Description:
media 3 dimensi bertujuan untuk memudahkan siswa ketika proses pembelajaran, sehingga agar mudah memahaminya, saya membuat media 3 dimensi jembatan hidrolik.
Popular Tags:
15
Group 3 1.MERI ANDANI RSA1C314001 2.LINA WAHYUNIRSA1C314004 3.SANTY M. MANURUNG RSA1C314005 4.SITI RAHMAH RSA1C314010 PENDIDIKAN FISIKA PGMIPA-U JURUSAN PENDIDIKAN MATEMATIKA ILMU PENGETAHUA ALAM UNIVERSITAS JAMBI 2015
Transcript

Group 3

Group 31.MERI ANDANIRSA1C3140012.LINA WAHYUNIRSA1C3140043.SANTY M. MANURUNG RSA1C3140054.SITI RAHMAHRSA1C314010

PENDIDIKAN FISIKA PGMIPA-UJURUSAN PENDIDIKAN MATEMATIKA ILMU PENGETAHUA ALAMUNIVERSITAS JAMBI2015

HYDRAULIC BRIDGEIndicator Formulating basic laws of fluid static Applying the basic laws of physics fluid static on everyday problems Formulating basic laws of fluid dynamics Applying the basic laws of fluid dynamics in everyday physics problemsWork Principle

The working principle of the simple hydraulic bridge this is to use a hydraulic piston in accordance with the application of the principle of Pascal: "The change in fluid pressure dterapkan closed can not be compressed, distributed and not reduced to any portion of the fluid and the wallcross-section. "

If we exert a force on the piston (represented by injection) containing fluid uncompressedwhich is connected with the other piston prop under the bridge, with the assumption of cross-sectional area both pistons together, the force applied will be channeled to a piston that is under the bridge with the same great style. This causes the piston under the bridge has a style forlift the bridge so that the bridge can be upwards. Conversely, if we pull the piston backas before, the piston under the bridge will be interested and cause the bridge down.How to making Hydraulic Bridge???First, prepare all necessary tools :

Ice cream sticksWood glueCellophane tapehoseInjectionhingeScisssors

break ice cream sticks that will be used as a buffer

stacking ice cream sticks as bridge support, and glued with a glue candles

dry the bridge piers that have been glued

stacking ice cream sticks like the picture on the side, then glued together using wood glue, and dry it

raft bridge with sticks of ice that has been assembled with the hinge

pole with a rope bridge and add a hinge, so that the bridge can be lifted. strung up like a picture on the side

Connect the house to the injection, as shown in the side

connect the hose to the hose connector

paste injection into the bottom of the bridge

hydraulic bridge is ready to be used as a medium of learning