primary rating: +90 psig, -26.6" Hg

• Secondary rating: +58 psig, -15" Hg

UPP 4" DuctØ (") Description Product Code Unit

4 Flexible PE duct 00-110-050-DUCT-1 Coil 165’

Page 5: PProduct Catalogroduct Catalog - Earthsafe Systems Product Catalog_0...The new UL approved double wall secondary containment pipe is an integral pipe. The secondary pipe now has a

5

Welding socketØ (") Description Product Code Pack

1½ Welding socket 02.50 20

2 Welding socket 02.63 25

3 Welding socket 02.90 20

2 Welding socket long 02.-063-L 15

90° Elbow - electrofusionØ (") Description Product Code Pack

1½ EIF 90° elbow 03.50EIF 25

2 EIF 90° elbow 03.63EIF 20

3 EIF 90° elbow 03.90EIF 15

4 EIF 90° elbow 03.110EIF 10

45° Elbow - electrofusionØ (") Description Product Code Pack

2 EIF 45° elbow 04.63EIF 25

3 EIF 45° elbowalso fi ts 04.160(SC) 04.90EIF 20

4 EIF 45° elbow 04.110EIF 10

SINGLE WALL FITTINGS

5

45° ElbowØ (") Description Product Code Pack

1½ 45° elbow 04.50 25

90° ElbowØ (") Description Product Code Pack

1½ 90° elbow 03.50 1

Have you seen the NEW UPP Fusion Chamber:• PE Chamber• Riser electrofuses to chamber base• Vacuum Testable• Fits square and round containment collars• Water resistant lid• Burial depth: 1.5ft - 5.25ft www.petrotechnik.com for more information

Page 6: PProduct Catalogroduct Catalog - Earthsafe Systems Product Catalog_0...The new UL approved double wall secondary containment pipe is an integral pipe. The secondary pipe now has a

6

Tee - electrofusionØ (") Description Product Code Pack

1½ EIF tee 08.50EIF 20

2 EIF tee 08.63EIF 20

3 EIF tee 08.90EIF 10

4 EIF tee 08.110EIF 6

Tee - reducingØ (") Description Product Code Pack

3x3x2 Reducing tee 08.90.63 8

ReducerØ (") Description Product Code Pack

2x1½ Reducer 09.63.50 40

3x2 Reducer 09.90.63 18

4x2 Reducer 09.110.63 12

Reducer - electrofusionØ (") Description Product Code Pack

3x2 EIF reducer 09.90.63 EIF 15

4X3 EIF reducer 09-110-090 EIF 5

End capØ (") Description Product Code Pack

2 End cap 10.63 25

2 SC End cap 10.75(SC) 25

3 End cap 10.90 65

4 SC End cap 10.110(SC) 10

5 SC End cap 10.125(SC)

SINGLE WALL FITTINGS

TeeØ (") Description Product Code Pack

1½ Tee 08.50 1

Page 7: PProduct Catalogroduct Catalog - Earthsafe Systems Product Catalog_0...The new UL approved double wall secondary containment pipe is an integral pipe. The secondary pipe now has a

7

Termination - threaded male (bronze)Ø (") Description Product Code Pack

1½ 1½" NPT 81.050 NPT 6

22" NPT 81.063 NPT 6

1½" NPT 81.063.1 NPT 6

3 3" NPT 81.090 NPT 2

4 4" NPT 81.110 NPT 2

Termination - Quick releaseØ (") Description Product Code Pack

2 2" Quick release 80.063 QL 6

3 3" Quick release 80.090 QL 6

Termination - union adaptor (bronze)Ø (") Description Product Code Pack

1½ 1½" union adapter NPT 82.050UF NPT 6

2 2" union adapter NPT 82.063UF NPT 6

2 Spare gasket for 2" union 82.063UFG 10

Termination - threaded female (bronze)Ø (") Description Product Code Pack

1½ 1½" NPT 82.050 NPT 6

2 2" NPT 82.063 NPT 6

2 1½" NPT 82.063.1 NPT 6

4 4" NPT 82.110 NPT 2

Termination - threaded femaleØ (") Description Product Code Pack

2 2" NPT 11.50 NPT 12

3 3" NPT 11.90 NPT 6

Hex adapterØ (") Description Product Code Pack

2 - 1½ NPT Adapter HEX 2 5

TERMINATION FITTINGS

Page 8: PProduct Catalogroduct Catalog - Earthsafe Systems Product Catalog_0...The new UL approved double wall secondary containment pipe is an integral pipe. The secondary pipe now has a

8

UPP Extra Secondary Containment 90° bend longØ (") Description Product Code Pack

4/2 SC 90° co-axial bend long 03.110.63(SC).L 1

UPP Extra Secondary Containment tee longØ (") Description Product Code Pack

4/2 SC tee long 08.110.63(SC).L 1

UPP Extra Secondary Containment 90° bendØ (") Description Product Code Pack

2 SC 90° co-axial bend 03.110.63(SC) 15

4 SC 90° use with 03.50 03.110(SC) 1

Secondary Containment welding socketPrimaryØ (")

Description Product Code Pack

1½ SC welding socket 02.63(SC) 20

2 SC welding socket 02.75(SC) 20

4 SC welding socket 02.110(SC) 20

5SC welding socket for 305R-1 ring

or UPP 5" secondary02.125(SC) 10

6 SC welding socket 02.160(SC) 5

8 SC welding socket 02.200(SC)-1 1

DOUBLE WALL FITTINGS

Page 9: PProduct Catalogroduct Catalog - Earthsafe Systems Product Catalog_0...The new UL approved double wall secondary containment pipe is an integral pipe. The secondary pipe now has a

9

Secondary Containment 90° elbowØ (") Description Product Code Pack

4* secondary SC 90° elbow 03.110(SC) 1

6* secondary SC 90° elbow 03.160(SC) 5

*For use with 03.90.LS-2 and 03.110.LS-2

Secondary Containment 45° elbowØ (") Description Product Code Pack

4 secondary SC 45° elbow 04.110(SC) 5

6* secondary SC 45° elbow 04.160(SC) 5

8 secondary SC 45° elbow 04.200(SC) 1

*For use with 04.90.LS-2 or 04.90EIF

Secondary Containment teeØ (") Description Product Code Pack

4* secondary SC tee 08.110(SC) 1

6** secondary SC tee 08.160(SC) 5

8*** secondary SC tee 08.200(SC) 1

*For use with 08.50**For use with 08.90 LONG M

*** for use with 08-110-M

DOUBLE WALL FITTINGS

UPP Extra 90° bend - linedØ (") Description Product Code Pack

3* 90° bend lined 03.90.LS-2 6

4* 90° bend lined 03.110.LS-2 6

UPP Extra 45° bend - linedØ (") Description Product Code Pack

3* 45° bend lined 04.90.LS-2 8

4* 45° bend lined 04.110.LS-2 8

Tee - longØ (") Description Product Code Pack

3* Long tee (modifi ed) 08.90.LONGM 1

4** Tee modifi ed 08.110-M 1

*For use with 03.160(SC)

*For use with 04.160(SC)

*For use with 08.160(SC)**For use with 08.200(SC)

Page 10: PProduct Catalogroduct Catalog - Earthsafe Systems Product Catalog_0...The new UL approved double wall secondary containment pipe is an integral pipe. The secondary pipe now has a

10

Secondary Containment reducerØ (") Description Product Code Pack

4x2 SC reducer 09.110.75(SC) 1

6x4 SC reducer 09.160.110(SC) 5

6x5 SC reducer 09.160.125(SC) 5

5x4 SC Reducer 09.125.110(SC) 1

8x6 SC Reducer 09.200.160(SC) 1

4 Spool piece 01.110 (SC) (0.3) 1

Secondary Containment terminating reducer / with test port

Ø (") Description Product Code Pack

6x4 SC terminating reducer 13.160.110 10

PrimaryØ (") Description Product Code Pack

1½ SC welding reducer 49-063-050 40

1½ SC welding reducer with test port 49-063-050-TP 40

2 SC welding reducer 49-075-063-1 27

2 SC welding reducer with test port 49-075-063-TP-1 25

4x1½ SC welding reducer 49-110-063-(SC) 14

4x2 SC welding reducer 49-110-075(SC) 14

4x3 SC welding reducer 49-110-090 1

4x3 SC welding reducer with test port 49-110-090-TP 1

5x4 SC welding reducer 49-125-110 1

5x4 SC welding reducer with test port 49-125-110-TP 1

Leak detection connecting tubeØ (") Description Product Code Pack

¼ Leak detection connecting tube (24") LDT 60-1 1

For use with fi ttings fi tted with a test port

DOUBLE WALL FITTINGS

10

Have you seen the NEW Quick Release Termination?• Electrofusable termination• Quick clamps to Flexible connectors• 2" and 3" versions available• UL approvedsee page 7 for more information

Page 11: PProduct Catalogroduct Catalog - Earthsafe Systems Product Catalog_0...The new UL approved double wall secondary containment pipe is an integral pipe. The secondary pipe now has a

11

Dispenser sump - polyethylene / stabilizer bar" Description Product Code Pack

36x17(top) Dispenser sump (fi ts Encore dispenser) DS3617 ENCORE 1

Stabilizer bar for Encore sump DS-SB17.1 ENCORE KIT 1

SUMPS AND ENTRY BOOTS

Tank access chamber - polyethylene electrofusionDescription Product Code Pack

Polyethylene fusion tank sump deep burial chamber assembly inclusive of water-resistant lid*Requires EW8 welder and white cables

LA-002-001 1

Polyethylene fusion tank chamberShallow burial chamber assembly with watertight lid

LA-002-002 1

Dispenser sump - polyethylene / stabilizer bar" Description Product Code Pack

27x11 (top) Dispenser sump (fi ts Wayne dispenser) DS2711 1

Stabilizer bar for DS2711 sump DS-SBA-11 1

Fits Wayne Vista 580D, 585D, 388D, 389D 387D

Dispenser sump - polyethylene / stabilizer bar" Description Product Code Pack

Dispenser sump (fi ts Wayne & Ovation dispenser) DS3915 1

Stabilizer bar for DS3915 Ovation sump DS-SB15 1

Page 12: PProduct Catalogroduct Catalog - Earthsafe Systems Product Catalog_0...The new UL approved double wall secondary containment pipe is an integral pipe. The secondary pipe now has a

12

Bulkhead conduit sealØ (") Description Product Code Pack

2" Seal for ¾"~1" conduit SB2.C01 25

See tools for appropriate holesaws

SUMPS AND ENTRY BOOTS

ID = 1 1/16" - 115/16"

Electrofusion conduit sealØ (") Description Product Code Pack

1¼" Electrofusion seal 302-40 1

1¼” Reducer boot 29-040-032-1 1

PetroSealØ (") Description Product Code Pack

2 PetroSeal D/sided for curved sumps PSD-C-075 10

4 PetroSeal D/sided for curved sumps PSD-C-110 10

Electrofusion entry seal with integrated couplerØ (") Description Product Code Pack

1½"SC & 2" primary Electrofusion seal with integrated welding socket 303-063-EIF 20

2" secondary Electrofusion seal with integrated welding socket 303-075-EIF 20

4"/3" Fusion seal with integrated termination coupler 304-110-090 1

4"/3" Fusion seal with integrated termination coupler and test port 304-110-090-TP 1

5"/4" Fusion Seal with integrated termination coupler 305-125-110 1

5"/4" Fusion seal with integrated termination coupler and test port 305-125-110-TP 1

4" Fusion Seal Duct with 2" DW UPP (for PE Sumps) with duct test boot 304-110-075-TP 1

4" Fusion Seal Duct with 1½" DW UPP (for PE Sumps) with duct test boot 304-110-063-TP 1

See tools for appropriate holesaws:304 seal requires HS5 / 305-125-110 & 305-125-110-TP require HS6

NB. No rubber boot. Fuses to either UPP primary or secondary containment pipe

Page 13: PProduct Catalogroduct Catalog - Earthsafe Systems Product Catalog_0...The new UL approved double wall secondary containment pipe is an integral pipe. The secondary pipe now has a

13

Fiberglass entry seal - for double wall sumpsØ (") Description Product Code Pack

2 FRP entry seal FEB-D-075-1 1

2 Internal cover for FRP seal FBC-N-075 1

2 External cover for FRP seal FBC-X-075 1

3 FRP entry seal FEB-D-110-1 1

3 Internal cover for FRP seal FBC-N-110 1

3 External cover for FRP seal FBC-X-110 1

4 FRP Entry Booth S/Sided FEB-S-125 2

Curved shims for FEB-D-110 / FEB-S-125 FBP-N-110

Curved shims for FEB-D-110 / FEB-S-125 FBP-X-100

Curved shims for FEB-D-075-1 FBP-N-075

Curved shims for FEB-D-075-1 FBP-X-075

Requires resin packs and fi tting tool

Test portØ (") Description Product Code Pack

¼ Test port (long) for entry fi ttings TPL 1

For use with 09.110.90EIF

SUMPS AND ENTRY BOOTS

Page 14: PProduct Catalogroduct Catalog - Earthsafe Systems Product Catalog_0...The new UL approved double wall secondary containment pipe is an integral pipe. The secondary pipe now has a

14

Installation tool boxDescription Product Code Pack

Toolbox without welder IB1000 (EX EW) 1

Toolbox without welder or tools IB 1

Hand-held electrofusion welder - E8Description Product Code Pack

UPP Hand-held welder * EW8-230V-TR 1

Spare Primary welding cable (orange) - 4mm pins EW8-PC 4mm 1

Spare Secondary welding cable (green) - 2mm pins EW8-SC 2mm 1

Spare Bridging cable for series welding of primary fi ttings EW8-BC 4mm 1

TOOL BOX & WELDERS

* Requires generator with 230v output, at least 4KVA rated ORStep up transformer 110v - 230, rated at least 1.5KVA

Electrofusion welder - EW8 - 110VDescription Product Code Pack

UPP welder - 110V EW8/110V 1

Spare Primary welding cable (orange) - 4mm pins EW8-PC 4mm 1

Spare Secondry welding cable (green) - 2mm pins EW8-SC 2mm 1

Spare Bridging cable for series welding of multiple fi ttings EW8-BC 4mm 1

Hand-held electrofusion welder - EF1Description Product Code Pack

UPP Hand-held welder * EF1 1

Spare Primary welding cable (red) - 4mm pins EF1-PC 4mm 1

Spare Secondary welding cable (green) - 2mm pins EW8-SC 2mm 1

Spare Fusion Chamber welding cable (white) - 2mm pins EF1

Spare Bridging cable for series welding of primary fi ttings EW8-BC 4mm 1

Page 15: PProduct Catalogroduct Catalog - Earthsafe Systems Product Catalog_0...The new UL approved double wall secondary containment pipe is an integral pipe. The secondary pipe now has a

15

Pipe cutterØ (") Description Product Code Pack

1½-5 Pipe cutter P.CUT 1

4-6 Pipe cutter P.CUT MED 1

Cutting wheel for P.CUT & P.CUT MED CW1 1

Wooden malletDescription Product Code Pack

Wooden mallet MAL1 1

Adjustable Rotary Scraper ToolØ (") Description Product Code Pack

1-4 Adjustable rotary scraper SCR-025-110 1

3-9 Adjustable rotary scraper SCR-090-225 1

Adjustable rotaty scraper blades SCR-BLADE-025-225 1

Handheld scraperDescription Product Code Pack

Handheld scraper SCR.HAR 1

Spare scraper blades (8 blades) SCR.HAR(B) 1

TOOLS

Clamp for pipeDescription Product Code Pack

Straight clamp - for straight joints (1-4”) CLAMP (S) 1

Angled clamp - for straight & elbow joints (1-4") CLAMP (A) 1

New

Fixed Rotary Scraper ToolDescription Product Code Pack

Fixed rotary scraper RS125 1

Page 16: PProduct Catalogroduct Catalog - Earthsafe Systems Product Catalog_0...The new UL approved double wall secondary containment pipe is an integral pipe. The secondary pipe now has a

16

Clamps for fusion SealsDescription Color Product Code Pack

Clamp for 302 fusion seal Orange 302-CLAMP 1

Clamp for 303 fusion seal Blue 303-CLAMP 1

Clamp for 304-110-090 Yellow 304-CLAMP 1

Clamp for 305 fusion seal Green 305-CLAMP 1

Clamp for 305-125-110 Red 305-EXT-CLAMP 1

Hole saw and mandrel - for electric drillØ (") For Entry Seal Product Code Pack

ALL Mandrel MAN1 1

4 HS31

1

41/8 HS075 1

5 HS4

5½ HS51

1

5 5/16 HS6 1

8¼ HS8 1

Towing head - for pipe retrofi tØ (“) Description Product Code Pack

1½" Single Wall towing head TH50-SDR8 1

2" Single Wall towing head TH63 1

75/2" Coaxial mud-tight towing head TH75SC 1

63/1½" Coaxial mud-tight towing head TH63SC-SDR8 1

TOOLS

Detector tapeDescription Product Code Pack

Detector tape D/TAPE 328´

See chart on page 18

Page 17: PProduct Catalogroduct Catalog - Earthsafe Systems Product Catalog_0...The new UL approved double wall secondary containment pipe is an integral pipe. The secondary pipe now has a

17

System integrity testing unit & test lidsDescription Product Code Pack

Tightness testing unit 110V VTU-110V 1

Test lids for spill containers are available on requestEach test lid comes with hard-wearing carry bag for ease of transportation

Chinagraph pencilDescription Product Code Pack

Box of pencils for marking fi ttings CHINA 12

Emery clothDescription Product Code Pack

Emery cloth - sold in 1 foot lengths EMERY per foot

Fiberglass seal tools and accessoriesDescription Product Code Pack

Tool to tighten FRP entry seal 2" FEB-075-TOOL 1

Tool to tighten FRP entry seal 3" FEB-110-TOOL 1

50ml Epoxy cartridge E32 1

50ml cartridge gun E32 GUN 1

1.1liter Resin tin for FBC Covers RESIN TIN 1

TOOLS

Consumables KitDescription Product Code Pack

UPP Consumables UPP Consumables Kit

- 1 x Lbs lint free rags- 2 x Magic markers- 2 x Qt. Spray bottle- 1 x Box nitrile gloves- 2 x Sharpie silver markers- 1 x Sheet emery cloth- 2 x Paint scrapers

Page 18: PProduct Catalogroduct Catalog - Earthsafe Systems Product Catalog_0...The new UL approved double wall secondary containment pipe is an integral pipe. The secondary pipe now has a

18

HS Diameter

mmDiameter

inchesCLAMP CLAMP COLOR

302-040 HSCS2 51 2 302-CLAMP Orange

303-063-EIF HS3 102 4 303-CLAMP Blue

303-075-EIF HS3 102 4 303-CLAMP Blue

304-110-063-TP HS5 140 5½ 304-CLAMP Yellow

304-110-075-TP HS5 140 5½ 304-CLAMP Yellow

304-110-090 HS5 140 5½ 304-CLAMP Yellow

304-110-090-TP HS5 140 5½ 304-CLAMP Yellow

305 HS5 140 5½ 305-CLAMP-1 Green

305-R HS5 140 5½ 305-CLAMP-1 Green

305-R-1 HS5 140 5½ 305-CLAMP-1 Green

305-125-110 HS6 160 6 5/16 305-EXT-CLAMP Red

305-125-110-TP HS6 160 6 5/16 305-EXT-CLAMP Red

308 HS8 210 8 ¼ 308-CLAMP Silver

308-R HS8 210 8 ¼ 308-CLAMP Silver

SB2.C01 HSCS2 51 2

PS3 HSP3 83 3¾

PS6 HSP6 168 6 5/8

FEB-D-075-1 HS075 105 41/8

FEB-D-110-1 HS5 140 5½

FEB-S-125 HS5 140 5½

PSD-075 HS4 127 5

PSD-125 HSP6 168 6 5/8

PSD-C-063 HS4 127 5

PSD-C-075 HS4 127 5

PSD-C-110 HSP6 168 6 5/8

PSD-H-170-160 HSP6 168 6 5/8

PSD-I-170-160 HSP6 168 6 5/8

U400 HS4 127 5

U300 HS4 102 4

U250 HS4 102 4

Seal / Holesaw / Clamp Matrix

Page 19: PProduct Catalogroduct Catalog - Earthsafe Systems Product Catalog_0...The new UL approved double wall secondary containment pipe is an integral pipe. The secondary pipe now has a

19

Code Weight per unit (KG)

Weight per unit (Lbs)

Pipe001.063.050.165PS 100 220001.063.050.033PS 17.27 38.1001.075.063.038PS 19.89 43.9001.075.063.100PS 94 207001.075.063.165PS 114 251001.110.090.019PS 25.58 56.4001.125.110.019PS 31.26 68.9001.063.019.V 6.13 13.5001.090.019.V 12.27 27

Single Wall Fittings02.50 0.08 0.1802.63 0.12 0.2602.90 0.2 0.4402.110 0.36 0.7903.50 0.08 0.1803.50EIF 0.2 0.4403.63EIF 0.28 0.6203.90EIF 0.71 1.5603.110EIF 1.33 2.9303.90.LS-2 1.04 2.2903.110.LS-2 1.56 3.4304.50 0.06 0.1304.63EIF 0.24 0.5304.90EIF 0.61 1.3404.110EIF 0.95 2.0904.90.LS-2 0.8 1.7604.110.LS-2 1.22 2.6808.50 0.12 0.2608.50EIF 0.24 0.5308.63EIF 0.35 0.7708.90EIF 0.91 2.0008.110EIF 1.68 3.7008.90.LONGM 1.04 2.2908.90.63 0.64 1.4109.63.50 0.08 0.1809.90.63 0.18 0.4009.110.63 0.32 0.7009.90.63EIF 0.40 0.909.110.90EIF 0.70 1.510.63 0.07 0.1510.75(SC) 0.07 0.1510.90 0.12 0.2610.110(SC) 0.2 0.4

Termination Fittings80.063 QL 0.45 180.090 QL 1.25 2.7581.050 NPT 0.5 181.063 NPT 0.8 1.7681.063.1 NPT 0.8 1.7681.090 NPT 2.04 4.581.110 NPT 3.80 8.3682.050 NPT 0.64 1.4182.050UF NPT 0.94 2.0782.063.1 NPT 0.82 1.8082.063 NPT 0.80 1.7682.063UF NPT 1.22 2.6882.063UFG 0.01 0.0282.110 NPT 3.8 8.3811.50NPT 1.1 2.4211.90NPT 2.4 5.28HEX 2 0.60 1.3

Code Weight per unit (KG)

Weight per unit (Lbs)

Double Wall Fittings02.63(SC) 0.1 0.2202.75(SC) 0.11 0.2402.110(SC) 0.17 0.3702.125(SC) 0.192 0.4202.160(SC) 0.33 0.7303.110.63(SC) 0.64 1.4103.110.63(SC).L 1.36 2.9908.110.63(SC).L 1.55 3.4103.110(SC) 0.27 0.5903.160(SC) 0.95 2.104.110(SC) 0.3 0.6704.160(SC) 0.7 1.5408.110(SC) 0.376 0.8308.160(SC) 1.16 2.5509.110.75(SC) 0.1 0.2209.160.110(SC) 0.2 0.4409.160.125(SC) 0.21 0.4613.160.110 0.55 1.2149-063-050 0.18 0.4049-063-050-TP 0.2 0.4449-075-063-1 0.2 0.4449-075-063 TP-1 0.22 0.4849-110-063 (SC) 0.48 1.149-110-075 (SC) 0.48 1.149-110-090 0.46 1.0149-110-090-TP 0.46 1.0149-125-110 0.60 1.3249-125-110-TP 0.60 1.32LDT-60-1 0.06 0.13

SumpsDS3617 ENCORE 35.91 79.00DS-SB17.1 ENCORE 3.18 7.00DS-2711 24.0 52.92DS-SB11A 3.18 7.00

Entry FittingsSB2.C01 0.16 0.3529-040-032-1 0.09 0.20302-40 0.1 0.22303-063-EIF 0.24 0.5303-075-EIF 0.24 0.5304-110-090 0.56 1.23304-110-090-TP 0.56 1.23305-125-110 0.76 1.67305-125-110-TP 0.76 1.67305-110-SB 0.18 0.40FEB-D-075-1 2.6 5.72FBP-N-075 0.12 0.26FBP-X-075 0.12 0.26FEB-D-110-1 4.6 10.12FBC-N-110 0.09 0.2FBC-X-110 0.09 0.2FEB-S-125 2.35 5.18PSD-C-075 1.42 3.13PSD-C-110 2.0 4.41

ToolsTPL 0.01 0.02TH50 0.96 2.11TH63 1.56 3.1TH75SC 2.92 6.43

PRODUCT WEIGHTS

Page 20: PProduct Catalogroduct Catalog - Earthsafe Systems Product Catalog_0...The new UL approved double wall secondary containment pipe is an integral pipe. The secondary pipe now has a

20

TYPICAL SITE DRAWINGG

EN

ER

IC 1

½"

UP

P P

RO

DU

CT

SY

STE

M

Page 21: PProduct Catalogroduct Catalog - Earthsafe Systems Product Catalog_0...The new UL approved double wall secondary containment pipe is an integral pipe. The secondary pipe now has a

21

TYPICAL SITE DRAWINGG

EN

ER

IC 2

" U

PP

PR

OD

UC

T S

YST

EM

Page 22: PProduct Catalogroduct Catalog - Earthsafe Systems Product Catalog_0...The new UL approved double wall secondary containment pipe is an integral pipe. The secondary pipe now has a

The polyethylene construction of UPP pipe allows all connections to be joined using an electrofusion welding process.

Electrofusion welding provides a joint which is stronger than the pipe itself, and with no leak paths.

Electrofusion is carried out quickly and simply using specialist tools available from PetroTechnik. It can be carried out in adverse weather conditions and climates and will always give a strong and secure joint.

A large variety of electrofusion fi ttings are available, from simple couplers (for making in-line pipework joints), to welded terminations (for terminating double wall secondary containment pipework) and entry seals.

Electrofusion entry seals• Seals weld directly to sump walls• No mechanical joints - no leak paths• No metallic parts• Variety of seals and sizes available• Seals weld directly to pipework• Simple installation• Unique to UPP Systems

Fiberglass entry seals• For single or double wall sumps• Seals bond to FRP sumps and containers• No mechanical joints - no leak paths• No exposed metallic parts• Seals weld directly to pipework• Variety of sizes available• Unique to UPP Systems

Double wall tees, elbows & joints• Full double wall fi ttings• 100% annular interstitial• Fully welded assembly• Can be direct buried• No leak paths

Termination fi ttings• Weld directly to UPP Pipework• Variety of sizes available• Male and Female NPT threads• Union terminations for easy removal• Very small footprint for easier installation

UPP welder, 230v or 110v systems

UPP ELECTROFUSION SYSTEM

22

Page 23: PProduct Catalogroduct Catalog - Earthsafe Systems Product Catalog_0...The new UL approved double wall secondary containment pipe is an integral pipe. The secondary pipe now has a

ELECTROFUSION OVERVIEW

1

65

43

2

7 8

Cut pipe to length allowing for correct insertion depth into welding coupler

Prepare the pipes and fi ttings for welding using the pipe scraping tool provided in the UPP tool kit

Measure and mark pipe or fi tting to indicate correct insertion depth

Clean scraped areas of pipe or fi tting using a lint free cloth moistened with Acetone. Acetone removes oils, fi ngerprints and moisture

Clean bore of welding coupler or fi tting with Acetone

Assemble the joint and use clamp to hold in place. Check insertion is up to the premarked depth indication

Connect clamped assembly to welder and follow welding unit instructions. Ensure appropriate welding cables are used

Allow joint to cool to ambient temperature. At least 20 minutes should pass before any stresses are exerted upon the assembly

FOLLOW INSTALLATION INSTRUCTIONS. NON-COMPLIANCE WILL INVALIDATE WARRANTY AND INSTALLER CERTIFICATION.

23

Page 24: PProduct Catalogroduct Catalog - Earthsafe Systems Product Catalog_0...The new UL approved double wall secondary containment pipe is an integral pipe. The secondary pipe now has a

•• Based on existing product range, not newly developed to pass UL test

•• Approved for all test category fuels

•• Extremely competitive pricing

•• Entirely electrofusable, existing fi ttings and electrofusion seals are compatible

•• Direct burial single and double wall fi ttings

•• Compatible with existing UPP tools

•• Welded polyethylene boot replaces rubber test boot

•• Sliding reducers make in-line joints and connections easier than ever before

•• 25+ Year pedigree

Proven in the fi eld, not just the lab...UL971 Pipework

Page 25: PProduct Catalogroduct Catalog - Earthsafe Systems Product Catalog_0...The new UL approved double wall secondary containment pipe is an integral pipe. The secondary pipe now has a

25

CERTIFICATE OF COMPLIANCE - UL971

Page 26: PProduct Catalogroduct Catalog - Earthsafe Systems Product Catalog_0...The new UL approved double wall secondary containment pipe is an integral pipe. The secondary pipe now has a

UIM

-V1.00.11.04

PetroTechnik Australia

PetroTechnik do Brasil

PetroTechnik France

PetroTeknik AB

+61 3 95 50 18 74

+55 11 3159 0909

+33 1 69 21 41 41

+46 8 767 86 34

PetroTechnik Ltd. (HQ) +44 1473 243300 USA OFFICEPetroTechnik Inc.80 BroadwayCresskill NJ 07626tel. +1 201 871 7300 fax. +1 201 871 2222email. [email protected]

w w w . p e t r o t e c h n i k . c o m

P&D Japan +81 3 3297 7870

CAT

.US

A-U

L-V

07-0

9/08


Recommended