Background
PPS Group was founded by a team of highly experienced power genera:on, construc:on and engineering professionals who have in excess of 200 years of combined experience with an array of Power Genera:on facili:es, including coal, biomass, natural gas, liquid fuel, LNG, solar, and geothermal. Our in-‐depth experience includes Engineering, Equipment Sourcing, Construc:on Management, Start-‐Up & Commissioning, and Project Development.
PPS Leadership Team o Joe Fischer – CEOo Lou Gonzales – Presidento John Stevens – Senior Vice Presidento Rob SchmiP – VP of Engineeringo Mike Horn – VP of Technical Services
o Jim Thompson – Senior Project Manager
o Don Marshall – Business Development – West U.S.
o Joaquin Mavares – VP of Interna:onal Business
PPS Group Difference
o Alignment of our goals with those of our customers
o Independent Products and Services Provider
o Management as Shareholders = Passion
o Customized Solu:ons Backed by Engineering
Project Experience
o Simple Cycle Projects
o Combined Cycle Projects
o Biomass/Coal/MSW Projects
o CHP (Combined Heat & Power) Projects
o Reciproca:ng Engine Projects o PV/Thermal Solar Projects
o Environmental Projects
Business Units
o Engineering Services o Equipment Sourcing
o Technical Services o Project Development
Engineering Services
o Design/Conceptual Engineering o Owner's Engineering o Applica:on Engineering o Civil and Structural Engineering o Mechanical Engineering
o Electrical and I & C Engineering o Architectural Design
Equipment Sourcing
o Gas Turbine Engines o Steam Turbine Engines
o Reciproca:ng Engines o Transformers
o Balance of Plant Equipment
Technical Services
o Start-‐up & Commissioning
o Documenta:on & Procedures
o 3rd Party O&M Plant Audits
o Training Services o Management So^ware
Implementa:on (CMMS)
o Owner’s Representa:on o Construc:on Management
Project Development
o Due Diligence Assessments
o Cost Es:ma:ng
o Permi`ng Assistance
o Project Management
o Feasibility Studies o BOOT (Build, Operate, Own,
Transfer)
Biomass Experience o Owner’s Engineering
– Macquarie-‐ Liberty Green (5 sites) -‐ 25-‐35MW – Decker Energy-‐ Plainfield Renewables -‐ 45MW
o Detail Engineering – NOVEC-‐ South Boston Energy -‐ 50 MW – SAIC-‐ Plainfield Energy -‐ 43 MW – EDF-‐ South Carolina (2 sites) -‐ 20 MW – ETEC-‐ Woodville Renewable -‐ 50 MW
o EPC – CMS-‐ Craven County Wood Energy -‐ 50 MW – CMS-‐ Exeter Energy -‐ 30 MW (10MM :res/yr)
Biomass Experience o Startup & Commissioning
– IHI/NAP-‐ Rio Bravo Fresno Power Sta:on -‐ 25 MW – IHI/NAP-‐ Rio Bravo Rocklin Power Sta:on -‐ 25MW – Covanta-‐ Burney Mountain Power -‐ 11MW
o Opera;ons & Maintenance – IHI/NAP-‐ Rio Bravo Fresno Power Sta:on -‐ 25 MW – IHI/NAP-‐ Rio Bravo Rocklin Power Sta:on -‐ 25MW – Covanta-‐ Burney Mountain Power -‐ 11MW – Jamestown/IHI-‐ Ultrapower Chinese Sta:on -‐ 20 MW – Indeck Energy-‐ Alexandria Biomass -‐ 16 MW
Coal-Fired Project Experience o Project Development
– Indeck Energy – Elwood, IL -‐ 500MW Circula:ng Fluidized Bed – CSW Energy – Victoria, TX -‐ 640MW Pulverized Coal
o Owner’s Project Manager – PSO – Oologah, OK -‐ 2 x 450MW Pulverized Coal
o Engineering – City U:li:es – Springfield, MO -‐ 300MW Material Handling – Empire District – Asbury, MO -‐ 240MW Selec:ve Cataly:c Reduc:on Retrofit
o Construc;on and Start-‐Up – Champion Intl. – Bucksport, ME – 500,000 lb/hr. Coal/Biomass/Tire Derived Fuel
o Retrofit – PSNH – Portsmouth, NH – 3 x 45MW Oil to Coal Conversion
o Opera;on and Maintenance (CMMS & Training) – Mid-‐American – Sioux City, IA – 1000MW, 650MW Pulverized Coal – Rio Bravo – Bakersfield, CA – 35MW Circula:ng Fluidized Bed
Municipal Solid Waste/Tire Derived Fuel Project Experience
o Project Development – Dynamis – Scotland, UK – 12MW
Municipal Solid Waste Gasifica:on
o EPC – CMS-‐ Exeter Energy – Sterling, CT -‐
30 MW (10MM :res/yr) – Ogden-‐Mar:n (Covanta) – Lake
County, FL – 14.5MW
o Construc;on and Start-‐Up – Champion Intl. – Bucksport, ME – 500,000 lb/hr. Coal/Biomass/Tire Derived Fuel
Environmental Project Experience
o Owner’s Engineering – Diamond Energy-‐ Mariposa, CA -‐ LM6000 SCR
o Detail Engineering – Empire Electric District-‐ Asbury #1 -‐ 240MW-‐ Coal SCR Retrofit – NOVEC-‐ South Boston Energy -‐ 50 MW-‐ ESP, SCR, and CO – SAIC-‐ Plainfield Energy -‐ 43 MW-‐ PJ Baghouse & SNCR – EDF-‐ South Carolina (2 sites) -‐ 20 MW-‐ ESP & SNCR – ETEC-‐ Woodville Renewable -‐ 50 MW-‐ PJ Baghouse & SCR – Arclight-‐ Victoria, TX -‐ 300MW-‐ Combined Cycle Repowering SCR
o EPC – Public Services of NH-‐ 150MW Oil-‐to-‐Coal Conversion, 3 ESPs
o Start-‐Up & Commissioning – Black Hills – 100MW – Coal-‐Scrubber/Baghouse
LM2500 Experience o Construc;on and Start-‐Up
– Riverside Public U:li:es -‐ Clearwater Cogen Plant – 1 Unit, Combined Cycle – Tennessee Valley Authority -‐ Tocoa Power Sta:on – 2 Units – CORPOELEC -‐ Guaraneas Power Sta:on – 2 x 30MW Units – PDVSA -‐ Los Morochas – 1 x 22MW Unit
o Start-‐Up & Commissioning – Calpine – Greenleaf Unit 1 – Upgrade from LM5000 to LM6000 – USS Callahan DDG-‐994 – 4 x LM2500 Main Propulsion – MMC Energy -‐ Midsun Power Sta:on – 1 x 20MW Simple Cycle
o Engineering – Consolidated Power Company – Lowell Cogenera:on Plant – 1 x LM2500
o Removal and Reloca;on – MMC Energy -‐ Midsun Power Sta:on – 1 x 20MW Simple Cycle
LM2500 Experience o Opera;ons and Maintenance (CMMS and Training)
– LM2500 Advanced Mechanical School – Trained over 2000 students – LM2500 Advanced Electrical & Controls School – Trained over 500 students – Celebrity Cruise Line – Millenium Vessel – 2 x 50MW Simple Cycle – Celebrity Cruise Line – Infinity Vessel – 2 x 50MW Simple Cycle – Celebrity Cruise Line – Summit Vessel – 2 x 50MW Simple Cycle
LM6000 Experience o Engineering
– Diamond Genera:on – Mariposa, Owner’s Engineer – 4 x LM6000PC Simple Cycle o EPC
– North Canadian Power – 2 x LM6000PA 2 x 1 Combined Cycle o Construc;on and Start-‐Up
– Calpine • Gilroy Energy Center– 3 x LM6000PC Combined Cycle • King City Cogenera:on Plant – 1 x LM6000PD Combined Cycle • Goose Haven Energy Center – 1 x LM6000PC Simple Cycle • Creed Energy Center – 1 x LM6000PC Simple Cycle • Yuba City Energy – 1 x LM6000PC Simple Cycle • Feather River Energy – 1 x LM6000PC Simple Cycle • Los Esteros Cri:cal Energy Facility – 4 x LM6000PC Combined Cycle • Riverside Energy Center – 1 x LM6000PC Combined Cycle
o Start-‐Up & Commissioning – Calpine – Greenleaf Unit 1 – Upgrade from LM5000 to LM6000 – LUFUSSA – Pavana 1 – 1 x LM6000 Simple Cycle – Ameren – Pickneyville Peaking Power Sta:on – 4 x LM6000 Simple Cycle – PSEG – Burlington Peaking Plant – 8 x LM6000 Simple Cycle – SDGE – Miramar – 2 x LM6000 Simple Cycle
LM6000 Experience o Removal and Reloca;on
– Pakistan Power Resources – Bhikhi Power Sta:on – 2 x LM6000PC and 1 x LM6000PD – Calpine – Norske Skog Newsprint – 1 x LM6000PC
o Opera;ons and Maintenance (CMMS and Training) – Keys Energy – Stock Island Power Sta:on – 1 x LM6000 Simple Cycle – PSEG – Kearny Peaking Plants – 1 x LM6000 Simple Cycle – SDGE – Miramar – 1 x LM6000 Simple Cycle – PSEG – Burlington Peaking Plant – 1 x LM6000 Simple Cycle
Representative Gas Turbine Experience
o Owner’s Engineer – Sunbury – 3 x 1 GE7FA Combined Cycle Repowering
o Detailed Engineering – KCPL – 1 x 1 Siemens 84.3A Combined Cycle Repowering – Arclight – 1 x 1 Mitsubishi 501F Combined Cycle Repowering
o EPC – Cogenera:on Partners of America – 1 x 1 GE 7EA Combined Cycle – Indeck Energy – 1 x 1 GE 6B Combined Cycle (3 Units) – EDF – 5 Projects -‐ Wes:nghouse 501F Combined Cycle (14 Units)
o Opera;ons and Maintenance – Ameren – 3 Projects -‐ GE 7E Simple Cycle (18 Units)
Ethanol and Biodiesel Experience
o Owner’s Engineer – Combined Solar Technologies – 40MM Gal/Yr Sugar Beet to Ethanol Plant
• Project Development • Process Engineering Coordina:on • Balance of Plant Design • P&ID Development • Site Layout • Permit Support
– Terra Biodiesel– 20MM Gal/Yr Biodiesel Facility • Balance of Plant Design • General Arrangement • Site Layout • P&ID Development
Keys To Success
o Well defined project budget, scope and schedule
o Coordina:on, coopera:on and alignment of goals between Owner, Engineer, Constructor, Start-‐up and Opera:ons
o Ability to source and procure gray market equipment
o Experienced people with “Can-‐do” a`tudes
o Ability to iden:fy issues and provide solu:ons o Teamwork, Teamwork, Teamwork
OEM Experience
o GE – LM2500, TM 2500, LM5000, LM6000, LMS100, Frame 5, Frame 6, 7EA, 7FA, Steam Turbines
o PraP & Whitney – FT-‐4, FT-‐8, Twin Pac, Mobile Pac, Power Pac o Siemens – 501F, 501D5, Steam Turbines o Rolls Royce – RB211, Trent 60 o Toshiba – Steam Turbines o Mitsubishi – Steam Turbines o GE/Jenbacher o Brush – Generators o Shin-‐Nippon – Steam Turbines o Deltak – HRSG o Nooter Erickson – HRSG o IHI – HRSG
SFCC Energy Innovation Center
o The facility houses two GE/Jenbacher reciproca:ng engine generators with 1-‐megawaP and a 1.4-‐megawaP electric genera:on capabili:es each.
o The project was completed as scheduled and under-‐budget.
o Completed December 2013.
o Installa:on and start-‐up of the 2.4 MW waste-‐to-‐energy plant located adjacent to the Waste Corpora:on community landfill.
o The facility provides reliable genera:on to KCPL. o The facility is a state of the art power plant and green-‐energy
training facility for State Fair Community College.
Engineering Power Solutions
We thank you for your time.